Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “load restoration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Adaptive Deep Reinforcement Learning Algorithm for Distribution System Cyber Attack Defense With High Penetration of DERs

With grid modernization, smart inverters are increasingly used to execute advanced controls for distribution network reliability. However, this also increases the cyber-attack space. Here this paper focuses on the defense approaches to restore the system to normal operation circumstances in the presence of cyber-attacks. A unique deep reinforcement learning (DRL) method is developed to minimize voltage violations and reduce power losses for impacted feeders. The defense problem is reformulated as a Markov decision-making process to dynamically control DERs while minimizing load shedding. This is achieved via an improved soft actor-critic (SAC)-based DRL algorithm, which can govern DER set points and load-shedding scenarios in discrete and continuous modes via the auto-tune entropy and Gaussian policy features. Numerical comparison results on the modified IEEE 123-node system with other control approaches, such as Volt-VAR (VV), Volt-Watt (VW), and model predictive control (MPC) show that the proposed method can eliminate voltage violations and provide feasible control actions that perform complete mitigation of cyber-threats.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Biomechanical Comparison of Anatomic Restoration of the Ulnar Footprint vs Traditional Ulnar Tunnels in Ulnar Collateral Ligament Reconstruction

Background: Current techniques for ulnar collateral ligament (UCL) reconstruction do not reproduce the anatomic ulnar footprint of the UCL. The purpose of this study was to describe a novel UCL reconstruction technique that utilizes proximal-to-distal ulnar bone tunnels to better re-create the anatomy of the UCL and to compare the biomechanical profile at time zero among this technique, the native UCL, and the traditional docking technique. Hypothesis: The biomechanical profile of the anatomic technique is similar to the native UCL and traditional docking technique. Study Design: Controlled laboratory study. Methods: Ten matched cadaveric elbows were potted with the forearm in neutral rotation. The palmaris longus tendon graft was harvested, and bones were sectioned 14 cm proximal and distal to the elbow joint. Specimen testing included (1) native UCL testing performed at 90° of flexion with 0.5 N·m of valgus moment preload, (2) cyclic loading from 0.5 to 5 N·m of valgus moment for 1000 cycles at 1 Hz, and (3) load to failure at 0.2 mm/s. Elbows then underwent UCL reconstruction with 1 elbow of each pair receiving the classic docking technique using either anatomic (proximal to distal) or traditional (anterior to posterior) tunnel locations. Specimen testing was then repeated as described. Results: There were no differences in maximum load at failure between the anatomic and traditional tunnel location techniques (mean ± SD, 34.90 ± 10.65 vs 37.28 ± 14.26 N·m; P = .644) or when including the native UCL (45.83 ± 17.03 N·m; P = .099). Additionally, there were no differences in valgus angle after 1000 cycles across the anatomic technique (4.58°± 1.47°), traditional technique (4.08°± 1.28°), and native UCL (4.07°± 1.99°). The anatomic group and the native UCL had similar valgus angles at failure (24.13°± 5.86° vs 20.13°± 5.70°; P = .083), while the traditional group had a higher valgus angle at failure when compared with the native UCL (24.88°± 6.18° vs 19.44°± 5.86°; P = .015). Conclusion: In this cadaveric model, UCL reconstruction with the docking technique utilizing proximal-to-distal ulnar tunnels better restored the ulnar footprint while providing valgus stability comparable with reconstruction with the docking technique using traditional anterior-to-posterior ulnar tunnel locations. These results suggest that utilization of the anatomic tunnel location in UCL reconstruction has similar biomechanical properties to the traditional method at the time of initial fixation (ie, not accounting for healing after reconstruction in vivo) while keeping the ulnar tunnels farther from the ulnar nerve. Further studies are warranted to determine if an anatomically based UCL reconstruction results in differing outcomes than traditional reconstruction techniques. Clinical Relevance: Current UCL reconstruction techniques do not accurately re-create the ulnar UCL footprint. The UCL is a dynamic constraint to valgus loads at the elbow, and a more anatomic reconstruction may afford more natural joint kinematics. This more anatomic technique performs similarly to the traditional docking technique at time zero, and the results of this study may offer a starting point for future in vivo studies.

