Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “infrastructures”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Solar Resource and Infrastructure Assessment for the Town of Westhampton

This report is a solar resource and infrastructure assessment for the town of Westhampton, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Westhampton. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Westhampton are oversaturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. Future upgrades could potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

The Design and Evaluation of Zero Trust Architecture for Electric Vehicle Charging Infrastructure: EVs @ Scale Series on EV Charging Station Cybersecurity

Implementing a zero trust architecture can significantly bolster the security of electric vehicle (EV) charging infrastructure. EV charging infrastructure includes numerous networked interfaces, each of which can present potential vulnerabilities. When these vulnerabilities are exploited, they can compromise the entire system, leading to severe operational and security risks. Zero trust is a security model that operates on the principle of "never trust, always verify," which helps manage the attack surface and limit the scope of any potential compromises. Fundamentally, this model ensures that no entity, whether inside or outside the network, is trusted by default. The design principles of zero trust include continuous verification, strict deny-by-default access controls, and micro-segmentation. Continuous verification ensures that every request is thoroughly checked, regardless of its origin. Strict access controls enforce the principle of least privilege, allowing users and devices only the minimum necessary access to perform their functions. Micro-segmentation involves dividing the network into smaller, isolated segments to prevent lateral movement in case of a breach. In the context of EV charging infrastructure, zero trust can be implemented through various strategies. For example, multi-factor authentication (MFA) can be required for engineers to access the management interfaces and control systems of charging stations. Real-time monitoring and analysis of network traffic can help detect and respond to anomalies. Systems that do not need to communicate with each other can be micro-segmented to enhance security. All communications should adhere to predefined policies to be permitted. Additionally, encrypting communications can protect sensitive information exchanged between chargers and management systems. This paper presents a zero trust architecture specifically designed for EV charging infrastructure. Implementing zero trust not only mitigates risks but also builds a resilient infrastructure capable of withstanding and quickly recovering from cyber threats. The architecture addresses six defined security objectives. A comprehensive test plan is developed to assess the architecture against these objectives, and the results of the evaluation are reported. This approach is essential for maintaining the reliability and integrity of EV charging services in an increasingly interconnected and vulnerable digital landscape. This is the first in a planned series of papers exploring the implementation of zero trust in EV charging infrastructure. Each paper will delve into different aspects and applications of zero trust, highlighting how various work processes and requirements can lead to distinct architectural designs. These architectures will be tailored to address specific security challenges and operational needs within the EV charging ecosystem, ensuring a robust and adaptable security framework.

33 ADVANCED PROPULSION SYSTEMS↗

Research Reactors Division Infrastructure Investment Plan for the High Flux Isotope Reactor

The High Flux Isotope Reactor (HFIR) is a unique national asset. Operational for nearly 60 years, continued investment into the aging infrastructure is necessary to ensure operation for another 6 decades. Additionally, growing missions require HFIR as well as important upgrades. Consequently, carefully integrated planning is required to ensure that infrastructure investments are timely executed to ensure long-term, reliable operation of HFIR. Concerns about challenges to the operational reliability of HFIR resulted in a recommendation from the 2023 Operations Review by the US Department of Energy (DOE) Office of Basic Energy Sciences that a HFIR management strategy be developed to address the infrastructure needs. This report defines the investment needs, which are evolving as new upgrade efforts are better defined. HFIR is part of the three-source strategy within the Neutron Sciences Directorate (NScD) and contributes to the five strategic science areas outlined in the NScD 10 Year Strategic Science Plan: quantum materials, soft matter, materials and engineering, chemistry, and biosciences. Fundamental to this strategy are three core values: operational excellence, responsible stewardship, and servant leadership. These values guide our mission of safe and reliable operation of the reactor and require a strong and just nuclear safety culture, a solemn respect for responsible care of the facility, good workforce development, robust procedures and processes, an effective communication strategy, world-class asset management, a determined customer focus, and a commitment to protecting the environment, the safety and health of the public and our people, and the quality of work performed within our facility. These principles are all essential to operate HFIR at a world-class level. The Research Reactors Division (RRD) will lead a new era of neutron science and isotope production at HFIR through responsible and purposeful leadership and unwavering support of the science community. The approach outlined in this plan highlights the direction leadership is taking to ensure that HFIR is ready to support the science challenges and national needs of the future and that the United States maintains world leadership in neutron sciences. The plan is in alignment with the DOE’s desire to continue operating HFIR and with the NScD strategic science goals for the future. HFIR is an aging facility with numerous infrastructure challenges and needs. It has an aging workforce in relation to the general population of Oak Ridge National Laboratory (ORNL), with many expected retirements over the next 5–10 years. With an increase in work scope caused by changing national priorities and science goals, several critical hires have been identified. To manage HFIR’s infrastructure needs, a prioritized list of equipment upgrades has been identified along with an analysis of future staffing requirements. A desire to operate HFIR at eight cycles per year will necessarily require some significant changes to procedures and processes currently in place as well as targeted staffing additions. Many of the equipment upgrades identified in this plan will significantly increase the reliability of the plant, thus contributing to the effort to reach the goal of safely operating eight cycles per year. A plan to attain eight-cycle operation is being prepared in parallel with the activities identified in this plan, although the actions identified to satisfy both plans will overlap. This plan identifies new infrastructure needs—for both plant equipment and staffing—thus necessitating formulation of future budget requests to fund the increased work scope and improvement activities. Some activities are currently being scheduled with the expectation that funding will be received. Any delays to funding or reductions of funding from the identified cost estimations will directly and negatively affect the plan’s implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cybersecurity Considerations for Hydrogen Infrastructure in Airport Environments

