At least 181 records · Page 10

Background Information on the Power Quality Requirements in IEEE Std 1547-2018

The revised Institute of Electrical and Electronics Engineers (IEEE) 1547-2018, Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces, was published in April 2018. This standard is one of the foundational documents in the United States needed for integrating distributed energy resources (DERs), including solar energy systems, and energy storage systems with the electric distribution grid. The revised standard contains 11 chapters (clauses) and 8 annexes that comprise 136 pages. The revision is significantly different from the 2003 version, and it contains new concepts and new technical requirements. Each clause specifies information or requirements that apply to certain aspects that are important to the interconnection of DERs to the electric power system. Implementing the requirements necessitates a careful study of the underlying technical concepts and requires appropriate information to calculate relevant settings and configurations. This document provides informative material on the requirements related to electrical power quality in IEEE Std 1547-2018, with the intent to equip the reader with basic knowledge and background information to improve understanding and use of the requirements specified.

14 SOLAR ENERGY↗

Automated System-wide Event Detection and Classification Using Machine Learning on Synchrophasor Data

As the number of phasor measurement units (PMUs) deployed in a power system increases, and their data volume streamed to the control canter intensifies, operators are facing challenges related to the analysis of such data, which need to be observed and responded to as the measurements are displayed in the Control Room. Humans are generally unable to process such large amount of data efficiently and rapidly. There is an apparent need for automated ways to analyze the data, extract actionable information about occurrence of specific events, and characterize the events quickly and cost effectively. This paper discusses the use of machine learning (ML) to facilitate such tasks by providing automated, highly computationally efficient, and cost-effective ways of extracting actionable information from synchrophasor big data in real-time. We developed Big Data Smart (BDSmart) ML-based prototype tool for the Control Room use that automatically analyses data properties from synchrophasor system measurements taken across the three grid Interconnections in the USA (Western, Eastern and ERCOT). The data collected from several hundreds of PMUs located across the Interconnections over a period of two years have been made available for our extensive study. As a result, we were able to identify a number of big data properties that influence how ML methodology is applied to select, develop, train and test the data models that can eventually be used for the tool implementation. The resulting set of candidate algorithms spans unsupervised, supervised, semi-supervised and transfer-learning approaches. Many ML techniques, such as decision trees, multinomial logistic regression, feed-forward neural networks, K-nearest neighbor, multiclass support vector machine, and single and multi-channel convolutional neural networks, are implemented, and their performance is examined. We offer the results from testing the data models. The novelty of our study is in the approaches for bad data detection and mitigation, selection of a simplified feature for event detection, and data label improvements. As a result, we came up with a list of recommendations for the utilities on how to improve the PMU recording practices to cater to the future ML applications aimed at automating the analysis of synchrophasor data.

Synchrophasors, Machine Learning, System-wide Even↗

Electric Vehicle Infrastructure Consequence Assessment

With consumers’ growing interest in electric vehicles, extreme fast charging stations are poised to provide high-power charging to rapidly recharge light-duty passenger vehicles. High-power charging requires high-level communication between vehicle and charger to govern the charging process. The coupling of power and communication increases the potential scale of cyberattacks. Using a full Western Electricity Coordinating Council planning model, load manipulation from high-power charging infrastructure is investigated. Two cases of load manipulation are studied: (i) a discrete, widespread system event and (ii) loads modulated near the Western Interconnect’s resonant frequency. In (i) some generation trips and in (ii) oscillations are observed on the California Oregon Intertie. Neither scenario results in significant adverse effects to the grid.

33 ADVANCED PROPULSION SYSTEMS↗

Interregional Transmission Operational Coordination (IRTOC)

This report presents a modeling and evaluation framework developed through the Inter-Regional Transmission Operational Coordination (IRTOC) project to study market-to-market (M2M) congestion management across day-ahead and real-time markets. The framework extends the Sienna platform through Sienna Decomposition, a multi-stage evaluation architecture that enables flexible representation of multiple regions and systematic assessment of alternative market coordination designs. Additional modeling capabilities include reserve deliverability constraints, High-Voltage Direct Current (HVDC) optimization for Alternating Current (AC) congestion management, and several real-time distributed coordination algorithms. Case studies using the RTS-GMLC test system and a large-scale Eastern Interconnection model demonstrate that the framework can evaluate alternative coordination structures and quantify their economic and operational impacts. The proposed framework provides a scalable platform for analyzing inter-regional coordination strategies in large-scale electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Poster: Responsible Adoption of Artificial Intelligence (AI) in Electric Grid Operations

