Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “crew scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Project APEX: Advanced manned exploration of the Martian moon Phobos

A preliminary design has been developed for a manned mission to the Martian moon Phobos. The spacecraft is to carry a crew of five and will be launched from Low Earth Orbit in the year 2010. The outbound trajectory to Mars uses a gravitational assisted swingby of Venus and takes eight months to complete. The stay at Phobos is scheduled for 60 days. During this time, the crew will be busily engaged in setting up a prototype fuel processing facility. The vehicle will then return to Earth orbit after a total mission duration of 656 days. The spacecraft is powered by three nuclear thermal rockets which also provide the primary electrical power via dual mode operation. The overall spacecraft length is 110 m, and the total mass departing from Low Earth Orbit is 900 metric tons.

Eisley, Joe G.↗

Reduced Crew/Single Pilot Operations for Commercial Aircraft - Concept of Operations and Technology Needs

In 2012, NASA began exploring the feasibility of single pilot operations (SPO) and reduced crew operations (RCO) in the context of scheduled passenger air carrier operations (i.e., Parts 121 and 125). Technology and automation, especially aircraft automation, have significantly advanced in the 21st century and may be enabling to SPO. However, a move to SPO also has significant challenges. The purpose of a three-year NASA effort was to identify those challenges through workshops, analytic studies, and human-in-the-loop simulations assessing promising concepts and prototype solutions. This presentation will describe the progress that has been made in that three year effort.

reduced crew operations↗

Modeling Separate and Combined Atmospheres in BIO-Plex

We modeled BIO-Plex designs with separate or combined atmospheres and then simulated controlling the atmosphere composition. The BIO-Plex is the Bioregenerative Planetary Life Support Systems Test Complex, a large regenerative life support test facility under development at NASA Johnson Space Center. Although plants grow better at above-normal carbon dioxide levels, humans can tolerate even higher carbon dioxide levels. Incinerator exhaust has very high levels of carbon dioxide. An elaborate BIO-Plex design would maintain different atmospheres in the crew and plant chambers and isolate the incinerator exhaust in the airlock. This design easily controls the crew and plant carbon dioxide levels but it uses many gas processors, buffers, and controllers. If all the crew's food is grown inside BIO-Plex, all the carbon dioxide required by the plants is supplied by crew respiration and the incineration of plant and food waste. Because the oxygen mass flow must balance in a closed loop, the plants supply all the oxygen required by the crew and the incinerator. Using plants for air revitalization allows using fewer gas processors, buffers, and controllers. In the simplest design, a single combined atmosphere was used for the crew, the plant chamber, and the incinerator. All gas processors, buffers, and controllers were eliminated. The carbon dioxide levels were necessarily similar for the crew and plants. If most of the food is grown, carbon dioxide can be controlled at the desired level by scheduling incineration. An intermediate design uses one atmosphere for the crew and incinerator chambers and a second for the plant chamber. This allows different carbon dioxide levels for the crew and plants. Better control of the atmosphere is obtained by varying the incineration rate. Less gas processing storage and control is needed if more food is grown.

Jones, Harry↗

Modeling Separate and Combined Atmospheres in BIO-Plex

We modeled BIO-Plex designs with separate or combined atmospheres and then simulated controlling the atmosphere composition. The BIO-Plex is the Bioregenerative Planetary Life Support Systems Test Complex, a large regenerative life support test facility under development at NASA Johnson Space Center. Although plants grow better at above-normal carbon dioxide levels, humans can tolerate even higher carbon dioxide levels. incinerator exhaust has very high levels of carbon dioxide. An elaborate BIO-Plex design would maintain different atmospheres in the crew and plant chambers and isolate the incinerator exhaust in the airlock. This design easily controls the crew and plant carbon dioxide levels but it uses many gas processors, buffers, and controllers. If all the crew's food is grown inside BIO-Plex, all the carbon dioxide required by the plants is supplied by crew respiration and the incineration of plant and food waste. Because the oxygen mass flow must balance in a closed loop, the plants supply all the oxygen required by the crew and the incinerator. Using plants for air revitalization allows using fewer gas processors, buffers, and controllers. In the simplest design, a single combined atmosphere was used for the crew, the plant chamber, and the incinerator. All gas processors, buffers, and controllers were eliminated. The carbon dioxide levels were necessarily similar for the crew and plants. If most of the food is grown, carbon dioxide can be controlled at the desired level by scheduling incineration. An intermediate design uses one atmosphere for the crew and incinerator chambers and a second for the plant chamber. This allows different carbon dioxide levels for the crew and plants. Better control of the atmosphere is obtained by varying the incineration rate. Less gas processing, storage, and control is needed if more food is grown.

