Results for “contingency analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Operating Reserves and Wind Power Integration: An International Comparison

The determination of additional operating reserves in power systems with high wind penetration is attracting a significant amount of attention and research. Wind integration analysis over the past several years has shown that the level of operating reserve that is induced by wind is not a constant function of the installed capacity. Observations and analysis of actual wind plant operating data has shown that wind does not change its output fast enough to be considered as a contingency event. However, the variability that wind adds to the system does require the activation or deactivation of additional operating reserves. This paper provides a high-level international comparison of methods and key results from both operating practice and integration analysis, based on the work in International Energy Agency IEA WIND Task 25 on Large-scale Wind Integration. The paper concludes with an assessment of the common themes and important differences, along with recent emerging trends.

17 WIND ENERGY↗

Novel AC Distribution Factor for Efficient Outage Analysis

We propose novel line outage distribution factors under AC power flow (AC-LODF) for providing very efficient approximate post-outage power flow solution. The AC-LODF is derived by using holomorphic embedding (HE) approach, and the approximate post-outage power flow solution is obtained with Pad approximation (PA). In this work, tests on IEEE 14-bus system, and Polish 2383-bus system verify that the proposed AC-LODF is effective on most outages, and can significantly speed up outage analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan

The Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan has been developed in accordance with the requirements identified in the: • Interagency Agreement for the Pantex Superfund Site, Article 8.5 Work to be Performed, • Compliance Plan Provision of Hazardous Waste Permit No. 50284, and • Record of Decision for Groundwater, Soil, and Associated Media, Pantex Plant. A Long‐Term Monitoring System Design has been designed to monitor conditions in the perched groundwater including changes in the perched aquifer as a result of implementing the response actions. Monitoring is required for verifying the effectiveness of perched groundwater response actions (i.e., conditions in the perched aquifer are being affected as intended) and for confirming that the perched aquifer and Ogallala Aquifer characterization as defined in the Resource Conservation and Recovery Act Facility Investigation Report and the Corrective Measure Studies/Feasibility Study remains accurate. If monitoring results obtained through the monitoring network identify an unexpected condition or deviation, contingent actions will be considered and implemented as necessary to ensure continued protection of the Ogallala Aquifer and human health and the environment. Potential deviations to expected technology performance may be encountered for each of the four primary response actions that compose the selected remedy for perched groundwater; Playa 1 Pump and Treat System, Southeast Area Pump and Treat System, Southeast Area In‐Situ Bioremediation System (comprised of the Southeast In‐Situ Bioremediation System Original System, Southeast Area In‐Situ Bioremediation System Extension System, Offsite In‐Situ Bioremediation System, Perchlorate/Chromium ISB, Northeast ISB and County Road 8 ISB), and Zone 11 In‐Situ Bioremediation System. Monitoring will also be conducted to determine if there are deviations to the expected characterization, e.g., contaminants not expected as a result of the RCRA Facility Investigation characterization. Deviations to expected conditions in the Ogallala Aquifer could also be encountered if the response actions in the perched groundwater are not performing as expected, i.e., preventing contaminants from migrating to the Ogallala Aquifer. Currently, Pantex has begun investigation of detections of high explosives above groundwater protection standards in wells on the Texas Tech University property and a plume that is moving to the northeast from that area. Due to those detections, this Plan recognizes the fact that future detections in the Ogallala will be focused on first‐ time detections of analytes. After a remedy is determined, this Plan will require modification to address-deviations and contingent actions. This Plan was developed to identify the contingent actions necessary to mitigate impacts resulting from deviations to site conditions or response action performance. The Plan defines the environmental problem being addressed by the response actions, clarifies the expected conditions and objectives of the response actions, and identifies the potential deviations to the response actions (due to site conditions or technology performance) that could be encountered. The deviations were evaluated to determine the likelihood of occurrence, potential impact, and time to respond to avoid impact. The Plan also identifies the monitoring outlined in the Long‐Term Monitoring System Design Report (Consolidated Nuclear Security, 2024) and Sampling Analysis Plan (PanTeXas Deterrence, 2024) that will be used to detect the deviations. Lastly, the Plan specifies the contingent actions that could be implemented in response to the deviations. Because each response focuses on a discrete portion of the perched aquifer and contaminant plume, each response action has a different set of expected conditions, and therefore differing impacts from deviations to the site and technology expectations. As a result, the contingent actions are identified for each response action and potential deviation including specific constituents, location, and conditions. If deviations are encountered that impact the ability of the response action to meet performance objectives, the contingent actions will be focused on ensuring the response action can meet the performance objective. Contingent actions may be implemented as interim actions (ISMs/removal actions) in accordance with the Record of Decision, Interagency Agreement, and Hazardous Waste Permit‐50284, if warranted by the specific circumstances. For deviations to site characterization expected conditions, the contingent action will focus on determination of the source of the deviation, determination of the appropriate response, and evaluation of additional work to be completed. However, if the deviation to characterization impacts the performance of the response action, the contingent action will again focus on ensuring performance objectives can be met. Early source term removals and cleanup actions have been implemented to protect the Ogallala Aquifer. Because of these actions and based on modeling results, the expected conditions in the Ogallala Aquifer are that constituents of concern will not be detected above the Groundwater Protection Standards (GWPSs) nor will they reach potential points of exposure above the GWPS. The primary deviation of concern for the Ogallala is if constituents are detected in the Ogallala Aquifer near or above GWPSs. If it occurs, this change in expected conditions would require further evaluation of site and contaminant characteristics to determine an appropriate course of action. The evaluation would include additional monitoring, source identification, implementation of interim protective measures (if necessary), and delineation of extent. These evaluations are necessary to determine an appropriate response action for the Ogallala. The primary goal of the Plan is to provide for the continued protection of the Ogallala Aquifer and the health of its consumers. In recognition, this Plan presents a flexible and rational approach for making future decisions associated with confirming the change in perched and Ogallala aquifer conditions and identifying a response (technical activities, changes to response actions, regulatory oversight, and public involvement).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Physically Realistic Estimates of Electric Water Heater Demand Response Resource