The rapid integration of artificial intelligence (AI) in the utility transmission and distribution (T&D) sector is revolutionizing traditional grid management practices. As utilities encounter complexities from evolving consumer behaviors and energy integration, AI becomes a critical solution for enhancing grid monitoring, fault detection, and operational optimization. However, increased reliance on interconnected technologies introduces significant cybersecurity risks, regulatory compliance challenges, and human factors concerns. This study proposes a strategic, responsible and consequence-driven approach to AI implementation, examining the dual nature of AI adoption by highlighting its transformative benefits for utilities and associated risks. It provides utilities with a framework for evaluating AI integration, enabling them to navigate challenges and capitalize on opportunities to achieve greater reliability, efficiency, and resilience in an increasingly complex energy landscape.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Technoeconomic Analysis Round Robin of a Retrofit of the Ivanpah Concentrating Solar Plant with a Molten-Salt System with Thermal Energy Storage

While the fidelity of technoeconomic analysis (TEA) models for concentrating solar thermal systems has improved in recent years, there is a lack of consensus on the specific inputs used to forecast performance of a newly built tower system due to a lack of validations and post-mortems available to the public. This effort is a joint initiative between multiple international organizations to validate and compare their TEA models. The specific case study is a proposed retrofit of one unit of the Ivanpah Solar Energy Generating System to include molten-salt storage, replacing the steam generation system with a molten-salt receiver, salt-to-steam heat exchanger train, and new balance of plant while keeping the existing steam turbine, solar field, and interconnection in place, using plant data for calibration. This manuscript discusses several of the agreed-upon assumptions for this study as well as a preliminary analysis from prior work that motivates the study.

14 SOLAR ENERGY↗

Developing IEEE Std 2800-Compliant Algorithms for Transmission-Connected Inverter-Based Resources

This study addresses the compliance of Inverter-based Resources (IBRs) with IEEE Standard 2800, a leading standard that defines interconnection and interoperability requirements for IBRs integrated into transmission systems. Focusing on abnormal grid scenarios, the research evaluates the specific demands on IBRs, proposing a controller development framework for abnormal grid conditions. This framework caters to maintaining ride-through operation in line with IEEE Std 2800, alongside managing currents during voltage ride-through scenarios. The effectiveness of this proposed controller framework is rigorously validated through case studies, employing a MATLAB/Simulink model of an IBR to test its performance under diverse grid fault conditions, ensuring the IBRs' alignment with standard requirements and their robust performance in enhancing grid reliability.

grid↗

Developing IEEE Std 2800-Compliant Algorithms for Transmission-Connected Inverter-Based Resources

This study addresses the compliance of Inverter-based Resources (IBRs) with IEEE Standard 2800, a leading standard that defines interconnection and interoperability requirements for IBRs integrated into transmission systems. Focusing on abnormal grid scenarios, the research evaluates the specific demands on IBRs, proposing a controller development framework for abnormal grid conditions. This framework caters to maintaining ride-through operation in line with IEEE Std 2800, alongside managing currents during voltage ride-through scenarios. The effectiveness of this proposed controller frame-work is rigorously validated through case studies, employing a MATLAB/Simulink model of an IBR to test its performance under diverse grid fault conditions, ensuring the IBRs' alignment with standard requirements and their robust performance in enhancing grid reliability.

IEEE Std 2800↗

Advancing AI-Driven Analysis in X-ray Absorption Spectroscopy: Spectral Domain Mapping and Universal Models

In recent years, rapid progress has been made in developing artificial intelligence (AI) and machine learning (ML) methods for X-ray absorption spectroscopy (XAS) analysis. Compared to traditional XAS analysis methods, AI/ML approaches offer dramatic improvements in efficiency and help eliminate human bias. To advance this field, we advocate an AI-driven XAS analysis pipeline that features several interconnected key building blocks: benchmarks, workflows, databases, and AI/ML models. Specifically, we present two case studies for XAS ML. In the first study, we demonstrate the importance of reconciling the discrepancies between simulation and experiment using spectral domain mapping (SDM). Our ML model, which is trained solely on simulated spectra, predicts an incorrect oxidation state trend for Ti atoms in a combinatorial zinc titanate film. After transforming the experimental spectra into a simulation-like representation using SDM, the same model successfully recovers the correct oxidation state trend. In the second study, we explore the development of universal XAS ML models that are trained on the entire periodic table, which enables them to leverage common trends across elements. Looking ahead, we envision that an AI-driven pipeline can unlock the potential of real-time XAS analysis to accelerate scientific discovery.

