Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “dispatch scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Wind-To-Hydrogen Energy Pilot Project

WIND-TO-HYDROGEN ENERGY PILOT PROJECT: BASIN ELECTRIC POWER COOPERATIVE In an effort to address the hurdles of wind-generated electricity (specifically wind's intermittency and transmission capacity limitations) and support development of electrolysis technology, Basin Electric Power Cooperative (BEPC) conducted a research project involving a wind-to-hydrogen system. Through this effort, BEPC, with the support of the Energy & Environmental Research Center at the University of North Dakota, evaluated the feasibility of dynamically scheduling wind energy to power an electrolysis-based hydrogen production system. The goal of this project was to research the application of hydrogen production from wind energy, allowing for continued wind energy development in remote wind-rich areas and mitigating the necessity for electrical transmission expansion. Prior to expending significant funding on equipment and site development, a feasibility study was performed. The primary objective of the feasibility study was to provide BEPC and The U.S. Department of Energy (DOE) with sufficient information to make a determination whether or not to proceed with Phase II of the project, which was equipment procurement, installation, and operation. Four modes of operation were considered in the feasibility report to evaluate technical and economic merits. Mode 1 - scaled wind, Mode 2 - scaled wind with off-peak, Mode 3 - full wind, and Mode 4 - full wind with off-peak In summary, the feasibility report, completed on August 11, 2005, found that the proposed hydrogen production system would produce between 8000 and 20,000 kg of hydrogen annually depending on the mode of operation. This estimate was based on actual wind energy production from one of the North Dakota (ND) wind farms of which BEPC is the electrical off-taker. The cost of the hydrogen produced ranged from $20 to $10 per kg (depending on the mode of operation). The economic sensitivity analysis performed as part of the feasibility study showed that several factors can greatly affect, both positively and negatively, the "per kg" cost of hydrogen. After a September 15, 2005, meeting to evaluate the advisability of funding Phase II of the project DOE concurred with BEPC that Phase I results did warrant a "go" recommendation to proceed with Phase II activities. The hydrogen production system was built by Hydrogenics and consisted of several main components: hydrogen production system, gas control panel, hydrogen storage assembly and hydrogen-fueling dispenser The hydrogen production system utilizes a bipolar alkaline electrolyzer nominally capable of producing 30 Nm3/h (2.7 kg/h). The hydrogen is compressed to 6000 psi and delivered to an on-site three-bank cascading storage assembly with 80 kg of storage capacity. Vehicle fueling is made possible through a Hydrogenics-provided gas control panel and dispenser able to fuel vehicles to 5000 psi. A key component of this project was the development of a dynamic scheduling system to control the wind energy's variable output to the electrolyzer cell stacks. The dynamic scheduling system received an output signal from the wind farm, processed this signal based on the operational mode, and dispatched the appropriate signal to the electrolyzer cell stacks. For the study BEPC chose to utilize output from the Wilton wind farm located in central ND. Site design was performed from May 2006 through August 2006. Site construction activities were from August to November 2006 which involved earthwork, infrastructure installation, and concrete slab construction. From April - October 2007, the system components were installed and connected. Beginning in November 2007, the system was operated in a start-up/shakedown mode. Because of numerous issues, the start-up/shakedown period essentially lasted until the end of January 2008, at which time a site acceptance test was performed. Official system operation began on February 14, 2008, and continued through the end of December 2008. Several issues continued to prevent consistent operation, resulting in operation of the system in fits and starts. During the operational period, three ramp tests were performed on the electrolyzer cell stacks to evaluate cell stack degradation, if present. In addition, from December 23 - 30 2008, the hydrogen system was operated using Mode 1 protocol. From February 14, 2008 - December 31, 2008, the system produced a total of just less than 26,000,000 liters (2320 kg), including approximately 3,300,000 liters (295 kg) of hydrogen during Mode 1 operation. Unfortunately, the chronic shutdown issues prevented consistent operation and, therefore, did not allow for any accurate economic analysis as originally intended. With that said, much valuable experience was gained in the form of "lessons learned," and the project served as an extremely valuable platform for educating the public.

17 WIND ENERGY↗

Multi-stage charging and discharging of electric vehicle fleets

Fleets of electric vehicles will likely shift electricity demand, and the effect of upstream charging emissions will come from generation sources that are dispatched in response. This study proposes a multi-stage charging and discharging problem to translate low-cost energy transactions into vehicle dispatch decisions. A day-ahead charging optimization problem minimizes electricity purchases and marginal emissions damages, with energy transactions becoming targets in an optimization-based dispatch strategy for an on-demand shared autonomous electric vehicle (SAEV) fleet. The framework was tested for Austin, Texas, using an agent-based simulator. Fleets can schedule charging to lower daily power costs (averaging 15.5% or $\$0.79$/day/SAEV) while reducing health damages from generation-related pollution (2.8% or $\$0.43$/day/SAEV). Finally, fleet managers can increase profits ($\$8$ per SAEV per day) by adopting a multi-stage charging and discharging strategy that can serve more passengers per day than price-agnostic dispatch strategies.

