Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “occupancy schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Facilities Condition and Hazards Assessment for Materials and Fuel Complex Facilities MFC-799, 799A, and 770C

The Materials & Fuel Complex (MFC) facilities 799 Sodium Processing Facility (a single building consisting of two areas: the Sodium Process Area (SPA) and the Carbonate Process Area (CPA), 799A Caustic Storage Area, and 770C Nuclear Calibration Laboratory have been declared excess to future Department of Energy mission requirements. Transfer of these facilities from Nuclear Energy to Environmental Management, and an associated schedule for doing so, have been agreed upon by the two offices. The prerequisites for this transfer to occur are the removal of nonexcess materials and chemical inventory, deinventory of the calibration source in MFC-770C, and the rerouting and/or isolation of utility and service systems. This report provides a description of the current physical condition and any hazards (material, chemical, nuclear or occupational) that may be associated with past operations of these facilities. This information will document conditions at time of transfer of the facilities from Nuclear Energy to Environmental Management and serve as the basis for disposition planning. The process used in obtaining this information included document searches, interviews and facility walk-downs. A copy of the facility walk-down checklist is included in this report as Appendix A. MFC-799/799A/770C are all structurally sound and associated hazardous or potentially hazardous conditions are well defined and well understood. All installed equipment items (tanks, filters, etc.) used to process hazardous materials remain in place and appear to have maintained their integrity. There is no evidence of leakage and all openings are properly sealed or closed off and connections are sound. The pits appear clean with no evidence of cracking or deterioration that could lead to migration of contamination. Based upon the available information/documentation reviewed and the overall conditions observed during the facilities walk-down, it is concluded that these facilities may be disposed of at minimal risk to human health, safety or the environment.

99 GENERAL AND MISCELLANEOUS↗

Respirator Cartridge Performance on Mixed Vapors from Hanford Tank Headspaces and Exhausters - 20427

Between 2016 and 2018, the Hanford Tank Operations Contractor - Washington River Protection Solutions (WRPS) - conducted a series of tests of air-purifying respirator (APR) chemical cartridges commonly used at Hanford tank farms to determine the period of time for which the cartridges would provide adequate performance when used in APRs and powered-air-purifying respirators (PAPRs) to protect workers when exposed to a mixture of vapors exiting tank headspaces. Although cartridge manufacturers provide service life estimating tools for individual chemical compounds, the projected performance of these cartridges on complex vapor mixtures is not available, and the adequacy of APRs for tank farm applications represents an important workforce concern. The Occupational Safety and Health Administration identifies cartridge testing as a valid approach for establishing cartridge service life. The primary function of the WRPS Cartridge Test Program was to obtain objective data to determine service lives for the APR and PAPR cartridges used at Hanford tank farms. WRPS contracted with Pacific Northwest National Laboratory to analyze the test data and offer an independent analysis of and recommendations based on respirator cartridge performance. A total of 28 APR and 10 PAPR cartridge tests were conducted between 2016 and 2018 on 12 different tank headspaces and tank farm exhauster slipstreams. Two APR cartridges from SCOTT (now 3M) and two PAPR cartridges from MSA Safety, Inc. and 3M were evaluated using a cartridge testing system specifically designed to measure and monitor test conditions and sample cartridge inlet and outlet vapor streams for important chemical compounds. Testing focused on analysis of approximately 61 tank vapor chemicals of potential concern (COPCs) that have been previously detected in tank vapors at levels above 10% of their occupational exposure limits (OELs). Each test was conducted over 16 hours of run time. Evidence of chemical breakthrough was assessed by comparing inlet and outlet COPC concentrations over the duration of each test. The breakthrough threshold was normally defined as exceeding 10% of the compounds OEL at the cartridge outlet. Ammonia breakthrough was observed in a majority of the cartridge tests and occurred earlier than breakthrough of any other chemical compound. Several other COPCs did exhibit breakthrough behavior, including mercury, 1,3-butadiene, furan, 2,5 dihydrofuran, and N-nitrosodimethylamine (NDMA), but only in a very limited number of cartridge tests and only after ammonia breakthrough had occurred. In addition, tests results suggest that breakthrough of some of these COPCs may have been affected by competition with and breakthrough of other non-COPC organics, such as ethanol and acetone, with substantially lower toxicological hazard. Comparison of cartridge manufacturers' service life estimates with the experimentally derived breakthrough times indicates that manufacturers' estimates are generally conservative, even in the presence of the complex mixed vapor streams experienced in these tests. With consideration of appropriate safety margins, these results provide valuable insights on cartridge performance to inform industrial hygiene professionals in establishing appropriate cartridge change-out schedules for APR and PAPR use in the Hanford tank farms. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy performance of an operational government building retrofitted with ceiling phase change material tiles in a mixed-humid climate