36 MATERIALS SCIENCE↗

III-V/Si Tandem Cells Utilizing Interdigitated Back Contact Si Cells and Varying Terminal Configurations

Integrating wide-bandgap III-V with Si solar cells has been shown to yield higher efficiencies than Si alone: As also presented at this conference, four-terminal efficiencies exceeding 32% have been attained. In this contribution, independent and electrically connected operation of the subcells in such tandem cells is examined. The optics of the tandem cell change significantly if a conducting interconnect, rather than an insulating glass slide, is required between the subcells. These effects are studied, and optically optimized structures for different types of tandem cell operation are presented. It is found that minimizing reflection at the conductive interface between the two cells while maintaining conductivity is the key challenge faced in such devices.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Deformation of pores in response to uniaxial and hydrostatic stress cycling in Marcellus Shale: Implications for gas recovery

One of the main challenges during gas production from shale reservoirs is low recovery rate. One contributing factor to this outcome is an insufficient understanding of pore systems, especially pore behaviour following changes in reservoir conditions or resulting from gas production practices. Because the pressure in the producing well can be controlled, understanding the effects of pressure variation on the pore size distribution and methane trapping is necessary to help design optimal conditions to improve the gas recovery rate. This work is the first systematic study of sub-millimeter pore deformation in shale caused by uniaxial and hydrostatic stress up to 100 MPa. Overmature samples from the Middle Devonian Marcellus Shale were analyzed using neutron scattering (SANS and USANS) techniques to interpret the response of nanopores to stress cycling of magnitude and duration compatible with the hydraulic fracturing treatments. Experiments reported here are performed at a series of uniaxial pressures up to 100 MPa and at hydrostatic pressures of deuterated methane 0 and 50 MPa. Since at the original depth of the shale samples’ burial of 2184 m the hydrostatic pressure is approximately 27 MPa and the lithostatic pressure is about 55 MPa, the experimental conditions reasonably well simulate the reservoir pressure regime. Our SANS and USANS results show that different pore sizes are affected by uniaxial stress in different ways. Specifically, in the pore size range from 1 nm to 800 nm, a decrease of pore density with pressure is observed, with the most depleted being mesopores of about 100 nm in diameter. The observed decrease is likely related to deformation of kerogen, followed by a loss of pore nano-volume, as well as methane trapped in the micropores. For pores larger than 5 μm, USANS data suggest that the negative trend is reversed at above 74 MPa, and the number density of large macropores may increase with increased stress even above the original value. The increased number of macropores at high pressure may create new interconnected conduits for gas migration, resulting in a better recovery rate. Another important finding of this study is an irreversible rearrangement of pore size distribution taking place after pressure cycling. Furthermore, this irreversible reorganization of pore size distribution should be taken into account during management of well production to maximize recovery rate.

03 NATURAL GAS↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Clause-by-Clause Summary of Requirements in IEEE Standard 1547-2018

The revised IEEE 1547 standard (IEEE Std 1547-2018) contains eleven chapters (clauses) and eight annexes that comprise 136 pages. Each clause specifies information or requirements that apply to certain aspects important to the interconnection of distributed energy resources to the electric power system. Implementation of the requirements needs a careful study of the underlying technical concept and also needs the appropriate information that may be required to calculate various settings and configurations. This document aims to provide an introductory text to assist users of IEEE Std 1547-2018 in identifying the following questions: what is the primary audience of the clause/subclause? What knowledge is required to understand the technical subject matter? What information is required to apply/implement the requirements specified? What level of fluency with the subject matter is required to apply/implement the requirements?