Chang, Edward S.↗

Advanced Compact Generation Module with Fish Safe Runner Technology

Hydropower is an important contributor of stable, load-leveling renewable energy to our national grid. Increasingly, the development of new hydropower facilities or the retrofit of existing ones hinges not only on minimizing costs but also environmental impact. In this report, the analysis and testing of a modular and scalable low-head hydropower generation design using Natel Energy’s Restoration Hydro Turbine is described. This design leverages many established industry approaches for compactness and efficiency while simultaneously allowing for safe downstream fish passage through the turbines themselves. This unique approach reduces overall hydropower facility costs and enables a simpler inclusive method of project design and operation. To assess this design, mechanical and fluid computational analyses were used to study and optimize key parameters. Passage tests of important migratory species (salmonids, American eel) were conducted through representative turbines. The unique propeller geometry of the fish-safe Restoration Hydro Turbine was subjected to detailed design and testing using advanced manufacturing composite techniques. Comprehensive module cost models were developed and assessed alongside hydraulic efficiency. The results of this project show promising and economical applications for downstream passage offish through Restoration Hydro Turbine modules.

13 HYDRO ENERGY↗

Evaluating Variable-Impedance Magnetically-Insulated Transmission Lines as a Risk-Mitigation Measure for Next-Generation Pulsed Power

This project has produced the first detailed characterizations of power flow resulting from applying the “variable-impedance MITL” concept to real-life systems in Sandia’s pulsed power program (Z and next-generation pulsed power (NGPP)). We present simulation results and analyses for constant-impedance versions of both Z and NGPP and survey the operational viability of several variable-impedance re-designs in the parameter space of linear tapers. Circuit modeling (SCREAMER/Bertha) was used to pinpoint promising candidate designs, and EM-PIC (Empire) simulations were used to evaluate these candidates more rigorously. This approach was particularly successful in the Z regime which resulted in the identification of several viable variable-impedance MITL designs for each level. The approach was more challenged in the operating space NGPP occupies, producing data points that speak to a more restrictive design space due to anode plasma turn-on. In the end, we were able to converge on one viable variable-impedance design for the highest inductance line (level “F”) and one for the highest current line (level “A”). Altogether, the body of simulation evidence presented in this report suggest there does exist flexibility in operating space for magnetically-insulated transmission lines (MITLs) having variable geometric impedance to be a potential enabling technology for safely increasing current delivery (and potentially lowering stack voltage) in pulsed-power drivers by manipulating electron losses; however, operating points for a particular design must be carefully screened. Circuit and EM-PIC modeling provided consistent verdicts in safe operating regimes for operational viability, but additional physics such as anode plasma turn-on which is included in Empire but not in SCREAMER/Bertha was found to be a critical factor affecting power flow that lead to different assessments between the codes. It is not always the case that the occurrence of anode plasma caused a design to fail (some designs turned on anode plasma yet still delivered load currents meeting design targets); the details matter such as how early in the pulse anode surfaces break down (and how large a region). However, in every case that it did fail it was found that the feedback from anode plasma was the cause (i.e., turning off the anode plasma model in Empire restored agreement with the circuit model prediction). As circuit simulations represent an efficient and practical means of surveying design space compared to more computationally-expensive approaches such as EM-PIC, it could be prudent to invest in the research and development of models to include the effects of anode plasma such as ion emission in circuit codes. The variable-impedance MITL design is a new concept that enables controlled manipulation of the initial electron losses in the outer MITL and can be tested on Z today. We encourage follow-on work to explore further optimization (including alternative variable-impedance profiles, e.g., having constant dZ/dR), and to confirm the major findings presented in this report by fielding test hardware on actual Z shots.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Preparing for Mars: the physiologic and medical challenges