Multiple grid integration studies have examined the value of demand response, including from water heaters, to bulk power systems. Common shortcomings of these studies include physically unrealistic assumptions. For example, studies often assume that all electric water heater load can be shed for up to an hour to provide capacity or contingency service, that all electric water heater load is shiftable, and that round-trip efficiencies for shifting service are 100%. Another issue is that simply summing up estimates of individual water heaters' flexibility bounds, an attractive idea for constructing the MW-scale resources necessary for direct inclusion in grid investment and operational models, can result in significant overestimates of actual resource, because, e.g., a water heater with the ability to reduce load may not be able sustain the reduction for as long as the aggregate model suggests is possible. This presentation demonstrates the impact of estimating the flexibility of electric water heaters with physically realistic models suitable for grid service analysis. Electric water heater flexibility representations are constructed based on ResStock simulations of New England. Specifically, we examine contingency resource (related to capacity, shed, and contingency reserve services) and energy shifting resource from electric resistance and heat pump water heaters. Different estimation methods are compared; and the surrogate models' event responses are validated against events directly simulated in EnergyPlus. We also demonstrate the impact of using electric water heaters for contingency reserves and energy shifting in detailed models of possible future ISO New England power systems.

building energy modeling↗

STATISTICAL ANALYSIS OF TANK 19F FLOOR SAMPLE RESULTS

Representative sampling has been completed for characterization of the residual material on the floor of Tank 19F as per the statistical sampling plan developed by Harris and Shine. Samples from eight locations have been obtained from the tank floor and two of the samples were archived as a contingency. Six samples, referred to in this report as the current scrape samples, have been submitted to and analyzed by SRNL. This report contains the statistical analysis of the floor sample analytical results to determine if further data are needed to reduce uncertainty. Included are comparisons with the prior Mantis samples results to determine if they can be pooled with the current scrape samples to estimate the upper 95% confidence limits (UCL95%) for concentration. Statistical analysis revealed that the Mantis and current scrape sample results are not compatible. Therefore, the Mantis sample results were not used to support the quantification of analytes in the residual material. Significant spatial variability among the current scrape sample results was not found. Constituent concentrations were similar between the North and South hemispheres as well as between the inner and outer regions of the tank floor. The current scrape sample results from all six samples fall within their 3-sigma limits. In view of the results from numerous statistical tests, the data were pooled from all six current scrape samples. As such, an adequate sample size was provided for quantification of the residual material on the floor of Tank 19F. The uncertainty is quantified in this report by an UCL95% on each analyte concentration. The uncertainty in analyte concentration was calculated as a function of the number of samples, the average, and the standard deviation of the analytical results. The UCL95% was based entirely on the six current scrape sample results (each averaged across three analytical determinations).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

