Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “load shedding”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Managing Power Systems-Induced Wildfire Risks Using Optimal Scheduled Shutoffs: Preprint

The growing demands for electricity and the increase in extreme weather conditions are putting unprecedented pressure on our electrical grids. Oftentimes, this pressure leads to electrical components failures which might ignite wildfires. This work develops a novel model to balance the reliability of power networks operations and risks of wildfires ignition by optimizing the operational schedule of power transmission networks considering time-varying risk measures that consider exogenous and operational factors. Energy storage systems are considered to deliver power during peak wildfire hours and enable temporal load shifting. The problem is formulated as a mixed-integer linear program that maximizes a weighted sum of the served power demand and the reduction in grid-induced wildfires risk. The results demonstrate the ability of the model to reduce wildfires risks significantly without considerable load shedding.

energy scheduling↗

A Simulation Framework for Analyzing the Impact of Stochastic Occupant Behaviors on Demand Flexibility in Typical Commercial Buildings

As one of the primary users of the electric grid, buildings and building equipment, including heating, ventilation, and air conditioning (HVAC) systems, can be leveraged to provide the flexible demand needed to balance the grid. Typical strategies to achieve demand flexibility are to reduce electricity use during peak or critical periods by shutting down equipment or relaxing system setpoints, which will inevitably impact the occupants’ comfort. When occupants feel uncomfortable, they may take actions to regain their comfort, and some of those actions (such as turning on a personal fan) may have a negative impact on meeting the demand response goal. Therefore, it is important to incorporate occupant behaviors into the assessment ofthe building demand flexibility potential. In this study, a simulation framework that includes simulation of zone thermal loads, an HVAC system, and occupant behaviors, was developed to investigate the impact of occupant behaviors on demand flexibility. A case study was conducted using a small office model from the U.S. Department of Energy (DOE) Commercial Prototype Building Models to simulate the building envelope and zone loads. An agent-based occupant thermal behavior model was adapted to forecast occupants’ thermal comfort and their resulting thermal behaviors. An artificial neural network (ANN) based airflow model trained from a computational fluid dynamics (CFD) model of the zone was adopted to better predict the ambient environment of each occupant. An air-source heat pump simulation model that was calibrated from a real two-stage air-source heat pump system was used as the HVAC system. A typical load shedding event during peak hours was studied. Repeated simulations were conducted to capture the stochastic effects of occupant behaviors. The interplay between the demand flexibility, occupant comfort and behavior were analyzed by evaluating key performance indicators, including the energy use, occupant discomfort duration, and occupant behavior duration during the peak period. The results suggest that this framework can be used to analyze typical commercial buildings and their HVAC systems in terms ofdemand flexibility potential under the impact of occupant behaviors.

Chen, Zhelun↗

Integrating a Microgrid Controller with a Local OpenADR Server

When military microgrids isolate themselves from the main electrical grid, they must locally balance electricity supply and demand. Since local generation may be limited, the current strategy is to shed all but the most critical loads by tripping smart circuit breakers, which must then be reset manually (e.g., ESTCP project EW-201350). This strategy is typically applied at the building level, meaning that entire buildings housing mission critical activities must be excluded from any load management, while those considered non-critical may lose service entirely. The remotely controlled switchgear needed to manage load in this way is very expensive ($\$30,000$-$\$50,000$ per building). While effective at shedding load, this strategy disrupts installation operation and risks damaging equipment during both disconnection and re-energization. With the goals of lowering costs, protecting equipment, and enhancing the agility of DoD microgrids, this report demonstrates the use of cybersecure automated demand response (ADR) technology to manage microgrid loads during grid-independent (a.k.a. "islanded") operation. This automated approach achieves load shedding and shifting through communication signals sent to equipment controllers rather than by cutting off the flow of electricity within the microgrid itself. Because it operates only on the base network, with no connection to external entities, this strategy avoids the main cybersecurity concern raised by past applications of ADR on military bases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstration of a Novel Technology to Manage Electricity Demand in Grid-Independent Military Microgrids

