Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “evaluations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Risk Evaluation in the Pre-Phase A Conceptual Design of Spacecraft

Typically, the most important decisions in the design of a spacecraft are made in the earliest stages of its conceptual design the Pre-Phase A stages. It is in these stages that the greatest number of design alternatives is considered, and the greatest number of alternatives is rejected. The focus of Pre-Phase A conceptual development is on the evaluation and comparison of whole concepts and the larger-scale systems comprising those concepts. This comparison typically uses general Figures of Merit (FOMs) to quantify the comparative benefits of designs and alternative design features. Along with mass, performance, and cost, risk should be one of the major FOMs in evaluating design decisions during the conceptual design phases. However, risk is often given inadequate consideration in conceptual design practice. The reasons frequently given for this lack of attention to risk include: inadequate mission definition, lack of rigorous design requirements in early concept phases, lack of fidelity in risk assessment methods, and under-evaluation of risk as a viable FOM for design evaluation. In this paper, the role of risk evaluation in early conceptual design is discussed. The various requirements of a viable risk evaluation tool at the Pre-Phase A level are considered in light of the needs of a typical spacecraft design study. A technique for risk identification and evaluation is presented. The application of the risk identification and evaluation approach to the conceptual design process is discussed. Finally, a computational tool for risk profiling is presented and applied to assess the risk for an existing Pre-Phase A proposal. The resulting profile is compared to the risks identified for the proposal by other means.

Fabisinski, Leo L., III↗

Evaluation of remote sensing-based evapotranspiration products at low-latitude eddy covariance sites

Remote sensing-based evapotranspiration (ET) products have been evaluated primarily using data from northern middle latitudes; therefore, little is known about their performance at low latitudes. To address this bias, an evaluation dataset was compiled using eddy covariance data from 40 sites between latitudes 30° S and 30° N. The flux data were obtained from the emerging network in Mexico (MexFlux) and from openly available databases of FLUXNET, AsiaFlux, and OzFlux. This unique reference dataset was then used to evaluate remote sensing-based ET products in environments that have been underrepresented in earlier studies. The evaluated products were: MODIS ET (MOD16, both the discontinued collection 5 (C5) and the latest collection (C6)), Global Land Evaporation Amsterdam Model (GLEAM) ET, and Atmosphere-Land Exchange Inverse (ALEXI) ET. Products were compared with unadjusted fluxes (ETorig) and with fluxes corrected for the lack of energy balance closure (ETebc). Three common statistical metrics were used: coefficient of determination (R2), root mean square error (RMSE), and percent bias (PBIAS). The effect of a vegetation mismatch between pixel and site on product evaluation results was investigated by examining the relationship between the statistical metrics and product-specific vegetation match indexes. Evaluation results of this study and those published in the literature were used to examine the performance of the products across latitudes. Differences between the MOD16 collection 5 and 6 datasets were generally smaller than differences with the other products. Performance and ranking of the evaluated products depended on whether ETorig or ETebc was used. When using ETorig, GLEAM generally had the highest R2, smallest PBIAS, and best RMSE values across the studied land cover types and climate zones. Neither MOD16 nor ALEXI performed consistently better than the other. When using ETebc, none of the products stood out in terms of both low bias and strong correlations. The use of ETebc instead of ETorig affected the biases more than the correlations. The product evaluation results showed no significant relationship with the degree of match between the vegetation at the pixel and site scale. The latitudinal comparison showed tendencies of lower R2 (all products) but better PBIAS and normalized RMSE values (MOD16 and GLEAM) for forests at low latitudes than for forests at northern middle latitudes. For non-forest vegetation, the products showed no clear latitudinal differences in performance.

