Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “large scale power system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Post-processing of phase change material in a zero-change commercial silicon photonic process

Integration of phase change material (PCM) with photonic integrated circuits can transform large-scale photonic systems by providing non-volatile control over phase and amplitude. The next generation of commercial silicon photonic processes can benefit from the addition of PCM to enable ultra-low power, highly reconfigurable, and compact photonic integrated circuits for large-scale applications. Despite all the advantages of PCM-based photonics, today’s commercial foundries do not provide them in their silicon photonic processes yet. We demonstrate the first-ever electrically programmable PCM device that is monolithically post-processed in a commercial foundry silicon photonics process using a few fabrication steps and coarse-resolution photolithography. These devices achieved 1.4 dB/μm of amplitude switching contrast using a thin layer of 12.5 nm GeSbTe in this work. We have also characterized the reconfiguration speed as well as repeatability of these devices over 20,000 switching cycles. Our solution enables non-volatile photonic VLSI systems that can be fabricated at low cost and high reliability in a commercial foundry process, paving the way for the development of non-volatile programmable photonic integrated circuits for a variety of emerging applications.

Optics↗

Solid State Transformer Architecture and Control Compensation for Common Mode Currents

A high-altitude electromagnetic pulse (HEMP) or similar geomagnetic disturbance (GMD) has the potential to impact the operation of large-scale electric power grids. By introducing low-frequency common-mode (CM) currents, these events can degrade the performance of critical system components, such as large power transformers by introducing CM currents which can lead to magnetic saturation of the transformer core. In this work, a solid-state transformer (SST) is developed to replace susceptible equipment and improve grid resiliency by safely absorbing these CM disturbances. This device will be referred to as a common-mode solid-state transformer (CM-SST). An SST architecture based on a four-legged AC/DC converter is developed. This architecture enables active control of CM signals without disturbing the AC voltages or the real and reactive power delivery capabilities. A system-level model of this architecture is created, and time-domain simulations are performed to evaluate the SST’s performance in response to simulated CM disturbances. A control strategy for mitigating CM current is also investigated. Hamiltonian surface shaping and power flow control (HSSPFC) is used to design a nonlinear controller for the SST’s output inverter. The objectives of the controller are to suppress CM-induced AC current offsets and regulate AC currents to desired setpoints. Nonlinear system analysis is applied to design and validate the controller. Two cases are tested: (a) the proposed four-leg inverter and (b) a standard three-leg inverter. The results show that the proposed controller rapidly mitigates CM disturbances while maintaining high-quality AC current waveforms in the four-leg configuration. Finally, the hardware performance of an SST prototype is evaluated. In particular, the ability of the SST to safely redirect and absorb CM currents is demonstrated, showing how it can protect neighboring conventional transformers in the system. The study confirms that appropriate control laws allow the SST to protect both itself and adjacent transformers during a HEMP or GMD event.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Adaptive Stiffness Power Take-Off System for a Hydraulic Hose-Pump Point Absorber Wave Energy Converter

Two crucial challenges faced in the design of ocean wave energy converters (WECs) are maintaining high capacity factors and remaining robust in everchanging, harsh ocean environments. This study introduces a novel mechanism for achieving reactive WEC control with a soft hydraulic power take-off, thereby addressing both challenges. The device of interest involves a hydraulic pump, constructed from a fluidic flexible matrix composite (F2MC), which is cyclically stretched by driving waves and pressurizes working fluid through a turbine-generator. This class of fiber-reinforced stretch hoses is established for ocean use as robust moorings and shock absorbers. The dynamic properties of the F2MC pump depend on internal pressure, which can be controlled by a continuously variable transmission between the turbine and generator, allowing the system to be adapted for better performance over a wide range of wave conditions. This work presents a dynamic model for operation and adaptive behavior of this power take-off system, experimentally validates components of the model, and performs dynamic simulations of the system that show increases in power production and capacity factor compared to non-adaptive operation for a variety of driving wave conditions. This work develops the basis for future large-scale experimental testing and controller design of this system.

