Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “failure cause”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

URBAN-NET: A Network-based Infrastructure Monitoring and Analysis System for Emergency Management and Public Safety

Abstract Critical Infrastructures (CIs) such as energy, water, and transportation are complex networks that are crucial for sustaining day-to-day commodity flows vital to national security, economic stability, and public safety. The nature of these CIs is such that failures caused by an extreme weather event or a man-made incident can trigger widespread cascading failures, sending ripple effects at regional or even national scales. To minimize such effects, it is critical for emergency responders to identify existing or potential vulnerabilities within CIs during such stressor events in a systematic and quantifiable manner and take appropriate mitigating actions. We present here a novel critical infrastructure monitoring and analysis system named URBAN-NET. The system includes a software stack and tools for monitoring CIs, pre-processing data, interconnecting multiple CI datasets as a heterogeneous network, identifying vulnerabilities through graph-based topological analysis, and predicting consequences based on what-if simulations along with visualization. As a proof-of-concept, we present several case studies to show the capabilities of our system. We also discuss remaining challenges and future work.

Lee, Sangkeun↗

Predicting Cement-Sheath Integrity with Consideration of Initial State of Stress and Thermoporoelastic Effects

In conventional wellbore-integrity analysis, the cement sheath’s initial state of stress and transient thermoporoelastic effects are often neglected. However, the initial state of stress is prerequisite information for accurately predicting the safe operating conditions that prevent a cemented well from being damaged. In addition, transient thermoporoelastic effects can have a profound effect on when damage will occur. Here in this paper, we propose a model that includes these effects to predict the safe operating pressures and temperatures that will prevent cement-sheath failure. For the initial state of stress, we proposed an empirical model using measurements. Subsequent stress changes are evaluated by a fully coupled transient thermoporoelastic model to analyze the mechanical behavior of the cement sheath. We predict the safe operating envelope (SOE) for shear, tensile, and debonding cement-sheath failures caused by pressure and temperature perturbations after the cement sets. Our model predicts that pore pressure is a key factor for cement failure, especially for rapid temperature changes. If the formation is low permeability, the transient pore pressures are amplified, causing the risk of damage to increase. Compared with conventional thermoelastic models, the thermoporoelastic model predicts a smaller SOE when heating the internal casing fluid and a larger envelope when cooling the internal casing fluid. Finally, the heating rate was considered with respect to field applications. The heating rate was also considered, and slower heating/cooling rates can prevent damage to the cement sheath. Finally, the thermoporoelastic model was applied to explain several laboratory and field experiments and achieved good matches.

02 PETROLEUM↗

Scalable Energy Efficiency with Resilience for High Performance Computing Systems: A Quantitative Methodology

Energy efficiency and resilience are two crucial challenges for HPC systems to reach exascale. While energy efficiency and resilience issues have been extensively studied individually, little has been done to understand the interplay between energy efficiency and resilience for HPC systems. Decreasing the supply voltage associated with a given operating frequency for processors and other CMOS-based components can significantly reduce power consumption. However, this often raises system failure rates and consequently increases application execution time. In this work, we present an energy saving undervolting approach that leverages the mainstream resilience techniques to tolerate the increased failures caused by undervolting.

energy, resilience↗

Powering the Blue Economy Foundational Research & Development Topics Reliability for Marine Energy Power Systems

Ocean observing platforms are deployed across the world’s oceans to collect meteorological and oceanographic data. Current technology makes use of solar panels and battery banks to provide power to these platforms, which can be challenging at high latitudes due to lack of solar insolation and cold temperatures. Marine renewable energy (MRE) generation offers a potential improvement in consistent power generation throughout the year for this use on ocean observation buoys. This report analyzes existing reliability of high latitude coastal weather buoys and tsunami detection buoys to determine performance standards that MRE generation sources must meet to become viable power sources for these remote systems. Using measurements recorded from the U.S. National Data Buoy Center’s coastal weather buoys and tsunami detection buoys, the analysis calculated the historic data availability – or the percentage of time a measurement is recorded – to evaluate the reliability of ocean observation buoys. The results show that coastal weather buoys operate at 74% data availability and the tsunami detection systems operate at an average 72% data availability. The results describe the total reliability of the system, including many different types of failures not associated with the power system such as mooring failures or equipment failures caused by extreme weather. Power system outages may only account for a small portion of the system failures. Reliability is an important design criterion for the power system of ocean observation platforms. Future power systems that would be designed for these buoys, such as an MRE generator, need to have a minimum reliability of 72% and 74% to meet the overall performance of the weather buoys and tsunami buoys, respectively. However, power system reliability likely needs to be much higher than overall system reliability, so that power system outages do not negatively impact the overall performance of the buoy.