Diego Salazar-Martínez↗

Evaluation of the NASA Artemis Regions of Interest for ISRU Water Mine Potential

The NASA Artemis Campaign has a stated goal to return to the Moon to maintain a sustainable presence; In-Situ Resource Utilization (ISRU) is a key part of sustainability. The regions of interest identified for the Artemis campaign are at Lunar the South Pole where water ice, a valuable resource for ISRU, has been identified. As such, a preliminary evaluation of the ISRU ice mining potential has been performed for of these regions of interest. A set of ground rules for this evaluation were developed to align with current assumptions for customer needs, hardware capabilities, an initially limited infrastructure, and lunar environments/terrain. These ground rules, and the evaluation of six regions of interest, are presented here. The site selections (ISRU and customer assets) and their associated traverses are notional and were intended only to provide a broad preliminary evaluation of the water ISRU potential of the regions. Evaluation of these regions are subject to change as decisions regarding utilization are made. Water ISRU is possible at all regions, though the degree to which each criterion are met is variable. The two regions near Shackleton ranked highest in this evaluation, while the de Gerlache region presented the most difficulties meeting the current criteria. The regions were not explicitly ranked due to the nuances associated with the high number of variables but evaluation summaries of each are presented. It should also be noted that all ISRU ‘mine’ sites in this analysis focused on smaller (few kilometer) size permanently shadowed regions (PSRs). This was necessary to meet proximity requirements between these PSRs and the highly illuminated regions needed for customers and ISRU processing. The areas identified in this study are meant to focus exploration and reconnaissance efforts needed to better evaluate the ISRU potential.

In-situ resource utilization↗

Evaluation of the NASA Artemis Regions of Interest for ISRU Water Mine Potential

The NASA Artemis Campaign has a stated goal to return to the Moon to maintain a sustainable presence; In-Situ Resource Utilization (ISRU) is a key part of sustainability. The regions of interest identified for the Artemis campaign are at Lunar the South Pole where water ice, a valuable resource for ISRU, has been identified. As such, a preliminary evaluation of the ISRU ice mining potential has been performed for of these regions of interest. A set of ground rules for this evaluation were developed to align with current assumptions for customer needs, hardware capabilities, an initially limited infrastructure, and lunar environments/terrain. These ground rules, and the evaluation of six regions of interest, are presented here. The site selections (ISRU and customer assets) and their associated traverses are notional and were intended only to provide a broad preliminary evaluation of the water ISRU potential of the regions. Evaluation of these regions are subject to change as decisions regarding utilization are made. Water ISRU is possible at all regions, though the degree to which each criterion are met is variable. The two regions near Shackleton ranked highest in this evaluation, while the de Gerlache region presented the most difficulties meeting the current criteria. The regions were not explicitly ranked due to the nuances associated with the high number of variables but evaluation summaries of each are presented. It should also be noted that all ISRU ‘mine’ sites in this analysis focused on smaller (few kilometer) size permanently shadowed regions (PSRs). This was necessary to meet proximity requirements between these PSRs and the highly illuminated regions needed for customers and ISRU processing. The areas identified in this study are meant to focus exploration and reconnaissance efforts needed to better evaluate the ISRU potential.

In-situ resource utilization↗

Status of HEU-Pb in the International Criticality Safety Benchmark Evaluation Project (ICSBEP) Handbook

The Department of Energy invests tens of millions of dollars each year to develop the next generation of nuclear engineering modeling & simulation (M&S) tools. These tools are used to analyze advanced reactor designs and the safety of current nuclear operations. As computers become more powerful, we are able to enhance resolution in our calculations. This improved resolution is taking us to a point where the limitations of simulation capability are in the quality of data, including our ability to quantify the uncertainty and sensitivity of the data. In order to model systems of interest with increasing accuracy, the industry must improve key nuclear data measurements. Thus, M&S tools need evaluated and quality-assured experimental data for validation purposes. The International Criticality Safety Benchmark Evaluation Project (ICSBEP) compiles and evaluates experiment data in a handbook that can be used by criticality safety engineers and others to validate computer codes and cross-section libraries at nuclear facilities. Both critical and subcritical experiments are included in the handbook. Figure 1 organizes all the benchmark evaluations that have been performed by the isotope of interest, in this case Pb, and the average neutron energy the system. Compared to other isotopes of interest for nuclear applications, there are few benchmark evaluations for Pb systems. The lack of integral measurements to determine errors in Pb cross-section data has caused the latest nuclear cross-section libraries to over/underestimate k eff compared to experimental results. Therefore, this evaluation fills an important knowledge gap in benchmark evaluations.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Consistent Nuclear Data Evaluations for Criticality Safety

