Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “corrective action management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Advanced Intelligent System Application to Load Forecasting and Control for Hybrid Electric Bus

The primary motivation for this research emanates from providing a decision support system to the electric bus operators in the municipal and urban localities which will guide the operators to maintain an optimal compromise among the noise level, pollution level, fuel usage etc. This study is backed up by our previous studies on study of battery characteristics, permanent magnet DC motor studies and electric traction motor size studies completed in the first year. The operator of the Hybrid Electric Car must determine optimal power management schedule to meet a given load demand for different weather and road conditions. The decision support system for the bus operator comprises three sub-tasks viz. forecast of the electrical load for the route to be traversed divided into specified time periods (few minutes); deriving an optimal 'plan' or 'preschedule' based on the load forecast for the entire time-horizon (i.e., for all time periods) ahead of time; and finally employing corrective control action to monitor and modify the optimal plan in real-time. A fully connected artificial neural network (ANN) model is developed for forecasting the kW requirement for hybrid electric bus based on inputs like climatic conditions, passenger load, road inclination, etc. The ANN model is trained using back-propagation algorithm employing improved optimization techniques like projected Lagrangian technique. The pre-scheduler is based on a Goal-Programming (GP) optimization model with noise, pollution and fuel usage as the three objectives. GP has the capability of analyzing the trade-off among the conflicting objectives and arriving at the optimal activity levels, e.g., throttle settings. The corrective control action or the third sub-task is formulated as an optimal control model with inputs from the real-time data base as well as the GP model to minimize the error (or deviation) from the optimal plan. These three activities linked with the ANN forecaster proving the output to the GP model which in turn produces the pre-schedule of the optimal control model. Some preliminary results based on a hypothetical test case will be presented for the load forecasting module. The computer codes for the three modules will be made available fe adoption by bus operating agencies. Sample results will be provided using these models. The software will be a useful tool for supporting the control systems for the Electric Bus project of NASA.

Momoh, James↗

Prevalence of typical operational problems and energy savings opportunities in U.S. commercial buildings

In the United States, as much as 30% of the 19 EJ that commercial buildings consume is considered excess. Much of the excess energy is due to the inability to manage building operations efficiently. Because almost 20% of the total primary energy consumption is associated with commercial buildings, significant energy reductions in this sector are needed to mitigate climate change. Therefore, many cities and states are mandating periodic “tune-ups” of these buildings to eliminate excess energy consumption. Although the benefits of tune-ups and retro-commissioning are clear, focusing these mandates to look for specific opportunities has been a challenge because of the lack of studies that document the prevalence of opportunities. Therefore, we analyzed building automation system data from 151 buildings across the United States to document common operational problems and opportunities to improve building operations. This analysis showed that opportunities to improve building operations exist in almost every building. These opportunities were not strongly correlated with building vintage or size, but were reflective of how the buildings are operated. The prevalence of the top 20 opportunities ranged between 74% and 23%, with 40% of these associated with air-handling units. The rest of the opportunities are associated with schedules, chilled and hot-water distribution, and zone controls. Of the 151 buildings, 69 of them implemented corrective actions of some or all opportunities that were identified. Implementation varied across the Re-tuning categories, with 60% for schedule opportunities, 50% for zone opportunities, over 40% for the air-handling unit and hot-water opportunities, and 35% of the chilled-water opportunities. There was wide variation in whole building energy savings, ranging from 0 to 50% and 0 to 18 $/m2 with median percent annual whole building savings of 12% and median normalized annual cost savings of $1.75/m2. In addition to documenting these key findings, the paper provides a list of opportunities that can be automatically and continuously identified and corrected and offers a list of those opportunities that should be the focus of the mandates.