As the twentieth century closes, retrospectives cite the Apollo moon missions as one of the important events of the past 100 years. A trip to Mars, however, would be even more challenging and significant. A round-trip Mars journey would require nearly three years away from Earth, a significant leap in complexity compared to the two week long Moon trips or the record-breaking fourteen-month flight on Mir. What would be the physiologic and medical challenges of a Mars flight? Two key areas of physiology present the greatest potential problems--calcium metabolism and radiation exposure. Data from Mir missions show that bone loss continues in space despite an aggressive countermeasure program. Average losses were 0.35% per month, but some load bearing areas lost >1% per month. A 1% loss rate, if it continued unabated for 30 months, could produce osteoporosis. Smaller losses could still increase fracture risk. Some bone loss can be well tolerated, particularly if the bone can be regained after the mission. But the effectiveness of post-flight rehabilitation to restore the density and quality of bone after spaceflight is not well known. Bone loss estimates are based on continuous weightlessness exposure, but this is not a requirement for a Mars trip. Most of the time on a Mars trip will be spent in the 1/3 Earth's gravity environment on Mars, and either intermittent or continuous artificial gravity can be provided for the transit between planets (although at an engineering cost). The dosing of the gravity exposure (e.g. the level and duration), however, has not been established. Radiation protection also requires a balance between engineering cost and human health. Excessive shielding could add billions of dollars to the cost of a mission. Trips in interplanetary space, however, expose the crew to heavy high-energy particles from cosmic rays (HZE particles), which have a high linear energy transfer. This high energy leads to significant biological damage (e.g. chromosomal aberrations, cancer induction). A recent report from the Committee on Space Biology and Medicine notes that only one systematic study of cancer induction from high-energy particles has been conducted (using the mouse Harderian gland). Predictions of cancer risk and acceptable radiation exposure in space are extrapolated from minimal data. Other areas of physiology also present problems, such as muscle loss, cardiovascular deconditioning, and vestibular adaptation. Despite all the issues, however, a focussed, aggressive research program that uses the resources of the International Space Station should pave the way for mankind's greatest adventure--a trip to Mars.

STS-90 Shuttle Project↗

International Space Station Electric Power System Performance Code-SPACE

The System Power Analysis for Capability Evaluation (SPACE) software analyzes and predicts the minute-by-minute state of the International Space Station (ISS) electrical power system (EPS) for upcoming missions as well as EPS power generation capacity as a function of ISS configuration and orbital conditions. In order to complete the Certification of Flight Readiness (CoFR) process in which the mission is certified for flight each ISS System must thoroughly assess every proposed mission to verify that the system will support the planned mission operations; SPACE is the sole tool used to conduct these assessments for the power system capability. SPACE is an integrated power system model that incorporates a variety of modules tied together with integration routines and graphical output. The modules include orbit mechanics, solar array pointing/shadowing/thermal and electrical, battery performance, and power management and distribution performance. These modules are tightly integrated within a flexible architecture featuring data-file-driven configurations, source- or load-driven operation, and event scripting. SPACE also predicts the amount of power available for a given system configuration, spacecraft orientation, solar-array-pointing conditions, orbit, and the like. In the source-driven mode, the model must assure that energy balance is achieved, meaning that energy removed from the batteries must be restored (or balanced) each and every orbit. This entails an optimization scheme to ensure that energy balance is maintained without violating any other constraints.