Evaluations of nuclear data are based on statistical analysis of available experimental data and their uncertainties plus model calculations and their uncertainties. As the models are currently rather limited, the evaluations are heavily biassed toward experimental data, with the caveat that a thorough analysis is also required to understand possible discrepancies between data sets. Hence, as new experimental data become available, they are incorporated into the evaluation procedure. Recent measurements of the 233 U capture to fission cross section ratio at the Los Alamos Neutron Science Center have prompted a re-evaluation of the capture cross section in the resonance and fast regions up to 250 keV. We will discuss the challenges of including the new fast neutron experimental data in an evaluation that is consistent with the resonance region. We will also discuss our consistent evaluation procedure based on the Hauser-Feshbach statistical model for nuclear reactions and its application to the evaluations of 239 Pu and 139 La neutron-induced reactions.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Evaluation Challenges for the Application of Extended Reality Devices in Medicine

Augmented and virtual reality devices are being actively investigated and implemented for a wide range of medical uses. However, significant gaps in the evaluation of these medical devices and applications hinder their regulatory evaluation. Addressing these gaps is critical to demonstrating the devices’ safety and effectiveness. We outline the key technical and clinical evaluation challenges discussed during the US Food and Drug Administration’s public workshop, “Medical Extended Reality: Toward Best Evaluation Practices for Virtual and Augmented Reality in Medicine” and future directions for evaluation method development. Evaluation challenges were categorized into several key technical and clinical areas. Finally, we highlight current efforts in the standards communities and illustrate connections between the evaluation challenges and the intended uses of the medical extended reality (MXR) devices. Participants concluded that additional research is needed to assess the safety and effectiveness of MXR devices across the use cases.

60 APPLIED LIFE SCIENCES↗

Evaluation of HVAC & refrigeration system fault behaviors and impacts: A systematic review

Achieving the goals of green buildings critically depends on the fault-free operation of heating, ventilation and air conditioning and refrigeration (HVAC&R) systems. However, faults frequently occur in these systems, causing a range of negative consequences, including increased energy consumption, diminished operational performance, compromised indoor environmental quality, higher operational costs, and shortened system lifespan. The evaluation of fault behaviors and impacts plays a critical role in revealing fault characteristics and consequently supports many research areas, including the design of the high-performance equipment, development of fault detection and diagnostics (FDD) and robust control approaches, as well as the enhancement of maintenance decision-making activities. This paper systematically reviews 112 research publications that reported the analysis and evaluation of fault behaviors and impacts in HVAC&R systems over the past thirty years. Here, we designed a review approach to address five crucial research questions, namely: 1) the objectives of analysis and evaluation of fault behaviors and impacts, 2) data sources, 3) equipment/system types and fault types, 4) evaluation methods including evaluation measures and associated metrics, and 5) challenges and future directions in the research on evaluating of fault behaviors and impacts. In-depth discussions on these questions help bridge the gap between the evaluation of fault behaviors and impacts and their practical applications, such as the development of high-performance systems, fault models, FDD methods, and maintenance decision-making tools within the HVAC&R FDD domain.

Chen, Yimin [Oak Ridge National Laboratory (ORNL),↗

An expert-driven literature review of “negative” chemicals for developmental neurotoxicity (DNT) in vitro assay evaluation