Wave energy conversion, fluidic flexible matrix co↗

Multiarea Distribution System State Estimation via Distributed Tensor Completion

Here, this paper proposes a model-free distribution system state estimation method based on tensor completion using canonical polyadic decomposition. In particular, we consider a setting where the network is divided into multiple areas. The measured physical quantities at buses located in the same area are processed by an area controller. A three-way tensor is constructed to collect these measured quantities. The measurements are analyzed locally to recover the full state information of the network. A distributed closed-form iterative algorithm based on the alternating direction method of multipliers is developed to obtain the low-rank factors of the whole network state tensor where information exchange happens only between neighboring areas. The convergence properties of the distributed algorithm and the sufficient conditions on the number of samples for each smaller network that guarantee the identifiability of the factors of the state tensor are presented. To demonstrate the efficacy of the proposed algorithm and to check the identifiability conditions, numerical simulations are carried out using the IEEE 123-bus system and a large-scale real utility feeder.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Future Automotive Systems Technology Simulator (FASTSim) Validation Report - 2021

The National Renewable Energy Laboratory's Future Automotive Systems Technology Simulator (FASTSim) captures the most important factors influencing vehicle power demands and performs large-scale fuel efficiency calculations very quickly. These features make FASTSim well suited to evaluate a representative distribution of real-world fuel efficiency over a large quantity of in-use driving profiles, which have become increasingly available in recent years owing to incorporation of Global Positioning System data collection into various travel surveys and studies. In addition, by being open source, computationally lightweight, freely available, and free from expensive third-party software requirements, analyses conducted using FASTSim may be easily replicated and critiqued in an open forum. This is highly desirable for situations in which technical experts seek to reach consensus over questions about what vehicle development plans or public interest strategies could maximize fuel savings and minimize adverse environmental impacts with an evolving vehicle fleet. While FASTSim continues to be refined and improved on an ongoing basis, this report compiles available runs using versions of the tool from the past few years to provide illustrative comparisons of the model results against measured data.

33 ADVANCED PROPULSION SYSTEMS↗

High-Power and Flexible Low-Frequency AC Transmission for Renewable Integration

This project develops a steady-state, dynamic, and production cost models of a multi-terminal, high-power, flexible low-frequency ac (LF-HVac) transmission system with grid-forming converters. Through both numerical analysis and EMTP simulation, the project goal is to demonstrate the feasibility of such an innovative and transformative LF-HVac system to support bulk integration of large-scale, cheap, and steady renewable resources from remote locations such as offshore wind farms to meet recent clean energy goals from DOE. The proposed adoption of low-frequency ac transmission aims to improve power transfer capability for remote large-scale renewable integration. In addition, the control for power electronics converters provides grid-support functions to improve the flexibility and resilience the existing 60-Hz HVac system. Future projects on this topic can be supported by both Energy Efficiency and Renewable Energy (DOEEE) and Office of Electricity Delivery & Energy Reliability (DOEOE) offices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multiscale modeling of microwave-heated multiphase systems

Modeling of microwave heating of multiphase systems requires resolving the electromagnetic field from the single particle to the entire cavity. We introduce a multiscale methodology for computationally affordable simulations of microwave heating of multiphase systems consisting of one phase dispersed in a continuum phase. The methodology homogenizes the original multiphase system, by taking advantage of the large separation of length scales, to calculate the effective permittivity, effective thermal conductivity, and volumetric power absorbed in each phase. The methodology is rigorously assessed against particle-resolved detailed numerical simulations of model systems. We demonstrate a significant reduction in computational cost while retaining the accuracy of detailed simulations. Lastly, the present methodology enables high throughput exploration of novel multiphase system designs utilizing microwave heating.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2020

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While many projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2020, as well as data on "completed" and "withdrawn" projects for five of the ISOs (CAISO, ISO-NE, MISO, NYISO, PJM). We find that the total capacity active in the queues is growing year-over-year, with over 750 GW of generation and an estimated 200 GW of storage capacity as of the end of 2020. Solar (462 GW) accounts for a large – and growing – share of generator capacity in the queues. Substantial wind (209 GW) capacity is also in development, 29% of which is for offshore projects (61 GW). In total, about 680 GW of zero-carbon capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 159 GW of solar hybrids (primarily solar+battery) and 13 GW of wind hybrids are currently active in the queues. However, much of this proposed capacity will not ultimately be built. Among a subset of queues for which data are available, only 24% of the projects seeking connection from 2000 to 2015 have subsequently been built. Completion percentages appear to be declining, and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: in four ISOs, the typical duration from connection request to commercial operation increased from ~1.9 years for projects built in 2000-2009 to ~3.5 years for those built in 2010-2020. There are growing calls for queue reform to reduce cost, lead times, and speculation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SynthEsizing Novel H2 Sensors for Operational Resilience in Pipeline Infrastructure (SENSOR) (CRADA Final Report)

Hydrogen (H₂) is gaining attention as a versatile energy carrier with potential applications across industrial processes, power generation, and transportation. However, its practical deployment, particularly in large-scale distribution systems, faces significant infrastructure challenges. Transporting hydrogen through dedicated pipelines or blending it into existing natural gas networks can lead to serious issues, such as leakage due to the small size of hydrogen molecules and material degradation in pipelines through embrittlement. These technical risks raise safety concerns and could limit the integration of hydrogen into current energy infrastructures. Additionally, using hydrogen-enriched gas mixtures in combustion systems like turbines and engines introduces new performance and compatibility challenges that must be resolved before widespread use becomes feasible.