Hojnicki, Jeffrey↗

Application of MODIS Products to Infer Possible Relationships Between Basin Land Cover and Coastal Waters Turbidity Using the Magdalena River, Colombia, as a Case Study

Basin development and consequent change in basin land cover have been often associated with an increased turbidity in coastal waters because of sediment yield and nutrients loading. The later leads to phytoplankton abundance further exacerbating water turbidity. This subsequently affects biological and physical processes in coastal estuaries by interfering with sun light penetration to coral reefs and sea grass, and even affecting public health. Therefore, consistent estimation of land cover changes and turbidity trend lines is crucial to design environmental and restoration management plans, to predict fate of possible pollutants, and to estimate sedimentary fluxes into the ocean. Ground solely methods to estimate land cover change would be unpractical and traditional methods of monitoring in situ water turbidity can be very expensive and time consuming. Accurate monitoring on the status and trends of basin land cover as well as the water quality of the receiving water bodies are required for analysis of relationships between the two variables. Use of remote sensing (RS) technology provides a great benefit for both fields of study, facilitating monitoring of changes in a timely and cost effective manner and covering wide areas with long term measurements. In this study, the Magdalena River basin and fixed geographical locations in the estuarine waters of its delta are used as a case to study the temporal trend lines of both, land cover change and the reflectance of the water turbidity using satellite technology. Land cover data from a combined product between sensors Terra and Aqua (MCD12Q1) from MODIS will be adapted to the conditions in the Magdalena basin to estimate changes in land cover since year 2000 to 2009. Surface reflectance data from a MODIS, Terra (MOD09GQ), band 1, will be used in lieu of in situ water turbidity for the time period between 2000 and present. Results will be compared with available existing data.

Madrinan, Max Jacobo Moreno↗

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. Procurement options available to all federal agencies include utility energy services contracts (UESC), energy savings performance contracts (ESPC), and utility services contracts (USC); other mechanisms such as a power purchase agreement (PPA), enhanced use lease (EUL), and utility privatization (UP) may also be useful to agencies that have the authority to use them. Implementing a microgrid in a comprehensive effort that also includes energy efficiency can provide an important savings component, while reducing power requirements for critical loads, thus reducing the cost of the microgrid and associated distributed energy resources (DER). However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. When a site is deciding if a microgrid is the best solution, activities early in the process include identifying critical loads and existing DERs, conversations with the local electric utility, and implementation options that work best for the agency and site. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Non-isolated 30 kW class arcjet PCU

A 30 kW class arcjet Power Conditioning Unit, PCU, was built and tested during this Phase 2 SBIR contract. The PCU is an improved version of two previously developed PCU's. All of these units are 3-phase, 20 kHz buck regulators with current mode feed back to modulate the duty cycle to control the arcjet current at any selected operating point. The steady state control can assure arcjet stability despite the negative dynamic resistance of the arc discharge. The system also has a circuit to produce a high voltage start pulse to breakdown the gas and initiate the arc. The start pulse is formed by temporarily switching a short current path across the output terminals with a special solid state switching array. The switches then open rapidly, and the energy stored in the output inductors of the buck regulator produces a pulse of approximately 2500 V for approximately 500 nsec. The system was tested and modified until the transition to steady operation occurred after start up with a very small surge current overshoot. The system also can withstand a direct short circuit across the output without damage. The automatic feed back control simply reduces the duty cycle to hold the current at the set point. When the short is removed the full power output is immediately restored. This latest version arcjet PCU is conduction cooled to remove waste heat by conduction to the base plate. This unit is closer to flight a type of design than the previous functional bread boards. Waste heat is small because the PCU has a very high efficiency, 296 percent. The PCU was extensively tested with resistor loads to simulate operation with an arcjet. The unit was tested with ammonia arcjets at the Jet Propulsion Laboratory. Approximately 400 hours of testing were completed, with several starts. Many hours were also demonstrated with resistive loads. Some testing with hydrogen arcjets was also carried out at NASA LeRC. This system concept is now the design base for the ATTD program.