To date, approximately 200 chemicals have been tested in US Environmental Protection Agency (EPA) or Organization for Economic Co-operation and Development (OECD) developmental neurotoxicity (DNT) guideline studies, leaving thousands of chemicals without traditional animal information on DNT hazard potential. To address this data gap, a battery of in vitro DNT new approach methodologies (NAMs) has been proposed. Evaluation of the performance of this battery will increase the confidence in its use to determine DNT chemical hazards. One approach to evaluate DNT NAM performance is to use a set of chemicals to evaluate sensitivity and specificity. Since a list of chemicals with potential evidence of in vivo DNT has been established, this study aims to develop a curated list of “negative” chemicals for inclusion in a “DNT NAM evaluation set”. A workflow, including a literature search followed by an expert-driven literature review, was used to systematically screen 39 chemicals for lack of DNT effect. Expert panel members evaluated the scientific robustness of relevant studies to inform chemical categorizations. Following review, the panel discussed each chemical and made categorical determinations of “Favorable”, “Not Favorable”, or “Indeterminate” reflecting acceptance, lack of suitability, or uncertainty given specific limitations and considerations, respectively. Further, the panel determined that 10, 22, and 7 chemicals met the criteria for “Favorable”, “Not Favorable”, and “Indeterminate”, for use as negatives in a DNT NAM evaluation set. Ultimately, this approach not only supports DNT NAM performance evaluation but also highlights challenges in identifying large numbers of negative DNT chemicals.

59 BASIC BIOLOGICAL SCIENCES↗

Correlations between Texture Profile Analysis and Sensory Evaluation of Cured Largemouth Bass Meat (Micropterus salmoides)

Texture is an important factor in evaluating the quality of aquatic products. To evaluate the texture properties of cured large mouth bass, edible sodium chloride (0, 1.0, 2.0, and 3.0%) was smeared to the bass meat. Texture profile analysis (TPA) and sensory evaluation were performed to evaluate the quality of the cured samples, and the correlations of the indexes in the two methods were analyzed. Two principal components were obtained from the TPA indexes and sensory evaluation indexes, and the cumulative variance contribution rates were 73.87% and 72.99%, respectively. Results from the principal component analysis showed that the main indicators that affected the TPA were gumminess and springiness, while those that affected sensory evaluation were chewiness and adhesiveness. The TPA index and sensory evaluation could be effectively improved when the sodium chloride added to the bass meat was 1%. In the correlation analysis, sensory springiness was negatively correlated with TPA hardness ( P < 0.05 , r = −0.553) but positively correlated with TPA chewiness ( P < 0.05 , r = 0.596). After stepwise regression analysis, the prediction equation between the sensory springiness and TPA hardness was obtained as SSp=5.770−0.002Ha. These results provide a basis for predicting the quality of large mouth bass cured products.

Li, Meijin↗

Including Chi-Nu 235 U PFNS Experimental Data into an ENDF/B-VIII.1 Release Candidate Evaluation

This report documents an evaluation of 235 U prompt fission neutron spectra (PFNS) that is a release candidate for the upcoming U.S. nuclear data library, ENDF/B-VIII.1. This evaluation differs from its predecessor, ENDF/B-VIII.0, mainly by the inclusion of 235 U PFNS measured by the Chi-Nu team of LANL and LLNL. This data set is the first one that covers the 235 U PFNS for continuous incident-neutron energies of 1⁻20 MeV and outgoing-neutron energies from 10 keV⁻10 MeV with high precision. Previous data sets were either measured in a limited energy range or with less precision. Hence, these new Chi-Nu data provide decisive information for the evaluation. The resulting evaluated data correspond well to the new experimental PFNS. The evaluated PFNS also produce average mean energies and 239 Pu/ 235 U PFNS in agreement with associated Chi-Nu data. If one uses the new evaluated data to predict the neutron multiplication factor, k eff , of selected ICSBEP critical assemblies, the differences of simulated values compared to those using ENDF/B-VIII.0 is modest (less than 55 pcm). This difference in k eff can be easily accommodated by changes in the 235 U average prompt fission neutron multiplicity that is currently being re-evaluated. In addition to that, the new PFNS predict on average 235 U LLNL pulsed-sphere neutron-leakage spectra better than ENDF/B-VIIII.0 PFNS.