42 ENGINEERING↗

Methodology for Physics and Engineering of Reliable Products

Physics of failure approaches have gained wide spread acceptance within the electronic reliability community. These methodologies involve identifying root cause failure mechanisms, developing associated models, and utilizing these models to inprove time to market, lower development and build costs and higher reliability. The methodology outlined herein sets forth a process, based on integration of both physics and engineering principles, for achieving the same goals.

failure analysis electronics reliability PACT (pre↗

Independent Orbiter Assessment (IOA): Analysis of the purge, vent and drain subsystem

The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA approach features a top-down analysis of the hardware to determine failure modes, criticality, and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. This report documents the independent analysis results corresponding to the Orbiter PV and D (Purge, Vent and Drain) Subsystem hardware. The PV and D Subsystem controls the environment of unpressurized compartments and window cavities, senses hazardous gases, and purges Orbiter/ET Disconnect. The subsystem is divided into six systems: Purge System (controls the environment of unpressurized structural compartments); Vent System (controls the pressure of unpressurized compartments); Drain System (removes water from unpressurized compartments); Hazardous Gas Detection System (HGDS) (monitors hazardous gas concentrations); Window Cavity Conditioning System (WCCS) (maintains clear windows and provides pressure control of the window cavities); and External Tank/Orbiter Disconnect Purge System (prevents cryo-pumping/icing of disconnect hardware). Each level of hardware was evaluated and analyzed for possible failure modes and effects. Criticality was assigned based upon the severity of the effect for each failure mode. Four of the sixty-two failure modes analyzed were determined as single failures which could result in the loss of crew or vehicle. A possible loss of mission could result if any of twelve single failures occurred. Two of the criticality 1/1 failures are in the Window Cavity Conditioning System (WCCS) outer window cavity, where leakage and/or restricted flow will cause failure to depressurize/repressurize the window cavity. Two criticality 1/1 failures represent leakage and/or restricted flow in the Orbiter/ET disconnect purge network which prevent cryopumping/icing of disconnect hardware. Each level of hardware was evaluated and analyzed for possible failure modes and effects. Criticality was assigned based upon the severity of the effect for each failure mode.

Bynum, M. C., III↗

Weld Repair of a Stamped Pressure Vessel in a Radiologically Controlled Zone

In September 2012 an ASME B&PVC Section VIII stamped pressure vessel located at the DOE Hanford Site Effluent Treatment Facility (ETF) developed a through-wall leak. The vessel, a steam/brine heat exchanger, operated in a radiologically controlled zone (by the CH2MHill PRC or CHPRC), had been in service for approximately 17 years. The heat exchanger is part of a single train evaporator process and its failure caused the entire system to be shut down, significantly impacting facility operations. This paper describes the activities associated with failure characterization, technical decision making/planning for repair by welding, logistical challenges associated with performing work in a radiologically controlled zone, performing the repair, and administrative considerations related to ASME code requirements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rock failure analysis by combined thermal weakening and water jet impact

The influence of preheating on the initiation of fracture in rocks subjected to the impingement of a continuous water jet is studied. Preheating the rock is assumed to degrade its mechanical properties and strength in accordance with existing experimental data. The water jet is assumed to place a quasi-static loading on the surface of the rock. The loading is approximated by elementary functions which permit analytic computation of the induced stresses in a rock half-space. The resulting stresses are subsequently coupled with the Griffith criteria for tensile failure to estimate the change, due to heating, in the critical stagnation pressure and velocity of the water jet required to cause failure in the rock.

Nayfeh, A. H.↗

Progressive Failure Analysis Methodology for Laminated Composite Structures

A progressive failure analysis method has been developed for predicting the failure of laminated composite structures under geometrically nonlinear deformations. The progressive failure analysis uses C(exp 1) shell elements based on classical lamination theory to calculate the in-plane stresses. Several failure criteria, including the maximum strain criterion, Hashin's criterion, and Christensen's criterion, are used to predict the failure mechanisms and several options are available to degrade the material properties after failures. The progressive failure analysis method is implemented in the COMET finite element analysis code and can predict the damage and response of laminated composite structures from initial loading to final failure. The different failure criteria and material degradation methods are compared and assessed by performing analyses of several laminated composite structures. Results from the progressive failure method indicate good correlation with the existing test data except in structural applications where interlaminar stresses are important which may cause failure mechanisms such as debonding or delaminations.

