Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “distribution system planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Priority scheme planning for the robust SSM/PMAD testbed

Whenever mixing priorities of manually controlled resources with those of autonomously controlled resources, the space station module power management and distribution (SSM/PMAD) environment requires cooperating expert system interaction between the planning function and the priority manager. The elements and interactions of the SSM/PMAD planning and priority management functions are presented. Their adherence to cooperating for common achievement are described. In the SSM/PMAD testbed these actions are guided by having a system planning function, KANT, which has insight to the executing system and its automated database. First, the user must be given access to all information which may have an effect on the desired outcome. Second, the fault manager element, FRAMES, must be informed as to the change so that correct diagnoses and operations take place if and when faults occur. Third, some element must engage as mediator for selection of resources and actions to be added or removed at the user's request. This is performed by the priority manager, LPLMS. Lastly, the scheduling mechanism, MAESTRO, must provide future schedules adhering to the user modified resource base.

Elges, Michael R.↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data Request for the Distribution Grid Atlas

Model-based, distribution powerflow analysis is a foundational component of system planning and grid modernization efforts, but data security is an impediment to collaboration among utility engineers, researchers, developers, community members, and other stakeholders. Pacific Northwest National Laboratory (PNNL) and the National Renewable Energy Laboratory (NREL) are partnering to develop the new Distribution Grid Atlas - a publicly available catalog of realistic, geographically relevant, representative distribution feeder models without sensitive geographic information, customer data, or disclosure of utility models. We are looking for utilities to share data for the Distribution Grid Atlas.

distribution↗

A computer model of solar panel-plasma interactions

High power solar arrays for satellite power systems are presently being planned with dimensions of kilometers, and with tens of kilovolts distributed over their surface. Such systems face many plasma interaction problems, such as power leakage to the plasma, particle focusing, and anomalous arcing. These effects cannot be adequately modeled without detailed knowledge of the plasma sheath structure and space charge effects. Laboratory studies of 1 by 10 meter solar array in a simulated low Earth orbit plasma are discussed. The plasma screening process is discussed, program theory is outlined, and a series of calibration models is presented. These models are designed to demonstrate that PANEL is capable of accurate self consistant space charge calculations. Such models include PANEL predictions for the Child-Langmuir diode problem.

Cooke, D. L.↗

A Plan for Revolutionary Change in Gas Turbine Engine Control System Architecture

The implementation of Distributed Engine Control technology on the gas turbine engine has been a vexing challenge for the controls community. A successful implementation requires the resolution of multiple technical issues in areas such as network communications, power distribution, and system integration, but especially in the area of high temperature electronics. Impeding the achievement has been the lack of a clearly articulated message about the importance of the distributed control technology to future turbine engine system goals and objectives. To resolve these issues and bring the technology to fruition has, and will continue to require, a broad coalition of resources from government, industry, and academia. This presentation will describe the broad challenges facing the next generation of advanced control systems and the plan which is being put into action to successfully implement the technology on the next generation of gas turbine engine systems.

Culley, Dennis E.↗

Distribution Capacity Expansion Planning: Current Practice, Opportunities, and Decision Support

The distribution utility industry and its engineers are experiencing monumental shifts in consumer needs and expectations. Characterizing future native loads as compared to net load demand for long-term capacity planning is especially difficult, as consumers are increasingly adopting prosumer technologies. This paper is the culmination of 5 months of utility interviews coordinated by the National Renewable Energy Lab (NREL) and Kevala, Inc. (Kevala) to better understand distribution capacity planning challenges. The interviews covered all aspects of capacity planning including load and DER forecasting, criteria for assessing system constraints, solution types, and organizational and decision-making structures. Our intent is to provide insight into distribution capacity planning decision support needs for utilities and the increasing number of stakeholders involved, from state and regulatory agencies to community and solution providers with interest in increasing their understanding in the distribution capacity planning process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Major Drivers of Long-Term Distribution Transformer Demand

Distribution transformers, used to step-down medium voltage to service-voltage level for end-use electrical consumption, are currently experiencing major shortages. Utilities are experiencing extended lead times for transformers of up to 2 years (a 4x increase on lead times pre-2022) and prices have gone up by as much as 5-6 times in the past 2 years. Current shortages have been attributed to pent-up post-pandemic demand, workforce shortages and low retention rates, component supply chain challenges, and materials shortages (grain-oriented electrical steel, aluminum, and copper). The supply of this equipment is critical for the reliability and growth of the power system, and in meeting administration climate goals in terms of electrification of demand and the growth of renewable energy. This report details some of the initial analysis conducted by the National Renewable Energy Laboratory (NREL), supported by the Department of Energy's Office of Electricity and Office of Policy, in assessing the long-term demand trends for distribution transformers. Expected increased demand is due to a confluence of not only electrification and renewable energy growth, but also in the context of aging electric infrastructure, increased frequency and severity of extreme weather events, and utility-driven investments in reliability and resiliency of the electricity distribution system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

UT-GOM2-2 Prospectus: Science and Sample Distribution Plan

The University of Texas (UT), Genesis of Methane Hydrate in Coarse-Grained Systems: Northern Gulf of Mexico Slope Project (GOM2), will perform the UT-GOM2-2 drilling and coring expedition in the Terrebonne Basin, Gulf of Mexico outer continental shelf. This is the scientific plan for the acquisition, storage, analysis, and distribution of core and other collected samples for UT-GOM2-2.