Jones, Harry↗

STS-103 Crew Training

The Hubble Space Telescope (HST) team is preparing for NASA's third scheduled service call to Hubble. This mission, STS-103, will launch from Kennedy Space Center aboard the Space Shuttle Discovery. The seven flight crew members are Commander Curtis L. Brown, Pilot Scott J. Kelly, European Space Agency (ESA) astronaut Jean-Francois Clervoy who will join space walkers Steven L. Smith, C. Michael Foale, John M. Grunsfeld, and ESA astronaut Claude Nicollier. The objectives of the HST Third Servicing Mission (SM3A) are to replace the telescope's six gyroscopes, a Fine-Guidance Sensor, an S-Band Single Access Transmitter, a spare solid-state recorder and a high-voltage/temperature kit for protecting the batteries from overheating. In addition, the crew plans to install an advanced computer that is 20 times faster and has six times the memory of the current Hubble Space Telescope computer. To prepare for these extravehicular activities (EVAs), the SM3A astronauts participated in Crew Familiarization sessions with the actual SM3A flight hardware. During these sessions the crew spent long hours rehearsing their space walks in the Guidance Navigation Simulator and NBL (Neutral Buoyancy Laboratory). Using space gloves, flight Space Support Equipment (SSE), and Crew Aids and Tools (CATs), the astronauts trained with and verified flight orbital replacement unit (ORU) hardware. The crew worked with a number of trainers and simulators, such as the High Fidelity Mechanical Simulator, Guidance Navigation Simulator, System Engineering Simulator, the Aft Shroud Door Trainer, the Forward Shell/Light Shield Simulator, and the Support Systems Module Bay Doors Simulator. They also trained and verified the flight Orbital Replacement Unit Carrier (ORUC) and its ancillary hardware. Discovery's planned 10-day flight is scheduled to end with a night landing at Kennedy.

Source record↗

Vehicle management and mission planning systems with shuttle applications

A preliminary definition of a concept for an automated system is presented that will support the effective management and planning of space shuttle operations. It is called the Vehicle Management and Mission Planning System (VMMPS). In addition to defining the system and its functions, some of the software requirements of the system are identified and a phased and evolutionary method is recommended for software design, development, and implementation. The concept is composed of eight software subsystems supervised by an executive system. These subsystems are mission design and analysis, flight scheduler, launch operations, vehicle operations, payload support operations, crew support, information management, and flight operations support. In addition to presenting the proposed system, a discussion of the evolutionary software development philosophy that the Mission Planning and Analysis Division (MPAD) would propose to use in developing the required supporting software is included. A preliminary software development schedule is also included.

Source record↗

Ares I-X Launch Vehicle Modal Test Overview

The first test flight of NASA's Ares I crew launch vehicle, called Ares I-X, is scheduled for launch in 2009. Ares IX will use a 4-segment reusable solid rocket booster from the Space Shuttle heritage with mass simulators for the 5th segment, upper stage, crew module and launch abort system. Flight test data will provide important information on ascent loads, vehicle control, separation, and first stage reentry dynamics. As part of hardware verification, a series of modal tests were designed to verify the dynamic finite element model (FEM) used in loads assessments and flight control evaluations. Based on flight control system studies, the critical modes were the first three free-free bending mode pairs. Since a test of the free-free vehicle is not practical within project constraints, modal tests for several configurations in the nominal integration flow were defined to calibrate the FEM. A traceability study by Aerospace Corporation was used to identify the critical modes for the tested configurations. Test configurations included two partial stacks and the full Ares I-X launch vehicle on the Mobile Launcher Platform. This paper provides an overview for companion papers in the Ares I-X Modal Test Session. The requirements flow down, pre-test analysis, constraints and overall test planning are described.

