Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “forecast scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Simulations of the monthly mean atmosphere for February 1976 with the GISS model

Three monthly mean simulations of the global atmosphere were computed for February 1976 with the GISS model from observed initial conditions on the first day of the month. In a replication experiment, two of these computations generated slightly different monthly mean states, apparently due to the schedule of interruptions on the computer. The root-mean-square errors of replication over the Northern Hemisphere were found to be about 2 mb, 20 m and 1 K for sea level pressure, 500 mb height and 850 mb temperature, respectively. The monthly mean 500 mb forecast results for February 1976 over the Northern Hemisphere are consistent with those from earlier GISS model experiments and again indicate some predictive skill at that level. Use of the observed monthly mean sea surface temperature (SST) field for February 1976 in place of the climatological SST field for February resulted in slightly improved simulations over the globe and Northern Hemisphere,

Spar, J.↗

A measurement system for large, complex software programs

This paper describes measurement systems required to forecast, measure, and control activities for large, complex software development and support programs. Initial software cost and quality analysis provides the foundation for meaningful management decisions as a project evolves. In modeling the cost and quality of software systems, the relationship between the functionality, quality, cost, and schedule of the product must be considered. This explicit relationship is dictated by the criticality of the software being developed. This balance between cost and quality is a viable software engineering trade-off throughout the life cycle. Therefore, the ability to accurately estimate the cost and quality of software systems is essential to providing reliable software on time and within budget. Software cost models relate the product error rate to the percent of the project labor that is required for independent verification and validation. The criticality of the software determines which cost model is used to estimate the labor required to develop the software. Software quality models yield an expected error discovery rate based on the software size, criticality, software development environment, and the level of competence of the project and developers with respect to the processes being employed.

Rone, Kyle Y.↗

Delta XTE Press Briefing

Live coverage of the pre-launch Delta X-Ray Timing Explorer (XTE) press briefing is presented. George Diller, NASA Public Affairs, introduces the panel. The panel consists of Floyd Curington, NASA Launch Manager, Kennedy Space Center; David Mitchell, Launch Vehicle Manager, NASA Goddard Space Flight Center; Dale Schulz, Mission Director, XTE Project Manager Goddard Space Flight Center; Dr. Hale Bradt, XTE Principle Investigator, Massachusetts Institute of Technology (MIT); and Joel Tumbiolo, Launch Weather Officer, Department of the Air Force. The launch of the Delta XTE spacecraft atop the Delta 230 expendable launch vehicle is discussed. Once lofted into orbit, the XTE spacecraft will embark on a two-year mission to carry out an in-depth study of x-ray sources in the universe. Floyd Curington gives the lift-off schedule, fueling, and countdown of the spacecraft. David Mitchell discusses the launch sequence and spacecraft separation. Dale Schulz presents viewcharts of the instrument side of the XTE. Dr. Hale will be studying compact stars such as light dwarfs, neutron stars and quasars. Joel Tumbiolo presents the weather forecast for the December 10, 1995 launch. The press briefing ends with a question and answer period.

Source record↗

STOCHASTIC OPTIMAL POWER FLOW FOR REAL-TIME MANAGEMENT OF DISTRIBUTED RENEWABLE GENERATION AND DEMAND RESPONSE (Final Report)

