Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “interconnections”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

GMLC Technical Assistance to States: DER Interconnection Workshop #3

NREL hosted this workshop to help state public utility commissions (PUCs) understand the materials and support available to assist in distributed energy resource (DER) interconnection activities. This workshop focused on DER interconnection and included four speakers, whose material will be posted at https://www.nrel.gov/grid/ieee-standard-1547/workshops.html. The slides in this deck were for the facilitator to provide context to the attendees as well as additional resources on the topics discussed.

DER↗

High-Level Assessment of Grid Infrastructure in Southeast Asia to Support Regional Interconnections

The purpose of this slide deck is to provide an overview of the benefits of interregional transmission and to assess the specific transmission landscape of Southeast Asia, with respect to potential interconnections between Singapore and neighboring countries. This analysis also explores the distribution of renewable resources and electricity demand in ASEAN (the Association of Southeast Asian Nations) as well as current and anticipated interregional transmission, in order to inform future interconnection plans.

ASEAN↗

Achieving 20.1% Efficiency in Organic Solar Cells Through Interconnected Fibrillar Networks via Local Molecular Stacking

ABSTRACT The performance of organic solar cells (OSCs) is governed by how molecular packing evolves into interconnected networks that facilitate exciton dissociation and charge transport. Using an all‐small‐molecule blend DR3TSBDT:Y6 as a model system, we study how local molecular stacking evolves into performance‐relevant morphology during solvent vapor annealing (SVA) and subsequent thermal annealing (TA). SVA promotes end‐to‐end stacking of amorphous acceptors to form interconnected fibrils, while TA compacts inter‐fibril spacing without disrupting favorable local order. Such molecular‐to‐morphological refinements broaden light absorption, enhance charge transport, and markedly improve device efficiency. Extending this approach to additional blend systems (D18:Y6, D18:L8‐BO, and DR3TSBDT:L8‐BO) yields similar structural evolution and performance gains, with the D18:L8‐BO system achieving up to 20.10% PCE. Our study establishes control over local stacking in amorphous acceptors into fibrillar networks as a general and effective route to realize high‐performance OSCs.

Wu, Junying↗

PtCoO 2 for Scaled Interconnects

Copper (Cu) interconnects are an increasingly important bottleneck in integrated circuits due to energy consumption and latency caused by the notable increase in Cu resistivity as dimensions decrease, primarily due to electron scattering at surfaces. Herein, the potential of a directional conductor, PtCoO 2 , which has a low bulk resistivity and a distinctive anisotropic structure that mitigates electron surface scattering is showcased. Thin films of PtCoO 2 of various thicknesses are synthesized by molecular beam epitaxy (MBE) coupled with a postdeposition annealing process and the superior quality of PtCoO 2 films is demonstrated by multiple characterization techniques. The thickness‐dependent resistivity curve illustrates that PtCoO 2 significantly outperforms effective Cu (Cu with TaN barriers) and Ru in resistivity below 20.0 nm with a more than 6x reduction compared to effective Cu below 6.0 nm, having a value of only 6.32 μΩ cm at 3.3 nm. It is determined that grain boundary scattering can still be improved for even lower resistivities in this material system through a combination of experiments and theoretical simulations. PtCoO 2 is therefore a highly promising alternative material for future interconnect technologies promising lower resistivities, better stability, and significant improvements in energy efficiency and latency for advanced integrated circuits.

Li, Yansong [Department of Electrical Engineering ↗

Platinum nanometal interconnection of copper–carbon nanotube hybrid electrical conductors

This study demonstrates the versatility of Joule heating driven chemical vapor deposition to deposit nanometal interconnections into porous CNT roving with application in the production of high electrical conductivity copper-carbon nanotube (Cu-CNT) hybrids. Modifications of vapor deposition parameters allow for deposited nanometal masses from less than 5% w/w to over 85% w/w and distributions that can be controlled towards either hot-spot site-specificity or overall uniformity. Here, depositions of copper, platinum, nickel, palladium, ruthenium, rhodium, and iridium are demonstrated from acetylacetonate precursors. In particular, platinum acetylacetonate [Pt(acac) 2 ] deposits nanometal seeds that adhere tightly to the CNT roving, producing improvements in resistance and specific conductivity. The properties of the platinum deposition compared to the copper deposition motivate an investigation into its use as an interfacial layer for Cu-CNT hybrids. CNT conductors with ~30% w/w platinum are electroplated with copper, densified, and annealed to produce Cu-CNT hybrid conductors with specific conductivities as high as 5772 S m 2 /kg and TCR (from 300 to 600 K) as low as 3.12 × 10 –3 K –1 , indicating good interconnection of the metal and CNT portions. Room temperature conductivities of 29.8 MS/m are achieved, comparable to metallic conductors. Thus, Pt(acac) 2 seeded Cu-CNT hybrids offer abundant promise in high conductivity applications.