The aging U.S. building stock requires various retrofit measures to enhance their energy efficiency. Here, this study explores the integration of thermal energy storage and advanced building controls as viable retrofit solutions for load flexibility and peak demand response while maintaining the occupants' comfort. A detailed assessment is conducted on the energy use of an administrative building in Sumner County, Kansas, focusing on the implementation of phase change materials (PCMs) in the ceiling of occupied zones. First, a time-resolved, whole-building energy model is developed in EnergyPlus, incorporating complex thermal behaviors such as air exchange between the plenum space and occupied zones, envelope leakage, and operational schedules. The model is then validated using experimental field test data, and subsequently a parametric assessment of key PCM properties and application strategies is performed to evaluate cooling electricity demand benefits. The parametric study shows that the optimal retrofit strategy, comprising a PCM with 23°C peak melting temperature, 0.125 in. (3.17 mm) thickness, and 150 kJ/kg latent heat, combined with active controls that include 8 h of precooling, forced convection under the ceiling, and a 2°C thermostat setback during peak hours, can result in a maximum load shift during the peak period of 99.6 % and the total electricity savings during the peak period of 98.9 % for the optimum case and thus provide significant cost savings under time-of-use pricing scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

lumicap v0.1

Automated HDR luminance imaging system designed for daylighting research and building science. It controls a fisheye-lens camera to capture time-lapse bracket sequences, merges them into calibrated HDR images, and runs a full post-processing pipeline — all unattended. Features: - Scheduled LDR bracket capture via gphoto2 - HDR merging with vignetting, ND filter, and fisheye projection corrections - Illuminance and luminance meter integration (Konica Minolta T-10A, LS-100/150) - Daylight glare probability (DGP) and solar position computation - Automated false-color rendering, JPEG thumbnails, and daily time-lapse video - CSV data logging per timestep Uses: - Long-term monitoring of daylight conditions in buildings - Glare analysis for occupant comfort research - Solar irradiance and sky luminance studies Advantages: - End-to-end automation — capture, calibration, analysis, and archiving run without manual intervention - Built on the proven Radiance toolchain, ensuring photometrically accurate HDR output - Hardware-agnostic meter support via serial auto-detection - Lightweight — no GUI overhead, deployable on a headless Raspberry Pi or similar embedded system

Wang, Taoning [Lawrence Berkeley National Laborato↗

Stabilizing the Grid and Reducing Utility Bills Through Price-Responsive Controls for Heat Pump Water Heaters

The electricity grid is facing increasing challenges in cost-effectively balancing supply and demand. These challenges are exacerbated by increased penetration of photovoltaics, which causes mid-day overproduction, and electrification of gas appliances, which increases peak-period electricity demand. Decarbonization requires shifting building loads from fossil-intensive high-cost times to renewable-intensive low-cost times while maintaining quality of service to occupants. Utilities and ISO’s are investigating new ways of incentivizing this load shifting. One promising method is the use of Highly Dynamic Prices (HDPs). HDPs feature continuously changing prices that reflect real-time grid generation and distribution costs and capacity constraints, and thus incentivize consumers to shift their loads. California’s CPUC CalFUSE proposal and Hawaii’s recent changes demonstrate that electricity tariffs are moving towards this model. For this to work however, loads must have the capability to respond to these prices. Heat pump water heaters (HPWHs) are an ideal device for this purpose because their storage tanks decouple delivery of domestic hot water from electricity consumption. The storage enables control strategies that consume midday solar power to increase the energy stored in the tank, then provide evening peak domestic hot water services using the stored energy. Berkeley Lab's CalFlexHub project is pioneering price-driven load flexibility by developing and deploying cost-minimizing controls for many flexible loads - including HPWHs - in response to HDP. Control development is based on simulations using the Flexible Heat Pump Water Heater Performance Predictor which captures the control decisions of the on-board controller in a residential, integrated HPWH . The price-responsive controls a) shift load in ways that consume additional midday solar power to help stabilize the grid and reduce overall emissions, b) ensure that occupants receive equal or better hot water delivery service, and c) minimize the operating cost for each home in the fleet. On the grid level, the resulting shift will reduce utility operating costs and emissions, and can avoid expensive system capacity expansions. The control approach is customized to each home based on typical hot water consumption patterns. HPWH controllers, whether on the device or remotely, will receive a schedule of CTA-2045-B signals or set temperature adjustments customized to the current HDP price schedule and home. Simulation results for a fleet of 148 HPWHs on a summer day in Berkeley, California show cost savings of 29% and high price electricity consumption reductions of 80%, while maintaining full quality of service.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The precision of today's satellite laser ranging systems

Recent improvements in the accuracy of modern satellite laser ranging (SLR) systems are strengthened by the new capability of many instruments to track an increasing number of geodetic satellite targets without significant scheduling conflict. This will allow the refinement of some geophysical parameters, such as solid Earth tidal effects and GM, and the improved temporal resolution of others, such as Earth orientation and station position. Better time resolution for the locations of fixed observatories will allow us to monitor more subtle motions at the stations, and transportable systems will be able to provide indicators of long term trends with shorter occupations. If we are to take advantage of these improvements, care must be taken to preserve the essential accuracy of an increasing volume of range observations at each stage of the data reduction process.