This report explores key cybersecurity concerns and best practices within environments that serve as reference points for the development of hydrogen fueling infrastructure for aviation. This cybersecurity analysis leverages prior NREL studies: 1) hydrogen fueling station component validation to identify vulnerabilities and failure events documented in physical equipment, and 2) electric aircraft charging infrastructure analysis to explore primary cybersecurity vulnerabilities. It reviews the criticality of digitized technologies in sustaining hydrogen fuel production, storage, and fueling systems, noting cybersecurity concerns that are universal to power systems and industrial control systems in general. In considering cybersecurity vulnerabilities within a future landscape of hydrogen energy for aviation applications, a reference architecture was intended to reveal the points of connection between assets and the potential sensors that are vulnerable to manipulation in the event of compromised access or communication within a SCADA system. A generalized reference architecture can help stakeholders, engineers, or strategists understand connections, criticalities, and standard practices when it comes to designing and planning for new systems. There are several gaps to account for in assessing the future of hydrogen production, storage, and fueling for aviation. Engaging stakeholders, including aircraft manufacturers, electric utilities, site property owners, and local communities, will inform decision-making around site structure, operations, and resources for future hydrogen fueling infrastructure to understand operational needs and cybersecurity awareness. Cybersecurity mitigation strategy must consider physical attack vectors that emerge with the integration of hydrogen systems into existing airport security requirements. The cybersecurity risk assessment contained in this report is an entry point into potential future granular-level analyses to be conducted as part of hazard and risk assessments for safe aviation hydrogen infrastructure, determining how the scale of hydrogen fuel infrastructure for aviation impacts the volume of cyber attack vectors, and what, if any, are the vulnerabilities associated with different types of on-board hydrogen systems. In this nascent development phase, assessing how best to integrate cybersecurity practices into an evolving U.S. aviation landscape provides critical insights into building increased awareness and stakeholder engagement to support a cyber-resilient infrastructure.

08 HYDROGEN↗

Hydrogen Scenario Analysis Summary Report: Analysis of the Transition to Hydrogen Fuel Cell Vehicles and the Potential Hydrogen Energy Infrastructure Requirements