24 POWER TRANSMISSION AND DISTRIBUTION↗

Developing IEEE Std 2800-Compliant Algorithms for Transmission-Connected Inverter-Based Resources: Preprint

This study addresses the compliance of Inverter-based Resources (IBRs) with the IEEE Std 2800, a leading standard that defines interconnection and interoperability requirements for IBRs integrated into transmission systems. Focusing on abnormal grid scenarios, the research evaluates the specific demands on IBRs, proposing a comprehensive controller development framework. This framework caters to maintaining ride-trhough operation or implementing strategic disconnections in line with IEEE Std 2800, alongside managing currents during voltage ride-through scenarios. The effectiveness of this proposed controller framework is rigorously validated through case studies, employing a MATLAB/Simulink model of an IBR to test its performance under diverse grid fault conditions, ensuring the IBRs' alignment with standard requirements and their robust performance in enhancing grid reliability.

IEEE Std 2800↗

Cross‐Coupling between Hydrazine and Aryl Halides with Hydroxide Base at Low Loadings of Palladium by Rate‐Determining Deprotonation of Bound Hydrazine

Abstract Reported here is the Pd‐catalyzed C–N coupling of hydrazine with (hetero)aryl chlorides and bromides to form aryl hydrazines with catalyst loadings as low as 100 ppm of Pd and KOH as base. Mechanistic studies revealed two catalyst resting states: an arylpalladium(II) hydroxide and arylpalladium(II) chloride. These compounds are present in two interconnected catalytic cycles and react with hydrazine and base or hydrazine alone to give the product. The selectivity of the hydroxide complex with hydrazine to form aryl over diaryl hydrazine was lower than that of the chloride complex, as well as the catalytic reaction. In contrast, the selectivity of the chloride complex closely matched that of the catalytic reaction, indicating that the aryl hydrazine is derived from this complex. Kinetic studies showed that the coupling process occurs by rate‐limiting deprotonation of a hydrazine‐bound arylpalladium(II) chloride complex to give an arylpalladium(II) hydrazido complex.

Wang, Justin Y.↗

Cross‐Coupling between Hydrazine and Aryl Halides with Hydroxide Base at Low Loadings of Palladium by Rate‐Determining Deprotonation of Bound Hydrazine

Abstract Reported here is the Pd‐catalyzed C–N coupling of hydrazine with (hetero)aryl chlorides and bromides to form aryl hydrazines with catalyst loadings as low as 100 ppm of Pd and KOH as base. Mechanistic studies revealed two catalyst resting states: an arylpalladium(II) hydroxide and arylpalladium(II) chloride. These compounds are present in two interconnected catalytic cycles and react with hydrazine and base or hydrazine alone to give the product. The selectivity of the hydroxide complex with hydrazine to form aryl over diaryl hydrazine was lower than that of the chloride complex, as well as the catalytic reaction. In contrast, the selectivity of the chloride complex closely matched that of the catalytic reaction, indicating that the aryl hydrazine is derived from this complex. Kinetic studies showed that the coupling process occurs by rate‐limiting deprotonation of a hydrazine‐bound arylpalladium(II) chloride complex to give an arylpalladium(II) hydrazido complex.

Wang, Justin Y.↗

The impact of infill percentage and layer height in small-scale material extrusion on porosity and tensile properties

We report material extrusion additive manufacturing is prone to introducing porosity within the structure due to the layer-by-layer construction using elliptical beads of material. This open porosity ultimately plays a role in determining the mechanical properties of printed parts. The shape, size, and amount of porosity within a printed part is influenced by a variety of factors, including nozzle diameter, infill percentage, layer height, raster orientation, and print speed. While several studies have investigated these and other parameters’ effects on mechanical performance and porosity, better understanding the interconnected relationships is crucial in balancing the various input parameters to achieve maximum strength. This work initially examined the influence of key print parameters (infill percentage and layer height) on the internal porosity of a printed Acrylonitrile Butadiene Styrene (ABS) part. Then, the print parameters and internal porosity were statistically correlated to final mechanical properties. Porosity was further classified as either open or closed to differentiate between connected voids in the mesostructure from isolated voids within the material itself. Mechanical performance increased with an increasing density and infill percentage, displaying a 224 % increase in elastic modulus and a 150 % increase in ultimate tensile strength. The contribution of layer height was found to be conditional upon the infill percentage.

3D Printing↗