Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “dynamic microgrids”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

171 records · Page 10

Thermal Reservoir Networks for Modularly Expandable Thermal Microgrids

The Department of Defense (DoD) faces the substantial challenge of cost-effectively retrofitting one to two installations per month, each comprising approximately 1,000 buildings, to improve resilience, reduce energy consumption, and enhance energy supply security. Achieving these objectives requires optimal system selection and effective risk mitigation during system integration. To address this need, we introduce Platform-Based Design (PBD), a structured, hierarchical methodology adapted from other industrial sectors to the domain of energy system retrofits. We demonstrate the effectiveness of PBD through a techno-economic feasibility study comparing geothermal-coupled thermal energy networks (TENs) with conventional energy systems for heating, cooling, and powering 17 buildings at Joint Base Andrews (JBA) in Maryland. Our analysis illustrates that the PBD approach enables rigorous, data-driven, sequential decision making, resulting in a family of Pareto-optimal systems, among which the TEN emerged as the most promising solution. The selected TEN design integrates geothermal borefields, heat recovery heat pumps, photovoltaic (PV) arrays, and battery storage. Compared to the baseline system – gas heating combined with air-source chillers – the proposed TEN reduces annual imported energy by 74% and peak electricity demand by 45%, achieves a levelized cost of energy of $\$0.210$/kWh, and substantially enhances resilience. Life-cycle costs increase by approximately 6%, and initial investment costs are about 2.5 times higher than the baseline. However, if central plant infrastructure, district loops, and utility-scale PV and battery systems are privately funded and operated, the initial investment would fall below the baseline system cost. Critical to achieving these significant performance improvements were detailed nonlinear dynamic simulations coupling geothermal heat transfer, energy system operation, and realistic feedback control logic. These simulations identified essential design modifications and control strategy refinements that substantially reduced energy use, peak demand, and compressor shortcycling, thereby improving durability and reliability—issues that would have been significantly more expensive to resolve during operation. Additionally, the verification step highlighted sensitivities to key design parameters that could reduce initial investment by approximately $\$2$ million and reduce annual life-cycle costs more than $\$300,000$. We recommend adopting the PBD methodology for future feasibility studies and TEN pilot projects to gain valuable operational experience. Furthermore, we recommend that DoD invest in transferring and scaling the PBD methodology to other installations. This entails developing standardized computational frameworks and component libraries as well as training industry in conducting PBD. Such investments would enable rapid, robust, reliable, and cost-effective retrofits, supporting DoD’s ambitious energy system modernization goals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Performance Evaluation of Multi-Vendor Grid-Forming Inverters for Grid-Connected Operation Through Hardware Experimentation: Preprint

Existing real-world projects of GFM inverters that operate in parallel to power grids typically are sized between dozens and a few hundreds Megawatt (MW) scale according to a recent NERC GFM inverter white paper. These large systems are often difficult to evaluate prior to deployments because of their large size. The performance of smaller GFM inverters (dozens to a few hundreds MW) that operate parallel with power grids (distribution systems) is even less understood. There is an opportunity to better understand these systems through hardware testing under controlled laboratory conditions. Therefore, this paper presents the functional performance evaluation tests of multiple (three) commercial GFM inverters when they operate in parallel with the grid through hardware experiments. The goal of these tests is to explore the GFM inverters' functionalities and dynamic response when in parallel with power grids to eventually develop universal specifications for GFM inverters. Both steady state (changing the inverter's frequency and voltage droop) and transient (adding step change in grid's frequency/voltage) tests are performed for each GFM inverter with the same testing circuit and testing protocol. The experimental results indicate the bench-marked performance that: 1) the GFM inverters can be dispatched through frequency and voltage droop intercepts to output the target power when paralleled to the grid; 2) the GFM inverters automatically respond to system frequency and voltage events to output the needed power, however, the GFM inverters all show stability issues when absorbing reactive power from the grid.

grid-forming inverters↗

High-Temperature Latent Heat Storage System using Transportable Heat Pipes for Versatile Integration with Emerging Microreactors

With the growing interest in the development of micro nuclear reactors and their application to microgrid, high-temperature thermal energy storage (TES) has also been receiving great attention as a technology to reinforce the energy utilization and profitability of this class of reactors. Given the importance and research needs of the TES technology, a research project is underway at Idaho National Laboratory (INL) to develop high-temperature TES that can be easily interfaced with emerging micro nuclear reactors. Currently under development is the Heat pipe-Integrated Thermal Battery (HITB), a novel latent heat storage design that enables flexible and robust integration with any design of currently considered micro nuclear reactors. The development of detailed design based on the proposed TES concept, HITB, requires not only development and validation of modeling and simulation capabilities, but also research that spans thermal performance analysis, component- and system-scale design optimization, and experimental demonstrations including high-temperature feasibility testing. The current research efforts (and plans) are divided into the following four areas: (i) Thermal and structural modeling and analysis at both system- and component-scales for evaluating performance and conducting design optimization, (ii) Small-scale experimental demonstrations for the key components of the proposed HITB design, (iii) Modelica-based dynamic model development for developing a control strategy under dynamic operation within integrated energy systems configuration, (iv) Integrated experimental testing and demonstration. This paper introduces the overall research efforts that have been and are being conducted to develop and demonstrate the novel design of the high-temperature latent heat storage device, HITB. The key design features, ongoing research efforts including the development of modeling and simulation capabilities, small-scale demonstrations of the HITB’s key functionalities prior to scaled-up experimental demonstration, are discussed. Then, this paper concludes with a remark on the future research plans for this project.