33 ADVANCED PROPULSION SYSTEMS↗

Automated power management and control

A comprehensive automation design is being developed for Space Station Freedom's electric power system. A joint effort between NASA's Office of Aeronautics and Exploration Technology and NASA's Office of Space Station Freedom, it strives to increase station productivity by applying expert systems and conventional algorithms to automate power system operation. The initial station operation will use ground-based dispatches to perform the necessary command and control tasks. These tasks constitute planning and decision-making activities that strive to eliminate unplanned outages. We perceive an opportunity to help these dispatchers make fast and consistent on-line decisions by automating three key tasks: failure detection and diagnosis, resource scheduling, and security analysis. Expert systems will be used for the diagnostics and for the security analysis; conventional algorithms will be used for the resource scheduling.

Dolce, James L.↗

Economic dispatch for electricity merchant with energy storage and wind plant: State of charge based decision making considering market impact and uncertainties

Here this paper investigates how the market impact of electricity merchants and uncertainty of wind generation affect their co-optimized scheduling policy, specifically for merchants who have both energy storage and wind plants. In the existing literature, merchants' trading actions are usually assumed not to affect market prices; however, a large-scale energy storage merchant's actions can affect market prices. To this end, we approximate the electricity price by a linear function of the quantity of power traded by the merchant in the reward function to achieve decision-making incorporating the market impact. This paper utilizes the dynamic programming approach to analyze merchants' optimal multi-period decision-making incorporating market impact, uncertain wind generation, and energy storage constraints. First, our results demonstrate that for a merchant with co-located energy storage facilities and wind power plants, the energy storage's feasible state of charge (SOC) range can be segmented into four possible sub-ranges by three analytically developed SOC reference points. The unique optimal trading decision can be achieved by comparing the current energy inventory and the SOC references of the next period. Second, our results show that market impact and uncertainties substantially change the optimal storage scheduling policy by impacting the values of the reference points. To mitigate the negative effect of the merchant's market impact on buying and selling actions, the merchant may reduce the amount of generating or pumping electricity each period to maximize profit. Moreover, we identify and investigate the trade-off between market price and transaction quantity. Our findings provide co-optimized scheduling guidance for electricity merchants with co-located energy storage and renewable power plants systems.

17 WIND ENERGY↗

A coordination theory for intelligent machines

A formal model for the coordination level of intelligent machines is established. The framework of the coordination level investigated consists of one dispatcher and a number of coordinators. The model called coordination structure has been used to describe analytically the information structure and information flow for the coordination activities in the coordination level. Specifically, the coordination structure offers a formalism to (1) describe the task translation of the dispatcher and coordinators; (2) represent the individual process within the dispatcher and coordinators; (3) specify the cooperation and connection among the dispatcher and coordinators; (4) perform the process analysis and evaluation; and (5) provide a control and communication mechanism for the real-time monitor or simulation of the coordination process. A simple procedure for the task scheduling in the coordination structure is presented. The task translation is achieved by a stochastic learning algorithm. The learning process is measured with entropy and its convergence is guaranteed. Finally, a case study of the coordination structure with three coordinators and one dispatcher for a simple intelligent manipulator system illustrates the proposed model and the simulation of the task processes performed on the model verifies the soundness of the theory.

Wang, Fei-Yue↗

A Methodology for Quantifying Reliability Benefits From Improved Solar Power Forecasting in Multi-Timescale Power System Operations

Solar power forecasting improvements are mainly evaluated by statistical and economic metrics, and the practical reliability benefits of these forecasting enhancements have not yet been well quantified. This paper aims to quantify reliability benefits from solar power forecasting improvements. To systematically analyze the relationship between solar power forecasting improvements and reliability performance in power system operations, an expected synthetic reliability (ESR) metric is proposed to integrate state-of-the-art independent reliability metrics. The absolute value and standard deviation of area control errors (ACE), and the North American Electric Reliability Corporation Control Performance Standard 2 (CPS2) score are calculated through the multi-timescale scheduling simulation, including the day-ahead unit commitment (DU), real-time unit commitment (RU), real-time economic dispatch (RE), automatic generation control (AGC) sub-models. The absolute area control error in energy (AACEE), CPS2 violations, CPS2 score, and standard deviation of the raw ACE are all calculated and combined as the ESR metric. Numerical simulations show that the reliability benefits of multi-timescale power system operations are significantly increased due to the improved solar power forecasts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-layered Energy Management Framework for Extreme Fast Charging Stations Considering Demand Charges, Battery Degradation, and Forecast Uncertainties