Achieving a successful transition to hydrogen-powered vehicles in the U.S. automotive market will require strong and sustained commitment by hydrogen producers, vehicle manufacturers, transporters and retailers, consumers, and governments. The interaction of these agents in the marketplace will determine the real costs and benefits of early market transformation policies, and ultimately the success of the transition itself. The transition to hydrogen-powered transportation faces imposing economic barriers. The challenges include developing and refining a new and different power-train technology, building a supporting fuel infrastructure, creating a market for new and unfamiliar vehicles, and achieving economies of scale in vehicle production while providing an attractive selection of vehicle makes and models for car-buyers. The upfront costs will be high and could persist for a decade or more, delaying profitability until an adequate number of vehicles can be produced and moved into consumer markets. However, the potential rewards to the economy, environment, and national security are immense. Such a profound market transformation will require careful planning and strong, consistent policy incentives. Section 811 of the Energy Policy Act (EPACT) of 2005, Public Law 109-59 (U.S. House, 2005), calls for a report from the Secretary of Energy on measures to support the transition to a hydrogen economy. The report was to specifically address production and deployment of hydrogen-fueled vehicles and the hydrogen production and delivery infrastructure needed to support those vehicles. In addition, the 2004 report of the National Academy of Sciences (NAS, 2004), The Hydrogen Economy, contained two recommendations for analyses to be conducted by the U.S. Department of Energy (DOE) to strengthen hydrogen energy transition and infrastructure planning for the hydrogen economy. In response to the EPACT requirement and NAS recommendations, DOE's Hydrogen, Fuel Cells and Infrastructure Technologies Program (HFCIT) has supported a series of analyses to evaluate alternative scenarios for deployment of millions of hydrogen fueled vehicles and supporting infrastructure. To ensure that these alternative market penetration scenarios took into consideration the thinking of the automobile manufacturers, energy companies, industrial hydrogen suppliers, and others from the private sector, DOE held several stakeholder meetings to explain the analyses, describe the models, and solicit comments about the methods, assumptions, and preliminary results (U.S. DOE, 2006a). The first stakeholder meeting was held on January 26, 2006, to solicit guidance during the initial phases of the analysis; this was followed by a second meeting on August 9-10, 2006, to review the preliminary results. A third and final meeting was held on January 31, 2007, to discuss the final analysis results. More than 60 hydrogen energy experts from industry, government, national laboratories, and universities attended these meetings and provided their comments to help guide DOE's analysis. The final scenarios attempt to reflect the collective judgment of the participants in these meetings. However, they should not be interpreted as having been explicitly endorsed by DOE or any of the stakeholders participating. The DOE analysis examined three vehicle penetration scenarios: Scenario 1--Production of thousands of vehicles per year by 2015 and hundreds of thousands per year by 2019. This option is expected to lead to a market penetration of 2.0 million fuel cell vehicles (FCV) by 2025. Scenario 2--Production of thousands of FCVs by 2013 and hundreds of thousands by 2018. This option is expected to lead to a market penetration of 5.0 million FCVs by 2025. Scenario 3--Production of thousands of FCVs by 2013, hundreds of thousands by 2018, and millions by 2021 such that market penetration is 10 million by 2025. Scenario 3 was formulated to comply with the NAS recommendation: 'DOE should map out and evaluate a transition plan consistent with developing the infrastructure and hydrogen resources necessary to support the committee's hydrogen vehicle penetration scenario, or another similar demand scenario (NAS, 2004, p. 4).' Each of the scenarios was extensively discussed at the stakeholder meetings and each received support from industry. Although there was no consensus on a particular vehicle penetration rate, it was agreed that this set of scenarios is inclusive of industry expectations and could provide a basis to interpolate or extrapolate the results to other cases. The purpose of the DOE study was not to select any one scenario but to assess the costs and impacts of achieving each.

08 HYDROGEN↗

Integrating Infrastructures in the United States: Experience and Prospects

Infrastructure integration has been limited in the United States because infrastructure management responsibilities are fragmented by divisions between sectors and between the public and the private sector, but some changes are under way. Stimulated by a number of extreme events in recent decades, data and modeling capabilities for simulating infrastructure interdependencies have been developed and applied, and infrastructure integration in some cities has been encouraged by such foci as emergency preparedness and “green infrastructure” strategies. Integrative strategies have been explored for energy and water resource systems, in some cases related to other sectors as well. In summary, infrastructure integration in the United States is occurring from the ground up, due in many cases to climate change impacts and risks. A number of examples of successes, supported by broad coalitions of interested parties (with evident sociopolitical payoffs), suggest that integration will increase through time.

60 APPLIED LIFE SCIENCES↗

Fabrication Infrastructure to Enable Efficient Exploration and Utilization of Space

Unlike past one-at-a-time mission approaches, system-of-systems infrastructures will be needed to enable ambitious scenarios for sustainable future space exploration and utilization. Fabrication infrastructure will be needed to support habitat structure development, tools and mechanical part fabrication, as well as repair and replacement of ground support and space mission hardware such as life support items, vehicle components and crew systems. The fabrication infrastructure will need the In Situ Fabrication and Repair (ISFR) element, which is working in conjunction with the In Situ Resources Utilization (ISRU) element, to live off the land. The ISFR Element supports the entire life cycle of Exploration by: reducing downtime due to failed components; decreasing risk to crew by recovering quickly from degraded operation of equipment; improving system functionality with advanced geometry capabilities; and enhancing mission safety by reducing assembly part counts of original designs where possible. This paper addresses the fabrication infrastructures that support efficient, affordable, reliable infrastructures for both space exploration systems and logistics; these infrastructures allow sustained, affordable and highly effective operations on the Moon, Mars and beyond.