Katipamula, Srinivas↗

Comprehensive Environmental Informatics System (CEIS) Integrating Crew and Vehicle Environmental Health

Integrated Vehicle Health Management (IVHM) systems have been pursued as highly integrated systems that include smart sensors, diagnostic and prognostics software for assessments of real-time and life-cycle vehicle health information. Inclusive to such a system is the requirement to monitor the environmental health within the vehicle and the occupants of the vehicle. In this regard an enterprise approach to informatics is used to develop a methodology entitled, Comprehensive Environmental Informatics System (CEIS). The hardware and software technologies integrated into this system will be embedded in the vehicle subsystems, and maintenance operations, to provide both real-time and life-cycle health information of the environment within the vehicle cabin and of its occupants. This comprehensive information database will enable informed decision making and logistics management. One key element of the CEIS is interoperability for data acquisition and archive between environment and human system monitoring. With comprehensive components the data acquired in this system will use model based reasoning systems for subsystem and system level managers, advanced on-board and ground-based mission and maintenance planners to assess system functionality. Knowledge databases of the vehicle health state will be continuously updated and reported for critical failure modes, and routinely updated and reported for life cycle condition trending. Sufficient intelligence, including evidence-based engineering practices which are analogous to evidencebased medicine practices, will be included in the CEIS to result in more rapid recognition of off-nominal operation to enable quicker corrective actions. This will result from better information (rather than just data) for improved crew/operator situational awareness, which will produce significant vehicle and crew safety improvements, as well as increasing the chance for mission success, future mission planning as well as training. Other benefits include improved reliability, increase safety in operations and cost of operations. The cost benefits stem from significantly reduced processing and operations manpower, predictive maintenance for systems and subjects. The improvements in vehicle functionality and cost will result from increased prognostic and diagnostic capability due to the detailed total human exploration system health knowledge from CEIS. A collateral benefit is that there will be closer observations of the vehicle occupants as wrist watch sized devices are worn for continuous health monitoring. Additional database acquisition will stem from activities in countermeasure practices to ensure peak performance capability by occupants of the vehicle. The CEIS will provide data from advanced sensing technologies and informatics modeling which will be useful in problem troubleshooting, and improving NASA s awareness of systems during operation.

Nall, Mark E.↗

Thematic mapper - An overview of spectral band registration

The Thematic Mapper (TM) is a high-resolution radiometer designed for earth resources classification and mapping. The TM employs multispectral scanning in a near polar orbit to sweep a 185-km swath. Data are obtained through a combination of spacecraft motion and the sweeping action of the scan mirror. These data are transmitted either directly to ground stations around the world or through a relay to the central data processing facility at White Sands, NM. Seven spectral passbands are employed, and applications include coastal water mapping, soil vegetation differentiation, biomass surveys, water body delineation, vegetation moisture measurement, plant heat stress management, and hydrothermal mapping. Attention is given to the scan mirror assembly, scan nonlinearities, the characterization and compensation of scan profiles, experimental performance, and a procedure for midscan correction.

Freudenstein, W. H.↗

A Fuzzy Logic Approach for Separation Assurance and Collision Avoidance for Unmanned Aerial Systems

In the coming years, operations in low altitude airspace will vastly increase as the capabilities and applications of small Unmanned Aerial Systems (sUAS) continue to multiply. Therefore, solutions to managing sUAS in highly congested airspace must be explored. In this study, a Fuzzy Logic based approach was used to help mitigate the risk of collisions between aircraft using separation assurance and collision avoidance techniques. The system was evaluated for its effectiveness to mitigate the risk of mid-air collisions between aircraft. This system utilizes only current state information and can resolve potential conflicts without knowledge of intruder intent. The avoidance logic was verified using formal methods and shown to select the correct action in all instances. Additionally, the Fuzzy Logic Controllers were shown to always turn the vehicles in the correct direction. Numerical testing demonstrated that the avoidance system was able to prevent a mid-air collision between two sUAS in all tested cases. Simulations were also performed in a three-dimensional environment with a heterogenous fleet of sUAS performing a variety of realistic missions. Simulations showed that the system was 99.98 effective at preventing mid-air collisions when separation assurance was disabled (unmitigated case) and 100 effective when enabled (mitigated case).