235U↗

Producing ENDF/B-quality Evaluations of 239 Pu(n,f) and 235 U(n,f) Average Prompt Neutron Multiplicities using the CGMF Model

This report documents evaluations of the neutron-induced 239 Pu and 235 U average prompt neutron multiplicities, $\overline{v}_p$, using the CGMF model developed at LANL. These evaluations are not updates of existing ENDF/B-VIII.0 nuclear data, but were both re-done from "scratch". That is, all experimental data were extracted from EXFOR, re-normalized to the newest nuclear data representing monitor observables, and detailed uncertainties were estimated from information in EXFOR as well as from templates of expected measurement uncertainties. We also included experimental data that were not yet available for ENDF/B-VIII.0, for instance, the data of Marini et al. for 239 Pu(n,f) $\overline{v}_p$ or the data of Khoklov et al. for 235 U(n,f) $\overline{v}_p$. Finally, we include the CGMF model; it computes $\overline{v}_p$ based on model parameters that at the same time calculate fission fragments as a function of mass, Y (A), the average total kinetic energy as a function of incident-neutron energy, $\langle TKE \rangle$(E inc ), etc. Such a detailed fission model that ties together many fission quantities has not been used to date for any $\overline{v}_p$ evaluation in ENDF/B. Here, we show that we can get evaluated 235 U(n,f) and 239 Pu $\overline{v}_p$ that not only correspond well to experimental $\overline{v}_p$, but that the associated evaluated model parameters also yield parameterizations of Y (A), $\langle TKE \rangle$(E inc ), etc., that correspond well to their respective experimental data. The new evaluated 239 Pu(n,f) $\overline{v}_p$ was also combined into a 239 Pu test file with the newest nuclear data for the 239 Pu prompt-fission neutron spectrum and fission cross sections. This new 239 Pu file performed reasonably well in predicting PU-MET-FAST assemblies, reaction rates in Jezebel and Flattop and three LLNL pulsed spheres. Due to that, the new 239 Pu(n,f) $\overline{v}_p$ evaluation presented here is being considered for ENDF/B-VIII.1. Hence, we can show here that CGMF is able to produce ENDF/B quality $\overline{v}_p$ nuclear data.

239Pu, 235U, Average Prompt-fission Neutron Multip↗

Technical Evaluation of Accelerated Basin De-Inventory Material Addition to Sludge Batch 11 (Rev. 1)

