Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Energy Consumption, Performance, and Cost Estimates for Medium and Heavy-Duty Vehicles Based on 2022 Assumptions

Assumptions for this work was collected and the analysis was completed in FY22. This contains information for more than 20 types of medium and heavy duty vehicles. Vehicles with various levels of hybridization, electric and fuel cell powertrains are considered in this work. More details are available in the report published by Argonne accessible from https://vms.taps.anl.gov/research-highlights/u-s-doe-vto-hfto-r-d-benefits/. TechScape, a convenient data visualization tool is also provided by Argonne for this data, accessible from [TechScape Web](https://vms.taps.anl.gov/data/techscape-web-2023/).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

One Earth Energy CO 2 Capture Facility FEED Study and Class 4 Cost Estimate

The One Earth Energy (OEE) plant in Gibson City, Illinois produces ethanol through a corn fermentation process. For this project, the maximum possible ethanol production rate for this facility is 160 million gallons per year (MMgal/yr) based on discussions with plant personnel regarding recent annual production rates and any foreseeable plans or possibilities to increase ethanol production at this facility. Yeast ferments the corn mash to produce ethanol and produces carbon dioxide (CO 2 ) as a by-product at the same time. The CO 2 bubbles out of the mash and flows through a packed bed water scrubber to remove volatile organic compounds before the gas vents to atmosphere. CO 2 will be captured after it has passed through the existing scrubber.

09 BIOMASS FUELS↗

Complete the Design, Cost Estimate, Assembly Plan, and Operating Instructions for a Bench-Scale Packed-Bed Tubular Methanol Catalyst Testing System

This report details the design of a test stand that converts carbon dioxide and hydrogen into methanol via a two-step process. The first step is a reverse water-gas shift reaction, carried out at 600°C and 25 bar to reduce carbon dioxide to carbon monoxide, and the second is a synthesis reaction that forms methanol at 260°C and 75 bar. The purpose of the system is to test catalysts for each of these steps. The test stand produces approximately 1.5 gallons of crude methanol (methanol mixed with water) per day, and recycles unreacted syngas for increased efficiency. At peak recycle, the stand is expected to consume 0.29 cylinders per day of carbon dioxide and 1.43 cylinders per day of hydrogen. It is planned to be built next to the Blue Star electrolysis unit in the Energy Systems Laboratory (ESL) and includes future plans of acquiring hydrogen from that stand rather than gas cylinders. At this phase of research, three key documents have been produced, as summarized in Table 1. These documents are primarily intended to describe the system and its operation, demonstrate that selected components are appropriate for the intended application, identify potential hazards, safeguards, and mitigation strategies, and ensure that the system is designed to appropriate standards. The body of the report and its appendices provide a narrative of the work completed in FY25. The parts required to build the test stand will be procured and assembled in FY26. Testing will be conducted in the final quarter.

10 - SYNTHETIC FUELS↗

Nuclear electric propulsion mission engineering study development program and costs estimates, Phase 2 review

The results are presented of the second six-month performance period of the Nuclear Electric Propulsion Mission Engineering Study. A brief overview of the program, identifying the study objectives and approach, and a discussion of the program status and schedule are presented. The program results are reviewed and key conclusions to date are summarized. Planned effort for the remainder of the program is reviewed.

Source record↗

Payload specialist station study. Volume 3: Program study cost estimates. Part 1: Work breakdown structure

The work breakdown structure (WBS) for the Payload Specialist Station (PSS) is presented. The WBS is divided into two elements--PSS contractor and mission unique requirements. In accordance with the study ground rules, it is assumed that a single contractor, hereafter referred to as PSS Contractor will perform the following: (1) provide C and D hardware (MFDS and elements of MMSE), except for GFE; (2) identify software requirements; (3) provide GSE and ground test software; and (4) perform systems engineering and integration in support of the Aft Flight Deck (AFD) C and D concept. The PSS Contractor WBS element encompasses a core or standardized PSS concept. Payload peculiar C and D requirements identified by users will originate as a part of the WBS element mission unique requirements; these requirements will be provided to the PSS Contractor for implementation.

Source record↗

DOE/NASA SIMS Prototype Solar System, no. 4. Part 1: Market analysis. Part 2: Modular manufacturing cost estimate

The findings of the IIT Research Institute (IITRI) market study of the SIMS Prototype System 4, a hot water (DHW) system are documented. The feasibility of prepackaging currently available solar heating components into modular subsystems for site assembly is addressed. A documented design and installation procedure and a performance test report were prepared. The potential markets and applications for this particular system in the nonfederal market are profiled by assessing the needs and requirements of potential users and specifiers, by characterizing the nature of the market and the competitive environment, by identifying the barriers to commercial acceptance, and by estimating the size of the potential market.

Source record↗

Space transfer vehicle concepts and requirements study. Volume 3: Program cost estimates. Book 2: WBS and dictionary

This document describes the products and services to be developed, tested, produced, and operated for the Space Transfer Vehicle (STV) Program. The Work Breakdown Structure (WBS) and WBS Dictionary are program management tools used to catalog, account by task, and summarize work packages of a space system program. The products or services to be delivered or accomplished during the STV C/D phase are the primary focus of this work breakdown structure document.

Peffley, A. F.↗

A Method for Estimating Costs and Benefits of Space Assembly and Servicing By Astronauts and Robots

One aspect of designing future space missions is to determine whether Space Assembly and Servicing (SAS) is useful and, if so, what combination of robots and astronauts provides the most effective means of accomplishing it. Certain aspects of these choices, such as the societal value of developing the means for humans to live in space, do not lend themselves to quantification. However, other SAS costs and benefits can be quantified in a manner that can help select the most cost-effective SAS approach. Any space facility, whether it is assembled and serviced or not, entails an eventual replacement cost due to wear and obsolescence. Servicing can reduce this cost by limiting replacement to only failed or obsolete components. However, servicing systems, such as space robots, have their own logistics cost, and astronauts can have even greater logistics requirements. On the other hand, humans can be more capable than robots at performing dexterous and unstructured tasks, which can reduce logistics costs by allowing a reduction in mass of replacement components. Overall, the cost-effectiveness of astronaut SAS depends on its efficiency; and, if astronauts have to be wholly justified by their servicing usefulness, then the serviced space facility has to be large enough to fully occupy them.

Purves, Lloyd R.↗