Verification & Validation of a Fuzzy Logic Control↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Fault Detection and Correction for the Solar Dynamics Observatory Attitude Control System

The Solar Dynamics Observatory is an Explorer-class mission that will launch in early 2009. The spacecraft will operate in a geosynchronous orbit, sending data 24 hours a day to a devoted ground station in White Sands, New Mexico. It will carry a suite of instruments designed to observe the Sun in multiple wavelengths at unprecedented resolution. The Atmospheric Imaging Assembly includes four telescopes with focal plane CCDs that can image the full solar disk in four different visible wavelengths. The Extreme-ultraviolet Variability Experiment will collect time-correlated data on the activity of the Sun's corona. The Helioseismic and Magnetic Imager will enable study of pressure waves moving through the body of the Sun. The attitude control system on Solar Dynamics Observatory is responsible for four main phases of activity. The physical safety of the spacecraft after separation must be guaranteed. Fine attitude determination and control must be sufficient for instrument calibration maneuvers. The mission science mode requires 2-arcsecond control according to error signals provided by guide telescopes on the Atmospheric Imaging Assembly, one of the three instruments to be carried. Lastly, accurate execution of linear and angular momentum changes to the spacecraft must be provided for momentum management and orbit maintenance. In th~sp aper, single-fault tolerant fault detection and correction of the Solar Dynamics Observatory attitude control system is described. The attitude control hardware suite for the mission is catalogued, with special attention to redundancy at the hardware level. Four reaction wheels are used where any three are satisfactory. Four pairs of redundant thrusters are employed for orbit change maneuvers and momentum management. Three two-axis gyroscopes provide full redundancy for rate sensing. A digital Sun sensor and two autonomous star trackers provide two-out-of-three redundancy for fine attitude determination. The use of software to maximize chances of recovery from any hardware or software fault is detailed. A generic fault detection and correction software structure is used, allowing additions, deletions, and adjustments to fault detection and correction rules. This software structure is fed by in-line fault tests that are also able to take appropriate actions to avoid corruption of the data stream.

Starin, Scott R.↗

Trends in Human Spaceflight: Failure Tolerance, High Reliability and Correlated Failure History

In a half century of human spaceflight, NASA has continuously refined agency safety and reliability requirements in response to mission demands, critical failures, and technology development. Early spacecraft, including Mercury, Gemini and Apollo vehicles, were highly reliant on dissimilar redundancy and demonstrated test margins. Later programs, such as the reusable Space Transportation System (STS) and International Space Station (ISS), introduced probabilistic studies and isolated two-failure tolerance to improve robustness at the expense of added complexity. More recently, the Orion Multi-Program Crew Vehicle (MPCV) program adopted universal single-failure tolerance with two categorical exceptions; Zero-Failure Tolerant (0FT) and Design for Minimum Risk (DFMR) hardware. Failure tolerance variances are defined and managed in accordance with agency human-rating requirements, and require concurrence from program Technical Authorities (TA) as well as the MPCV Safety and Mission Assurance Safety and Engineering Review Panel (MSERP). To understand and reaffirm standards applied to Apollo, Space Shuttle and Orion vehicles, Orion and Deep Space Gateway Safety and Mission Assurance (S&MA) representatives conducted accelerated research to compare unique safety and reliability criteria against ground and flight anomalies, based on information contained in post-mission reports and the Problem Reporting and Corrective Action (PRACA) database. In some cases, high-profile failures and narrow escapes have reinforced decisions to maintain or adapt safety requirements. In others, empirical trends have highlighted the need for vigilance and innovative safety guidelines. Given the inability to achieve absolute compliance with evolving safety and reliability requirements, the team conducted a targeted review of DFMR and 0FT propulsion elements within the framework of changing system design, inspection, materials and process developments to formulate conclusions on technological maturity, failure density, and net changes in safety risk. Based on the aggregate performance of high-reliability and failure-tolerant systems, the authors have attempted to establish best practices and guidelines to inform future program decisions. On a somewhat cautionary note, this study is not intended to direct a universal set of requirements for future missions based on prior lessons learned. Spacecraft safety is a multi-variable problem, and attempts to mitigate past failures will not guarantee future success. However, this assessment offers a retrospective review of policy changes, implementation and effectiveness. In the future, NASA, European Space Agency (ESA) and industry partners may benefit from a more robust correlation between requirements and performance, as space-faring nations work toward more challenging, complex and long-duration commercial and deep-space ventures.