This research was conducted by the National Renewable Energy Laboratory (NREL) in collaboration with the S&C Electric Inc. through funding provided by the ESTCP. The project demonstrates use of cybersecure Automated Demand Response (ADR) technology to effectively manage microgrid loads during grid-independent, also known as "islanded," operation. When military microgrids become isolated from the main electrical grid, they are required to balance electricity supply and demand locally. Given that local generation may be constrained, the prevailing strategy involves shedding all but the most critical loads by tripping smart circuit breakers, which then necessitate manual resetting. This approach is generally implemented at the building level, which means that the buildings with mission-critical activities are exempt from load management and remain fully powered, whereas those deemed non-critical can experience a complete loss of service. In this research we developed a method that allows building automation systems to selectively control their assets in response to load shedding request from a microgrid controller, avoiding total loss of service in contrast to the conventional control approach. A commercial OpenADR client server by GridFabric is used for communication between the microgrid controller and the building management system (BMS). The microgrid controller monitors both generation capacity and various assets within the microgrid and issues a demand reduction request when necessary. This request is communicated to the OpenADR server via Modbus. Upon receiving the request, the OpenADR server forwards it to the BMS utilizing the OpenADR protocol. The BMS is pre-configured with various levels of load reduction strategies based on the controllable assets available, allowing for a nuanced approach to demand reduction. Both lab and field tests were performed that considered load shedding needed to achieve closed transition into island mode and to accommodate changing loads and power source availability while islanded. A commercial microgrid controller was used for these tests with normal programming within the expected constraints of the system capabilities. That is, the solution did not require any specialized modification to the code base of the controller. Given the latency of the round-trip communication path between the microgrid controller and the various devices involved with the load shed processes, there are certain scenarios for which the demonstrated solution are appropriate and some which are not. The methods described in this report can be used for load shedding/restoration during transitions between islanded and grid-tied modes of operation, as well as accommodating normal variations in load and the need to remove a power source from operation for maintenance. These methods should not be used for scenarios that require load shedding within a second or two such as sudden and unanticipated significant load increases or loss of power sources through equipment faults.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilient Operation of Power Distribution Systems Using MPC-Based Critical Service Restoration

Power distribution systems are more prone to disruptions and cause most power system outages. We propose a service restoration technique to recover the system service (electricity delivery) following an extreme event-triggered substation outage. The proposed technique considers the problem of controlling distributed energy resources (DERs) of a distribution system with the objective of achieving maximum load pick up while satisfying network flow and voltage constraints. The problem is formulated as a model predictive control (MPC), where a linearized optimal power flow (OPF) model is employed to describe the network. The formulation is augmented with a ramping (up) reserve product for the DERs to ensure an upward monotonic load restoration as time evolves. We perform simulations considering the IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage devices. We demonstrate the efficacy of the devised technique in restoring the system loads monotonically, without shedding previously restored loads. We also show the benefit of co-optimization of power and reserve products for DERs on service restoration. In addition, the capability of the technique in regulating nodal voltages and reducing renewable power curtailment is demonstrated.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Resilient Operation of Power Distribution Systems Using MPC-Based Critical Service Restoration: Preprint

Power distribution systems are more prone to disruptions and cause most power system outages. We propose a service restoration technique to recover the system service (electricity delivery) following an extreme event-triggered substation outage. The proposed technique considers the problem of controlling distributed energy resources (DERs) of a distribution system with the objective of achieving maximum load pick up while satisfying network flow and voltage constraints. The problem is formulated as a model predictive control (MPC), where a linearized optimal power flow (OPF) model is employed to describe the network. The formulation is augmented with a ramping (up) reserve product for the DERs to ensure an upward monotonic load restoration as time evolves. We perform simulations considering the IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage devices. We demonstrate the efficacy of the devised technique in restoring the system loads monotonically, without shedding previously restored loads. We also show the benefit of co-optimization of power and reserve products for DERs on service restoration. In addition, the capability of the technique in regulating nodal voltages and reducing renewable power curtailment is demonstrated.

61 RADIATION PROTECTION AND DOSIMETRY↗

Resilient Operation of Power Distribution Systems Using MPC-Based Critical Service Restoration

Power distribution systems are more prone to disruptions and cause most power system outages. We propose a service restoration technique to recover the system service (electricity delivery) following an extreme event-triggered substation outage. The proposed technique considers the problem of controlling distributed energy resources (DERs) of a distribution system with the objective of achieving maximum load pick up while satisfying network flow and voltage constraints. The problem is formulated as a model predictive control (MPC), where a linearized optimal power flow (OPF) model is employed to describe the network. The formulation is augmented with a ramping (up) reserve product for the DERs to ensure an upward monotonic load restoration as time evolves. We perform simulations considering the IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage devices. We demonstrate the efficacy of the devised technique in restoring the system loads monotonically, without shedding previously restored loads. We also show the benefit of co-optimization of power and reserve products for DERs on service restoration. In addition, the capability of the technique in regulating nodal voltages and reducing renewable power curtailment is demonstrated.