Sleight, David W.↗

Reliability Growth in Space Life Support Systems

A hardware system's failure rate often increases over time due to wear and aging, but not always. Some systems instead show reliability growth, a decreasing failure rate with time, due to effective failure analysis and remedial hardware upgrades. Reliability grows when failure causes are removed by improved design. A mathematical reliability growth model allows the reliability growth rate to be computed from the failure data. The space shuttle was extensively maintained, refurbished, and upgraded after each flight and it experienced significant reliability growth during its operational life. In contrast, the International Space Station (ISS) is much more difficult to maintain and upgrade and its failure rate has been constant over time. The ISS Carbon Dioxide Removal Assembly (CDRA) reliability has slightly decreased. Failures on ISS and with the ISS CDRA continue to be a challenge.

life support↗

Practical Application of PRA as an Integrated Design Tool for Space Systems

This paper presents the application of the first comprehensive Probabilistic Risk Assessment (PRA) during the design phase of a joint NASA/NOAA weather satellite program, Geostationary Operational Environmental Satellite Series R (GOES-R). GOES-R is the next generation weather satellite primarily to help understand the weather and help save human lives. PRA has been used at NASA for Human Space Flight for many years. PRA was initially adopted and implemented in the operational phase of manned space flight programs and more recently for the next generation human space systems. Since its first use at NASA, PRA has become recognized throughout the Agency as a method of assessing complex mission risks as part of an overall approach to assuring safety and mission success throughout project lifecycles. PRA is now included as a requirement during the design phase of both NASA next generation manned space vehicles as well as for high priority robotic missions. The influence of PRA on GOES-R design and operation concepts are discussed in detail. The GOES-R PRA is unique at NASA for its early implementation. It also represents a pioneering effort to integrate risks from both Spacecraft (SC) and Ground Segment (GS) to fully assess the probability of achieving mission objectives. PRA analysts were actively involved in system engineering and design engineering to ensure that a comprehensive set of technical risks were correctly identified and properly understood from a design and operations perspective. The analysis included an assessment of SC hardware and software, SC fault management system, GS hardware and software, common cause failures, human error, natural hazards, solar weather and infrastructure (such as network and telecommunications failures, fire). PRA findings directly resulted in design changes to reduce SC risk from micro-meteoroids. PRA results also led to design changes in several SC subsystems, e.g. propulsion, guidance, navigation and control (GNC), communications, mechanisms, and command and data handling (C&DH). The fault tree approach assisted in the development of the fault management system design. Human error analysis, which examined human response to failure, indicated areas where automation could reduce the overall probability of gaps in operation by half. In addition, the PRA brought to light many potential root causes of system disruptions, including earthquakes, inclement weather, solar storms, blackouts and other extreme conditions not considered in the typical reliability and availability analyses. Ultimately the PRA served to identify potential failures that, when mitigated, resulted in a more robust design, as well as to influence the program's concept of operations. The early and active integration of PRA with system and design engineering provided a well-managed approach for risk assessment that increased reliability and availability, optimized lifecyc1e costs, and unified the SC and GS developments.

Kalia, Prince↗

Heroic Reliability Improvement in Manned Space Systems

System reliability can be significantly improved by a strong continued effort to identify and remove all the causes of actual failures. Newly designed systems often have unexpected high failure rates which can be reduced by successive design improvements until the final operational system has an acceptable failure rate. There are many causes of failures and many ways to remove them. New systems may have poor specifications, design errors, or mistaken operations concepts. Correcting unexpected problems as they occur can produce large early gains in reliability. Improved technology in materials, components, and design approaches can increase reliability. The reliability growth is achieved by repeatedly operating the system until it fails, identifying the failure cause, and fixing the problem. The failure rate reduction that can be obtained depends on the number and the failure rates of the correctable failures. Under the strong assumption that the failure causes can be removed, the decline in overall failure rate can be predicted. If a failure occurs at the rate of lambda per unit time, the expected time before the failure occurs and can be corrected is 1/lambda, the Mean Time Before Failure (MTBF). Finding and fixing a less frequent failure with the rate of lambda/2 per unit time requires twice as long, time of 1/(2 lambda). Cutting the failure rate in half requires doubling the test and redesign time and finding and eliminating the failure causes.Reducing the failure rate significantly requires a heroic reliability improvement effort.

life support↗

Bayesian And Human Reliability Analysis (hra)-aided Method For The Reliability Analysis Of Software (bahamas)

The purpose of the BAHAMAS code is to provide a simplified process for performing quantitative evaluations of software reliability. The Bayesian and Human Reliability Analysis (HRA)-Aided method for the Reliability Analysis of software (BAHAMAS) was developed specifically to perform quantification under limited data conditions, i.e., when limited testing or operational data are available, such as during early development stages. BAHAMAS essentially examines the quality of a software development life cycle to determine the probability of specific types of software failure. BAHAMAS will have modules to support user input for detailed and simplified analyses. The user interface will also support software common cause failure analysis.