To meet the grand challenge of a sustainable energy future, there has been a surge of interest in renewable energy. Today, the uncertainty associated with renewable resources is handled by using operating reserves. The high penetration of renewable resources, however, introduces difficult-to-control dynamics and challenges for power system operation. Decision support tools are necessary at the bulk system operational level to recognize and efficiently utilize renewable resources and distributed demand response products in concert with traditional grid resources. It is envisaged that responsive load can potentially have very significant cost advantages over either spinning or non-spinning ramping reserve. Critical decisions are made during hour(s)-ahead and real-time power system operation regarding the commitment and dispatch of generators to ensure power delivery is both reliable and economic. These decisions are typically made by a security constrained optimal flow, which determines future generator commitments, dispatches, and ensures adequate reserves are available in the event of a contingency (unexpected outage) or if future system conditions deviate from forecasts. However, security has been always based on a pre-specified subset of contingency constraints whose enforcement does not guarantee security under all possible future possibilities while also giving little or no weight to the likelihood of each contingent event or the severity of its consequences. Existing tools, which are based exclusively on deterministic optimization models, do not yield optimal operational decisions to address these new challenges, in terms of both reliability and cost-effectiveness. This project has focused on developing a stochastic optimal power flow (SOPF) framework, which integrates renewable resource uncertainty, load uncertainty, distributed storage (DS), demand response (DR) products, in a holistic manner to address the uncertainty associated with ever-increasing renewable resources, along with the inclusion of distributed demand response products in future power systems. A proof-of-concept problem was created using the Pennsylvania-Jersey-Maryland (PJM) power system network. Synthetic wind generation was added to the system to simulate 50% wind penetration. A 1-hour test of SOPF operation indicated more than 6% operational cost savings. The project continued by adding the Midwestern Independent System Operator (MISO) as a partner, with focus shifting from SOPF to Stochastic Look-Ahead Unit Commitment (SLAC). Unlike PJM, MISO is faced with significant renewable energy resources within its footprint and is challenged with substantial uncertainty in its operations. The SLAC distinguishes itself from existing tools that operators use. At best, today’s tools solve two to three cases independently, where one or two system parameters, such as forecasted load level (e.g., a low, base, and high forecast), are varied and the resulting scenarios are analyzed independently. The stochastic-based optimization of SLAC leverages statistical information from an ensemble of potential operational scenarios and their respective likelihood. The SLAC output can be translated into valuable information to the operator such as suggested commitments, optimal scheduling and dispatch of resources, reserve requirements at both locational and zonal resolutions, ramping availability and requirements, availability of demand response including operational guidance concerning the near-term and real-time coordination between distributed energy resources, and utilization of distributed storage resources. The developed SOPF/SLAC tool, a stand-alone tool compatible with existing EMSs, will provide system operators with unprecedented visibility, flexibility and predictability to these resources and operational guidance concerning the real-time coordination between DERs and DR/DS products. The game changing and practical impact of this disruptive technology will be dramatic and will usher in a new era in the electric power industry, wherein green energy concepts are fully embraced, and electric power costs are lowered throughout the nation.

42 ENGINEERING↗

Simulations of the monthly mean atmosphere for February 1976 with the GISS model

Monthly mean simulations of the global atmosphere were computed for February 1976 with the GISS model from observed initial conditions. In a replication experiment, two of these computations generated slightly different monthly mean states, apparently due to the schedule of interruptions on the computer. The root-mean-square errors of replication over the Northern Hemisphere were found to be about 2 mb, 20 m, and 1 K for sea-level pressure, 500 mb height, and 850 mb temperature, respectively. The monthly mean 500 mb forecast results for February 1976 over the Northern Hemisphere were consistent with those from earlier GISS model experiments.

Spar, J.↗

Required Time of Arrival as a Control Mechanism to Mitigate Uncertainty in Arrival Traffic Demand Management