Howell, Joe T.↗

On-Site Fabrication Infrastructure to Enable Efficient Exploration and Utilization of Space

Unlike past one-at-a-time mission approaches, system-of-systems infrastructures will be needed to enable ambitious scenarios for sustainable future space exploration and utilization. So what do we do when we get to the moon for sustainable exploration. On-site fabrication infrastructure will be needed to support habitat structure development, tools and mechanical part fabrication, as well as repair and replacement of ground support and space mission hardware such as life support items, vehicle components and crew systems. The on-site fabrication infrastructure will need the In Situ Fabrication and Repair (ISFR) element, which is working in conjunction with the In Situ Resources Utilization (ISRU) element, to live off the land. The ISFR element has worked closely with the ISRU element in the past year to assess the ability of using lunar regolith as a viable feedstock for fabrication material. Preliminary work has shown promise and the ISFR Element will continue to concentrate on this activity. Fabrication capabilities have been furthered with the process certification effort that, when completed, will allow for space-qualified hardware to be manufactured. Materials being investigated include titanium and aluminum alloys as well as lunar regolith simulants with binders. This paper addresses the latest advancements made in the fabrication of infrastructures that support efficient, affordable, reliable infrastructures for both space exploration systems and logistics; infrastructures that allow sustained, affordable and highly effective operations on the Moon and beyond.

Howell, Joe T.↗

Building safeguards infrastructure

Much has been written in recent years about the nuclear renaissance - the rebirth of nuclear power as a clean and safe source of electricity around the world. Those who question the nuclear renaissance often cite the risk of proliferation, accidents or an attack on a facility as concerns, all of which merit serious consideration. The integration of these three areas - sometimes referred to as 3S, for safety, security and safeguards - is essential to supporting the growth of nuclear power, and the infrastructure that supports them should be strengthened. The focus of this paper will be on the role safeguards plays in the 3S concept and how to support the development of the infrastructure necessary to support safeguards. The objective of this paper has been to provide a working definition of safeguards infrastructure, and to discuss xamples of how building safeguards infrastructure is presented in several models. The guidelines outlined in the milestones document provide a clear path for establishing both the safeguards and the related infrastructures needed to support the development of nuclear power. The model employed by the INSEP program of engaging with partner states on safeguards-related topics that are of current interest to the level of nuclear development in that state provides another way of approaching the concept of building safeguards infrastructure. The Next Generation Safeguards Initiative is yet another approach that underscored five principal areas for growth, and the United States commitment to working with partners to promote this growth both at home and abroad.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Assessing Current and Future Infrastructure Hazards

Project Objective Execute intelligent analytics via an advanced analytical framework, to assess the current state of offshore infrastructure, evaluate infrastructure life, and identify technologies to reduce infrastructure hazards, costs, and extend infrastructure life. Approach &amp; Results thus Far• Build comprehensive dataset• Perform data-driven analytics to evaluate infrastructure integrity<p> 1. Remaining lifespan</p><p> 2. Likelihood of future risk</p><p>• Apply data-driven advanced spatial, statistical, and Machine Learning (ML) models to quantify existing infrastructure integrity</p><p>• Release data and models through a smart, online platform hosted by Energy Data eXchange (EDX)</p>

Romeo, Lucy F.↗

Critical Infrastructure Classification via CNN-based Modeling and Image Analysis

With recent advances in the fields of satellite imagery and machine learning we now have the ability to develop explainable deep learning models that enhance critical infrastructure analysis. Funded through Idaho National Laboratory’s (INL) Laboratory Directed Research and Development (LDRD) office we are in the process of developing a deep learning model capable of identifying critical infrastructure facilities and embedded features within those facilities. Utilizing current limit of practice techniques in the machine learning areas of explainability and transfer learning our model, once complete, will have the capacity to be used on multiple different imagery data sets and produce results that not only classify critical infrastructure facilities, but also explain why a critical infrastructure facility was classified as a certain type of facility. These advancements eliminate the ‘black box’ approach deep learning models have had in the past, where a user will have to trust the conclusion of a model without understanding what reasoning when into the model’s classification process. They also expand a model’s usefulness, traditionally a deep learning model will have to use the same data set it was originally trained on. Given the long training times of deep learning models this is impractical in a number of scenarios. By utilizing transfer learning advancements, we are eliminating the need to train our model on the same data set it is then run on to classify critical infrastructure facilities. We are also enabling the analysis and classification of data sets that are potentially too small to be divided into a training and testing data set. Once completed this model can provide a foundation to enhanced critical infrastructure analysis, dependency analysis, and potential disaster relief efforts.

