Design Considerations for Human Rating of Liquid Rocket Engines

I.Human-rating is specific to each engine; a. Context of program/project must be understood. b. Engine cannot be discussed independently from vehicle and mission. II. Utilize a logical combination of design, manufacturing, and test approaches a. Design 1) It is crucial to know the potential ways a system can fail, and how a failure can propagate; 2) Fault avoidance, fault tolerance, DFMR, caution and warning all have roles to play. b. Manufacturing and Assembly; 1) As-built vs. as-designed; 2) Review procedures for assembly and maintenance periodically; and 3) Keep personnel trained and certified. c. There is no substitute for test: 1) Analytical tools are constantly advancing, but still need test data for anchoring assumptions; 2) Demonstrate robustness and explore sensitivities; 3) Ideally, flight will be encompassed by ground test experience. III. Consistency and repeatability is key in production a. Maintain robust processes and procedures for inspection and quality control based upon development and qualification experience; b. Establish methods to "spot check" quality and consistency in parts: 1) Dedicated ground test engines; 2) Random components pulled from the line/lot to go through "enhanced" testing.

Parkinson, Douglas↗

Advanced Stirling Radioisotope Generator Engineering Unit 2 (ASRG EU2) Final Assembly

NASA Glenn Research Center (GRC) has recently completed the assembly of a unique Stirling generator test article for laboratory experimentation. Under the Advanced Stirling Radioisotope Generator (ASRG) flight development contract, NASA GRC initiated a task to design and fabricate a flight-like generator for in-house testing. This test article was given the name ASRG Engineering Unit 2 (EU2) as it was effectively the second engineering unit to be built within the ASRG project. The intent of the test article was to duplicate Lockheed Martin's qualification unit ASRG design as much as possible to enable system-level tests not previously possible at GRC. After the cancellation of the ASRG flight development project, the decision was made to continue the EU2 build, and make use of a portion of the hardware from the flight development project. GRC and Lockheed Martin engineers collaborated to develop assembly procedures, leveraging the valuable knowledge gathered by Lockheed Martin during the ASRG development contract. The ASRG EU2 was then assembled per these procedures at GRC with Lockheed Martin engineers on site. The assembly was completed in August 2014. This paper details the components that were used for the assembly, and the assembly process itself.

Stirling Cycle↗

Component qualification and initial build of the AGT 100 advanced automotive gas turbine

In advance of initial dynamometer testing of the AGT 100 engine, all prime components and subsystems were bench/rig tested. Included were compressor, combustor, turbines, regenerator, ceramic components, and electronic control system. Results are briefly reviewed. Initial engine buildup was completed and rolled-out for test cell installation in July 1982. Shakedown testing included motoring and sequential firing of the combustor's three fuel nozzles.

Johnson, R. A.↗

NASA Progress on the Development and Qualification of a 12-kW Hall-Effect, Solar Electric Propulsion Thruster

The National Aeronautics and Space Administration (NASA) continues to evolve the human exploration approach for beyond low-Earth orbit and in a manner involving international, academic, and industry partners. The center of this approach is NASA’s Gateway program that will establish a permanent human presence in lunar orbit for human cislunar science, operations, and lunar surface access to eventually land the next American astronauts on the south pole of the Moon. In support of the effort, NASA’s Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The resulting Advanced Electric Propulsion System (AEPS) project has developed a 12 kW Hall-effect thruster in support of the Gateway program. The project is managed by the NASA Glenn Research Center (GRC), supported by the NASA Jet Propulsion Laboratory (JPL) with development, qualification & flight hardware all supplied by L3 Harris Aerojet Rocketdyne (AR). Development of the 12-kW Hall thruster electric propulsion system began with maturation of the Hall Effect Rocket with Magnetic Shielding (HERMeS) Technology Demonstration Units (TDUs). The technology development was then transitioned to AR via the AEPS contract, which built and tested two Engineering Test Unit (ETU) thrusters and multiple critical components. The project transitioned to the production of the three flight thrusters and entered qualification testing at the component and thruster levels.