The objective of this study is to explore the use of Required Time of Arrival (RTA) capability on the flight deck as a control mechanism on arrival traffic management to improve traffic delivery accuracy by mitigating the effect of traffic demand uncertainty. The uncertainties are caused by various factors, such as departure error due to the difference between scheduled departure and the actual take-off time. A simulation study was conducted using the Multi Aircraft Control System (MACS) software, a comprehensive research platform developed in the Airspace Operations Laboratory (AOL) at NASA Ames Research Center. The Crossing Time (CT) performance (i.e. the difference between target crossing time and actual crossing time) of the RTA for uncertainty mitigation during cruise phase was evaluated under the influence of varying two main factors: wind severity (heavy wind vs. mild wind), and wind error (1 hour, 2 hours, and 5 hours wind forecast errors). To examine the CT performance improvement made by the RTA, the comparison to the CT of the aircraft that were not assigned with RTA (Non-RTA) under the influence of the selected factors was also made. The Newark Liberty International Airport (EWR) was chosen for this study. A total 66 inbound traffic to the EWR (34 of them were airborne when the simulation was initiated, 32 were pre-departures at that time) was simulated, where the pre-scripted departure error was assigned to each pre-departure (61 conform to their Expected Departure Clearance Time, which is +-300 seconds of their scheduled departure time). The results of the study show that the delivery accuracy improvement can be achieved by assigning RTA, regardless of the influence of the selected two factors (the wind severity and the wind information inaccuracy). Across all wind variances, 66.9 (265 out of 396) of the CT performance of the RTA assigned aircraft was within +- 60 seconds (i.e. target tolerance range) and 88.9 (352 out of 396) aircraft met +-300 seconds marginal tolerance range, while only 33.6 (133 out of 396) of the Non-RTA assigned aircrafts CT performance achieved the target tolerance range and 75.5 (299 out of 396) stayed within the marginal. Examination of the impact of different error sources i.e. departure error, wind severity, and wind error suggest that although large departure errors can significantly impact the CT performance, the impacts of wind severity and errors were modest relative the targeted +- 60 second conformance range.

required time of arrival (RTA)↗

Calculation of Flight Deck Interval Management Assigned Spacing Goals Subject to Multiple Scheduling Constraints

The Federal Aviation Administration's Next Generation Air Transportation System will combine advanced air traffic management technologies, performance-based procedures, and state-of-the-art avionics to maintain efficient operations throughout the entire arrival phase of flight. Flight deck Interval Management (FIM) operations are expected to use sophisticated airborne spacing capabilities to meet precise in-trail spacing from top-of-descent to touchdown. Recent human-in-the-loop simulations by the National Aeronautics and Space Administration have found that selection of the assigned spacing goal using the runway schedule can lead to premature interruptions of the FIM operation during periods of high traffic demand. This study compares three methods for calculating the assigned spacing goal for a FIM operation that is also subject to time-based metering constraints. The particular paradigms investigated include: one based upon the desired runway spacing interval, one based upon the desired meter fix spacing interval, and a composite method that combines both intervals. These three paradigms are evaluated for the primary arrival procedures to Phoenix Sky Harbor International Airport using the entire set of Rapid Update Cycle wind forecasts from 2011. For typical meter fix and runway spacing intervals, the runway- and meter fix-based paradigms exhibit moderate FIM interruption rates due to their inability to consider multiple metering constraints. The addition of larger separation buffers decreases the FIM interruption rate but also significantly reduces the achievable runway throughput. The composite paradigm causes no FIM interruptions, and maintains higher runway throughput more often than the other paradigms. A key implication of the results with respect to time-based metering is that FIM operations using a single assigned spacing goal will not allow reduction of the arrival schedule's excess spacing buffer. Alternative solutions for conducting the FIM operation in a manner more compatible with the arrival schedule are discussed in detail.

ATD-1↗

Stochastic Analysis for Long Term Capital Structures, Systems, and Components Refurbishment and Replacement