25 ENERGY STORAGE↗

Use of Digital Real-Time Simulation and Optimization to Identify Maximum Real Power Injection on the Banshee Distribution Network: Preprint

This study investigates the hosting capacity of the Banshee Distribution Network by optimizing the real power injection at carefully selected Distributed Energy Resource (DER) locations. The analysis is conducted within the framework of power system operational constraints, including bus voltage ranges, thermal line ratings, and transformer loading limits. A Python-based Genetic Algorithm (GA), implemented using the PyGAD library, is employed to iteratively identify the optimal power injection configuration that maximizes network utilization while preserving system reliability. The methodology integrates a real-time simulation environment using the Real-Time Digital Simulator (RTDS), allowing high-fidelity evaluation of power flow and voltage behavior under each proposed injection scenario. By coupling the optimization algorithm with real-time simulation feedback, this approach ensures that both static and dynamic constraints are enforced during the evaluation process. The GA leverages evolutionary operators such as selection, crossover, and mutation to navigate the nonlinear search space efficiently. The results of the study delineate the feasible hosting capacity at three targeted buses, reflecting maximum real power levels that can be injected without causing voltage violations, transformer overloading, or line congestion. These findings provide a decision- support tool for distribution planners and utilities aiming to integrate higher penetrations of DERs in existing infrastructure. Additionally, the work lays the foundation for extending such optimization techniques to multi-objective formulations, including economic dispatch and reactive power coordination, in future studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Use of Digital Real-Time Simulation and Optimization to Identify Maximum Real Power Injection on Banshee Distribution Network

This study investigates the hosting capacity of the Banshee Distribution Network by optimizing the real power injection at carefully selected Distributed Energy Resource (DER) locations. The analysis is conducted within the framework of power system operational constraints, including bus voltage ranges, thermal line ratings, and transformer loading limits. A Python-based Genetic Algorithm (GA), implemented using the PyGAD library, is employed to iteratively identify the optimal power injection configuration that maximizes network utilization while preserving system reliability. The methodology integrates a real-time simulation environment using the Real-Time Digital Simulator (RTDS), allowing high-fidelity evaluation of power flow and voltage behavior under each proposed injection scenario. By coupling the optimization algorithm with real-time simulation feedback, this approach ensures that both static and dynamic constraints are enforced during the evaluation process. The GA leverages evolutionary operators such as selection, crossover, and mutation to navigate the nonlinear search space efficiently. The results of the study delineate the feasible hosting capacity at three targeted buses, reflecting maximum real power levels that can be injected without causing voltage violations, transformer overloading, or line congestion. These findings provide a decision- support tool for distribution planners and utilities aiming to integrate higher penetrations of DERs in existing infrastructure. Additionally, the work lays the foundation for extending such optimization techniques to multi-objective formulations, including economic dispatch and reactive power coordination, in future studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling Framework for Data Center

This chapter highlights the critical need for advanced modeling of data centers due to their rapidly increasing energy consumption and impact on grid reliability. Driven by the demand for AI applications, data centers are projected to consume a significant portion of US energy by 2028, putting stress on an already challenged power grid. The chapter emphasizes the importance of "fast" time-scale models to understand the dynamic interactions between data centers and the grid, especially given the rapid power fluctuations of AI workloads. It outlines a modeling framework that includes both offline and real-time EMT domain simulations, detailing the necessary representations for various components like utility interfaces, transformers, IT loads, UPS, cooling loads, Battery Energy Storage Systems (BESS), generators, protection systems, and higher-level control systems. While standard simulation tools like PSCAD offer basic models, custom development is often required to accurately capture the unique and fast-changing behaviors of modern data centers. The chapter also discusses key metrics and test cases for validating these models, focusing on transient load responses, protection relay coordination, and demand flexibility. Finally, it addresses the challenges of modeling large-scale data centers, such as computational complexity and the trade-off between model fidelity and practicality, suggesting hybrid modeling approaches as a solution. The overarching goal is to create a robust framework that helps assess data center impacts on grid stability, identify vulnerabilities, and inform the development of standards for reliable integration of these large loads into the bulk power system.