61 RADIATION PROTECTION AND DOSIMETRY↗

Latent Viruses: A Space Travel Hazard??

A major issue associated with long-duration space flight is the possibility of infectious disease causing an unacceptable medical risk to crew members. Our proposal is designed to gain information that addresses several issues outlined in the Immunology/Infectious disease critical path. The major hypothesis addressed is that space flight causes alterations in the immune system that may allow latent viruses which are endogenous in the human population to reactivate and shed to higher levels than normal which can affect the health of crew members during a long term space-flight mission. We will initially focus our studies on the human herpesviruses and human polyomaviruses which are important pathogens known to establish latent infections in the human population. Both primary infection and reactivation from latent infection with this group of viruses can cause a variety of illnesses that result in morbidity and occasionally mortality of infected individuals. Effective vaccines exist for only one of the eight known human herpesviruses and the vaccine itself can still reactivate from latent infection. Available antivirals are of limited use and are effective against only a few of the human herpesviruses. Although most individuals display little if any clinical consequences from latent infection, events which alter immune function such as immunosuppressive therapy following solid organ transplantation are known to increase the risk of developing complications as a result of latent virus reactivation. This proposal will measure both the frequency and magnitude of viral shedding and genome loads in the blood from humans participating in activities that serve as ground based models of space flight conditions. Our initial goal is to develop sensitive quantitative competitive PCR- based assays (QC-PCR) to detect the herpesvirus Epstein-Barr virus (EBV), and the polyomaviruses SV40, BKV, and JCV. Using these assays we will establish baseline patterns of viral genome load in the blood and viral shedding from normal volunteers in a longitudinal study over I year in length. As a comparison, we will measure patterns of viral genome loads and shedding from individuals who are severely immunosuppressed, in whom herpesvirus reactivation or primary infection with a herpesvirus is known to cause complications. In addition, we will proceed to testing ground based analogs in collaboration with Dr. Duane Pierson (Lyndon B. Johnson Space Center). This will include measuring samples obtained from individuals living and working in the extreme environment of Antarctica. We expect to detect viral shedding or reactivation from most of the test groups, although the magnitude of shedding or reactivation cannot be predicted. The data accumulated from studies in this proposal should allow us to evaluate whether events that simulate certain aspects of space flight reactivate viral infections severe enough in nature that they may compromise the success of long-term space flight missions. These studies will also provide a foundation to monitor viral reactivation and shedding from crew members participating in actual space flight missions. We will present data showing the establishment of our QC-PCR assay for detection of EBV.

Ling, P. D.↗

Photovoltaic stand-alone modular systems, phase 2

The final hardware and system qualification phase of a two part stand-alone photovoltaic (PV) system development is covered. The final design incorporated modular, power blocks capable of expanding incrementally from 320 watts to twenty kilowatts (PK). The basic power unit (PU) was nominally rated 1.28 kWp. The controls units, power collection buses and main lugs, electrical protection subsystems, power switching, and load management circuits are housed in a common control enclosure. Photo-voltaic modules are electrically connected in a horizontal daisy-chain method via Amp Solarlok plugs mating with compatible connectors installed on the back side of each photovoltaic module. A pair of channel rails accommodate the mounting of the modules into a frameless panel support structure. Foundations are of a unique planter (tub-like) configuration to allow for world-wide deployment without restriction as to types of soil. One battery string capable of supplying approximately 240 ampere hours nominal of carryover power is specified for each basic power unit. Load prioritization and shedding circuits are included to protect critical loads and selectively shed and defer lower priority or noncritical power demands. The baseline system, operating at approximately 2 1/2 PUs (3.2 kW pk.) was installed and deployed. Qualification was successfully complete in March 1983; since that time, the demonstration system has logged approximately 3000 hours of continuous operation under load without major incident.