Wong, See-Pok↗

A passive gust alleviation system for light aircraft

A passive aeromechanical gust alleviation system has been examined for application to a Cessna 172. The system employs small auxiliary wings to sense changes in angle of attack and to drive the wing flaps to compensate the resulting incremental lift. The flaps also can be spring loaded to neutralize the effects of variations in dynamic pressure. Conditions for gust alleviation are developed and shown to introduce marginal stability if both vertical and horizontal gusts are compensated. Satisfactory behavior is realized if only vertical gusts are absorbed; however, elevator control is effectively negated by the system. Techniques to couple the elevator and flaps are demonstrated to restore full controllability without sacrifice of gust alleviation.

Roesch, P.↗

A passive gust alleviation system for a light aircraft

A passive aeromechanical gust alleviation system was examined for application to a Cessna 172. The system employs small auxiliary wings to sense changes in angle of attack and to drive the wing flaps to compensate the resulting incremental lift. The flaps also can be spring loaded to neutralize the effects of variations in dynamic pressure. Conditions for gust alleviation are developed and shown to introduce marginal stability if both vertical and horizontal gusts are compensated. Satisfactory behavior is realized if only vertical gusts are absorbed; however, elevator control is effectively negated by the system. Techniques to couple the elevator and flaps are demonstrated to restore full controllability without sacrifice of gust alleviation.

Roesch, P.↗

Compressive strength of damaged and repaired composite plates

Tests were performed assessing the effectiveness of repair in restoring the mechanical properties of damaged, solid composite plates made either of Fiberite T300/976 graphite-epoxy, Fiberite IM7/977-2 graphite-toughened epoxy, or ICI APC-2 graphite-PEEK. The plate length, the layup and the amount of damage were also varied. Damage was introduced in the plates either by impacting them with a solid projectile or by applying a transverse static load. Some (75 percent) or all (100 percent) of the damaged zone was then cut out, and the plate was repaired by plugging and patching the hole. The effectiveness of the repair was evaluated by measuring the compressive strengths of undamaged plates, damaged plates with no cutout, damaged plates with a cutout, and repaired plates. The data at an intermediate stage of repair provide information on the effect of each repair step on the compressive strength. The results indicated that for the solid plates used in these tests, the repair methods used herein did not improve the compressive strength of already damaged plates.

Finn, Scott R.↗

Performance of a MQXF Nb 3 Sn Quadrupole Magnet Under Different Stress Level

In a dipole or in a quadrupole accelerator magnet, the displacement of the coil turns induced by the electromagnetic forces can cause quenches limiting the magnet performance. For this reason, an azimuthal preload is applied to avoid azimuthal movements of the coil up to the required operational current. However, several tests showed that accelerator magnets can operate with a partial preload, i.e. that coil unloading during the ramp does not prevent reaching higher currents. This issue is particularly relevant for Nb 3 Sn magnets, where the loads applied to the Nb3Sn filaments can reach the degradation limits of critical current. In order to investigate the impact of coil preload on the quench performance, the MQXFS6 short model quadrupole for the High Luminosity Upgrade was tested under an azimuthal preload at 80% of the short sample current, reaching 93% of short sample current at 1.9 K. The preload was then released to 60%, still showing ability to operate in the range of 80-85% of short sample current as required by HL-LHC project. With this lower preload, the ability of going above 90% of short sample was lost, and a significant training appeared above 85%. When the preload was restored to the original 80% value, the magnet reached with few quenches 95% of short sample (13.4 T peak field). Magnetic measurements confirm the larger movement of the coil in the case with lower preload, and agree with finite element simulations.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Fundamental concepts in the suppression of delamination buckling by stitching

Elementary results are presented for the buckling of stitched, laminated composites containing delamination cracks. The stitching fibers are assumed to provide continuous, linear restoring tractions opposing the deflection of the delaminated layer adjacent to the crack. It is shown that there exists a characteristic length a(0) for buckling: if the length, 2a, of the delamination crack exceeds 2a(0), then, when buckling occurs, it will consist of waves of period 2a(0) and will usually not span the whole delamination. Simple expressions are derived for the critical buckling load and the minimum stitching density required to suppress buckling of the delaminated layer.