Green, Carrie↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, For Calendar Year 2021 (Revision 1)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and CAU 112, Area 23 Hazardous Waste Trenches. This report will address all monitoring requirements noted in the RCRA Permit NEV HW0101, except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site.

54 ENVIRONMENTAL SCIENCES↗

Acceptance Test of WCTC with LEU Fuel at the IVG.1M Research Reactor Site in Kazakhstan

The water-cooled technological channels (WCTC) with low-enriched uranium (LEU) fuel, in the amount required for conversion, were delivered to the IVG.1M site by the manufacturer in February 2021 and thereafter the site acceptance test (SAT) of the WCTCs and the fuel elements started immediately. The paper provides an overview of the SAT conducted between March and November 2021 by the designated experts of the reactor operator and the manufacturer. It includes the introduction of the IVG.1M reactor and its unique WCTCs, and the inspection methodology to verify the conformity of the quality of the LEU fuel with the Technical Design (reference document). The paper presents results of the non-destructive and destructive tests, the outcomes of the thermohydraulic measurements, as well as the evaluation and corrective actions (if any), including the amendments (modifications) of the Technical Design initiated by the manufacturer based on the test results. Finally, the paper draws conclusions on the effectiveness of the SAT method used, captures consolidated experiential knowledge and shares lessons learned that can be used in general when planning and performing fuel verification.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Requirements for significant problem reporting and trend analysis

This handbook supplements policies, requirements, and procedures of NMI 8070.3 to ensure that NASA management at each organizational level is: fully aware of trends affecting both the level of safety and the potential for mission success established for both NASA manned space programs and its supporting institutions; fully and independently informed of problems that represent significant risk to the safety of all personnel (including the general populace) and to the success of a mission or operation through a program mechanism herein defined as Significant Problem Reporting; and in full agreement with the level of elimination of these problems through the closed-loop accounting of corrective actions. The requirements of this handbook are supportive of the agency's safety, reliability, maintainability, and quality assurance (SRM&QA) program objectives and are applicable to all organizational elements of NASA connected with or supporting developmental or operational manned space program/projects (including associated payloads) and the related institutional facilities.

George A Rodney↗

Management of government quality assurance functions for NASA contracts

This handbook sets forth requirements for NASA direction and management of government quality assurance functions performed for NASA contracts and is applicable to all NASA installations. These requirements will standardize management to provide the minimum oversight and effective use of resources. This handbook implements Federal Acquisition Regulation (FAR) Part 46, NASA FAR Supplement 18-46, Quality Assurance, and NMI 7410.1. Achievement of established quality and reliability goals at all levels is essential to the success of NASA programs. Active participation by NASA and other agency quality assurance personnel in all phases of contract operations, including precontract activity, will assist in the economic and timely achievement of program results. This involves broad participation in design, development, procurement, inspection, testing, and preventive and corrective actions. Consequently, government, as well as industry, must place strong emphasis on the accomplishment of all functions having a significant bearing on quality and reliability from program initiation through end-use of supplies and services produced. For purposes of implementing NASA and other agency agreements, and to provide for uniformity and consistency, the terminology and definitions prescribed herein and in a future handbook shall be utilized for all NASA quality assurance delegations and subsequent redelegations.