Naff, G. J.↗

High Performance Computing Peak Shaving for Microreactor Operation

There are multiple nuclear microreactors currently under development that are designed to provide autonomous power for as many as ten or more years without refueling and are designed to power high performance computing (HPC) datacenters. But the load-follow speeds for a nuclear microreactor will be much slower than grid power and slower than the power variance typical of a HPC system. HPC datacenters experience peak power load variance driven by several factors ranging from the operation of cooling systems to remove heat from the servers to supporting a wide range of user application workflows and architectures each with different power signatures. One mechanism to support the limited load-follow of a microreactor is peak shaving where an energy storage mechanism is used to shed peak load and reduce significant power variance. This work explores peak electrical load shaving using uninterruptible power supply (UPS) systems designed for HPC support in the context of peak shaving when operating using a nuclear microreactor with a load-follow limited to 10% of load per minute. Using a self contained HPC datacenter complete with stand-alone cooling system and provisioned with an x86 cluster, an ARM cluster, and a graphics processing unit (GPU) cluster, peak shaving for microreactor operation using the UPS battery backup is explored while running two classes of typical HPC user applications. HPC architecture suitability for microreactor operation under this type of peak shaving is examined.

97 MATHEMATICS AND COMPUTING↗

Resilient Microgrid Scheduling Considering Multi-Level Load Priorities

In this paper, we propose a novel resilient microgrid scheduling model considering the multi-level load priorities. The resiliency of the microgrid is guaranteed by quickly adjusting the output of committed local resources and shedding the loads with low priorities when the power supply from the main grid is interrupted. Considering the uncertainty of renewable energy resources and loads as well as exchanged power at PCC, the probability of successful islanding (PSI) is used to quantify the resiliency of electricity supply for various loads with different priorities. Then, the multi-level priorities are enforced through chance constrains. Results of numerical simulation validate the proposed resilient scheduling model. In addition, the impacts of resiliency requirement of loads with high priority on the resiliency of loads with low priority are analyzed as well.

Liu, Guodong↗

Electric Load Planning Tool (ELPT) v0.9

The Electric Load Planning Tool (ELPT) helps facilities understand the economic and environmental impacts of their electricity consumption. Using a user-provided Excel input, ELPT analyzes electricity use, costs, and grid CO2e emissions to identify savings opportunities through load management strategies such as load shifting, shedding, and planning. It accounts for Time-of-Use (TOU) tariffs and hourly emissions factors, varying by location and time of day. Users input details about their facility's load profile, location, year of analysis, and electricity billing tariff to receive customized insights. The tool provides visual representations of cost and GHG impacts, helping users understand the benefits of adjusting electricity usage to align with periods of cheaper and cleaner electricity, thereby achieving cost savings and reducing Scope 2 CO2e emissions

Karki, Unique [Lawrence Berkeley National Laborato↗

Entropy Stabilization Effects and Ion Migration in 3D “Hollow” Halide Perovskites

A recently discovered new family of 3D halide perovskites with the general formula (A) 1–x (en) x (Pb) 1–0.7x (X) 3–0.4x (A = MA, FA; X = Br, I; MA = methylammonium, FA = formamidinium, en = ethylenediammonium) is referred to as “hollow” perovskites owing to extensive Pb and X vacancies created on incorporation of en cations in the 3D network. The “hollow” motif allows fine tuning of optical, electronic, and transport properties and bestowing good environmental stability proportional to en loading. To shed light on the origin of the apparent stability of these materials, we performed detailed thermochemical studies, using room temperature solution calorimetry combined with density functional theory simulations on three different families of “hollow” perovskites namely en/FAPbI 3 , en/MAPbI 3 , and en/FAPbBr 3 . We found that the bromide perovskites are more energetically stable compared to iodide perovskites in the FA-based hollow compounds, as shown by the measured enthalpies of formation and the calculated formation energies. The least stable FAPbI 3 gains stability on incorporation of the en cation, whereas FAPbBr 3 becomes less stable with en loading. This behavior is attributed to the difference in the 3D cage size in the bromide and iodide perovskites. Configurational entropy, which arises from randomly distributed cation and anion vacancies, plays a significant role in stabilizing these “hollow” perovskite structures despite small differences in their formation enthalpies. With the increased vacancy defect population, we have also examined halide ion migration in the FA-based “hollow” perovskites and found that the migration energy barriers become smaller with the increasing en content.