As commercial Nuclear Power Plants (NPPs) pursue extended plant operation in the form of Second License Renewal (SLR), opportunities exist for these plants to provide capital investments to ensure long-term safe and economic performance. At the current time, several utilities have announced an intention to pursue extended operation for one or more of their NPPs via SLR . The goal of this research is to develop a risk-informed approach to evaluate and prioritize plant capital investments made in preparation for, and during the period of, extended plant operations to support decisions for NPP operations. Since the capital investments are influenced by various factors, such as markets, safety and regulatory, the decision-making process of NPP operations should take into account relevant factors for balancing risks, costs and profits. The traditional method of capital budgeting is based on the priority list of candidate projects using economic measures such as benefit-investment ratio, net present value (NPV) and internal rate of return. In the literatures, the problem of capital budgeting or the variant can be represented by an appropriate knapsack problem. The knapsack approach to capital budgeting takes as input as investment, along with the cost and profit of each project. The objective of capital budgeting is to find the combination of the binary decisions for every investment such that the overall profit is as large as possible. The output is a collection of projects to be carried out, and we refer this selected collection of projects as a project portfolio. One limitation of traditional optimization models for capital budgeting is that they do not account for risk/uncertainty in profit and cost streams associated with individual projects, they do not account for risk in resource availability in future years [1,2,3]. Projects can incur cost over-runs, especially when projects are large, performed infrequently, and when there is risk regarding technical viability, external contractors, and/or suppliers of requisite parts and materials. Occasionally, projects are performed ahead of schedule and with cost savings. Planned budgets for capital improvements can be cut and key personnel may be lost. Or, there may be surprise windfalls in budgets for maintenance activities due to decreased costs for “unplanned” maintenance. In these cases, how should we resolve capital budgeting when we have risk forecasts for costs, profits and budgets? One approach we proposed in this summary is to re-solve the optimization models based on assumed statistical distributions of given parameters. If these distributions were not available, a two-stage stochastic optimization approach can be used to provide priority lists to decision-makers to support better risk-informed decisions [4, 5]. In this summary, we will only focus on the first approach.

42 ENGINEERING↗

Future Air Traffic Growth and Schedule Model User's Guide

The Future Air Traffic Growth and Schedule Model was developed as an implementation of the Fratar algorithm to project future traffic flow between airports in a system and of then scheduling the additional flights to reflect current passenger time-of-travel preferences. The methodology produces an unconstrained future schedule from a current (or baseline) schedule and the airport operations growth rates. As an example of the use of the model, future schedules are projected for 2010 and 2022 for all flights arriving at, departing from, or flying between all continental United States airports that had commercial scheduled service for May 17, 2002. Inter-continental US traffic and airports are included and the traffic is also grown with the Fratar methodology to account for their arrivals and departures to the continental US airports. Input data sets derived from the Official Airline Guide (OAG) data and FAA Terminal Area Forecast (TAF) are included in the examples of the computer code execution.

Kimmel, William M.↗

Future Air Traffic Growth and Schedule Model, Supplement

The Future Air Traffic Growth and Schedule Model was developed as an implementation of the Fratar algorithm to project future traffic flow between airports in a system and of then scheduling the additional flights to reflect current passenger time-of-travel preferences. The methodology produces an unconstrained future schedule from a current (or baseline) schedule and the airport operations growth rates. As an example of the use of the model, future schedules are projected for 2010 and 2022 for all flights arriving at, departing from, or flying between all continental United States airports that had commercial scheduled service for May 17, 2002. Inter-continental US traffic and airports are included and the traffic is also grown with the Fratar methodology to account for their arrivals and departures to the continental US airports. Input data sets derived from the Official Airline Guide (OAG) data and FAA Terminal Area Forecast (TAF) are included in the examples of the computer code execution.

Kimmel, William M.↗

TPSAS-NF1676L-12441-DND

The increasing presence of airport surface surveillance technologies has spawned a strong interest in airport surface traffic management research; the vast majority has assumed that the airport’s runway configuration is known and constant. Tactical Runway Configuration Management (TRCM), one component of NASA’s System Oriented Runway Management concept, plans the airport configuration to optimize traffic efficiency for the forecast weather, traffic, and other factors. While planning runway configuration can provide benefit and is required by other automation concepts, larger benefits are possible by planning other airport configuration decisions, such as runway assignment policies, that are currently made manually by controllers. A laboratory prototype of the TRCM algorithm which selects optimal airport configuration schedules has been implemented and studied within a simulation environment. The presentation will describe simulation results for several airports, under various weather and traffic conditions. The sequence of airport configurations recommended by TRCM result in significantly less delay than the airport configurations that were actually used by controllers, illustrating both the potential benefit from airport configuration optimization and the ability of TRCM to provide effective airport configuration schedules. The application to several, distinct airports demonstrates the approach is capable of handling the differences between airports with a common algorithm, while providing decision support that respects the current procedures at those airports. Consequently, TRCM is able to be deployed to any airport within the current National Airspace System. The TRCM algorithmic approach is also extensible to future operational scenarios. NASA is in the process of transferring the initial TRCM technology to the FAA. Future research will extend the concept and algorithm to provide coordinated plans for metroplex airports and study NextGen applications.