Dunn, Peter J.↗

Modern Integrated Decommissioning at Chalk River Laboratories - 19401

Canadian Nuclear Laboratories (CNL), formerly Atomic Energy of Canada Limited (AECL) is Canada's premier nuclear science and technology (S and T) organization in Canada. Over the next decade, CNL will be transforming its many different sites through the revitalization of essential site infrastructure, the decommissioning of aging infrastructure and a significant investment in new, world-class science facilities. In particular, the main site for CNL resides at the Chalk River Laboratories (CRL), where the majority of parallel activities of revitalization and decommissioning will take place. In 2016, CRL started an ambitious ten year plan to decommission more than 120 buildings. In order to ensure this project remains on track and the ALARA (as low as reasonably achievable) principle is maintained, a strategy is required. This strategy is to focus on integrated activities, which meet/exceed international best practices, to ensure the work is carried out as efficiently as possible. Given the complexity of CRL operations and the legacy issues accumulated over 60 years of operation, CNL needed to adopt a modern and integrated approach to handle competing project priorities. As a starting point, achieving complete radiological characterization of many building structures is required. CNL engaged various vendors to modernize radiological surveys from paper records to electronic documentation, deploying modern survey tools such as data-logging instruments, gamma cameras, robotic surveying tools, and introducing tablets to improve the flow of information while workers are in the field. Once fully implemented, these improvements will ensure that quality information is readily available at all stages of decommissioning, which greatly reduces project schedules and results in important company savings. These techniques will ensure that, during planning, historic radiological survey data is easily searchable from the electronic documentation system. Any additional data required can be quickly and safety collected using robotic surveying tools in areas of higher radiation to reduce possible exposure to individuals. As decommissioning progresses, individuals in the field can use tablets, gamma cameras and data-logging instruments to accurately retrieve, collect and share data. As a result of these efforts, CNL is progressing towards becoming a leader in the field of decommissioning within Canada, applying modern techniques and best practices to reduce decommissioning project risk. Access to high quality information results in improved decommissioning plans, which will reduce the amount of rework and scheduling delays required and improve worker safety as the project is executed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The National Transonic Facility - Status and operational planning

The National Transonic Facility is scheduled to be completed in 1982. Several technical concerns remain, including thermal stress constraints which may limit the rate at which temperatures can be changed, seal performance in the cryogenic environment, and the tunnel process controls which could affect data acquisition rate. The current design affords the capability of dealing with all these concerns if they become problems. The outstanding instrument need is a real-time model surface deformation measurement system. Finally, an examination of the occupancy cost and the cost of liquid nitrogen for high Reynolds number tests indicates that operating costs should not be an inhibiting factor in the use of the facility.

Howell, R. R.↗

A Picture Speaks 360,000 Words - Virtual Reality as a Decommissioning Planning Tool - 19364

Whiteshell Laboratories, located in Manitoba, Canada, provided research facilities for the Canadian nuclear industry since the early 1960's. Decommissioning of Whiteshell Laboratories has been ongoing since 2002 under Atomic Energy of Canada (AECL) and, more currently, since 2015 under the WL Closure Project managed by Canadian Nuclear Laboratories (CNL). One of the key steps to ensuring safe decommissioning operations is effective planning, including pre-job briefings, and post-job verification and review. Effective planning involves clear and concise communication of the field conditions, system configurations, hazards, and task goals or achievements to front line employees, and task approvers and verifiers. In many instances, employees can enter, view, inspect, verify or otherwise familiarize themselves with the task and task location. However, in several cases, hazardous conditions in the task location make it difficult for employees to easily access the location themselves, due to hazardous conditions, PPE requirements, training qualification gaps or space limitations. Since 2016, 360 deg. cameras have been used to create a virtual 'tour' of the hazardous task locations at Whiteshell Laboratories, which can be viewed by one or all of the employees involved in a task, from a position of safety. This allows a task to be discussed with all employees involved without the need for added risk of exposure to dose or industrial hazards or costly PPE, and supports ALARA control techniques of removing the hazard by moving work planning walk downs away from hazardous locations and guarding the worker by limiting the time a worker is exposed to the hazard. This paper provides an overview of the technologies used to capture and present the 360 virtual tours, the benefits from a safety, schedule and cost perspective, and the limitations of the current implementation that could be improved upon in a future iteration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SBIR Phase II Final Report - Multi-Protocol Energy Management Gateway for Home-Area Networks