Buehrle, Ralph D.↗

Behavioral Health Support of NASA Astronauts for International Space Station Missions

Two areas of focus for optimizing behavioral health and human performance during International Space Station missions are 1) sleep and circadian assessment and 2) behavioral medicine. The Mir experience provided the opportunity to examine the use and potential effectiveness of tools and procedures to support the behavioral health of the crew. The experience of NASA has shown that on-orbit performance can be better maintained if behavioral health, sleep, and circadian issues are effectively monitored and properly addressed. For example, schedules can be tailored based upon fatigue level of crews and other behavioral and cognitive indicators to maximize performance. Previous research and experience with long duration missions has resulted in the development and upgrade of tools used to monitor fatigue, stress, cognitive function, and behavioral health. Self-assessment and objective tools such as the Spaceflight Cognitive Assessment Tool have been developed and refined to effectively address behavioral medicine countermeasures in space.

Sipes, Walter↗

A noncontacting motion monitoring system for an astronaut translation aid

The development of a noncontacting motion sensing system designed to monitor the movement of a cart along a track in the low earth orbit space environment is described. The system uses Hall effect sensors to detect the position of small permanent magnets located along the track. The measurement criteria are described, the system design is discussed, and estimates of the system error are given. The system will be used on the Crew and Equipment Translation Aid (CETA) experiment scheduled for the STS37 flight in November 1990. It will allow the position, velocity, and acceleration of the cart to be determined as it moves along the track.

Finley, Tom D.↗

STS-86 Day 08 Highlights

On this eighth day of the STS-86 mission, the flight crew, Cmdr. James D. Wetherbee, Jr., Pilot Michael J. Bloomfield, Mission Specialists Scott E. Parazynski, Jean-Loup Chretien, Vladimir G. Titov, Wendy B. Lawrence and Mike Foale and the Mir crew take a break from their busy schedules to hold a news conference. They talk with media assembled in the United States, Russia and France.

Source record↗

World, We Have Problems: Simulation for Large Complex, Risky Projects, and Events

Prior to a spacewalk during the NASA STS/129 mission in November 2009, Columbia Broadcasting System (CBS) correspondent William Harwood reported astronauts, "were awakened again", as they had been the day previously. Fearing something not properly connected was causing a leak, the crew, both on the ground and in space, stopped and checked everything. The alarm proved false. The crew did complete its work ahead of schedule, but the incident reminds us that correctly connecting hundreds and thousands of entities, subsystems and systems, finding leaks, loosening stuck valves, and adding replacements to very large complex systems over time does not occur magically. Everywhere major projects present similar pressures. Lives are at - risk. Responsibility is heavy. Large natural and human-created disasters introduce parallel difficulties as people work across boundaries their countries, disciplines, languages, and cultures with known immediate dangers as well as the unexpected. NASA has long accepted that when humans have to go where humans cannot go that simulation is the sole solution. The Agency uses simulation to achieve consensus, reduce ambiguity and uncertainty, understand problems, make decisions, support design, do planning and troubleshooting, as well as for operations, training, testing, and evaluation. Simulation is at the heart of all such complex systems, products, projects, programs, and events. Difficult, hazardous short and, especially, long-term activities have a persistent need for simulation from the first insight into a possibly workable idea or answer until the final report perhaps beyond our lifetime is put in the archive. With simulation we create a common mental model, try-out breakdowns of machinery or teamwork, and find opportunity for improvement. Lifecycle simulation proves to be increasingly important as risks and consequences intensify. Across the world, disasters are increasing. We anticipate more of them, as the results of global warming prove more and more ominous-glaciers melting in Bolivia, floods in Saudi Arabia, the Maldives sinking and salt rising along the Nile. Fear grows about potential asteroid crashes and nightly television images raise awareness of victims of floods, hurricanes, cyclones and typhoons, fire, tornado, tsunami, bombings, landslides, and cross-boundary criminality. The Red Cross says that disasters impact 250 million people each year. That means that 700,000 people are having a very bad day today. Modeling and simulation is and must be part of the solution.

Elfrey, Priscilla↗

Evaluation of User Experience of Self-Scheduling Software for Astronauts: Defining a Satisfaction Baseline

As NASA turns its sights to deep-space exploration, a greater focus on sup-porting crew autonomy has led to the development of Playbook, a self-scheduling software tool. Evaluating the user satisfaction of Playbook is essential in ensuring its usability for critical spaceflight operations. Satisfaction of an interface is often quantified with attitude surveys, such as the User Experience Questionnaire (UEQ). This paper demonstrates an application of the UEQ in comparing the user experience of Playbook interface de-signs for displaying graphical data. We lay the foundation for future user experience comparisons by defining a satisfaction baseline, which is crucial as more features are integrated into Playbook’s interface. This work ex-tends a validated user experience framework into a spaceflight domain, allowing optimization of human-computer interaction as future operational tools are developed.