The Accelerated Basin De-inventory (ABD) program involves discarding spent nuclear fuel that is currently stored in L-Basin to the Defense Waste Processing Facility (DWPF) for vitrification. The first ABD discards will occur during the preparation of Sludge Batch (SB) 11. Savannah River Mission Completion has requested that the Savannah River National Laboratory assess the technical gaps related to the increased gadolinium poisoning requirement and the impacts of performing the Low Temperature Aluminum Dissolution (LTAD) process in Tank 51 with H-Canyon discards present. The following summarizes the evaluation of the impacts of increasing the quantity of gadolinium (and related topics) from what was previously evaluated in the SRNL studies of gadolinium-poisoned ABD material solubility, the overall ABD flowsheet review, and increasing the fissile mass loading in glass: 1) Based on literature surveys, there is no indication that organic interactions with gadolinium will be significant at the high pH (typically >13) conditions of the Concentration, Storage, and Transfer Facilities. Any interactions of gadolinium with organics in DWPF are not expected to adversely impact DWPF or downstream facilities. Thus, there is little-to-no residual risk from organic interactions with gadolinium [Gap closed]; 2) Adding depleted uranium to ABD material, targeting 235 U enrichment of 4.90% within each transfer window, will mitigate potential impacts from an increase in soluble 235 U enrichment during sludge washing and LTAD. The plan to take advantage of previous transfers and allow 235 U enrichment of >5% during the final transfer window carries a risk that Tank 51 supernate will have a 235 U enrichment of >5%, which should be evaluated for acceptance; 3) Increasing the gadolinium mass ratio to 3.0:1 Gd: 235 U(eq SLU ) should lead to the same or higher partitioning of gadolinium into the solid phase within the DWPF Chemical Process Cell, resulting in both liquid and solid phases with expected partitioning of Gd consistent with the prior solubility study [Gap closed for SB11]; 4) There are no expected impacts on DWPF melt temperature and melter operations due to the minimal ~0.2 weight percent (wt%) increase in Gd concentration relative to previous sludge batches [Gap closed for SB11]; 5) As observed previously, Gd is expected to enter the off-gas system via physical entrainment, but at a slightly higher concentration than what was observed for SB9 melter off-gas pluggage deposits (0.07 wt%) [Gap closed for SB11] ; 6) There are no expected impacts on DWPF recycle or the Recycle Collection Tank glycolate destruction process. [Gap closed for SB11]; 7) Gd is projected to be a trace component in the SB11 glass (<0.5 wt%) and can be ignored for process control. Trace components do not significantly impact glass durability, thus the conclusions of the previous Product Consistency Test evaluation at a fissile mass loading of 2,500 g fissile/m3 glass still applies to SB11. The ~0.1 wt% increase in Gd2O3 concentration relative to the previous study will not impact the predictability of SB11 glass with the DWPF Product Composition Control System (PCCS) models for durability or the acceptability of glass according to the Waste Acceptance Product Specifications (WAPS) criterion for product consistency [Gap closed for SB11]; 8) No additional Toxicity Characteristic Leaching Procedure testing is necessary for SB11 and the hazardous waste specification of the SB11 DWPF waste form is unchanged after the addition of the ABD stream [Gap closed for SB11]. The following summarizes the evaluation of the impacts of adding two-thirds of the ABD material to Tank 51 prior to LTAD: 1) The addition of two-thirds of the ABD increases overall aluminum mass from 1.39×10 4 kg to 1.64×10 4 kg (15.5% ABD Al). The form of the insoluble portion of the Al resulting from ABD addition should be the more readily dissolved Al(OH) 3 and amorphous forms. The portion of the ABD aluminum that is processed by LTAD is expected to be completely soluble, thus requiring that less of the boehmite in the sludge be dissolved to reach the same Al target in the SB. [Gap closed for SB11]; The expected LTAD impact on other components, as related primarily to the components in ABD, are discussed. Gd is expected to remain insoluble during LTAD and not impact the solubility of other components. [Gap closed for SB11]; The addition of two-thirds of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 13,100 kg (63% ABD U) and the projected plutonium mass from 86.0 kg to 89.5 kg (3.9% ABD Pu). The addition of all of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 16,100 kg (70% ABD U) and the projected plutonium mass from 86.0 kg to 90.4 kg (5.3% ABD Pu). The 235 U enrichment will be ≤5%. The fissile uranium will be adequately poisoned by Gd and the fissile Pu will be adequately poisoned by Fe from the sludge. [Gap closed for SB11]; There is a low risk that ABD addition will impact the rheology or pumpability of the slurry. There is a low but higher risk of ABD addition prior to LTAD impacting the settling rate; Based on the evaluation of adding two-thirds of the ABD material and all of the ABD material prior to the LTAD process, there is no volume or mass limit that would need to be imposed on ABD additions prior to LTAD. [Gap closed for SB11]. Revision 1 of this report addresses a variation on the ABD additions and LTAD strategy where sodium hydroxide additions for LTAD may be performed intermittently or concurrently with an ABD addition window. The proposed change does not alter the conclusions of this evaluation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Consistent $\overline{ν}$ evaluation for minor Pu isotopes with CGMF

This report follows up on the evaluation work done in 2023 where we developed a procedure and performed the first consistent evaluation of the average prompt neutron multiplicity for minor Pu isotopes, including 238,240-242 Pu, using CGMF. Details on the necessary updates to the release version of CGMF, the experimental data and experimental uncertainty quantification that went into the evaluation, and this first evaluation effort are documented in and will not be repeated in this report. Instead, we discuss here the further investigations into the CGMF model space to improve the evaluation results from FY23. Additionally, we note that these evaluation results have been transformed into the ENDF format for mean values and covariances, and validation with critical assemblies has been performed; that work is documented elsewhere. In this short report, we discuss the updated evaluation efforts performed during FY24 in Sec. 2, show results from CGMF for other prompt fission observables in Sec. 3, and then briefly conclude in Sec. 4.