Stephen Atkins↗

TPSAS-NF1676L-12263-DND

The increasing presence of airport surface surveillance technologies has spawned a strong interest in airport surface traffic management research; the vast majority has assumed that the airport’s runway configuration is known and constant. Tactical Runway Configuration Management (TRCM), one component of NASA’s System Oriented Runway Management concept, plans the airport configuration to optimize traffic efficiency for the forecast weather, traffic, and other factors. While planning runway configuration can provide benefit and is required by other automation concepts, larger benefits are possible by planning other airport configuration decisions, such as runway assignment policies, that are currently made manually by controllers. A laboratory prototype of the TRCM algorithm which selects optimal airport configuration schedules has been implemented and studied within a simulation environment. The presentation will describe simulation results for several airports, under various weather and traffic conditions. The sequence of airport configurations recommended by TRCM result in significantly less delay than the airport configurations that were actually used by controllers, illustrating both the potential benefit from airport configuration optimization and the ability of TRCM to provide effective airport configuration schedules. The application to several, distinct airports demonstrates the approach is capable of handling the differences between airports with a common algorithm, while providing decision support that respects the current procedures at those airports. Consequently, TRCM is able to be deployed to any airport within the current National Airspace System. The TRCM algorithmic approach is also extensible to future operational scenarios. NASA is in the process of transferring the initial TRCM technology to the FAA. Future research will extend the concept and algorithm to provide coordinated plans for metroplex airports and study NextGen applications.

Stephen Atkins↗

The Applied Meteorology Unit: Nineteen Years Successfully Transitioning Research into Operations for America's Space Program

The Applied Meteorology Unit (AMU) provides technology transition and technique development to improve operational weather support to the Space Shuttle and the entire American space program. The AMU is funded and managed by NASA and operated by a contractor that provides five meteorologists with a diverse mix of advanced degrees, operational experience, and associated skills including data processing, statistics, and the development of graphical user interfaces. The AMU's primary customers are the U.S. Air Force 45th Weather Squadron at Patrick Air Force Base, the National Weather Service Spaceflight Meteorology Group at NASA Johnson Space Center, and the National Weather Service Melbourne FL Forecast Office. The AMU has transitioned research into operations for nineteen years and worked on a wide range of topics, including new forecasting techniques for lightning probability, synoptic peak winds,.convective winds, and summer severe weather; satellite tools to predict anvil cloud trajectories and evaluate camera line of sight for Space Shuttle launch; optimized radar scan strategies; evaluated and implemented local numerical models; evaluated weather sensors; and many more. The AMU has completed 113 projects with 5 more scheduled to be completed by the end of 2010. During this rich history, the AMU and its customers have learned many lessons on how to effectively transition research into operations. Some of these lessons learned include collocating with the operational customer and periodically visiting geographically separated customers, operator submitted projects, consensus tasking process, use of operator primary advocates for each project, customer AMU liaisons with experience in both operations and research, flexibility in adapting the project plan based on lessons learned during the project, and incorporating training and other transition assistance into the project plans. Operator involvement has been critical to the AMU's remarkable success and many awards from NASA, the National Weather Association, and two citations from the Navy's Center of Excellence for Best Manufacturing Practices. This paper will present the AMU's proven methods and explain how they may be applied by other organizations to effectively transition research into operations.