Electric Propulsion↗

NASA Progress on the Development and Qualification of a 12-kW Hall-Effect, Solar Electric Propulsion Thruster

The National Aeronautics and Space Administration (NASA) continues to evolve the human exploration approach for beyond low-Earth orbit and in a manner involving international, academic, and industry partners. The center of this approach is NASA’s Gateway program that will establish a permanent human presence in lunar orbit for human cislunar science, operations, and lunar surface access to eventually land the next American astronauts on the south pole of the Moon. In support of the effort, NASA’s Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The resulting Advanced Electric Propulsion System (AEPS) project has developed a 12 kW Hall-effect thruster in support of the Gateway program. The project is managed by the NASA Glenn Research Center (GRC), supported by the NASA Jet Propulsion Laboratory (JPL) with development, qualification & flight hardware all supplied by L3 Harris Aerojet Rocketdyne (AR). Development of the 12-kW Hall thruster electric propulsion system began with maturation of the Hall Effect Rocket with Magnetic Shielding (HERMeS) Technology Demonstration Units (TDUs). The technology development was then transitioned to AR via the AEPS contract, which built and tested two Engineering Test Unit (ETU) thrusters and multiple critical components. The project transitioned to the production of the three flight thrusters and entered qualification testing at the component and thruster levels.

Electric Propulsion↗

Monopropellant hydrazine resistojet model specification

The specifications for the electrothermal hydrazine thruster model are presented including performance, design and qualification requirements, and product configuration and acceptance tests. The contamination control procedures, acceptance test plan, and engineering drawings are included.

Grabbi, R.↗

Stirling Convertor Technologies Being Developed for a Stirling Radioisotope Generator

The Department of Energy, Lockheed Martin, Stirling Technology Company (STC), and the NASA Glenn Research Center are developing a high-efficiency Stirling Radioisotope Generator (SRG) for NASA space science missions. The SRG is being developed for multimission use, including providing electric power for unmanned Mars rovers and deep space missions. On Mars, rovers with SRGs would be used for missions that might not be able to use photovoltaic power systems, such as exploration at high Martian latitudes and missions of long duration. The projected SRG system efficiency of 23 percent will reduce the required amount of radioisotope by a factor of 4 or more in comparison to currently used Radioisotope Thermoelectric Generators. The Department of Energy recently named Lockheed Martin as the system integration contractor. Lockheed Martin has begun to develop the SRG engineering unit under contract to the Department of Energy, and has contract options to develop the qualification unit and the first flight units. The developers expect the SRG to produce about 114 Wdc at the beginning of mission, using two opposed Stirling convertors and two General Purpose Heat Source modules. STC previously developed the Stirling convertor under contract to the Department of Energy and is now providing further development as a subcontractor to Lockheed Martin. Glenn is conducting an in-house technology project to assist in developing the convertor for space qualification and mission implementation. A key milestone was recently reached with the accumulation of 12 000 hr of long-term aging on two types of neodymium-iron boron permanent magnets. These tests are characterizing any possible aging in the strength or demagnetization resistance of the magnets used in the linear alternator. Preparations are underway for a thermal/vacuum system demonstration and unattended operation during endurance testing of the 55-We Technology Demonstration Convertors. In addition, Glenn is developing a charging system for the convertors to ensure clean fills of the helium working fluid and to monitor levels of any possible contaminants at different test intervals. Possible oxidation effects depend on the level of any oxygen contamination-regenerator materials and displacer radiation shields are now being evaluated for possible oxidation effects.

Thieme, Lanny G.↗

Development, Qualification and Integration of the Optical Fiber Array Assemblies for the Lunar Reconnaissance Orbiter

The NASA Goddard Fiber Optics Team in the Electrical Engineering Division of the Applied Engineering and Technology Directorate, designed, developed and integrated the space flight optical fiber array hardware for the Lunar Reconnaissance Orbiter (LRO). The two new assemblies that were designed and manufacturing at GSFC for the LRO exist in configurations that are unique in the world for the application of ranging and LIDAR. Described here is an account of the journey and the lessons learned from design to integration for the Lunar Orbiter Laser Altimeter and the Laser Ranging Application on the LRO.

Ott, Melanie N.↗

Qualification of Electrical Ground Support Equipment for New Space Programs

With the Space Shuttle program coming to an end, the National Aeronautics and Space Administration (NASA) is moving to a new space flight program that will allow expeditions beyond low earth orbit. The space vehicles required to comply with these missions will be carrying heavy payloads. This implies that the Earth departure stage capabilities must be of higher magnitudes, given the current propulsion technology. The engineering design of the new flight hardware comes with some structural, thermal, propulsion and other subsystems' challenges. Meanwhile, the necessary ground support equipment (GSE) used to test, validate, verify and process the flight hardware must withstand the new program specifications. This paper intends to provide the qualification considerations during implementation of new electrical GSE for space programs. A team of engineers was formed to embark on this task, and facilitate the logistics process and ensure that the electrical, mechanical and fluids subsystems conduct the proper level of testing. Ultimately, each subsystem must certify that each piece of ground support equipment used in the field is capable of withstanding the strenuous vibration, acoustics, environmental, thermal and Electromagnetic Interference (EMf) levels experienced during pre-launch, launch and post-launch activities. The benefits of capturing and sharing these findings will provide technical, cost savings and schedule impacts infon11ation to both the technical and management community. Keywords: Qualification; Testing; Ground Support Equipment; Electromagnetic Interference Testing; Vibration Testing; Acoustic Testing; Power Spectral Density.