Significant amounts of electricity, natural gas, and heating oil are wasted by homeowners due to inefficient operation and inadequate maintenance of heating, ventilation, and air conditioning (HVAC) equipment. Coincident’s work under this award reduces energy waste, saves consumers money, and reduces carbon emissions. It does so in three ways: First, Coincident’s approach replaces the traditional thermostat with a wireless network of sensors and controllers that measure temperature, humidity and occupancy in multiple rooms in the house. The “Internet of Things” is a technology trend holding the promise of ubiquitous inexpensive sensors. The reality, however, is that energy and HVAC monitoring and management is a patchwork of incompatible protocols and expensive proprietary technologies. Coincident’s multi-protocol architecture, developed in part under this award tackles this problem and brings low cost interoperable sensor and control devices to market. Second, the Coincident system eliminates hard-to-program and rigid thermostat schedules and instead provides automatic operation of heating and cooling by combining individual temperature and comfort preferences with energy-saving targets, real-time utility use information, weather data, and room utilization patterns. Energy efficiency technology must be appealing to consumers otherwise it will not be used. The Coincident user interface has engaging features such as remote control from any smart phone or web browser and per-room performance breakdowns. Expected energy savings resulting from more efficient operation of heating and air conditioning equipment are in the range of 10-20%. Third, the Coincident system provides heating and air-conditioning contractors with fine-grained performance data for every residence they support (subject to customer privacy controls). This data is integrated from diverse networks within the residence and includes HVAC performance and fuel use data. This information allows the partner to validate energy savings and identify potential system faults (whether from installation problems or maintenance issues). When combined with professional installation as part of high-efficiency HVAC upgrade, energy savings levels of 20-30% can be achieved. Economic feasibility of energy efficiency technology is one of the key challenges addressed in this award. The Coincident system is engineered to be delivered at a disruptive price point, making the system financially feasible for new and retrofit homes of all types and sizes. The Coincident system is intended to be sold through the HVAC professional—the industry most capable of improving HVAC efficiency. Providing HVAC contractors with detailed home performance data motivates them to sell the product, provides them with maintenance and upgrade revenue opportunities, and therefore delivers customer savings and environmental benefits. Having demonstrated technical and financial feasibility, Coincident has won additional grants and awards, participated in pilot projects, started partnership discussions with several HVAC equipment vendors, and has lined up several large channel partners ready to participate in large pilot rollouts.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

First Road / River Barge Security Transport of SNF under the New German Transport Security Guidelines - 19102

A transfer of 342 spent fuel assemblies from NPP Obrigheim to NPP Neckarwestheim, both located alongside the river Neckar in the south of Germany, is required to promote the decommissioning process of NPP Obrigheim, which started in 2008 after the NPP had been shut down three years before. The spent fuel storage facility in Neckarwestheim offers sufficient storage space to accept the 342 SNF assemblies, stored in fifteen dry casks type CASTOR{sup R} 440/84 mvK. After several transport feasibility studies had been conducted, Daher Nuclear Technologies GmbH was awarded the commission to plan, prepare and conduct the SNF transport. Since the combined road / river barge transport promised to be the most suitable mode of transportation Daher Nuclear Technologies started to prepare its security concept, a prerequisite to apply for and attain the transport license mandatory for transporting spent nuclear fuel in Germany. In March 2014 the company applied for the transport license, which, after more than three years and numerous amendments to the security concept, was finally granted to Daher Nuclear Technologies on May 16, 2017 by the German Federal Office for the Safety of Nuclear Waste Management (successor organization of the BfS). Simultaneously to the license application phase the transport equipment - amongst others the heavy-duty trucks and trailers, the pusher tugs, the river barge and transport frames - had to be provided and modified to meet the intensified requirements of the New German Transport Security Guidelines Road / Rail as well as several other legal regulations referring to the transport of dangerous goods by road and inland waterways (e.g. ADR - European Agreement concerning the International Carriage of Dangerous Goods by Road and ADN - European Agreement concerning the International Carriage of Dangerous Goods by Inland Waterways). The planning process involved various meetings with representatives of different authorities and administrative bodies incl. accredited experts as well as subcontractors. Tremendous training efforts had to be undertaken to train more than 100 transport participants regarding security measures, health, safety and environmental measures, as well as the proper handling of radioactive material. This also included the training of the security staff, that had to be qualified in compliance with the new Transport Security Guidelines Road and Rail. Finally, in June 2017, when all preparations where complete, all requirements met, and all permits obtained, the first ever security SNF transport on a German river was performed. Three laden CASTOR{sup R} 440/84 mvK transport and storage casks were transported in one batch via heavy-duty truck-trailer from the NPP Obrigheim to the NPP's own harbor, to be rolled on to the river barge, that would carry the three casks upstream the river Neckar to the approx. fifty kilometer distant NPP Neckarwestheim. The journey on the river took about eleven hours, in which several bridges and locks had to be passed. The entire transport was escorted by qualified security staff and auxiliary police forces on waterways and alongside on roads. It attracted nationwide public attention, due to its pioneer status and the fact, that there hadn't been any SNF or HLW shipments in Germany since 2011. After the convoy safely arrived at NPP Neckarwestheim's pier the three laden CASTOR{sup R} 440/84 mvK casks were rolled off the river barge via heavy-duty truck-trailers to be stored in the on-site interim storage facility. This first transport was a success and was followed by four additionally successful security transports in September, October, November and December 2017. The public attention receded significantly during the transport campaign, which ended on December 19, 2017 with the transfer of the last three of fifteen casks to the on-site interim storage facility in Neckarwestheim. With the last cask safely transferred to the interim storage facility Daher Nuclear Technologies successfully completed the transport campaign on schedule, meeting one of EnBW's fundamental objectives to finish the transfer of the 342 SNF assemblies by the end of 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Novel Mobile Examination and Remediation Facility for On-Site Remediation of Dry Storage Systems - 18389