To achieve a cost-effective and expeditious charging experience for extreme fast charging station (XFCS) owners and electric vehicle (EV) users, the optimal operation of XFCS is crucial. It is however challenging to simultaneously manage the profit from energy arbitrage, the cost of demand charges, and the degradation of a battery energy storage system (BESS) under uncertainties. This paper, therefore, proposes a multi-layered multi-time scale energy flow management framework for an XFCS by considering long- and short-term forecast uncertainties, monthly demand charges reduction, and BESS life degradation. In the proposed approach, an upper scheduling layer (USL) ensures the overall operation economy and yields optimal scheduling of the energy resources on a rolling horizon basis, thereby considering the long-term forecast errors. A lower dispatch layer (LDL) takes the short-term forecast errors into account during the real-time operation of the XFCS. Per the latest research, monthly demand charges can be as high as 90% of the total monthly bills for EV fast charging stations; to this end, this paper takes the first attempt at the reduction of demand charges cost by considering the trade-off between the energy cost and monthly demand charges. Contrasting literature, this work allocates an energy reserve in the BESS stored energy to deal with the impact of short-term forecast errors on the optimized real-time operation of the XFCS. Moreover, degradation modeling considers the trade-off between short-term benefits and long-term BESS life degradation. As a result, case studies and a comparative analysis prove the efficacy of the proposed framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Accurate Load and Generation Scheduling for Linearized DC Models with Contingencies

The power restoration timeline suggested by the DC power flow and the Angle Constrained DC power flow is shown. Unfortunately, the suggested generator dispatch does not always lead to feasible AC power flow solutions. Even when the AC solution is feasible, the inaccuracies of the DC power flow can lead to significant line overloads.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Three-Stage Production Cost Modeling Approach for Evaluating the Benefits of Intra-Hour Scheduling Between Balancing Authorities

This paper introduces a production cost modeling approach for evaluating the benefits of intra-hour scheduling among Balancing Authorities (BAs). System operation is modeled in a three-stage sequential manner: day ahead (DA)-hour ahead (HA) real time (RT). In addition to contingency reserve, each BA will need to carry out 'up' and 'down' load following and regulation reserve capacity requirements in the DA and HA time frames. In the RT simulation, only contingency and regulation reserves are carried out as load following is deployed. To model current RT operation with hourly schedules, a new constraint was introduced to force each BA net exchange schedule deviation from HA schedules to be within North American Electric Reliability Corporation (NERC) area control error (ACE) limits. Case studies that investigate the benefits of moving from hourly exchange schedules between Western Electricity Coordinating Council (WECC) BAs into 10-minute exchange schedules under two different levels of wind and solar penetration (11% and 33%) are presented.

17 WIND ENERGY↗

Federated Architecture for Secure and Transactive Distributed Energy Resource Management Solutions (FAST-DERMS)

This document provides system-level specifications for a federated architecture for secure and transactive distributed energy resource management solutions (FAST-DERMS), presents a solution, and describes operational concepts for the proposed solution. FAST-DERMS enables the provision of reliable, resilient, and secure transmission and distribution (T&D) grid services through the scalable aggregation and near-real-time management of utility-scale and small-scale distributed energy resources (DERs). We first present the principles and objectives of FAST-DERMS. Then, after discussing important system concepts, we present the specifications for FAST-DERMS and a solution that employs a distributed and federated control methodology in which the DERs connected to a single point of common coupling with the rest of the system, such as individual substations, are optimized coordinately to provide system-level grid services. FAST-DERMS aims to aggregate and coordinate the operations of DERs to support T&D grid operations. The key optimization and control component of this FAST-DERMS reference implementation is a flexible resource scheduler (FRS) that aggregates the DERs within a substation service area. These FRSs operate at the substation level and perform constrained economic dispatch of DERs, either directly or through a transactive market or aggregator, as shown in Figure ES-1. An FRS Coordinator at the distribution system operator (DSO) level aggregates distribution substations operated by FRSs and interfaces with the transmission system operator (TSO) to provide transmission services. FAST-DERMS also allows for the integration of the FRS Coordinator with an existing distribution utility management system that could be employed by the DSO to enhance distribution grid operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic Controllability and Dispatchability Relationships