SotoToro, Felix A.↗

Liquid Engine Test Facilities Assessment

The John C. Stennis Space Center (SSC) requested The Aerospace Corporation to examine the current testing capability of all existing large liquid engine test facilities located in the United States. That information along with projected liquid rocket engine development was used to examine future liquid rocket engine testing facilities needs in the coming decade. Current domestic liquid engine test facilities capabilities, when examined against engine concepts for the coming decade, indicate there are ample facilities offering altitude simulation during test. In addition, it was observed that many contractor facilities have limited ambient test capability of larger thrust engines under current consideration. Finally, it was concluded that diminished contractor participation engine development testing will drive this activity to the government sector. Only three facilities are seen as key contributors to engine testing in the coming decade, namely John C. Stennis Space Center (SSC), Marshall Space Flight Center (MSFC), and Air Force Research Laboratory (AFRL). Past rocket engine test experience was evaluated as a possible resource for projecting future engine test needs. A database comprised of various engine models and the level of testing performed to flight qualify those systems for their first flight was constructed. For comparison purposes in this study, development and qualification efforts were totaled and treated as one test program. Based on experience with past Air Force programs, the time on the test stand accounts for typically 50% or more of the total program time. Historical data show that the time to design and develop new engines has increased over the last 40 years, most likely due to scarcer resources in today's funding environment.

Adams, Michael J.↗

Affordable Development and Qualification Strategy for Nuclear Thermal Propulsion

Nuclear Thermal Propulsion (NTP) is a concept which uses a nuclear reactor to heat a propellant to high temperatures without combustion and can achieve significantly greater specific impulse than chemical engines. NTP has been considered many times for human and cargo missions beyond low earth orbit. A lot of development and technical maturation of NTP components took place during the Rover/NERVA program of the 60's and early 70's. Other NTP programs and studies followed attempting to further mature the NTP concept and identify a champion customer willing to devote the funds and support the development schedule to a demonstration mission. Budgetary constraints require the use of an affordable development and qualification strategy that takes into account all the previous work performed on NTP to construct an existing database, and include lessons learned and past guidelines followed. Current guidelines and standards NASA uses for human rating chemical rocket engines is referenced. The long lead items for NTP development involve the fuel elements of the reactor and ground testing the engine system, subsystem, and components. Other considerations which greatly impact the development plans includes the National Space Policy, National Environmental Policy Act, Presidential Directive/National Security Council Memorandum #25 (Scientific or Technological Experiments with Possible Large-Scale Adverse Environmental Effects and Launch of Nuclear Systems into Space), and Safeguards and Security. Ground testing will utilize non-nuclear test capabilities to help down select components and subsystems before testing in a nuclear environment to save time and cost. Existing test facilities with minor modifications will be considered to the maximum extent practical. New facilities will be designed to meet minimum requirements. Engine and test facility requirements are based on the driving mission requirements with added factors of safety for better assurance and reliability. Emphasis will be placed on small engines, since the smaller the NTP engine, the easier it is to transport, assemble/disassemble, and filter the exhaust during tests. A new ground test concept using underground bore holes (modeled after the underground nuclear test program) to filter the NTP engine exhaust is being considered. The NTP engine system design, development, test, and evaluation plan includes many engine components and subsystems, which are very similar to those used in chemical engines, and can be developed in conjunction with them Other less mature NTP engine components and subsystems (e.g., reactor) will be thoroughly analyzed and tested to acceptable levels recommended by the referenced standards and guidelines. The affordable development strategy also considers a prototype flight test, as a final step in the development process. Preliminary development schedule estimates show that an aggressive development schedule (without much margin) will be required to be flight ready for a 2033 human mission to Mars.