Madura, John T.↗

Temperature Knowledge and Model Correlation for the Soil Moisture Active and Passive (SMAP) Reflector Mesh

NASA's Earth observing Soil Moisture Active & Passive (SMAP) Mission is scheduled to launch in November 2014 into a 685 km near-polar, sun synchronous orbit. SMAP will provide comprehensive global mapping measurements of soil moisture and freeze/thaw state in order to enhance understanding of the processes that link the water, energy, and carbon cycles. The primary objectives of SMAP are to improve worldwide weather and flood forecasting, enhance climate prediction, and refine drought and agriculture monitoring during its 3 year mission. The SMAP instrument architecture incorporates an L-band radar and an L-band radiometer which share a common feed horn and parabolic mesh reflector. The instrument rotates about the nadir axis at approximately 15 rpm, thereby providing a conically scanning wide swath antenna beam that is capable of achieving global coverage within 3 days. In order to make the necessary precise surface emission measurements from space, a temperature knowledge of 60 deg C for the mesh reflector is required. In order to show compliance, a thermal vacuum test was conducted using a portable solar simulator to illuminate a non flight, but flight-like test article through the quartz window of the vacuum chamber. The molybdenum wire of the antenna mesh is too fine to accommodate thermal sensors for direct temperature measurements. Instead, the mesh temperature was inferred from resistance measurements made during the test. The test article was rotated to five separate angles between 10 deg and 90 deg via chamber breaks to simulate the maximum expected on-orbit solar loading during the mission. The resistance measurements were converted to temperature via a resistance versus temperature calibration plot that was constructed from data collected in a separate calibration test. A simple thermal model of two different representations of the mesh (plate and torus) was created to correlate the mesh temperature predictions to within 60 deg C. The on-orbit mesh temperature will be predicted using the correlated analytical thermal model since direct measurements from in-situ flight thermal sensors are not possible.

Mikhaylov, Rebecca↗

Implementation of Active Thermal Control (ATC) for the Soil Moisture Active and Passive (SMAP) Radiometer

NASA's Earth Observing Soil Moisture Active and Passive (SMAP) Mission is scheduled to launch in November 2014 into a 685 kilometer near-polar, sun-synchronous orbit. SMAP will provide comprehensive global mapping measurements of soil moisture and freeze/thaw state in order to enhance understanding of the processes that link the water, energy, and carbon cycles. The primary objectives of SMAP are to improve worldwide weather and flood forecasting, enhance climate prediction, and refine drought and agriculture monitoring during its three year mission. The SMAP instrument architecture incorporates an L-band radar and an L-band radiometer which share a common feed horn and parabolic mesh reflector. The instrument rotates about the nadir axis at approximately 15 revolutions per minute, thereby providing a conically scanning wide swath antenna beam that is capable of achieving global coverage within three days. In order to make the necessary precise surface emission measurements from space, the electronics and hardware associated with the radiometer must meet tight short-term (instantaneous and orbital) and long-term (monthly and mission) thermal stabilities. Maintaining these tight thermal stabilities is quite challenging because the sensitive electronics are located on a fast spinning platform that can either be in full sunlight or total eclipse, thus exposing them to a highly transient environment. A passive design approach was first adopted early in the design cycle as a low-cost solution. With careful thermal design efforts to cocoon and protect all sensitive components, all stability requirements were met passively. Active thermal control (ATC) was later added after the instrument Preliminary Design Review (PDR) to mitigate the threat of undetected gain glitches, not for thermal-stability reasons. Gain glitches are common problems with radiometers during missions, and one simple way to avoid gain glitches is to use the in-flight set point programmability that ATC affords to operate the radiometer component away from the problematic temperature zone. A simple ThermXL model (10 nodes) was developed to exercise quick trade studies among various proposed control algorithms: Modified P control vs. PI control. The ThermXL results were then compared with the detailed Thermal Desktop (TD) model for corroboration. Once done, the simple ThermXL model was used to evaluate parameter effects such as temperature digitization, heater size and gain margin, time step, and voltage variation of power supply on the ATC performance. A Modified P control algorithm was implemented into the instrument flight electronics based on the ThermXL results. The thermal short-term stability margin decreased by 10 percent with ATC and a wide temperature error band (plus or minus 0.1 degrees Centigrade) compared to the original passive thermal design. However, a tighter temperature error band (plus or minus 0.1 degrees Centigrade) increased the thermal short-term stability margin by a factor of three over the passive thermal design. The current ATC design provides robust thermal control, tighter stability, and greater in-flight flexibility even though its implementation was prompted by non-thermal performance concerns.