42 ENGINEERING↗

Data-Driven Distributed Algorithms for Estimating Eigenvalues and Eigenvectors of Interconnected Dynamical Systems

Here, the paper presents data-driven algorithms to estimate in a distributed manner the eigenvalues, right and left eigenvectors of an unknown linear (or linearized) interconnected dynamic system. In particular, the proposed algorithms do not require the identification of the system model in advance before performing the estimation. As a first step, we consider interconnected dynamical system with distinct eigenvalues. The proposed strategy first estimates the eigenvalues using the well-known Prony method. The right and left eigenvectors are then estimated by solving distributively a set of linear equations. One important feature of the proposed algorithms is that the topology of communication network used to perform the distributed estimation can be chosen arbitrarily, given that it is connected, and is also independent of the structure or sparsity of the system (state) matrix. The proposed distributed algorithms are demonstrated via a numerical example.

97 MATHEMATICS AND COMPUTING↗

3D Nanomagnetism in Low Density Interconnected Nanowire Networks

Free-standing, interconnected metallic nanowire networks with densities as low as 40 mg/cm 3 have been achieved over centimeter-scale areas, using electrodeposition into polycarbonate membranes that have been ion-tracked at multiple angles. Networks of interconnected magnetic nanowires further provide an exciting platform to explore 3-dimensional nanomagnetism, where their structure, topology, and frustration may be used as additional degrees of freedom to tailor the materials properties. New magnetization reversal mechanisms in cobalt networks are captured by the first-order reversal curve method, which demonstrate the evolution from strong demagnetizing dipolar interactions to intersection-mediated domain wall pinning and propagation, and eventually to shape-anisotropy dominated magnetization reversal. These findings open up new possibilities for 3-dimensional integrated magnetic devices for memory, complex computation, and neuromorphics.

36 MATERIALS SCIENCE↗

Monthly hydropower generation data for Western Canada to support Western-US interconnect power system studies

Hydroelectric power generation in Western Canada significantly contributes to power grid operations of the North American Western Interconnection through substantial generation, some of which is exported to the United States (U.S.). However, the lack of publicly available hydropower generation datasets poses challenges for future market projections and resource adequacy evaluations. We present a simulation-based monthly power system model-ready hydropower generation dataset for 110 facilities in British Columbia and Alberta from 1981 to 2019. These monthly hydropower generation estimates are developed from integrated hydrologic model simulations of runoff and reservoir-operated streamflow, followed by scaling that considers diversion inflow constraints based on hydropower water license information. To address the lack of comparable hydropower generation records, we conduct step-by-step evaluations for simulated runoff, regulated streamflow, and hydropower generation using available observations or estimates. The presented hydropower dataset aims to enhance the representation of hydropower resources in Western Canada, supporting power grid system studies for the Western Interconnection of the U.S. and Canada.

13 HYDRO ENERGY↗

A Comprehensive Method to Mitigate Forced Oscillations in Large Interconnected Power Grids

Multiple severe forced oscillation events have recently been observed across the North American interconnections and around the world. These forced oscillations have caused power swings, limited power transfer capability, damaged equipment, and persisted indefinitely until the driving source was located and removed. This paper proposes a comprehensive method to mitigate forced oscillations. Once a forced oscillation is detected, a new source location algorithm can be used to locate the source based on the oscillation mode angle without requiring system topology information. If the source cannot be quickly located and removed, a control strategy can be activated to modulate the active power of utility-scale inverterbased battery energy storage systems (BESSs) to reduce the energy of forced oscillations to a safe level and allow sufficient time for locating the exact source. The proposed source location algorithm is validated using measurements collected during the January 11, 2019 forced oscillation event in North America and other actual grid events, while the proposed control strategy is verified using the Eastern Interconnection dynamic model under the replicated January 11, 2019 forced oscillation event. The simulation results demonstrated that the proposed source location algorithm can accurately identify the forced oscillation source, and the proposed control strategy can significantly reduce forced oscillation energy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Medium Voltage Energy Hub Based on Multilevel Cascaded H Bridge-Dual Active Bridge Back-to-Back Converter for Power Distribution Feeders Interconnection and Multiple Simultaneous Grid Services

This paper presents a medium voltage energy hub based on a modular design of a multilevel cascaded H bridge (CHB)-dual active bridge (DAB) converter. The energy hub composed of the two CHB-DAB modules with a back-to-back topology can be utilized as a grid interconnection component between distribution feeders. The energy hub can provide multiple simultaneous grid services such as voltage regulation, power factor correction, as well as active power flow control between the connected feeders, contributing to grid flexibility, efficiency, reliability, and resilience. Circuit structure and control schemes for the energy hub including both local controllers for each converter and outer loop controllers are proposed to enable simultaneous grid services with coordination to prevent the overloading of the hub. To validate the performance of the hub, the hub system is interconnected between two IEEE 4-bus feeders and provides voltage regulation for both feeders, while controlling active power flow between them. The system and the feeders are implemented in Real-Time Digital Simulator (RTDS) for real-time simulation verification.