97 MATHEMATICS AND COMPUTING↗

Infrastructure development assistance modeling for nuclear power plant

The purpose of this paper is to develop a model, a general frame to be utilized in assisting newcomer countries to start a nuclear power program. A nuclear power plant project involves technical complexity and high level of investment with long duration. Considering newcomers are mostly developing countries that lack the national infrastructure, key infrastructure issues may constitute the principal constraints to the development of a nuclear power program. In this regard, it is important to provide guidance and support to set up an appropriate infrastructure when we help them with the first launch of nuclear power plant project. To date, as a sole nuclear power generation company, KHNP has been invited many times to mentor or assist newcomer countries for their successful start of a nuclear power program since Republic of Korea is an exemplary case of a developing country which began nuclear power program from scratch and became a major world nuclear energy country in a short period of time. Through hosting events organized to aid newcomer countries' initiation of nuclear power projects, difficulties have been recognized. Each event had different contents according to circumstances because they were held as an unstructured and one-off thing. By developing a general model, we can give more adequate and effective aid in an efficient way. In this paper, we created a model to identify necessary infrastructures at the right stage, which was mainly based on a case of Korea. Taking into account the assistance we received from foreign companies and our own efforts for technological self-reliance, we have developed a general time table and specified activities required to do at each stage. From a donor's perspective, we explored various ways to help nuclear infrastructure development including technical support programs, training courses, and participating in IAEA technical cooperation programs on a regular basis. If we further develop the model, the next task would be to make the model more sophisticated as a 'semi-tailored model' so that it can be applied to a certain country reflecting its unique conditions. In accordance with its degree of established infrastructure, we can adjust or modify the model. Despite lots of benefits of using this model, there remain limitations such as time and budget constraints. These problems, however, can be addressed by cooperating with international organization such as the IAEA and other companies that share the same goal of helping newcomer countries introduce nuclear power. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Offshore Advanced Infrastructure Integrity Model (AIIM) Dashboard

The Advanced Infrastructure Integrity Model (AIIM) is a multivariate, multi-machine learning modeling technology applied to evaluate the integrity of offshore energy infrastructure (e.g., pipelines, platforms) in the U.S Gulf Region. Offshore energy infrastructure plays an essential role in ensuring access to safe and secure energy for the United States. According to the U.S. Energy Information Administration (EIA), production in the U.S. Gulf Region accounts for 15% of total crude and 5% of total natural gas from the United States. Many of these structures have been operating for close to or past their design life, while others have the chance of attrition before return on investment. To better understand the potential for reuse or life extension opportunities, an assessment of the infrastructure integrity is critical to inform safe decision making. Assessing structural integrity, AIIM provides key insights that inform infrastructure use and reuse, as well as hazard prevention planning, in support of stakeholders including researchers and industry.

Advanced Infrastructure Integrity Model↗

Scenario Evaluation and Regionalization Analysis (SERA) Model: Demand Side and Refueling Infrastructure Buildout

The National Renewable Energy Laboratory's Scenario Evaluation and Regionalization Analysis (SERA) model estimates the number, size, and locations of hydrogen refueling stations that satisfy the fuel demand from fuel cell electric vehicles (FCEVs) and the hydrogen supply requirements to meet such a demand in terms of hydrogen production plants and delivery infrastructure. SERA simulates the systemwide cost-optimal evolution of hydrogen refueling infrastructure, providing insights that reduce the informational and financial risks associated with infrastructure investment decisions and helping accelerate the adoption of FCEVs. This report describes the SERA model's demand-side and refueling infrastructure buildout algorithms, and it also illustrates use of the model for simulating hydrogen refueling stations deployment scenarios using as an example the recent H2USA national hydrogen infrastructure report.