STATISTICAL ANALYSIS OF TANK 18F FLOOR SAMPLE RESULTS

Representative sampling has been completed for characterization of the residual material on the floor of Tank 18F as per the statistical sampling plan developed by Shine [1]. Samples from eight locations have been obtained from the tank floor and two of the samples were archived as a contingency. Six samples, referred to in this report as the current scrape samples, have been submitted to and analyzed by SRNL [2]. This report contains the statistical analysis of the floor sample analytical results to determine if further data are needed to reduce uncertainty. Included are comparisons with the prior Mantis samples results [3] to determine if they can be pooled with the current scrape samples to estimate the upper 95% confidence limits (UCL{sub 95%}) for concentration. Statistical analysis revealed that the Mantis and current scrape sample results are not compatible. Therefore, the Mantis sample results were not used to support the quantification of analytes in the residual material. Significant spatial variability among the current sample results was not found. Constituent concentrations were similar between the North and South hemispheres as well as between the inner and outer regions of the tank floor. The current scrape sample results from all six samples fall within their 3-sigma limits. In view of the results from numerous statistical tests, the data were pooled from all six current scrape samples. As such, an adequate sample size was provided for quantification of the residual material on the floor of Tank 18F. The uncertainty is quantified in this report by an upper 95% confidence limit (UCL{sub 95%}) on each analyte concentration. The uncertainty in analyte concentration was calculated as a function of the number of samples, the average, and the standard deviation of the analytical results. The UCL{sub 95%} was based entirely on the six current scrape sample results (each averaged across three analytical determinations).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydrogen Production Cost from Proton-Conducting Solid Oxide Electrolysis

Rigorous stakeholder-vetted techno-economic analysis (TEA) was conducted to estimate the cost of hydrogen (H 2 ) production using Proton-Conducting Solid Oxide (PSO) electrolysis. The analysis evaluates Current (2025) and Future (2035) technology cases at centralized plant scales of 50 and 500 metric tonnes per day (MTD), assuming electricity, water, and air as the only system inputs. Untaxed, unsubsidized levelized cost of hydrogen (LCOH) is projected to range from 2020 $\$$1.81 to $\$$2.47/kg H 2 at an electricity price of $\$$0.03/kWh and 97% capacity factor under Nth-of-a-kind (NOAK) deployment assumptions. Total installed capital cost was developed using bottom-up Design for Manufacture and Assembly (DFMA) stack cost modeling and detailed balance-of-plant estimates, including mechanical and electrical subsystems, installation, site preparation, engineering, and contingency. Stack performance assumptions include thermoneutral operation, degradation over time, and periodic replacement. LCOH was calculated using the Hydrogen Analysis (H2A) discounted cash flow model in constant 2020 dollars. Results indicate PSO electrolysis has potential for competitive hydrogen production costs under low-cost electricity and mature manufacturing conditions.

08 HYDROGEN↗

Feasibility and strategic implications of deploying nuclear power reactors in Africa