An important issue for temporal planners is the ability to handle temporal uncertainty. Recent papers have addressed the question of how to tell whether a temporal network is Dynamically Controllable, i.e., whether the temporal requirements are feasible in the light of uncertain durations of some processes. We present a fast algorithm for Dynamic Controllability. We also note a correspondence between the reduction steps in the algorithm and the operations involved in converting the projections to dispatchable form. This has implications for the complexity for sparse networks.

controllability↗

Validation and Demonstration of Control System Functional Capabilities within the IES Plug-and-Play Simulation Environment

The concept of an integrated energy system (IES) is meant to combine different energy technologies in synergistic ways to achieve a more secure and economical energy supply. The RAVEN-based HYBRID framework is used to find the optimal installed capacity and the optimal economical dispatch of each component of the IES. The new RAVEN plugin for grid and capacity optimization (HERON) only addresses the limits that affect the production variables and the corresponding rates of variation (explicit constraints). However, other variables are subject to constraints, and the associated limits should be accounted for (implicit constraints). In particular, for the power dispatch problem, the optimization algorithm takes into account the limits on the electrical power output and the corresponding hourly power variations but does not consider other constraints on process variables whose response affects the service life of the IES. This report describes a scheme that allows accounting for implicit constraints without increasing the size of the optimization problem. To obtain a more accurate approximation of the nonlinear dynamic behavior, a parametric version of the dynamic mode decomposition with control (DMDc) algorithm was developed to derive the state-space representation matrices of the IES components at different scheduling parameter. Thanks to this approach, a more accurate approximation of the system response can be obtained, the limits imposed by thermal mechanical implicit constraints can be translated into power dispatch limits, and the feedbacks to HERON power dispatcher can be provided. To assess the developed methodology, a power dispatching test case composed of three power generating and storage units (Balance of Plant, Secondary Energy Source, Thermal Energy Storage) was developed. The power output of each one of the three units was optimized to meet the imposed time-dependent load demand trajectory and to maximize the IES profitability by meeting both the explicit and implicit constraints.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Hidden Flexibility of the Natural Gas Network for Electric Power Operations: A Case Study of a Near-Miss Winter Event

The U.S. power sector has become increasingly reliant on gas pipeline networks to deliver fuel to natural gas power plants. In addition to supplying relatively low-cost fuel, gas networks offer generators flexibility in their operations through the ability to deliver fuel when needed by using gas storage facilities or linepack if the gas network is at an operating point below its design capacity. However, disruptions or stress events on the gas network - like those occurring in the Northeast and Texas in recent years - can result in limitations on gas availability to generators at times when generation is in short supply. Here we examine a period of stress that occurred in the winter of 2022 in the Western United States. Using data on the region's natural gas pipeline network and electric generators, we build an integrated gas and electric model that closely replicates the actual dispatch of the period. We then evaluate the implications of removing flexibility employed by the gas network operator, which during that period curtailed scheduled gas deliveries to other parties to increase deliveries to natural gas power plants, which requested more gas than initially forecasted. We find that without the flexibility supplied by the gas network operator, there would have been curtailment of gas generation due to gas offtake constraints, requiring the power system operator to redispatch relying on more expensive generation or to potentially shed load. A sensitivity exploring a wind drought further exacerbates the strain, illustrating the potential challenge of managing gas and grid interactions as systems move to higher shares of variable renewable electricity. Based on this example, we discuss potential coordination strategies between the two system operators to ensure that the power system can successfully utilize and rely on the flexibility offered by natural gas networks.

03 NATURAL GAS↗

On Why It Is Impossible to Prove that the BDX90 Dispatcher Implements a Time-sharing System

The Software Implemented Fault Tolerance SIFT system, is written in PASCAL except for about a page of machine code. The SIFT system implements a small time sharing system in which PASCAL programs for separate application tasks are executed according to a schedule with real time constraints. The PASCAL language has no provision for handling the notion of an interrupt such as the B930 clock interrupt. The PASCAL language also lacks the notion of running a PASCAL subroutine for a given amount of time, suspending it, saving away the suspension, and later activating the suspension. Machine code was used to overcome these inadequacies of PASCAL. Code which handles clock interrupts and suspends processes is called a dispatcher. The time sharing/virtual machine idea is completely destroyed by the reconfiguration task. After termination of the reconfiguration task, the tasks run by the dispatcher have no relation to those run before reconfiguration. It is impossible to view the dispatcher as a time-sharing system implementing virtual BDX930s running concurrently when one process can wipe out the others.