Wang, Congjian (0000000207789927)↗

Experimental stress analysis of large plastic deformations in a hollow sphere deformed by impact against a concrete block

An experimental plastic strain measurement system is presented for use on the surface of high velocity impact test models. The system was used on a hollow sphere tested in impact against a reinforced concrete block. True strains, deviatoric stresses, and true stresses were calculated from experimental measurements. The maximum strain measured in the model was small compared to the true failure strain obtained from static tensile tests of model material. This fact suggests that a much greater impact velocity would be required to cause failure of the model shell structure.

Morris, R. E.↗

Investigating the Interplay between Energy Efficiency and Resilience in High Performance Computing

Energy efficiency and resilience are two crucial challenges for HPC systems to reach exascale. While energy efficiency and resilience issues have been extensively studied individually, little has been done to understand the interplay between energy efficiency and resilience for HPC systems. Decreasing the supply voltage associated with a given operating frequency for processors and other CMOS-based components can significantly reduce power consumption. However, this often raises system failure rates and consequently increases application execution time. In this work, we present an energy saving undervolting approach that leverages the mainstream resilience techniques to tolerate the increased failures caused by undervolting.

failures↗

Joint strength in high speed friction stir spot welded DP 980 steel

High speed friction stir spot welding was applied to 1.2 mm thick DP 980 steel sheets under different welding conditions, using PCBN tools. The range of vertical feed rates used during welding was 2.5 mm – 102 mm per minute, while the range of spindle speeds was 2500 – 6000 rpm. Extended testing was carried out for five different sets of welding conditions, until tool failure. These welding conditions resulted in vertical welding loads of 3.6 – 8.2 kN and lap shear tension failure loads of 8.9 – 11.1 kN. PCBN tools were shown, in the best case, to provide lap shear tension fracture loads at or above 9 kN for 900 spot welds, after which tool failure caused a rapid drop in joint strength. Joint strength was shown to be strongly correlated to bond area, which was measured from weld cross sections. Failure modes of the tested joints were a function of bond area and softening that occurred in the heat-affected zone.

DP980↗

ISS Fiber Optic Failure Investigation Root Cause Report

In August of 1999, Boeing Corporation (Boeing) engineers began investigating failures of optical fiber being used on International Space Station flight hardware. Catastrophic failures of the fiber were linked to a defect in the glass fiber. Following several meetings of Boeing and NASA engineers and managers, Boeing created and led an investigation team, which examined the reliability of the cable installed in the U.S. Lab. NASA Goddard Space Flight Center's Components Technologies and Radiation Effects Branch (GSFC) led a team investigating the root cause of the failures. Information was gathered from: regular telecons and other communications with the investigation team, investigative trips to the cable distributor's plant, the cable manufacturing plant and the fiber manufacturing plant (including a review of build records), destructive and non-destructive testing, and expertise supplied by scientists from Dupont, and Lucent-Bell Laboratories. Several theories were established early on which were not able to completely address the destructive physical analysis and experiential evidence. Lucent suggested hydrofluoric acid (HF) etching of the glass and successfully duplicated the "rocket engine" defect. Strength testing coupled with examination of the low strength break sites linked features in the polyimide coating with latent defect sites. The information provided below explains what was learned about the susceptibility of the pre-cabled fiber to failure when cabled as it was for Space Station and the nature of the latent defects.

Leidecker, Henning↗

Susceptibility to Cracking of Different Lots of CDR35 Capacitors

On-orbit flight anomalies that occurred after several months of operation were attributed to excessive leakage currents in CDR35 style 0.47 microF 50 V capacitors operating at 10 V. In this work, a lot of capacitors similar to the lot that caused the anomaly have been evaluated in parallel with another lot of similar parts to assess their susceptibility to cracking under manual soldering conditions and get insight into a possible mechanism of failure. Leakage currents in capacitors were monitored at different voltages and environmental conditions before and after terminal solder dip testing that was used to simulate thermal shock during manual soldering. Results of cross-sectioning, acoustic microscopy, and measurements of electrical and mechanical characteristics of the parts have been analyzed, and possible mechanisms of failures considered. It is shown that the susceptibility to cracking and failures caused by manual soldering is lot-related. Recommendations for testing that would help to select lots that are more robust against manual soldering stresses and mitigate the risk of failures suggested.

cracking↗