03 NATURAL GAS↗

Probabilistic Reasoning for Plan Robustness

A planning system must reason about the uncertainty of continuous variables in order to accurately project the possible system state over time. A method is devised for directly reasoning about the uncertainty in continuous activity duration and resource usage for planning problems. By representing random variables as parametric distributions, computing projected system state can be simplified in some cases. Common approximation and novel methods are compared for over-constrained and lightly constrained domains. The system compares a few common approximation methods for an iterative repair planner. Results show improvements in robustness over the conventional non-probabilistic representation by reducing the number of constraint violations witnessed by execution. The improvement is more significant for larger problems and problems with higher resource subscription levels but diminishes as the system is allowed to accept higher risk levels.

autonomous planning↗

OAST space power technology program

The current research and technology (R and T) base program is first described, then special attention is directed toward outlining a new system technology specifically oriented toward providing the utility power plant technology base for semi-permanent earth orbital facilities expected to be needed in the middle to late 1980's. The R and T program involves five areas of research: (1) photovoltaic energy conversion; (2) chemical energy conversion and storage; (3) thermal-to-electric conversion; (4) environment interactions; and (5) power systems management and distribution. The general objectives and planned direction of efforts in each of these areas is summarized.

Mullin, J. P.↗

Estimating the impacts of natural gas power generation growth on solar electricity development: PJM's evolving resource mix and ramping capability

Abstract Expansion of distributed solar photovoltaic (PV) and natural gas‐fired generation capacity in the United States has put a renewed spotlight on methods and tools for power system planning and grid modernization. This article investigates the impact of increasing natural gas‐fired electricity generation assets on installed distributed solar PV systems in the Pennsylvania–New Jersey–Maryland (PJM) Interconnection in the United States over the period 2008–2018. We developed an empirical dynamic panel data model using the system‐generalized method of moments (system‐GMM) estimation approach. The model accounts for the impact of past and current technical, market and policy changes over time, forecasting errors, and business cycles by controlling for PJM jurisdictions‐level effects and year fixed effects. Using an instrumental variable to control for endogeneity, we concluded that natural gas does not crowd out renewables like solar PV in the PJM capacity market; however, we also found considerable heterogeneity. Such heterogeneity was displayed in the relationship between solar PV systems and electricity prices. More interestingly, we found no evidence suggesting any relationship between distributed solar PV development and nuclear, coal, hydro, or electricity consumption. In addition, considering policy effects of state renewable portfolio standards, net energy metering, differences in the PJM market structure, and other demand and cost‐related factors proved important in assessing their impacts on solar PV generation capacity, including energy storage as a non‐wire alternative policy technique. This article is categorized under: Photovoltaics > Economics and Policy Fossil Fuels > Climate and Environment Energy Systems Economics > Economics and Policy

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Multi-agent planning and scheduling, execution monitoring and incremental rescheduling: Application to motorway traffic

This article describes a planning method applicable to agents with great perception and decision-making capabilities and the ability to communicate with other agents. Each agent has a task to fulfill allowing for the actions of other agents in its vicinity. Certain simultaneous actions may cause conflicts because they require the same resource. The agent plans each of its actions and simultaneously transmits these to its neighbors. In a similar way, it receives plans from the other agents and must take account of these plans. The planning method allows us to build a distributed scheduling system. Here, these agents are robot vehicles on a highway communicating by radio. In this environment, conflicts between agents concern the allocation of space in time and are connected with the inertia of the vehicles. Each vehicle made a temporal, spatial, and situated reasoning in order to drive without collision. The flexibility and reactivity of the method presented here allows the agent to generate its plan based on assumptions concerning the other agents and then check these assumptions progressively as plans are received from the other agents. A multi-agent execution monitoring of these plans can be done, using data generated during planning and the multi-agent decision-making algorithm described here. A selective backtrack allows us to perform incremental rescheduling.

Mourou, Pascal↗

Plan It Together: Optimizing Across Generation, Transmission, Distribution, and Distributed Energy Resources

Integrated planning holds the promise of unlocking lower total system cost solutions by connecting previously siloed planning processes. This article summarizes the state of bulk and local grid planning today and details multiple new analytical approaches that can enable more holistic planning methods to develop comprehensive solutions to generation, transmission, distribution, and distributed energy resource needs. These include both iterative approaches as well as cooptimization techniques. In addition to the benefits of these methods, the technical and institutional challenges and associated solutions are also discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Field Evaluations of Sampling, Interviewing, and Flight Tracking of NASA's Low Boom Flight Demonstrator Aircraft