Gerrish, Harold P., Jr.↗

Affordable Development and Qualification Strategy for Nuclear Thermal Propulsion

Nuclear Thermal Propulsion (NTP) is a concept which uses a nuclear reactor to heat a propellant to high temperatures without combustion and can achieve significantly greater specific impulse than chemical engines. NTP has been considered many times for human and cargo missions beyond low earth orbit. A lot of development and technical maturation of NTP components took place during the Rover/NERVA program of the 60's and early 70's. Other NTP programs and studies followed attempting to further mature the NTP concept and identify a champion customer willing to devote the funds and support the development schedule to a demonstration mission. Budgetary constraints require the use of an affordable development and qualification strategy that takes into account all the previous work performed on NTP to construct an existing database, and include lessons learned and past guidelines followed. Current guidelines and standards NASA uses for human rating chemical rocket engines is referenced. The long lead items for NTP development involve the fuel elements of the reactor and ground testing the engine system, subsystem, and components. Other considerations which greatly impact the development plans includes the National Space Policy, National Environmental Policy Act, Presidential Directive/National Security Council Memorandum #25 (Scientific or Technological Experiments with Possible Large-Scale Adverse Environmental Effects and Launch of Nuclear Systems into Space), and Safeguards and Security. Ground testing will utilize non-nuclear test capabilities to help down select components and subsystems before testing in a nuclear environment to save time and cost. Existing test facilities with minor modifications will be considered to the maximum extent practical. New facilities will be designed to meet minimum requirements. Engine and test facility requirements are based on the driving mission requirements with added factors of safety for better assurance and reliability. Emphasis will be placed on small engines, since the smaller the NTP engine, the easier it is to transport, assemble/disassemble, and filter the exhaust during tests. A new ground test concept using underground bore holes (modeled after the underground nuclear test program) to filter the NTP engine exhaust is being considered. The NTP engine system design, development, test, and evaluation plan includes many engine components and subsystems, which are very similar to those used in chemical engines, and can be developed in conjunction with them Other less mature NTP engine components and subsystems (e.g., reactor) will be thoroughly analyzed and tested to acceptable levels recommended by the referenced standards and guidelines. The affordable development strategy also considers a prototype flight test, as a final step in the development process. Preliminary development schedule estimates show that an aggressive development schedule (without much margin) will be required to be flight ready for a 2033 human mission to Mars.

Gerrish, Harold P., Jr.↗

Maturation of In-space Welding in Reduced Gravity and Reduced Pressure Environments Through Progression to Suborbital Flight Experiments

Development of in-space welding (ISW) is a key and enabling manufacturing technology as welding is currently involved in producing approximately 90% of durable goods, and this trend is expected to hold for in-space manufacturing as well. ISW is critical to a sustainable space economy. To mature in-space welding, numerous gaps must be closed since NASA has not made a weld in space in 50 years. Advancing laser beam welding (LBW) towards a suborbital flight demonstration will help mature the process for in-space assembly & manufacturing (ISAM) through demonstration in relevant environments and achieving technology readiness milestones. LBW technologies and science improved by this work will benefit in-space manufacturing, long-term sustainability of space structures & operations, and the overall space economy. Ground-based welding of aerospace hardware requires an Edisonian approach to qualify a welding process; however, this approach is infeasible for ISW qualification due to mass, volume, logistic, and cost challenges inherent to the space environment. To address this challenge, we are conducting ground and suborbital tests with partners performing parabolic flights to gather data on LBW processes and infuse them into NASA & partner missions. This progression from ground to flight experiments will elucidate relevant physics during LBW: 1) reduced gravity, 2) reduced pressure, and 3) extreme temperature. Data from post-flight evaluation and in situ instrumentation will feed integrated computational materials engineering (ICME) tools to reduce the burden of ISW infusion by establishing a link between space and terrestrial environments, ultimately accelerating the qualification of LBW in space.

in-space welding↗

Data Management Working Group report

The current flight qualification program lags technology insertion by 6 to 10 years. The objective is to develop an integrated software engineering and development environment assisted by an expert system technology. An operating system needs to be developed which is portable to the on-board computers of the year 2000. The use of ADA verses a High-Order Language; fault tolerance; fiber optics networks; communication protocols; and security are also examined and outlined.