Mikhaylov, Rebecca↗

(ODIN): An Open Source, Low-Latency Data Integration & Visualization Framework for the NASA System Wide Safety Project's Disaster Response Safety Demonstration Series

The Open Data Integration Framework (ODIN) is an open source, low latency data integration and visualization framework (https://github.com/NASARace/race-odin) developed under NASA’s System WideSafety Program to demonstrate new safety capabilities designed to improve US airspace operations. Safety demonstrations are a set of increasingly complex (from public safety perspective) disaster response scenarios under which air systems must operate with increased capacity and include: 1) Wildland fire response, 2) Hurricane relief and recovery, 4) Emergency medical delivery via UAS and 4) Urban disaster relief. To accommodate disaster response, ODIN is field deployable and can scale on one or more multi-core, commodity laptops operating with full to limited or intermittent internet connectivity, conditions likely encountered during operations. ODIN runs as webserver with local, persistent data storage to serve either public or a secured, ad hoc network (e.g., an incident command post). The current released ODIN, ODIN-Fire is tailored for wildland fire management incorporating information on satellite overpasses with links to the near real-time data and imagery from the respective agencies. Included are winds data, an important variable for emergency responders and airspace operations, and high-resolution wind forecasts generated by super-computing resources and ingested into ODIN. As an open-source project, ODIN has attracted interest from multiple entities. We will show how 1) a commercial field instrument and data provider uses ODIN to help users visualize, publish and integrate their in-situ sensor network data and 2) ODIN’s capabilities to ingest, integrate and display near-real time satellite data with air traffic and a USFS winds forecast model used in fire response and post-fire assessment. Within NASA ODIN demonstrated novel, near terminal airspace safety capabilities for a project close-out event and previously it monitored the national airspace in real-time to meet an agency milestone. ODIN is presently under development for the anticipated hurricane relief and response demonstration notionally scheduled for the 2025-27 time frame and is available from NASA's github at the above link.

Aeronautics↗

The Soil Moisture Active Passive (SMAP) Applications Activity

The Soil Moisture Active Passive (SMAP) mission is one of the first-tier satellite missions recommended by the U.S. National Research Council Committee on Earth Science and Applications from Space. The SMAP mission 1 is under development by NASA and is scheduled for launch late in 2014. The SMAP measurements will allow global and high-resolution mapping of soil moisture and its freeze/thaw state at resolutions from 3-40 km. These measurements will have high value for a wide range of environmental applications that underpin many weather-related decisions including drought and flood guidance, agricultural productivity estimation, weather forecasting, climate predictions, and human health risk. In 2007, NASA was tasked by The National Academies to ensure that emerging scientific knowledge is actively applied to obtain societal benefits by broadening community participation and improving means for use of information. SMAP is one of the first missions to come out of this new charge, and its Applications Plan forms the basis for ensuring its commitment to its users. The purpose of this paper is to outline the methods and approaches of the SMAP applications activity, which is designed to increase and sustain the interaction between users and scientists involved in mission development.

Brown, Molly E.↗

Detection of visible-wavelength aurora on Mars

Mars hosts various auroral processes despite the planet’s tenuous atmosphere and lack of a global magnetic field. To date, all aurora observations have been at ultraviolet wavelengths from orbit. We describe the discovery of green visible-wavelength aurora, originating from the atomic oxygen line at 557.7 nanometers, detected with the SuperCam and Mastcam-Z instruments on the Mars 2020 Perseverance rover. Near–real-time simulations of a Mars-directed coronal mass ejection (CME) provided sufficient lead-time to schedule an observation with the rover. The emission was observed 3 days after the CME eruption, suggesting that the aurora was induced by particles accelerated by the moving shock front. To our knowledge, detection of aurora from a planetary surface other than Earth has never been reported, nor has visible aurora been observed at Mars. This detection demonstrates that auroral forecasting at Mars is possible, and that during events with higher particle precipitation, or under less dusty atmospheric conditions, aurorae will be visible to future astronauts.

Science & Technology - Other Topics↗