Most of the spent nuclear fuel (SNF) in dry storage in the United States is safely and securely stored in dual-purpose (i.e., storage and transportation) canisters [1]. However, some of the SNF is stored in storage-only (i.e., non-transportable) packages, or packages that may become nonconforming for continued storage or transportation for a variety of reasons. Currently, the capability to remediate dry storage systems (DSSs) for SNF that are not transportable or that need to be repaired to maintain confinement boundary integrity during storage service does not exist without on-site access to a spent fuel pool. Hence, there is a potential future need for a mobile facility with remediation capabilities that can be used at multiple storage installations. These capabilities would permit needed repairs to an existing DSS to support continued storage or for the dry transfer of fuel to a new conveyance suitable for transport, if necessary. This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. A novel design concept for a Mobile Examination and Remediation Facility (MERF) is proposed with functions and capabilities to remediate a DSS. The proposed MERF would be a multi-purpose facility, remotely operated and computer-controlled with semi-automated equipment to allow trained operators to safely perform remediation activities while keeping worker radiation dose as low as reasonably achievable. It would include a shielded rotating platform with support towers and would use commercial off- the-shelf examination and repair equipment. A slip ring arrangement underneath the rotating platform would allow for the power supply without impeding the continuous rotation and would simplify cable management. The support towers would be mounted on the rotating platform, and each tower would have vertical and horizontal positioning capability for axial and radial tool location. The rotating platform would be attached to the main MERF structure. Capabilities would include visual, surface, and volumetric examinations to fully characterize physical conditions on canister surface before and after a repair; repair techniques, e.g., laser beam welding, friction stir welding, or cold spray, to perform needed remediation activities; and associated equipment for surface preparation such as cutting and grinding equipment. The proposed design would be simple, modular, robust, economically viable, and easily transportable and would have a small footprint. The modular design would present several advantages including compatibility with a variety of different DSSs, on-site assembly, and transportability; it also would be built in interchangeable sections to facilitate decontamination. Further, shielding would be supplemented through interface with the existing transfer cask and storage overpack. Robustness and canister stability would be achieved using pneumatic holders and steel support structures designed with vibration absorbers to reduce impacts and/or a 'pendulum' effect during a seismic event. Thus, the proposed MERF would be designed to: (i) minimize handling of an affected DSS to the extent practicable, (ii) provide radiation shielding and minimize dose to operators and the public during remediation activities, and (iii) enable examination, repair, and repackaging. This paper describes the proposed MERF design concept and capabilities, main components, equipment, different modes of operation, and operating procedures. Structural and safety assessments would need to be performed before final design, licensing, and deployment. The MERF is evaluated with respect to regulatory impact (first of a kind, prior experience), operational impact (safety, security, staffing, ongoing operations, constraints), worker dose (low, medium, high), cost (low, medium, high), schedule (duration, time sequence), and technology readiness level. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feasibility of Achieving a Zero-Net-Energy, Zero-Net-Cost Homes