Boyer, R. S.↗

Post-Disturbance Dynamic Distribution System Restoration with DGs and Mobile Resources

Distributed generations (DGs) can act as emergency power supplies when distribution systems suffer from outages. However, the generation capabilities of DGs are generally limited by a number of factors including weather conditions, fuel limitations, etc. In this context, mobile resources that are able to reallocate resources to desired locations are regarded as important complements to conventional fixed DGs in assisting distribution system restoration. In this paper, a distribution system restoration model with DGs and mobile resources is proposed. Firstly, the dispatch and allocation of mobile resources are modeled with respect to the characteristics of the traffic network. Then the developed mobile resource models are integrated into the distribution system restoration model to co-optimize the scheduling of DGs and mobile resources. Uncertainty factors are managed by a model predictive control approach so that system operators can dynamically adjust the restoration strategy with the up-to-date information. The effectiveness of the proposed method is validated through an IEEE 13-bus test system.

distributed generations (DGs)↗

Review of the WECC EDT phase 2 EIM benefits analysis and results report.

A region-wide Energy Imbalance Market (EIM) was recently proposed by the Western Electricity Coordinating Council (WECC). In order for the Western Area Power Administration (Western) to make more informed decisions regarding its involvement in the EIM, Western asked Argonne National Laboratory (Argonne) to review the EIM benefits study (the October 2011 revision) performed by Energy and Environmental Economics, Inc. (E3). Key components of the E3 analysis made use of results from a study conducted by the National Renewable Energy Laboratory (NREL); therefore, we also reviewed the NREL work. This report examines E3 and NREL methods and models used in the EIM study. Estimating EIM benefits is very challenging because of the complex nature of the Western Interconnection (WI), the variability and uncertainty of renewable energy resources, and the complex decisions and potentially strategic bidding of market participants. Furthermore, methodologies used for some of the more challenging aspects of the EIM have not yet matured. This review is complimentary of several components of the EIM study. Analysts and modelers clearly took great care when conducting detailed simulations of the WI using well-established industry tools under stringent time and budget constraints. However, it is our opinion that the following aspects of the study and the interpretation of model results could be improved upon in future analyses. The hurdle rate methodology used to estimate current market inefficiencies does not directly model the underlying causes of sub-optimal dispatch and power flows. It assumes that differences between historical flows and modeled flows can be attributed solely to market inefficiencies. However, flow differences between model results and historical data can be attributed to numerous simplifying assumptions used in the model and in the input data. We suggest that alternative approaches be explored in order to better estimate the benefits of introducing market structures like the EIM. In addition to more efficient energy transactions in the WI, the EIM would reduce the amount of flexibility reserves needed to accommodate forecast errors associated with variable production from wind and solar energy resources. The modeling approach takes full advantage of variable resource diversity over the entire market footprint, but the projected reduction in flexibility reserves may be overly optimistic. While some reduction would undoubtedly occur, the EIM is only an energy market and would therefore not realize the same reduction in reserves as an ancillary services market. In our opinion the methodology does not adequately capture the impact of transmission constraints on the deployment of flexibility reserves. Estimates of flexibility reserves assume that forecast errors follow a normal distribution. Improved estimates could be obtained by using other probability distributions to estimate up and down reserves to capture the underlying uncertainty of these resources under specific operating conditions. Also, the use of a persistence forecast method for solar is questionable, because solar insolation follows a deterministic pattern dictated by the sun's path through the sky. We suggest a more rigorous method for forecasting solar insolation using the sun's relatively predictable daily pattern at specific locations. The EIM study considered only one scenario for hydropower resources. While this scenario is within the normal range over the WI footprint, it represents a severe drought condition in the Colorado River Basin from which Western schedules power. Given hydropower's prominent role in the WI, we recommend simulating a range of hydropower conditions since the relationship between water availability and WI dispatch costs is nonlinear. Also, the representation of specific operational constraints faced by hydropower operators in the WI needs improvements. The model used in the study cannot fully capture all of the EIM impacts and complexities of power system operations. In particular, a primary benefit of the EIM is a shorter dispatch interval; namely, 5 minutes. However, the model simulates the dispatch hourly. Therefore it cannot adequately measure the benefits of a more frequent dispatch. A tool with a finer time resolution would significantly improve simulation accuracy. When the study was conducted, the rules for the EIM were not clearly defined and it was appropriate to estimate societal benefits of the EIM assuming a perfect market without a detailed specification of the market design. However, incorporating a more complete description of market rules will allow for better estimates of EIM benefits. Furthermore, performing analyses using specific market rules can identify potential design flaws that may be difficult and expensive to correct after the market is established. Estimated cost savings from a more efficient dispatch are less than one percent of the total cost of electricity production.

14 SOLAR ENERGY↗