The first year’s effort identified sampling and interviewing as the principal risks to assessment of prompt reactions to overflights producing low-amplitude sonic booms. It also 1) established the utility of geo-information system-based route planning for LBFD flight missions, 2) developed and demonstrated a prototype of a geographically-distributed, Internet-enabled instrumentation system capable of wide-area tracking of LBFD aircraft in near-real time. The latter system permits synchronizing the conduct of interviews in multiple overflown communities with arrival times of shock waves at interviewing sites; and of measuring, archiving, and processing their acoustic signatures. Means were also recommended for constructing representative, telephone-based samples of eligible respondents living in households within carpet boom corridors adjacent to LBFD flight tracks, and for conducting interviews with cross-sectional (independent) samples of such respondents about their prompt reactions to exposure to low-amplitude sonic booms. A detailed study design was prepared and accepted by NASA for a set of single-contact attempt telephone interviews with a nationally representative sample of households. The study design focused on testing automated and live agent interview completion rates obtainable without callbacks. A minimal (two monitoring station) version of the aircraft tracking system was built and installed near a civil airport in a successful demonstration of the system’s ability to detect and track aircraft movements. The field exercise also demonstrated the ability of the system to capture the acoustic emissions of departing aircraft, and to serve aircraft position and sound level information to remote, geographically-distributed analysts in near-real time. Upon approval of OMB and IRB of the detailed study plan, a stratified, nationally representative sample of landline and wireless telephone-subscribing households was constructed. A total of 12,734 telephone interview contact attempts of the sort required by a straightforward cross-sectional study design were then made. These contact attempts demonstrated the impracticality of conducting a time-critical, cross-sectional study of prompt community response to low-amplitude sonic booms by means of “independent” (single contact attempt per respondent for each LBFD flight mission) telephone samples of respondents. The observed interview completion rates for these single telephone contact attempts were so low (~ 1% to 3% for automated and live agent interviews, respectively) that: 1) the representativeness of collected opinions would be susceptible to intuitive challenge as inadequate, even absent conclusive evidence of non-representativeness. Refuting challenges to representativeness would have to demonstrate that the composition of the actual sample did not differ from that of the target population, a task that is tantamount to proving a negative; 2) the information required to refute allegations of non-representativeness would require a questionnaire considerably lengthier than that required simply to determine the prevalence of boom-induced startle and annoyance. Such a questionnaire would have to inquire about potentially sensitive and intrusive matters, including respondents’ age, gender, education, employment, home ownership, income, ethnicity, family size, and other demographic factors; and 3) unreasonable numbers of attempts would be required to re-contact households with unsuccessful initial contact attempts, given the limited time available for doing so. For example, if about 500 completed interviews were desired in a supersonically overflown community, approximately 50,000 automated interview attempts would have to be made within ten to fifteen minutes of each LBFD overflight. Such large numbers of contact attempts could well exceed the numbers of households available for interview in areas of similar boom exposure levels in some communities near LBFD flight tracks. Such large numbers of interviews could be cost-effectively undertaken only by means of automated (i.e., outgoing interactive voice response) interviewing, a data collection method ill-suited for complex and sensitive questionnaire items. The infeasibility of independent sampling for evaluating prompt responses to LBFD overflights in a cross-sectional study is due in large part to simple non-response: that is, potential respondents – particularly those contacted on wireless telephones – refusing to answer calls with unfamiliar caller IDs. It is also due in part, however, to 1) the lack of time to attempt to contact the same respondent more than once within a few minutes after the arrival of a shock wave at the respondent’s location; and 2) the need to place calls during weekday/daytime hours, when response rates are notably lower than during evenings and weekends. Despite the poor interview completion rates achieved under the above constraints, cross sectional assessments of delayed reactions to LBFD overflights could still be feasible, if multiple attempts could be made to contact respondents during evening and weekend time periods, over extended time periods. Detailed plans for a longitudinal (panel) sample were developed as an alternative to a cross sectional sample design.

Fidell, Sanford↗

Puerto Rico Grid and Recovery Post Hurricane Maria

This presentation discusses the impact of and recovery from Hurricanes Irma and Maria in Puerto Rico. The hurricanes hit two weeks apart in 2017, resulting in damage to all elements (generation, distribution, and transmission) of Puerto Rico's already fragile energy system.

demand response↗

Frequency Recovery in Power Grids Using High-Performance Computing

Maintaining electric power system stability is paramount, especially in extreme contingencies involving unexpected outages of multiple generators or transmission lines that are typical during severe weather events. Such outages often lead to large supply-demand mismatches followed by subsequent system frequency deviations from their nominal value. The extent of frequency deviations is an important metric of system resilience, and its timely mitigation is a central goal of power system operation and control. This paper develops a novel nonlinear model predictive control (NMPC) method to minimize frequency deviations when the grid is affected by an unforeseen loss of multiple components. Our method is based on a novel multi-period alternating current optimal power flow (ACOPF) formulation that accurately models both nonlinear electric power flow physics and the primary and secondary frequency response of generator control mechanisms. We develop a distributed parallel Julia package for solving the large-scale nonlinear optimization problems that result from our NMPC method and thereby address realistic test instances on existing high-performance computing architectures. Our method demonstrates superior performance in terms of frequency recovery over existing industry practices, where generator levels are set based on the solution of single-period classical ACOPF models.

nonlinear model predictive control↗