A green building competition, to be known as the Energy Free Home Challenge (EFHC), is scheduled to be opened to teams around the world in 2010. This competition will encourage both design innovation and cost reduction, by requiring design entries to meet 'zero net energy' and 'zero net cost' criteria. For the purposes of this competition, a 'zero net energy' home produces at least as much energy as it purchases over the course of a year, regardless of the time and form of the energy (e.g., electricity, heat, or fuel) consumed or produced. A 'zero net cost' home is no more expensive than a traditional home of comparable size and comfort, when evaluated over the course of a 30-year mortgage. In other words, the 'green premium' must have a payback period less than 30 years, based on the value of energy saved. The overarching goal of the competition is to develop affordable, high-performance homes that can be mass-produced at a large scale, and are able to meet occupant needs in harsh climates (as can be found where the competition will be held in Illinois). This report outlines the goals of the competition, and gauges their feasibility using both modeling results and published data. To ensure that the established rules are challenging, yet reasonable, this report seeks to refine the competition goals after exploring their feasibility through case studies, cost projections, and energy modeling. The authors of this report conducted a survey of the most progressive home energy-efficiency practices expected to appear in competition design submittals. In Appendix A, a summary can be found of recent projects throughout the United States, Canada, Germany, Switzerland, Sweden and Japan, where some of the most progressive technologies have been implemented. As with past energy efficient home projects, EFHC competitors will incorporate a multitude of energy efficiency measures into their home designs. The authors believe that the cost of electricity generated by home generation technologies will continue to exceed the price of US grid electricity in almost all locations. Strategies to minimize whole-house energy demand generally involve some combination of the following measures: optimization of surface (area) to volume ratio; optimization of solar orientation; reduction of envelope loads; systems-based engineering of high efficiency HVAC components, and on-site power generation. A 'Base Case' home energy model was constructed, to enable the team to quantitatively evaluate the merits of various home energy efficiency measures. This Base Case home was designed to have an energy use profile typical of most newly constructed homes in the Champaign-Urbana, Illinois area, where the competition is scheduled to be held. The model was created with the EnergyGauge USA software package, a front-end for the DOE-2 building energy simulation tool; the home is a 2,000 square foot, two-story building with an unconditioned basement, gas heating, a gas hot-water heater, and a family of four. The model specifies the most significant details of a home that can impact its energy use, including location, insulation values, air leakage, heating/cooling systems, lighting, major appliances, hot water use, and other plug loads. EFHC contestants and judges should pay special attention to the Base Case model's defined 'service characteristics' of home amenities such as lighting and appliances. For example, a typical home refrigerator is assumed to have a built-in freezer, automatic (not manual) defrost, and an interior volume of 26 cubic feet. The Base Case home model is described in more detail in Section IV and Appendix B.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

High Altitude Radiations Relevant to the High Speed Civil Transport (HSCT)

The Langley Research Center (LaRC) performed atmospheric radiation studies under the SST development program in which important ionizing radiation components were measured and extended by calculations to develop the existing atmospheric ionizing radiation (AIR) model. In that program the measured neutron spectrum was limited to less than 10 MeV by the available 1960-1970 instrumentation. Extension of the neutron spectrum to high energies was made using the LaRC PROPER-3C monte carlo code. It was found that the atmospheric neutrons contributed about half of the dose equivalent and approximately half of the neutron contribution was from high energy neutrons above 10 MeV. Furthermore, monte carlo calculations of solar particle events showed that potential exposures as large as 10-100 mSv/hr may occur on important high latitude routes but acceptable levels of exposure could be obtained if timely descent to subsonic altitudes could be made. The principal concern was for pregnant occupants onboard the aircraft. As a result of these studies the FAA Advisory Committee on the Radiobiological Aspects of the SST recommended: 1. Crew members will have to be informed of their exposure levels 2. Maximum exposures on any flight to be limited to 5 mSv 3. Airborne radiation detection devices for total exposure and exposure rates 4. Satellite monitoring system to provide SST aircraft real-time information on atmospheric radiation levels for exposure mitigation 5. A solar forecasting system to warn flight operations of an impending solar event for flight scheduling and alert status. These recommendations are a reasonable starting point to requirements for the HSCT with some modification reflecting new standards of protection as a result of changing risk coefficients.

Wilson, J. W.↗

K-25 Structural Separation and Demolition

The K-25 building is a former gaseous diffusion plant, built in 1944-1945 as part of the United States Manhattan Project. The structure was the largest structure under one roof, surpassed only by the Pentagon. Together the three wings represent about 17.8 hectare (44 acres) under roof and are generally about 18.3 meters (60 ft.) high on the outside face and approximately 12.2 meters (40 ft.) high on the inside face. The entire structure was built in the shape of a 'U', with a lateral distance of approximately one mile. It was constructed in individual building units with each unit connected using expansion joint-type connection. A single unit is approximately 24.4 meters (80 ft.) across and 122 meters (400 ft.) deep. The northern structure is connected to the eastern and western structures at the upper level floors. The four-level, U-shaped building is a steel-frame structure with corrugated cement-asbestos siding. The cell level is an elevated concrete structure supported by reinforced concrete columns located in the basement, or vault area. The vault area can be accessed at grade level from the outside perimeter. Inside the courtyard, the grade level has been raised to provide entry to the second or cell floor level. An engineering evaluation of the structure was performed to determine the condition of the structure and possibility of unplanned collapse of any portion of the structure. The evaluation included physical inspections, calculations for wind, pre-demolition loads, and evaluation of failure modes. The results of the evaluation have provided guidance for the demolition plan and the development of criteria for protection of personnel performing pre-demolition activities. Challenges include degradation of the structure that necessitated repair, dealing with changes in the code revisions from both the American Concrete Institute (ACI) and the American Institute of Steel Construction (AISC), access to areas of the structure that were not necessarily designed for access, and acceleration of the building degradation due to the pre-demolition activities. When a full building is evaluated, 50 percent of wind and applied forces are dissipated in 3 units and 80 percent is dissipated in 12 units. The forces are basically linear for the first 6 units once the building is opened at the start of demolition. Some column buckling, based on current codes, was noted in the analysis that would have to be mitigated to ensure a controlled demolition. Loading for the removal of the equipment required structural engineering evaluation of the certainty of the load and the application of the load. Corbels are being evaluated through an inspection program and criteria for repair based on current loading and anticipated additional live loads. Access issues continue to be a challenge and have created the need for a significant fall protection program. Other areas of access require different approaches and engineering solutions, sometime considering ultimate strength design versus standard yield stress design. An evaluation of separating a wing into two sections to allow for worker re-entry to perform pre-demolition activities during the demolition off shift was conducted. The evaluation has shown that because of both design and history of the K-25 and K-27 Buildings, significant care and attention is needed to demolish these structures from a structural perspective. When the project schedule issues are overlaid, that may demand workers in other parts of the structure after demolition has begun, the structural issues become severe, demanding exacting analysis and significant controls to ensure the safety of the workers both in and outside the building performing the demolition work.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Transportation of Radioactive Waste in Support of Ontario Power Generation's Darlington Nuclear Generating Station Refurbishment Project - 19384