36 MATERIALS SCIENCE↗

Characterization of the fatigue threshold behavior of UHMWPE

Ultra-high-molecular-weight-polyethylene (UHMWPE) has been the material of choice for bearings in total joint replacements (TJRs) for decades as a result of its excellent wear resistance, chemical inertness, energetic toughness, low friction, and biocompatibility. Utilization of this polymer in orthopedic devices requires oxidation, wear, and fatigue resistance. Balancing these important properties by tailoring processing techniques and modulating microstructural features has been an ongoing endeavor in the field. Research into the clinical applications of UHMWPE has primarily focused on the challenges of wear and oxidation while studies into the realm of fatigue have been more limited. Literature gaps exist in fully understanding the fatigue crack initiation near notches or propagation of small existing flaws in UHMWPE used in TJRs. In particular, the characterization of the fatigue thresholds and near-threshold fatigue behavior of orthopedic grade UHMWPE has yet to be thoroughly explored. In this work, we characterized the fatigue crack arrest threshold of clinically-relevant UHMWPE formulations. Correlations between the fatigue thresholds and bulk mechanical properties as well as microstructural properties were examined across these medical resins. The important role played by crosslinking in influencing the fatigue performance of UHMWPE is highlighted in this study. In addition, it is established that J-integral fracture toughness is the best predictor of fatigue thresholds and could possibly be used as a stand-in metric for fatigue performance if thresholds cannot be directly ascertained. Finally, this study corroborates that the true constitutive parameters best describe the mechanical behavior of UHMWPE.

Cross-linking↗

Optimal hybrid power plants for electric vehicle charging demand

Transmission constraints, increasing motivations to decarbonize, and concerns over peak electric vehicle (EV) load impacts on local grids have driven electric customers to consider behind-the-meter, hybrid power plant generation and storage at the distributed-grid level for EV charging. In this study, we develop capabilities to optimize hybrid power plant component capacities for EV charging. We then demonstrate these capabilities in a case study for Boulder, Colorado, using public EV charging data as well as wind and solar resource data. Our results show system designs that balance the cost of energy with load-meeting and peak shaving performance. Within the case study, systems designed for wind, solar photovoltaic (PV), and storage resulted in lower cost of energy than those optimized for PV and storage only. This indicates that in areas where wind resource exists, hybrid power plants that include wind, PV, and battery assets can better meet EV charging loads (including peak loads that are prone to overloading local grids) than PV and battery assets alone. Future work to address limitations in this paper include extending cost modeling to include performance losses (e.g., based on operations or weather) and charging station costs to estimate levelized cost of charging, and quantifying uncertainty and error in our aggregation methods for estimating EV charging loads at the hourly timescale.

14 SOLAR ENERGY↗

Distributional Deep Reinforcement Learning-Based Emergency Frequency Control

Emergency frequency control is one of the most critical approaches to maintain power system stability after major disturbances. With the increasing number of grid-connected renewable energy sources, existing model-based methods of frequency control are facing up with challenges of computational speed and scalability for large-scale systems. In this paper, the emergency frequency control problem is formulated as a Markov Decision Process (MDP) and solved through a novel Distributional Deep Reinforcement Learning (DDRL) method, namely the distributional soft actor critic (DSAC) method. Compared with other RL methods that only estimate the mean value, the proposed DSAC model estimates the distribution of value function over returns. This advancement can lead to more insights and knowledge for the agent, with the benefit of a much faster and more stable learning process, and the improved frequency control performance. Here, the simulation results on IEEE 39-bus and IEEE 118-bus systems demonstrate the effectiveness and robustness of proposed models, as well as the advantage compared to other state-of-the-art DRL algorithms.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Learning and Fast Adaptation for Grid Emergency Control via Deep Meta Reinforcement Learning

As power systems are undergoing a significant transformation with more uncertainties, less inertia and closer to operation limits, there is increasing risk of large outages. Thus, there is an imperative need to enhance grid emergency control to maintain system reliability and security. Towards this end, great progress has been made in developing deep reinforcement learning (DRL) based grid control solutions in recent years. However, existing DRL-based solutions have two main limitations: 1) they cannot handle well with a wide range of grid operation conditions, system parameters, and contingencies; 2) they generally lack the ability to fast adapt to new grid operation conditions, system parameters, and contingencies, limiting their applicability for real-world applications. Here, in this paper, we mitigate these limitations by developing a novel deep meta-reinforcement learning (DMRL) algorithm. The DMRL combines the meta strategy optimization together with DRL, and trains policies modulated by a latent space that can quickly adapt to new scenarios. We test the developed DMRL algorithm on the IEEE 300-bus system. We demonstrate fast adaptation of the meta-trained DRL polices with latent variables to new operating conditions and scenarios using the proposed method, which achieves superior performance compared to the state-of-the-art DRL and model predictive control (MPC) methods.

24 POWER TRANSMISSION AND DISTRIBUTION↗