user experience↗

Crew Exploration Vehicle (CEV) Potable Water System Verification Description

The Crew Exploration Vehicle (CEV), also known as Orion, will ferry a crew of up to six astronauts to the International Space Station (ISS), or a crew of up to four astronauts to the moon. The first launch of CEV is scheduled for approximately 2014. A stored water system on the CEV will supply the crew with potable water for various purposes: drinking and food rehydration, hygiene, medical needs, sublimation, and various contingency situations. The current baseline biocide for the stored water system is ionic silver, similar in composition to the biocide used to maintain quality of the water transferred from the Orbiter to the ISS and stored in Contingency Water Containers (CWCs). In the CEV water system, the ionic silver biocide is expected to be depleted from solution due to ionic silver plating onto the surfaces of the materials within the CEV water system, thus negating its effectiveness as a biocide. Since the biocide depletion is expected to occur within a short amount of time after loading the water into the CEV water tanks at the Kennedy Space Center (KSC), an additional microbial

Peterson, Laurie↗

Crew Exploration Vehicle (CEV) Potable Water System Verification Description

The Crew Exploration Vehicle (CEV), also known as Orion, will ferry a crew of up to six astronauts to the International Space Station (ISS), or a crew of up to four astronauts to the moon. The first launch of CEV is scheduled for approximately 2014. A stored water system on the CEV will supply the crew with potable water for various purposes: drinking and food rehydration, hygiene, medical needs, sublimation, and various contingency situations. The current baseline biocide for the stored water system is ionic silver, similar in composition to the biocide used to maintain quality of the water transferred from the Orbiter to the ISS and stored in Contingency Water Containers (CWCs). In the CEV water system, the ionic silver biocide is expected to be depleted from solution due to ionic silver plating onto the surfaces of the materials within the CEV water system, thus negating its effectiveness as a biocide. Since the biocide depletion is expected to occur within a short amount of time after loading the water into the CEV water tanks at the Kennedy Space Center (KSC), an additional microbial control is a 0.1 micron point of use filter that will be used at the outlet of the Potable Water Dispenser (PWD). Because this may be the first time NASA is considering a stored water system for longterm missions that does not maintain a residual biocide, a team of experts in materials compatibility, biofilms and point of use filters, surface treatment and coatings, and biocides has been created to pinpoint concerns and perform testing to help alleviate those concerns related to the CEV water system. Results from the test plans laid out in the paper presented to SAE last year (Crew Exploration Vehicle (CEV) Potable Water System Verification Coordination, 2008012083) will be detailed in this paper. Additionally, recommendations for the CEV verification will be described for risk mitigation in meeting the physicochemical and microbiological requirements on the CEV PWS.

Peterson, Laurie↗

STS-79 Flight Day 9

On this ninth day of the STS-79 mission, the flight crew, Cmdr. William F. Readdy, Pilot Terrence W. Wilcutt, Mission Specialists, Thomas D. Akers, Shannon Lucid, Jay Apt, and Carl E. Walz having completed five days of joint operations between the American astronauts and the Russian cosmonauts are seen flying solo once again after undocking from the Mir Space Station. As Atlantis/Mir flew over the Ural Mountains of central Asia, the docking hooks and latches that joined the vehicles together were commanded open and Atlantis drifted slowly away from Mir. Wilcutt then initiated a tail-forward fly-around of the Russian space station. After one and one-half revolutions around Mir, Atlantis' jets were fired in a separation maneuver to enable Atlantis to break away from Mir. On board Atlantis, the six-member crew is settling back into its normal routine with a fairly light schedule for the remainder of the day. Early in the morning as Atlantis flew over the United States, the crew took time to talk with anchors for the CBS Up to the Minute' network news broadcast.