Ontario Power Generation's (OPG) Darlington Nuclear Generating Station (DNGS) is currently executing a major refurbishment of the first of their four Candu reactors. As expected, the volumes of Low and Intermediate Level Waste (LILW) generated from this large-scale project have been significant. As a result, unique solutions were needed for the safe and efficient transportation of radioactive waste from the Darlington Nuclear Generating Station to OPG's Western Waste Management Facility for volume reduction and interim storage. OPG's Nuclear Waste Management Division and the Darlington Refurbishment Project worked together to identify unique radioactive waste transportation solutions. These solutions included staging and temporary storage facilities, new waste containers and specialized transportation packages, additional human resources and enhanced planning and logistics required to transport large volumes of routine and non-routine radioactive waste in a manner that minimized the impact on employee and public safety, project schedule and project costs. From a facilities perspective a shielded 'Marshalling Area' that allowed for loaded transportation packages to be staged was built on the Darlington site and a temporary licensed off-site radioactive waste storage facility close to the DNGS was contracted through a third party vendor. These two facilities allowed for more consistent and efficient schedules that limited radioactive waste shipments during off-hours and avoided peak traffic periods thereby limiting the risk to Refurbishment critical path activities. Special purpose-built transportation packages and waste containers were designed and fabricated to handle unique waste streams such as feeder pipes and other miscellaneous intermediate level waste items associated with reactor dismantling. Twenty-four Type A qualified transportation packages mounted to six flat deck trailers were designed and fabricated to support the shipment of contaminated feeder pipes. An Intermediate Level Waste Utility Container (ILWUC) to be used in conjunction with the Type B qualified Trillium Transportation Package was designed and fabricated to handle unique intermediate level waste streams arising from the reactor dismantling process. Logistics software was used to plan the shipments to ensure waste transportation packages could be loaded, transported, unloaded and returned safely to the project site in a timely manner without impacting project schedules. Several shipping scenarios were simulated and adjusted using the software to ensure that the most efficient use of equipment and resources for the radioactive waste transportation aspects of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigating the Effects of Exposure to Blue-Enriched Light or Peppermint Odor on Alertness, Mood, and Performance Upon Awakening from Deep Sleep at Night