This report assesses the feasibility and strategic implications of deploying nuclear power reactors, including large-scale plants, advanced small modular reactors (SMRs), and microreactors, in African countries. Case studies focus on South Africa, Egypt, Kenya, Ghana, and Nigeria, examining nuclear energy’s role in Africa’s rapidly evolving energy landscape, marked by fast-growing demand, significant electricity access gaps, increasing renewable penetration, and strong policy commitments to industrialization and energy security. Several U.S. reactor technologies and designs are considered based on their development status and readiness for deployment. The analysis finds that nuclear power can provide reliable, clean baseload and flexible generation, as well as high-temperature process heat for desalination, hydrogen production, and industrial applications. However, suitability is highly country-specific, depending on grid size and stability, transmission capacity, cooling water availability, regulatory readiness, and fuel supply chains. Near-term deployment opportunities are strongest for light-water reactors (such as NuScale, BWRX-300, AP300, and SMR-300) that use low-enriched uranium and build on proven technology. More advanced concepts, including gas-cooled, sodium-cooled, molten-salt cooled reactors, and microreactors, will likely be relevant for African deployment in the 2030s or later, contingent on demonstration projects, high-assay low-enriched uranium (HALEU) fuel availability, and mature international licensing frameworks. Economic analysis shows that SMRs are capital-intensive, with projected overnight costs for 300 MWe units in 2025 ranging from approximately 1.4 to 2.6 billion USD per module. The levelized cost of electricity (LCOE) is highly sensitive to the weighted average cost of capital (WACC). Given typically higher financing costs and utility balance-sheet weaknesses in many African countries, bankable project structures will require sovereign guarantees, robust offtake arrangements, and layered financing from export credit agencies, development finance institutions, and vendor nations. Comparisons with recent large nuclear projects in the United Arab Emirates (UAE) and Egypt underscore the central role of state-backed loans, long tenors, and concessional terms. Country case studies illustrate a spectrum of readiness and opportunity. South Africa operates two 920 MWe pressurized light water reactors (totaling 1,840 MWe) at Koeberg and has the most mature regulatory and industrial base, positioning it as a prime candidate for both large reactors and SMRs to replace coal, support desalination, and anchor industrial hubs. Egypt is constructing four VVER-1200 units at El Dabaa with strong state leadership and could later complement this fleet with SMRs for coastal and industrial applications. Kenya and Ghana are advancing through IAEA Milestones with growing institutional capacity and clear interest in SMRs that match their smaller grids and industrialization plans. Nigeria has the largest demand potential but faces acute constraints in grid reliability, project bankability, and regulatory capacity; targeted deployments of large reactors and SMRs near coastal or industrial sites could have high impact if accompanied by major grid upgrades and institutional reforms. The report identifies cross-cutting challenges such as financing, political continuity, public acceptance, nonproliferation and security, waste and back-end management, regulatory capacity, grid adequacy, and long deployment timelines for first-of-a-kind designs, and ANL/NSE-26/3 ii proposes broad directions for resolution. These include stronger multifaceted financing for nuclear, long-term national energy strategies that transcend electoral cycles, proactive stakeholder engagement, strengthened regional and national regulators, and systematic workforce development through centers of excellence and expanded training. The United States should develop partnerships with African countries and offer end-to-end nuclear package similar to those used effectively by competitors: coordinated project development, state-backed financing, long-term fuel services, and durable in-country support through regional offices and sustained workforce/regulatory training. With timely planning, sustained political commitment, and appropriate financing and institutional support, nuclear energy, both large reactors and advanced SMRs, can become a meaningful, though not dominant, pillar of Africa’s future power mix, enhancing energy security, enabling industrial growth, and supporting climate goals.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Demand Response Availability Profiles for California in the Year 2020

Demand response (DR) is being considered as a valuable resource for keeping the electrical grid stable and efficient, and deferring upgrades to generation, transmission, and distribution systems. However, simulations to determine how much infrastructure upgrades can be deferred are necessary in order to plan optimally. Production cost modeling is a technique, which simulates the dispatch of generators to meet demand and reserves in each hour of the year, at minimal cost. By integrating demand response resources into a production cost model (PCM), their value to the grid can be estimated and used to inform operations and infrastructure planning. DR availability profiles and constraints for 13 end-uses in California for the year 2020 were developed by Lawrence Berkeley National Laboratory (LBNL), and integrated into a production cost model by Lawrence Livermore National Laboratory (LLNL), for the California Energy Commission’s Value of Energy Storage and Demand Response for Renewable Integration in California Study. This report summarizes the process for developing the DR availability profiles for California, and their aggregate capabilities. While LBNL provided potential DR hourly profiles for regulation product in the ancillary services market and five-minute load following product in the energy market for LLNL’s study, additional results in contingency reserves and an assumed flexible product are also defined. These additional products are included in the analysis for managing high ramps associated with renewable generation and capacity products and they are also presented in this report.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Statistical Steady-State Stability Analysis for Transmission System Planning for Offshore Wind Power Plant Integration

This paper presents a statistical steady-state stability analysis for transmission system planning studies in order to identify operational issues inherent in the integration of offshore wind power plants. It includes normal and contingency operation. This study considers the integration of a 1000-MW offshore wind power plant into the FirstEnergy/PJM service territory in the U.S. Great Lakes region as a case study and uses a realistic computer model of the U.S. Eastern Interconnection, a 63,000-bus test system. The results show the utility of this statistical analysis tool and its effectiveness in identification of the operational impacts as a result of the integration of offshore wind power plant.