Source record↗

Site A and Plot M 2023 Surveillance Report and 2024 Inspection Report

This report is prepared for the U. S. Department of Energy (DOE) Office of Legacy Management (DOE-LM) by the Worker Safety & Environment (WSE) Division at Argonne National Laboratory (Argonne). Beginning in 2024, Argonne drafted a combined report containing the annual inspection results for the current year and the annual surveillance data/discussion from the previous year. The annual inspection results will be contained within an appendix at the end of the surveillance report. The results of the environmental monitoring program at Site A and Plot M and an assessment of the impact of the site on the environment and the public are presented in this publication as well as findings and assigned corrective actions as a result of the Site A/Plot M annual inspection. Funding to support this program was provided by DOE-LM.

54 ENVIRONMENTAL SCIENCES↗

A Predictive Safety Management System Software Package Based on the Continuous Hazard Tracking and Failure Prediction Methodology

The goal of this research was to integrate a previously validated and reliable safety model, called Continuous Hazard Tracking and Failure Prediction Methodology (CHTFPM), into a software application. This led to the development of a safety management information system (PSMIS). This means that the theory or principles of the CHTFPM were incorporated in a software package; hence, the PSMIS is referred to as CHTFPM management information system (CHTFPM MIS). The purpose of the PSMIS is to reduce the time and manpower required to perform predictive studies as well as to facilitate the handling of enormous quantities of information in this type of studies. The CHTFPM theory encompasses the philosophy of looking at the concept of safety engineering from a new perspective: from a proactive, than a reactive, viewpoint. That is, corrective measures are taken before a problem instead of after it happened. That is why the CHTFPM is a predictive safety because it foresees or anticipates accidents, system failures and unacceptable risks; therefore, corrective action can be taken in order to prevent all these unwanted issues. Consequently, safety and reliability of systems or processes can be further improved by taking proactive and timely corrective actions.

Quintana, Rolando↗

SRS Composite Analysis Monitoring Plan (FY2019 Model Validation)

Using a projected end-state date of 2065 (SRNS 2015b), the Savannah River Site (SRS) Composite Analysis (CA) modeling for each facility and waste site began on the inventory year assigned to it so that source depletion and radionuclide transport out of the system could be appropriately captured. Some SRS waste sites that have already achieved their end states (i.e. end-state inventories and end-state configuration) are currently contributing to the potential off-site public dose through source release, groundwater transport, discharge to on-site surface streams, and stream transport to the CA point of assessments (POAs). The inventory year assigned to these waste sites is 2002 or before. This means that SRS CA results from 2002 and beyond are a reasonable representation for these waste sites that have already achieved their end states and are currently contributing to the potential off-site public dose. The SRS Annual Environmental Report (AER) monitoring can differentiate and separate liquid pathway data allowing the data representing only waste sites at their end state to be produced. Because the SRS CA has projected reasonable end-state impacts from 2002 and beyond, and the AER monitoring can differentiate and separate operating and end-state contributions to annual liquid pathway release, an opportunity exists to use the AER monitoring data to validate the SRS CA model. The CA model validation program uses a graded and systematic approach for taking corrective action, starting with an SRS established administrative dose limit of 15 mrem/yr, below which no action is required. Based on the location of the 2010 SRS CA POAs, the only potential exposure pathway for the public is through surface water. The completion of the FY2019 CA model validation indicates that the SRS CA projected dose, while generally conservative, provides a reasonable representation of the maximum annual doses. These doses are well below the administrative limit; therefore, no additional action is required.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A 1987 overview of free-piston Stirling technology for space power application

An overview is presented of the NASA Lewis Research Center free-piston Stirling engine activities directed toward space-power application. NASA Lewis serves as the project office to manage the newly initiated NASA SP-100 Advanced Technology Program. One of the major elements of this five-year program is the development of advanced power conversion concepts of which the Stirling cycle is a viable growth candidate. Under this program the status of the 25 kWe opposed-piston Space Power Demonstrator Engine (SPDE) is presented. Included in the SPDE discussion are comparisons between predicted and experimental engine performance, enhanced performance resulting from regenerator modification, increased operating stroke brought about by isolating the gas bearing flow between the displacer and power piston, identifying excessive energy losses and recommending corrective action, and a better understanding of linear alternator design and operation. Technology work is also conducted on heat exchanger concepts, both design and fabrication. Design parameters and conceptual design features are also presented for a 25 kWe, single-cylinder free-piston Stirling space-power converter.