07 ISOTOPE AND RADIATION SOURCES↗

Evaluation of high-voltage, high-power, solid-state remote power controllers for amps

The Electrical Power Branch at Marshall Space Flight Center has a Power System Development Facility where various power circuit breadboards are tested and evaluated. This project relates to the evaluation of a particular remote power controller (RPC) energizing high power loads. The Facility equipment permits the thorough testing and evaluation of high-voltage, high-power solid-state remote power controllers. The purpose is to evaluate a Type E, 30 Ampere, 200 V dc remote power controller. Three phases of the RPC evaluation are presented. The RPC is evaluated within a low-voltage, low-power circuit to check its operational capability. The RPC is then evaluated while performing switch/circuit breaker functions within a 200 V dc, 30 Ampere power circuit. The final effort of the project relates to the recommended procedures for installing these RPC's into the existing Autonomously Managed Power System (AMPS) breadboard/test facility at MSFC.

Callis, Charles P.↗

Evaluation of NASA space grant consortia programs

The meaningful evaluation of the NASA Space Grant Consortium and Fellowship Programs must overcome unusual difficulties: (1) the program, in its infancy, is undergoing dynamic change; (2) the several state consortia and universities have widely divergent parochial goals that defy a uniform evaluative process; and (3) the pilot-sized consortium programs require that the evaluative process be economical in human costs less the process of evaluation comprise the effectiveness of the programs they are meant to assess. This paper represents an attempt to assess the context in which evaluation is to be conducted, the goals and limitations inherent to the evaluation, and to recommend appropriate guidelines for evaluation.

Eisenberg, Martin A.↗

Postflight hardware evaluation 360T025 (RSRM-25, STS-46)

The final report for the Clearfield disassembly evaluation and a continuation of the KSC postflight assessment for the 360T025 (STS-46) Redesign Solid Rocket Motor (RSRM) flight set is presented. All observed hardware conditions were documented on PFOR's and are included in Appendices A through C. Appendices D and E contain the measurements and safety factor data for the nozzle and insulation components. Along with the KSC Ten-Day Postflight Hardware Evaluation Report (TWR-60687), a summary of the 360T025 hardware evaluation is provided. The as-flown hardware configuration is documented in TWR-60470. Disassembly evaluation photograph numbers are logged in TWA-1986. The 360T025 flight set disassembly evaluations described were performed at the RSRM Refurbishment Facility in Clearfield, Utah. The final factory joint demate occurred on 16 Mar. 1993. Detailed evaluations were performed in accordance with the Clearfield PEEP, TWR-50051, Revision A. All observations were compared against limits that are also defined in the PEEP. These limits outline the criteria for categorizing the observations as acceptable, reportable, or critical. Hardware conditions that were unexpected and/or determined to be reportable or critical were evaluated by the applicable CPT and tracked through the PFAR system.

Morgan, Ferral↗

Postflight hardware evaluation (RSRM-29, STS-54)

This document is the final report for the Clearfield disassembly evaluation and a continuation of the KSC postflight assessment for the RSRM-29 flight set. All observed hardware conditions were documented on PFOR's and are included in Appendices A, B, and C. Appendices D and E contain the measurements and safety factor data for the nozzle and insulation components. This report, along with the KSC Ten-Day Postflight Hardware Evaluation Report (TWR-64221), represents a summary of the RSRM-29 hardware evaluation. Disassembly evaluation photograph numbers are logged in TWA-1990. The RSRM-29 flight set disassembly evaluations described in this document were performed at the RSRM Refurbishment Facility in Clearfield, Utah. The final factory joint demate occurred on September 9, 1993. Detailed evaluations were performed in accordance with the Clearfield PEEP, TWR-50051, Revision A. All observations were compared against limits that are also defined in the PEEP. These limits outline the criteria for categorizing the observations as acceptable, reportable, or critical. Hardware conditions that were unexpected and/or determined to be reportable or critical were evaluated by the applicable CPT and tracked through the PFAR system.

Source record↗