Choi, Jongchan↗

Review—(Mn,Co) 3 O 4 -Based Spinels for SOFC Interconnect Coating Application

With the reduction of solid oxide fuel cell (SOFC) operating temperature to the range of 600 °C–800 °C, Cr-containing ferritic alloys have become the preferred interconnect material, which unfortunately are susceptible to continuous scale growth and Cr volatility at the SOFC operating temperatures. The (Mn,Co) 3 O 4 spinel system is widely regarded as the most effective coating for SOFC interconnect protection, due to its high thermal and electrical conductivity, adequate coefficient of thermal expansion, and excellent Cr blocking capability. This article reviews the physical and chemical properties of the (Mn,Co) 3 O 4 -based spinels; different types of coating precursors and deposition techniques; and the effects of spinel composition, quality and thickness on the coating performance. Furthermore, it is concluded that the spinel coating composition, quality, and thickness are more critical than the coating process in affecting the overall coating performance.

08 HYDROGEN↗

Evaluating Trade-offs in Potential Exascale Interconnect Technologies

This report details work to study trade-offs in topology and network bandwidth for potential interconnects in the exascale (2021-2022) timeframe. The work was done using multiple interconnect models across two parallel discrete event simulators. Results from each independent simulator are shown and discussed and the areas of agreement and disagreement are explored.

97 MATHEMATICS AND COMPUTING↗

Interconnections Seam Study [Slides]

The Interconnections Seam Study analyzes the grid impacts of increased connections between the Eastern and Western Interconnections in North America.

17 WIND ENERGY↗

An Overview of Inverter-based Resource Interconnection Standards

For the past century, electric power systems have primarily been bulk power systems consisting of generation, transmission, and distribution networks. Now the rapid expansion of distributed renewable power sources (RESs) and the shift from large, conventional synchronous machine resources to smaller-sized resources with diverse generation characteristics become the most significant change in modern power systems. With the increasing penetration of RESs, which are inverter-based resources (IBRs), it is important to develop interconnection standards that define performance and capability criteria for these IBRs. This is necessary to ensure the stable and reliable operation of power systems. This report summarizes the standards for IBRs interconnection in North America.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2024 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2023 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require projects seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. The amount of new electric capacity in these queues is growing dramatically, with nearly 2,600 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). However, most projects that apply for interconnection are ultimately withdrawn, and those that are built are taking longer on average to complete the required studies and become operational. Data from these queues nonetheless provide a general indicator for mid-term trends in developer interest.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Western Interconnection Baseline Study

The purpose of the baseline study is to evaluate the degree to which current industry planning processes meet the national 2035 decarbonization goals for the Western Interconnection. This analysis serves as a comparative baseline for the scenario analysis conducted in the NTP Study using a Western Interconnection dataset that is readily available to industry. This baseline analysis differs from the production cost modeling analysis and power flow analysis in the main NTP Study report (forthcoming). In particular, the analysis presented in this report reflects a business-as-usual future with an optimistic build out of specific planned transmission projects and foreseeable generation. In contrast, the NTP Study models a future generation and transmission expansion based on optimization from a capacity expansion model. The analysis presented herein also reflects a 2030 timeframe, whereas the main NTP Study production cost modeling analysis and power flow analysis reflect a 2035 time frame. This baseline analysis utilizes industry’s most reliable data to account for future transmission projects across various stages of development, with a particular focus on those in the permitting stage. Additionally, it incorporates projections for changes in generation capacity (both additions and retirements). This baseline analysis outlines a probable trajectory, given current process and practice, for the future of the bulk power system with a horizon extending to 2030.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Review of Distributed Wind Interconnection Technology and Standards

The objectives of this report are to discuss the uniqueness of power converters in distributed wind (DW), identify challenges in complying with existing standards, prioritize technological innovations to facilitate interconnection of DW energy systems, and, where necessary, propose potential clarifications or revisions to standards. This report evaluates IEEE 1547-2018, IEEE 1547.1-2020, and UL 1741 SB standards and their implications for DW. A standards review and interviews of DW industry stakeholders were conducted to identify challenges in the application of current standards to DW. The study concludes with a combination of recommendations of pathways towards facilitating DW product commercialization and DW interconnection, which draws on participation from multiple stakeholders in the space. These solutions can continue to be explored to improve DW standards compliance, improve the applicability of the standards to DW, reduce certification testing barriers, and ensure the safe and reliable operation of DW energy resources and electric power systems.

17 WIND ENERGY↗

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