Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “correction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Beam correction for multi-pass arcs in FFA@CEBAF: status update

This work examines the multi-pass steering of six electron beams in an FFA arc ranging from approximately 10.5 GeV to 22 GeV. Shown here is an algorithm based on singular value decomposition (SVD) to successfully steer all six beams through the arc given precise knowledge of all beam positions at each of one hundred and one diagnostic locations with one hundred individual corrector magnets: that is successive application of SVD to different 100 × 101 response matrices—one for each beam energy. Further, a machine learning scheme is developed which only requires knowledge of the energy-averaged beam position at each location to provide equivalent steering. Extension of this scheme to other beam optics quantities as well as transverse and longitudinal coupling is explored.

Accelerator Physics↗

Corrective Action Investigation Plan for Corrective Action Unit 550: Smoky Contamination Area Nevada National Security Site, Nevada, Revision 0

Corrective Action Unit (CAU) 550 is located in Areas 7, 8, and 10 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 550, Smoky Contamination Area, comprises 19 corrective action sites (CASs). Based on process knowledge of the releases associated with the nuclear tests and radiological survey information about the location and shape of the resulting contamination plumes, it was determined that some of the CAS releases are co-located and will be investigated as study groups.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada

This Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 104, Area 7 Yucca Flat Atmospheric Test Sites, in Area 7 of the Nevada National Security Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order.

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 577: Area 5 Chromium Containing Waste Disposal Cells, Nevada National Security Site, Nevada

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) is for Corrective Action Unit (CAU) 577, “Area 5 Chromium Containing Waste Disposal Cells,” which is located in Area 5 of the Nevada National Security Site (NNSS). CAU 577 includes five low-level waste cells at the Area 5 Radioactive Waste Management Site (RWMS) where buried waste received from Nuclear Fuel Services, Inc. (NFS), was subsequently determined to contain chromium that exceeded the Toxicity Characteristic Leaching Procedure regulatory limit, which would require the waste to carry hazardous waste code D007. To resolve issues related to this alleged violation of hazardous waste regulations, a Settlement Agreement was executed between the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office on April 25, 2019, which identified agreed-upon mitigation measures. The Settlement Agreement required that the chromium-containing waste received from NFS would be addressed following the closure process laid out in the Federal Facility Agreement and Consent Order (FFACO).

54 ENVIRONMENTAL SCIENCES↗

Addendum to: Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the Subsurface Corrective Action Unit 447 Shoal, Nevada, Site

This document is an addendum to the original CADD/CAP. It includes the summaries of the corrective action activities, numeral model validation results, enhancements made to the monitoring program and monitoring network as implemented through three short-term data acquisition plans and updates made to SCMs since CADD/CAP approval in 2006.The document begins at Section 5.6 as a continuation of the "Implementation of the Corrective Action Plan" of the CADD/CAP. Table and figure numbers are in a sequence with the CADD/CAP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 34: Area 3 Contaminated Waste Sites, Nevada Test Site, Nevada

This document constitutes an addendum to the April 2002, Corrective Action Decision Document/Closure Report for Corrective Action Unit 34: Area 3 Contaminated Waste Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications.

54 ENVIRONMENTAL SCIENCES↗

Shear-layer correction after Amiet under consideration of additional temperature gradient. Working diagrams for correction of signals

Amiet's correction scheme for sound wave transmission through shear-layers is extended to incorporate the additional effects of different temperatures in the flow-field in the surrounding medium at rest. Within a parameter-regime typical for acoustic measurements in wind tunnels amplitude- and angle-correction is calculated and plotted systematically to provide a data base for the test engineer.

Dobrzynski, W.↗

Corrective Action Site 02-37-02 Background Information and Comparison to Corrective Action Site 09-99-06

Corrective Action Site (CAS) 02-37-02, Gas Sampling Assembly, is associated with nuclear test MULLET. MULLET was an underground safety test conducted on October 17, 1963. The experiment also involved prompt sampling of particulate material from the detonation, similar to CAS 09-99-06, Gas Sampling Assembly, which is associated with PLAYER/YORK.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Error correction in multi-fidelity molecular dynamics simulations using functional uncertainty quantification

We use functional, Fréchet, derivatives to quantify how thermodynamic outputs of a molecular dynamics (MD) simulation depend on the potential used to compute atomic interactions. Our approach quantifies the sensitivity of the quantities of interest with respect to the input functions as opposed to its parameters as is done in typical uncertainty quantification methods. We show that the functional sensitivity of the average potential energy and pressure in isothermal, isochoric MD simulations using Lennard–Jones two-body interactions can be used to accurately predict those properties for other interatomic potentials (with different functional forms) without re-running the simulations. This is demonstrated under three different thermodynamic conditions, namely a crystal at room temperature, a liquid at ambient pressure, and a high pressure liquid. The method provides accurate predictions as long as the change in potential can be reasonably described to first order and does not significantly affect the region in phase space explored by the simulation. The functional uncertainty quantification approach can be used to estimate the uncertainties associated with constitutive models used in the simulation and to correct predictions if a more accurate representation becomes available.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

New XDM-corrected potential energy surfaces for Ar–NO(X{sup 2}Π): A comparison with CCSD(T) calculations and experiments

We report new potential energy surfaces for the ground state Ar–NO(X{sup 2}Π) van der Waals system calculated using the unrestricted Hartree-Fock (UHF) method with the addition of the Becke-Roussel correlation functional and exchange-hole dipole moment dispersion correction (XDM). We compare UHFBR-XDM surfaces and those previously reported by Alexander from coupled cluster CCSD(T) calculations [J. Chem. Phys. 111, 7426 (1999)]. The bound states of Ar–NO have been investigated with these new UHFBR-XDM surfaces, including relative energy-level spacing, adiabatic bender states and wave functions, and spectroscopic data. These results have been found to be in good agreement with calculations based on the CCSD(T) PESs. These new PESs are used to investigate the inelastic scattering of NO(X) by Ar. Full close-coupling integral cross sections at collision energies of 442 cm{sup −1}, 1774 cm{sup −1} and differential cross sections at collision energy of 530 cm{sup −1} were determined for transitions out of the lowest NO(X) rotational level (j = ω = 1/2,f). These cross sections are in good agreement with those calculated with CCSD(T) and accordingly in good agreement with the most recent initial and final state resolved experimental data. The UHFBR-XDM scheme yields high-quality potential surfaces with computational cost comparable to the Hartree-Fock method and our results may serve as a benchmark for application of this scheme to collisions between larger molecules.

74 ATOMIC AND MOLECULAR PHYSICS↗