Source record↗

NASA’s Space Launch System: Progress Toward Launch

The Space Launch System (SLS), NASA’s cornerstone launch capability for a new generation of deep space exploration, has begun assembly at Kennedy Space Center (KSC) in preparation for launch in 2021. SLS will provide an unparalleled launch capability for human and robotic deep space exploration missions. Its proven propulsion system, upgrade path to more powerful vehicles, and high-volume payload fairings make it the foundation for ambitious and demanding as part of the Artemis program. Artemis is NASA’s 21st-century plan to put boots on the Moon and to perform sustainable, long-term science in deep space, with eyes toward sending explorers to Mars. The initial SLS vehicle to fly, Block 1 in the crew configuration – with the new Orion spacecraft – is scheduled to lift off from revitalized launch facilities at KSC in 2021 for an uncrewed test flight known as Artemis I. Manufacturing is complete on the vehicle and all elements have been delivered to the Exploration Ground Systems (EGS) Program, except the core stage. The program’s all-new development, the core stage is currently in the midst of a “Green Run” test campaign at Stennis Space Center (SSC). Eight progressively more challenging tests in the Green Run series will culminate in a hot-fire of four flight-proven liquid hydrogen/liquid oxygen (LH2/LOX) RS25 engines. Following the Green Run hotfiring, the core stage will ship to KSC. Already at KSC, aft sections of the fivesegment solid rocket boosters are being assembled. Previously delivered elements, including the upper stage, are undergoing final checkouts in preparation for stacking. An exciting 2021 will include such milestones as stacking SLS and Orion in KSC’s Vehicle Assembly Building (VAB), modal testing, roll out to Launch Pad 39B, Wet Dress Rehearsal (WDR), and launch. Teams across the country are preparing for launch by finalizing procedures, defining launch constraints and flight rules, training console operators, performing simulations, and more. With the SLS Block 1 vehicle for Artemis I nearing integration and launch, the second Block 1 vehicle in the crew configuration, which will carry astronauts on an Artemis II hybrid lunar flyby mission, has several elements manufactured. In fact, the solid rocket motor segments and RS-25 engines are complete. Those program elements are processing hardware for the third flight and working toward manufacturing the second SLS variant to fly, Block 1B, which will onramp a powerful new upper stage, the Exploration Upper Stage (EUS).

John Honeycutt↗

Development of Acoustic Mufflers for Cabin Noise Reduction in Orion Spacecraft

Controlling cabin acoustic noise levels in the Crew Module (CM) of the Orion spacecraft is critical to ensure adequate speech intelligibility, to avoid fatigue, and prevent any possibility of temporary and permanent hearing loss to the crew. The primary source of cabin noise for the on-orbit phase of the mission is from the Environmental Control and Life Support System (ECLSS) which recycles and conditions breathing air and maintains cabin pressurization through its duct network and components. Unfortunately, as a side effect, noise from the ECLSS fans propagates through theses ducts and emanate into the cabin habitable volume via the ECLSS inlet and outlets. To mitigate excessive duct-borne noise, two ECLSS mufflers have been designed to provide significant acoustic transmission loss (TL) so that the cabin noise requirements can be met. Each muffler is meant to be installed in the ducting of the ECLSS air inlet and outlet sides, respectively. Packaging constraints and tight volume requirements necessitated the mufflers to be of complex geometry and compatible with the bends of the ECLSS duct layout. To design and characterize the acoustic performance of the inlet and outlet mufflers, computational acoustic models were developed using the Finite Element Method (FEM) with 𝑤𝑎𝑣𝑒଺ vibroacoustic software. Characterization of the acoustic material and perforations in the mufflers were addressed with poroelastic theory. Once the mufflers were designed on paper and its TL predicted, prototypes of these mufflers were created using additive manufacturing. The muffler prototypes were subsequently tested for acoustic TL in the laboratory with various con-figurations of acoustic materials. Comparing the analytical predictions to the test performance yielded excellent correlation for acoustic TL and demonstrated significant broadband noise attenuation. The ECLSS mufflers are currently scheduled to be installed on the Artemis II Crew Module (CM) of the Orion spacecraft and will provide significant cabin comfort to crew during the mission.

Indranil Dandaroy↗

Towards Optimal and Executable Distribution Grid Restoration Planning With a Fine-Grained Power-Communication Interdependency Model

Distribution service restoration (DSR) under natural disasters is always a critical and challenging problem for utility companies. An effective solution must not ignore the power-communication interdependency as various systems are getting increasingly connected in the Smart Grid era. In this paper, we propose a two-layer distribution system model with both power and communication components. Based on this model, we formulate the restoration process as a routing problem that schedules the path and action sequence of utility crews that involves repairing damaged components, closing power switches, and enabling communication paths between the control center and remote field devices. Further, we develop a simulation-based method to quantitatively evaluate the restoration process with public reference models of large-scale power systems. The experimental results show that our method improves the total restored energy up to 57.6% and reduces the recovery time up to 63% by considering the power-communication interdependency.

24 POWER TRANSMISSION AND DISTRIBUTION↗