30 DIRECT ENERGY CONVERSION↗

Fast Charging Infrastructure for Electrifying Road Trips to and from National Parks in the Western United States

National parks in the Western United States draw over 80 million visitors every year, and most visitors rely on personal cars for their road trips (or long-distance travels). Travel to national parks represents distinct travel demand, as they are typically located in remote areas necessitating long-distance trips. This study investigates the quantity and locations of on-route fast charging infrastructure needed by 2030 to enable seamless travel to/from national parks using electric vehicles in seven target states in the region, employing unprecedented high-resolution spatial and temporal analysis. We find that the required number of fast charging ports for on-route charging infrastructure ranges from 1,200 to 22,000, depending on different assumptions of key input parameters - vehicle electrification rate, charging behavior, average gap between charging stations, port utilization rate, and towing trailers. Our analysis also indicates that electrical load for on-route fast charging infrastructure would peak in the afternoon, in the range of 70-400 MW, varying with the key input parameters. This study illustrates how different input parameters result in different degrees of impact on various aspects of charging infrastructure. We also examine the characteristics of projected charging infrastructure in terms of land use type, relationship with traffic volume, size of stations, and other variables.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Robotics for Energy Infrastructure Construction on Earth and Beyond: Pilot Study Exploring Level 3-4 Semi-Autonomous Installation of a Reduced-Scale Photovoltaic Power Plant Prototype: Preprint

There is a growing need to build energy infrastructure at massive scale on both Earth and in space. On Earth, increasing electricity demand from applications such as AI data centers is driving rapid expansion of power systems, while in space, long-duration missions such as lunar operations require reliable and resilient energy infrastructure that can be deployed quickly. These needs outpace the capabilities of conventional construction methods. Robotic construction offers a path to faster, lower-cost, and more consistent deployment, yet most existing approaches focus on automating individual tasks rather than end-to-end assembly. The Industrialized Construction Innovation (ICI) team at the National Laboratory of the Rockies (NLR), in collaboration with the Colorado School of Mines, has been investigating robotics and automation strategies for rapid end-to-end energy infrastructure construction. This paper presents a pilot study demonstrating level 3-4 semi-autonomous, end-to-end robotic assembly of a reduced-scale photovoltaic power plant prototype under terrestrial conditions. The approach combines hardware redesign of photovoltaic components for robotic compatibility, discrete-event and physics-based robotic simulations in synthetic environments, and sim-to-real deployment to execute end-to-end robotic assembly of[NM1.1][NM1.2] tracking components, structural members, photovoltaic modules, and embedded electrical connections. The pilot identifies key limitations like tolerance management, perception and localization, end effector capability, fastening methods, and multi-physics simulation fidelity, that must be addressed to enable end-to-end robotic assembly of full-scale energy infrastructure. The study highlights how these insights inform scaling strategies for terrestrial energy infrastructure and adaptation to unstructured and extreme environments, including off-world scenarios such as robotic assembly of vertical tall lunar towers.

14 SOLAR ENERGY↗

Integrated U.S. nationwide corridor charging infrastructure planning for mass electrification of inter-city trips

This study introduces an integrated modeling framework to evaluate long-term national corridor charging infrastructure requirements in the United States to support the growing inter-city charging demand with the rapid growth in the battery electric vehicle (BEV) market. The core model is an optimization model that considers spatial and temporal dimensions and models heterogeneous behaviors between travelers. The model also introduces the travelers’ inconvenience cost function by linking travelers’ acceptance of the charging infrastructure with exogenous technology and social factors. The inconvenience cost function simulates mode choice between BEVs and alternative modes by heterogenous travelers. We applied the framework to assess the inter-regional charging infrastructure requirements for the entire U.S. mainland interstate highway network. We evaluated impacts on the infrastructure design and its public acceptance with changes in policy, technology, and demographic characteristics, and we also quantified the importance of modeling full-scale inter-regional charging infrastructure requirements compared to the conventional regional level analyses.

24 POWER TRANSMISSION AND DISTRIBUTION↗

How to support EV adoption: Tradeoffs between charging infrastructure investments and vehicle subsidies in California

Supporting the adoption of zero-emission vehicle (ZEVs), including plug-in electric vehicles (EVs), has become a priority for governments due to their ability to reduce petroleum demand, improve air quality, and reduce carbon dioxide (CO2) emissions. Optimal strategies to accelerate EV adoption must weigh the relative value of alternative policy mechanisms to consumers, including public charging infrastructure and vehicle purchase subsidies. We use a historically validated light-duty vehicle consumer choice tool, the ADOPT model, to simulate personal light-duty vehicle adoption and related emissions in California. ADOPT is updated to incorporate a quantification of the tangible value of public charging infrastructure, allowing us to simulate the impact of investments in public charging infrastructure and vehicle purchase subsidies under different scenarios. We show that both policies result in increased EV adoption, with the most effective policy varying depending on vehicle technology assumptions. Under conservative technology improvement assumptions, infrastructure investments are most effective in promoting EV sales and reducing CO2 emissions, while under optimistic technology improvement assumptions a combination of infrastructure and subsidies best supports EV sales and CO2 emission reductions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