Filardo, Edward J.↗

Advanced Small Rocket Chambers. Option 3: 110 1Bf Ir-Re Rocket, Volume 1

This report describes the AJ10-221, a high performance Iridium-coated Rhenium (Ir-Re) 110 lbf (490N) welded rocket chamber with 286:1 area ratio nozzle. This engine was designed, built, and hot fired for over 6 hours on this program. It demonstrated an I(s) of 321.8 sec, which is 10 sec higher than conventional 110 lbf silicide coated Cb chambers now in use. The approach used in this portion of the program was to demonstrate the performance improvement that can be made by the elimination of fuel film cooling and the use of a high temperature (4000F) (2200C) iridium-coated rhenium (Ir-Re) rocket chamber. Detailed thermal, performance, mechanical, and dynamic design analyses of the full engine were conducted by Aerojet. Two Ir-Re chambers were built to the Aerojet design by Ultramet, using the chemical vapor deposition (CVD) process. Incorporation of a secondary mixing device or Boundary Layer Trip (BLT) within the combustion chamber (Aerojet Patents 4882904 and 4936091) results in improvement in flow uniformity, and a significant life and performance increase. The 110 lbf engine design was verified in bolt-up hardware tests at sea level and altitude. The effects of injector design on performance were studied. Two duplicate injectors were fabricated matching the preferred design and were demonstrated to be interchangeable in operation. One of these units was fabricated matching the preferred design and was demonstrated to be interchangeable in operation. One of these units was welded into a flight type thruster which was tested for an accumulated duration of 22,590 sec in 93 firings, one of which was a continuous burn of two hours. A design deficiency in the C-103 nozzle near the Re-Cb transition joint was discovered, studied and corrected design has been prepared. Workhardening studies have been conducted to investigate methods for increasing the low yield strength of the Re in the annealed conditions. An advanced 490N high performance engine has been demonstrated which, when proven to be capable of withstanding launch vibration, is ready for flight qualification.

Jassowski, Donald M.↗

Advanced small rocket chambers. Option 3: 110 1bf Ir-Re rocket, volume 2

This is the second part of a two-part report that describes the AJ10-221, a high performance iridium-coated rhenium (Ir-Re) 110 lbf (490N) welded rocket chamber with 286:1 area ratio nozzle. This engine was designed, built, and hot fired for over 6 hours on this program. It demonstrated an I(s) of 321.8 sec, which is 10 sec higher than conventional 110 lbf silicide coated Cb chambers now in use. The approach used in this portion of the program was to demonstrate the performance improvement that can be made by the elimination of fuel film cooling and the use of a high temperature (4000 F) (2200 C) iridium-coated rhenium (Ir-Re) rocket chamber. Detailed thermal, performance, mechanical, and dynamic design analyses of the full engine were conducted by Aerojet. Two Ir-Re chambers were built to the Aerojet design by Ultramet, using the chemical vapor deposition (CVD) process. Incorporation of a secondary mixing device or Boundary Layer Trip (BLT) within the combustion chamber (Aerojet Patents 4882904 and 4936091) results in improvement in flow uniformity, and a significant life and performance increase. The 110 lbf engine design was verified in bolt-up hardware tests at sea level and altitude. The effects of injector design on performance were studied. Two duplicate injectors were fabricated matching the preferred design and were demonstrated to be interchangeable in operation. One of these units were welded into a flight type thruster which was tested for an accumulated duration of 22,590 sec in 93 firings, one of which was a continuous burn of two hours. A design deficiency in the C-103 nozzle near the Re-Cb transition joint was discovered, studied and corrected design has been prepared. Workhardening studies have been conducted to investigate methods for increasing the low yield strength of the Re in the annealed conditions. An advanced 490N high performance engine has been demonstrated which, when proven to be capable of withstanding launch vibration, is ready for flight qualification.

Jassowski, Donald M.↗

Guide for Hydrogen Hazards Analysis on Components and Systems

The physical and combustion properties of hydrogen give rise to hazards that must be considered when designing and operating a hydrogen system. One of the major concerns in the use of hydrogen is that of fire or detonation because of hydrogen's wide flammability range, low ignition energy, and flame speed. Other concerns include the contact and interaction of hydrogen with materials, such as the hydrogen embrittlement of materials and the formation of hydrogen hydrides. The low temperature of liquid and slush hydrogen bring other concerns related to material compatibility and pressure control; this is especially important when dissimilar, adjoining materials are involved. The potential hazards arising from these properties and design features necessitate a proper hydrogen hazards analysis before introducing a material, component, or system into hydrogen service. The objective of this guide is to describe the NASA Johnson Space Center White Sands Test Facility hydrogen hazards analysis method that should be performed before hydrogen is used in components and/or systems. The method is consistent with standard practices for analyzing hazards. It is recommended that this analysis be made before implementing a hydrogen component qualification procedure. A hydrogen hazards analysis is a useful tool for hydrogen-system designers, system and safety engineers, and facility managers. A hydrogen hazards analysis can identify problem areas before hydrogen is introduced into a system-preventing damage to hardware, delay or loss of mission or objective, and possible injury or loss of life.

Beeson, Harold↗