Slaby, Jack G.↗

The Necessity of Functional Analysis for Space Exploration Programs

As NASA moves toward expanded commercial spaceflight within its human exploration capability, there is increased emphasis on how to allocate responsibilities between government and commercial organizations to achieve coordinated program objectives. The practice of program-level functional analysis offers an opportunity for improved understanding of collaborative functions among heterogeneous partners. Functional analysis is contrasted with the physical analysis more commonly done at the program level, and is shown to provide theoretical performance, risk, and safety advantages beneficial to a government-commercial partnership. Performance advantages include faster convergence to acceptable system solutions; discovery of superior solutions with higher commonality, greater simplicity and greater parallelism by substituting functional for physical redundancy to achieve robustness and safety goals; and greater organizational cohesion around program objectives. Risk advantages include avoidance of rework by revelation of some kinds of architectural and contractual mismatches before systems are specified, designed, constructed, or integrated; avoidance of cost and schedule growth by more complete and precise specifications of cost and schedule estimates; and higher likelihood of successful integration on the first try. Safety advantages include effective delineation of must-work and must-not-work functions for integrated hazard analysis, the ability to formally demonstrate completeness of safety analyses, and provably correct logic for certification of flight readiness. The key mechanism for realizing these benefits is the development of an inter-functional architecture at the program level, which reveals relationships between top-level system requirements that would otherwise be invisible using only a physical architecture. This paper describes the advantages and pitfalls of functional analysis as a means of coordinating the actions of large heterogeneous organizations for space exploration programs.

program management↗

System Health and Status Reporting is Used to Improve Infrastructure Systems at the Hanford Site - 20449

Reliable physical infrastructure systems are vital to completing the clean-up mission and the start-up and commissioning of new nuclear waste processing facilities at the Hanford Site. Key infrastructure systems at Hanford include water, sewer, and electrical utilities, roads, telecommunications/network systems, and fire systems. All of the infrastructure systems are non-nuclear, General Service systems that are being maintained under formal engineering configuration control and none are specifically credited in any documented safety analysis (DSA). Starting in calendar year 2017, the Hanford Site's infrastructure and services contractor started producing system health and status reports for a total of 15 critical infrastructure systems as means to get a better understanding of each system's health and how it could be improved to ensure better and more reliable service delivery. As the reporting, tracking, and use of the metrics has matured, the number of systems for which reports are being developed has been expanded to a total of 23. Each of the critical infrastructure systems are assigned primary and alternate design authorities that complete qualifications on each assigned system. The design authorities actively manage and maintain configuration control on each of their systems and track metrics associated with availability, maintenance (corrective and preventive), and configuration of the technical baseline. The metrics are based on the principles established in Chapter V of DOE O 420.1C, Facility Safety, [1] and have been tailored as appropriate to each of the key infrastructure systems. An overall assessment of system health is performed and documented on a routine basis (e.g., quarterly). Included in this documentation is a quantitative score for each of the metrics (i.e., availability, maintenance, configuration management) along with results of system walk-downs, description of any permanent design modifications, identification of new or emerging issues and vulnerabilities affecting the system, and an assessment by the design authority of actions necessary to improve the system health score. The overall status scores are calculated using a formula and based on a pre-determined grading scale, a color is assigned for simple presentation. The information gained from developing the reports is being used to (1) assist with making timely and better informed decisions through the use of solid technical bases that are increasing the overall reliability and capabilities of the Site's infrastructure systems as new expense and capital projects in the Reliability Projects Investment Portfolio (RPIP) are prioritized and executed; (2) feed the risk management program, and (3) integrate the technical content of Master Plans that describe the Site's needs for the system and the system's capabilities to meet those future needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