25 ENERGY STORAGE↗

Impedance Scan of Inverter-Based Resources and Diesel Generator for Stability Analysis: Preprint

Impedance-based methods are widely used for power system stability analysis with inverter-based resources (IBRs), e.g., assessing dynamic interactions between the power grid and an IBR, control interactions between multiple IBRs, and the sub-synchronous oscillation and damping phenomenon. Since it is difficult to get a numerical model 100% matching with the hardware IBR, using the hardware inverter directly to obtain its output impedance has become a prominent approach nowadays. Therefore, this article presents the impedance scan using hardware IBRs, and also a hardware diesel generator as it still stays with the grid before the grid completely goes to renewable. The devices under test (DuTs) for the impedance scan includes two 3-..phi.., 480 V, 60 Hz commercial grid-forming IBRs (one of 250 kVA and another of 125 kVA rating) in series with ..delta..-Y transformers, one 3-..phi.., 480 V, 60 Hz commercial grid-following IBR (of 125 kVA rating), and a 3-..phi.., 480 V, 60 Hz commercial diesel generator (of 187.5 kVA rating). Using voltage signals perturbed with sub-, inter-, and higher harmonic components, and measuring the current response, the positive-sequence impedances are computed via an offline- based post-analysis. Moreover, best-fit transfer functions are estimated that closely resemble the measured data points of the positive-sequence impedances. Based on the observations from various outcomes of the hardware experiments, this article also provides some fundamental insights on the equivalent positive- sequence impedance of a combination of multiple hardware components by comparing the estimated and the empirically computed impedances. A comparative insight on the damping capability of the DuTs using the positive-sequence impedances of the hardware is also discussed.

grid following inverter↗

Integrated Optimization and Control of a Hybrid Gas Turbine/sCO 2 Power System

During phase-I, the project team led by Echogen Power Systems (EPS) had two primary objectives based on investigating the application of gas turbines with supercritical carbon dioxide (sCO 2 ) power cycles. The first objective was to improve the overall efficiency and performance of a hybrid gas turbine/sCO 2 power system through a joint optimization of the two subsystems (gas turbine and sCO 2 power cycle) using non-linear optimization techniques that simultaneously evaluate thermal performance of the combined cycle. The hybrid power system included several points of interaction, including (but not limited to) gas turbine exhaust, fuel heating, inlet chilling and turbine cooling. The second objective was to establish a baseline transient response model of the hybrid power system and a notional microgrid and begin steps to integrate the control systems of the three major elements (gas turbine, sCO 2 cycle and grid controller). The project team established a baseline performance for a combined cycle power plant using a production gas turbine and scaled sCO 2 power cycle only utilizing exhaust heat recovery. Echogen’s non-linear techno-economic optimization code was extended by adding gas turbine component models derived from a in-house developed gas turbine design code. With the two cycles coupled by the gas turbine exhaust, design parameters of both cycles were allowed to vary simultaneously to determine performance opportunity versus isolated designs. Returning to the baseline gas turbine/sCO 2 power cycle transient models: Echogen had in-house developed sCO 2 cycle transient model in GT-Suite system simulation software, and had partnered with Siemens Finspång for gas turbine transient model, and Siemens PTI group to provide micro-grid load profile as well as hybrid power cycle generated load (power and frequency) analysis. The transient model for the SGT-750 Siemens gas turbine was a “black-box” functional mock-up interface (FMI) model developed by Siemens Industrial Turbomachinery in Finspång, Sweden. The SGT-750 is a twin-shaft gas turbine that produces 40 MW electricity with an efficiency of about 40% at ISO conditions. At 100% gas turbine throttle (load), the SGT-750 has average exhaust conditions of 114.6 kg/s and 469.8°C. The transient model for sCO 2 power cycle was developed by Echogen in GT-SUITE 1D system simulation software platform. The basic CO 2 flow circuit has single-shaft turbomachinery with net 11.5 MW electrical power output at design conditions. The power turbine has a double-ended shaft with one end connected to synchronous generator through a fixed-ratio gearbox. The other end of power turbine is connected to the compressor through a continuously variable transmission. The major components of the sCO 2 power cycle modeled include air cooled condenser/cooler, CO 2 compressor, recuperator, two waste heat exchanger coils, power turbine, continuous variable transmission, gearbox and generator. Integration of SGT-750 transient model and sCO 2 power cycle transient model was done in Matlab Simulink. In the integrated model, the gas turbine and sCO 2 power cycle interacted at two points, first one being the gas turbine exhaust gas flow rate and temperature, which were inputs to sCO 2 power cycle model. The second point was the distribution of micro-grid load demand signal between the SGT-750 generator and sCO 2 cycle generator. For a given combined-cycle load demand, the gas turbine load demand was equal to the total demand minus the sCO 2 cycle power generated. In the present study the integrated model was simulated for two cases of grid load demand: (i) for a step change, both positive-step and negative-step, in grid load demand (ii) for a micro-grid load demand curve provided by Siemens PTI group. Finally, the time series plots representing load demand versus integrated system response were presented including the sCO 2 power cycle control system performance plots. The actual generated power and frequency of both the generators, gas turbine and sCO 2 power cycle, was supplied to Siemens PTI group for dynamic grid assessment, results of which are provided in appendices.

03 NATURAL GAS↗