08 HYDROGEN↗

Analysis and Mitigation of Cascading Outages Using an Interaction Graph Addressing Transient Stability

Cascading outages of power systems pose great threats to system security and reliability, potentially leading to large-scale blackouts. For analysis and mitigation of cascading outages, this paper proposes a transient stability-incorporated interaction graph. This graph statistically quantifies the interactions among line outages and instabilities of generators, which can model propagation paths and patterns of cascading outages. Compared with an interaction graph that only models line outages, this new interaction graph provides important insights on how transient instability occurs along with cascading outages. It also offers more effective strategies for mitigating outage propagation. The proposed interaction graph can be constructed from datasets of historical or simulated cascading events. It is demonstrated on an NPCC 140-bus system with mitigation strategies.

Guo, Zhenping↗

Architecture for Web-Based Visualization of Large-Scale Energy Domains: Preprint

With the growing penetration of inverter-based distributed energy resources and increased loads through electrification, power systems analyses are becoming more important and more complex. Moreover, these analyses increasingly involve the combination of interconnected energy domains with data that are spatially and temporally increasing in scale by orders of magnitude, surpassing the capabilities of many existing analysis and decision-support systems. We present the architectural design, development, and application of a high-resolution web-based visualization environment capable of cross-domain analysis of tens of millions of energy assets, focusing on scalability and performance. Our system supports the exploration, navigation, and analysis of large data from diverse domains such as electrical transmission and distribution systems, mobility and electric vehicle charging networks, communications networks, cyber assets, and other supporting infrastructure. We evaluate this system across multiple use cases, describing the capabilities and limitations of a web-based approach for high-resolution energy system visualizations.

grid modernization↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Learning-Based Real-Time Event Identification Using Rich Real PMU Data

A large-scale deployment of phasor measurement units (PMUs) that reveal the inherent physical laws of power systems from a data perspective enables an enhanced awareness of power system operation. However, the high-granularity and non-stationary nature of PMU data and imperfect data quality could bring great technical challenges for real-time system event identification. To address these challenges, this paper proposes a two-stage learning-based framework. In the first stage, a Markov transition field (MTF) algorithm is exploited to extract the latent data features by encoding temporal dependency and transition statistics of PMU data in graphs. Then, a spatial pyramid pooling (SPP)-aided convolutional neural network (CNN) is established to efficiently and accurately identify power events. The proposed method fully builds on and is also tested on a large real-world dataset from several tens of PMU sources (and the corresponding event logs), located across the U.S., with a time span of two consecutive years. We report the numerical results validate that our method has high identification accuracy while showing good robustness against poor data quality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deep Reinforcement Learning for Distribution System Operations: A Tutorial and Survey

Here, the rapid evolution of modern electric power distribution systems into complex networks of interconnected active devices, distributed generation (DG), and storage poses increasing difficulties for system operators. The large-scale integration of distributed energy resources (DERs) and the rapid exchange of measurement data via communication networks present major opportunities for advancing grid operations but also introduce greater uncertainty, higher data dimensionality, more complex network and device models, and challenging control and optimization problems. Deep reinforcement learning (DRL) algorithms are promising in addressing these challenges. However, they have not been effectively adapted for power systems applications, requiring extensive customization for implementation and evaluation. This has resulted in reproducibility challenges and a steep learning curve for researchers new to applying DRL algorithms to the power systems domain. To bridge these gaps, this tutorial aims to serve as a valuable resource for researchers interested in exploring learning-based algorithms to operate active power distribution networks. Specifically, this work presents a generalized process for translating sequential decision-making problems in power distribution systems into Markov decision process (MDP) formulations, illustrated through concrete grid service examples. Additionally, we introduce a simple environment design strategy to develop and evaluate example DRL algorithms for distribution system applications, complete with an included code repository to guide users through environment construction.

24 POWER TRANSMISSION AND DISTRIBUTION↗