Introduction: Sleep inertia refers the transient neurobehavioral impairments experienced immediately after waking from sleep. This period of reduced alertness and performance poses a significant safety risk to on-call workers who may be required to perform a safety-critical task immediately after waking (e.g., emergency services, health care, and military). In these operations, the need for a rapid return to full alertness is critical to mission safety and success. Several factors may exacerbate sleep inertia, resulting in greater impairment upon waking, including: waking from deep sleep, (i.e., slow wave sleep, SWS), waking at night, and waking following prior sleep loss. Awakenings under these conditions are common for on-call and extended shift workers who may need to perform safety-critical tasks soon after waking from unprotected sleep opportunities. Therefore, there is a need for evidence-based reactive countermeasures (i.e., used upon waking) to the cognitive consequences sleep inertia. Specifically, countermeasures that can rapidly restore alertness and performance immediately following sleep. A recent review of the literature on reactive countermeasures highlighted several research gaps and promising candidates for further investigation. The review also emphasized the need for countermeasures that are operationally viable and readily deployed in occupational settings. This study aims to address the identified gaps and limitations by assessing the efficacy of exposure to two known acute alerting stimuli - blue-enriched light and peppermint odor - to improve cognitive performance, alertness, and mood immediately after waking from SWS at night. Materials and Methods: Twelve participants completed a two-week within-subject, randomized, cross-over intervention study including two in-laboratory overnight visits. During each experimental week, the subjects experienced one intervention (light or peppermint) and a control condition upon awakening from SWS at night. The presentation order of the two conditions (intervention or control) at wake-up and the order of intervention (light or peppermint) by week was randomized by sex. Prior to each in-laboratory visit, participants maintained a sleep schedule of 8.5 h for 5 nights and 5 h for one night. Compliance with this sleep schedule was confirmed by actigraphy. In the laboratory, participants went to bed at their habitual bedtime and were monitored by standard polysomnography. After at least five minutes of continuous SWS, participants were awoken and exposed, in a randomized order, to either the control or intervention condition. During the hour after awakening from SWS (at 2, 17, 32, and 47 minutes after waking), participants completed a battery of tasks including a 5-minute psychomotor vigilance task (PVT), a subjective scale of alertness (Karolinska Sleepiness Scale, KSS), and visual analogue scales (VAS) of mood. Following this sleep inertia measurement period, all lights were turned off and participants were allowed to return to sleep. They were then awoken again from their subsequent SWS period and exposed to the alternative condition (control or intervention). Following this second awakening, participants were allowed to sleep until their habitual wake time and were then released from the laboratory. Participants then followed the at-home sleep schedule and returned to the laboratory for the second intervention (light or peppermint) following the procedures described above. The light intervention involved exposure to a blue-enriched light canvas illuminated for 1 hour at a distance of ~56 cm from the participant (~200 lux and ~60 melanopic lux at angle of gaze). For the peppermint intervention, peppermint oil was pipetted onto a mask, and participants inhaled the odor with the mask covering the nose and mouth for 1 minute. The control condition for both weeks involved a dim, red ambient light (<1 lux). An odorless mask, without any oil pipetted onto the mask, was also worn in the peppermint control condition. Results: Compared to the control condition, participants exposed to blue-enriched light had fewer PVT lapses (χ2 = 5.285, p = .022), reported feeling more alert (KSS: F1,77 = 4.955, p = .029; VASalert: F1,77 = 8.226, p = .005), and had improved mood (VAScheerful: F1,77 = 8.615, p = .004; VASdepressed: F1,77 = 4.649, p = .034; VASlethargic: F1,77 = 5.652, p = .020). Exposure to peppermint oil did not improve any outcome measures on any of the tasks compared to control condition (p > .05). Conclusions: We found that participants had fewer lapses of attention upon awakening when exposed to blue-enriched light compared to dim, red light. In addition, participants reported feeling more alert, more cheerful, less depressed, and less lethargic in the blue-enriched light condition. Brief exposure to a peppermint odor, however, did not appear to improve performance, alertness, or mood under the experimental conditions. Our null results in the peppermint condition may have been due to methodological limitations such as the duration and method of administration. Given the need to mitigate the potential impact of sleep inertia on safety-critical tasks in on-call operations, our findings suggest that blue-enriched light exposure upon awakening may help to improve performance and alertness during the sleep inertia period following awakening from deep, nocturnal sleep. We are currently exploring the potential mechanisms for the effect of light on cognitive performance upon awakening as well as investigating its application in real-world settings to explore the translational efficacy of this countermeasure to occupational environments. Continued exploration into light and other reactive countermeasures, and potentially their combination, is needed in order to provide evidence-based guidance on effective sleep inertia countermeasures to improve the alertness and performance of those required to perform safety-critical tasks soon after waking.

sleep inertia↗

Innovation in Contracting Strategy for a Master Services Agreement for Remediation of Low Level Radioactive Waste - 18381

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from several locations, including the Port Hope Harbour, a closed municipal landfill and approximately 800 residential properties. This complex project requires contracting the services of qualified, skilled and experienced environmental remediation contractors to meet the diverse needs of the myriad tasks that comprise the remediation and restoration of all properties. This paper will highlight how the CNL contracting services team developed an innovative approach to a contracting strategy designed to deliver the safe execution of work and keep the project on time and within budget. The approach addresses the complexities of a scope of work that consists of multiple work packages to be executed both concurrently and in tandem, and that require highly specialized trades/skills, as well as high-level project management expertise to ensure seamless coordination among the various contractors. The author will discuss CNL's strategy to engage the market with a Request for Expression of Interest to identify potential qualified suppliers and gauge their level of interest, issue a Request for Prequalification (RFPQ) to determine eligible contractors and, ultimately, issue a Request for Proposal for a Master Services Agreement (MSA) that would competitively evaluate each contractor's direct experience, technical expertise, quality management programs, safety systems compliance and track record. Using CNL's experience as a case study, the paper will highlight how an innovative approach can positively affect project timelines by describing how CNL addressed the challenge associated with the limited time available to implement procurement processes and deliver a series of executed agreements while ensuring that work would begin on time and key project milestones would be met. The author will summarize how CNL's strategy put the project back on schedule, without compromising the process guideline/requirements, and ensured that a qualified and experienced set of contractors, committed to a strong safety culture, will be available to perform the work required when the cleanup in the Port Hope community begins in 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