Cox, B. N.↗

Mixed-Mode Decohesion Finite Elements for the Simulation of Delamination in Composite Materials

A new decohesion element with mixed-mode capability is proposed and demonstrated. The element is used at the interface between solid finite elements to model the initiation and non-self-similar growth of delaminations. A single relative displacement-based damage parameter is applied in a softening law to track the damage state of the interface and to prevent the restoration of the cohesive state during unloading. The softening law for mixed-mode delamination propagation can be applied to any mode interaction criterion such as the two-parameter power law or the three-parameter Benzeggagh-Kenane criterion. To demonstrate the accuracy of the predictions and the irreversibility capability of the constitutive law, steady-state delamination growth is simulated for quasistatic loading-unloading cycles of various single mode and mixed-mode delamination test specimens.

Camanho, Pedro P.↗

Robotic Scaffolds for Tissue Engineering and Organ Growth

The aim of tissue engineering (TE) is to restore tissue and organ functions with minimal host rejection. TE is seen as a future solution to solve the crisis of donor organs for transplant, which faces a shortage expected only to increase in the future. In this innovation, a flexible and configurable scaffold has been conceived that mechanically stresses cells that are seeded on it, stimulating them to increased growth. The influence of mechanical stress/ loading on cell growth has been observed on all forms of cells. For example, for cartilages, studies in animals, tissue explants, and engineered tissue scaffolds have all shown that cartilage cells (chondrocytes) modify their extracellular matrix in response to loading. The chondrocyte EMC production response to dynamics of the physical environment (in vivo cartilage development) illustrates a clear benefit (better growth) when stressed. It has been shown that static and dynamic compression regulates PRG4 biosynthesis by cartilage explants. Mechanical tissue stimulation is beneficial and (flexible) scaffolds with movable components, which are able to induce mechanical stimulation, offer advantages over the fixed, rigid scaffold design. In addition to improved cell growth from physical/mechanical stimulation, additional benefits include the ability to increase in size while preserving shape, or changing shape. By making scaffolds flexible, allowing relative movement between their components, adding sensing (e.g., for detecting response of cells to drug release and to mechanical actions), building controls for drug release and movement, and building even simple algorithms for mapping sensing to action, these structures can actually be made into biocompatible and biodegradable robots. Treating them as robots is a perspective shift that may offer advantages in the design and exploitation of these structures of the future.

Stoica, Adrian↗

Parallel Grid-Forming Inverter-Driven Black Start: Power-Hardware-in-the-Loop Validation: Preprint

With power systems encountering increasing deployment levels of inverter-based resources (IBRs), system restoration using grid-forming (GFM) IBRs has gained attention. Engineered to establish grid voltages in the absence of a stiff grid, black-start-capable GFM IBRs are expected to enhance power system resilience by playing a critical role in bottom-up system restoration. This paper experimentally studies the feasibility of the novel approach through power-hardware-in-the-loop (PHIL) testing and validation with a commercial GFM inverter. The PHIL test setup demonstrates an inverter-driven black start of a 5-MW unbalanced distribution feeder where two GFM inverters collectively black start the feeder: one is a commercial hardware GFM inverter interacting through the PHIL interface, and the other is a software GFM emulated by a real-time simulation with full electromagnetic transient (EMT) models. Both GFM inverters are equipped with negative-sequence voltage control to suppress the voltage imbalance resulting from the unbalanced loading, allowing us to study the dynamic interactions between the GFMs with their control parameters unknown. To evaluate the dynamic behavior of the GFM inverters under the entire black-start process, the EMT model of the distribution system details the transformer and motor dynamics to emulate their inrush and startup behaviors. It abstracts conventional grid-connected inverter dynamics, i.e., grid-following inverters. Oscilloscope measurements of the hardware GFM inverter are also presented for critical steps. Takeaways for further study and field deployment are provided.

grid-forming inverter↗