Sajadi, Amirhossein↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I -- National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Thanks to advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India's RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU's anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD $920 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment - from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India's 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India’s Electric Grid, Vol. 1. National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Using advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India’s RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (Berkeley Lab), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU’s anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD 980 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment—from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India’s 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Lignite-plus-Biomass to Synthetic Jet Fuel with CO2 Capture and Storage: Design, Cost, and Greenhouse Gas Emissions Analysis for a Near-Term First-of-a-Kind Demonstration Project and Prospective Future Commercial Plants

We report on a 30-month design study for a first-of-a-kind (FOAK) demonstration plant that would be built at a site near Meridian, Mississippi, to coprocess lignite coal and woody biomass into jet fuel. The design uses an oxygen-blown TRIG™ gasifier developed by KBR and Southern Company. Fischer-Tropsch conversion of the syngas produces synthetic paraffinic kerosene (SPK) as the primary product, plus naphtha. Other co-products include electricity sold to the grid and CO 2 sold for use in enhanced oil recovery (EOR). Previous studies have identified coprocessing of various coals and biomass with CO 2 capture as promising options for cost-competitive production of low net lifecycle greenhouse gas (GHG) emissions synthetic fuels. The effort reported here goes beyond earlier studies in the level of detail in process design and cost estimation with the aim of improving the understanding of the economic prospects for lignite and woody biomass coprocessing systems. Key objectives in the design of the FOAK lignite/biomass-to-jet (LBJ) plant were to achieve net lifecycle GHG emissions for the SPK that are less than for conventional petroleum-derived jet fuel and to make process design and equipment selections such that the plant could be built and operated in the near term, e.g., before 2025. The process design was developed by researchers at Princeton University and the University of Queensland and validated by engineers at the WorleyParsons Group (WP). Commercial vendors provided design and cost estimates for several major plant components. Bare-erected capital costs and operating and maintenance costs were estimated by WP. The primary objective in building and operating the FOAK plant would be to demonstrate the technical viability of the LBJ concept as an essential first step toward launching commercial-scale plants in the longer term. With this in mind, the project team developed a set of principles to help guide the process design: the total plant cost should be less than 2 billion USD (to limit investment risk); the level of input biomass should be both proportionally significant to reflect biomass/lignite co-gasification and sufficient to achieve GHG emissions goals; process design decisions and vendor/equipment selections should prioritize the likelihood of technical success over minimizing the cost of jet fuel production. The resulting FOAK plant design capacity is 1,551 metric t/d (45.5% moisture) lignite and 556 t/d (43.3% moisture) biomass, for a total input of 295 MW HHV , of which 25% is biomass. The design output is 1,252 actual barrels per day of liquids, of which 80% is SPK (62.3 MW LHV ) and 20% is naphtha (13.9 MW LHV ). It exports 15 MW e of electricity after satisfying a 38 MW e onsite auxiliary load. Additional products are 1,326 t/d of pressurized pipeline-quality CO 2 and 49 t/day of sulfuric acid (93 wt% H 2 SO 4 ). With thinnings from sustainably-managed southern pine plantations as the biomass, and with captured CO 2 stored underground via EOR, the net lifecycle emissions for the SPK product are estimated to be about one-quarter of those for petroleum-derived jet fuel. The bare-erected cost (BEC) estimated by WP for this plant is 588 million USD (2015). The authors’ best estimate of total plant cost (TPC) is 1,230 million USD, arrived at by assuming engineering, procurement and construction management services (20% of BEC), process 5 contingencies (35% of BEC), and project contingencies (35% of the sum of all other costs, i.e., 35% of 1.55xBEC). Not surprisingly, an annual discounted cash flow (DCF) analysis determined that it would be impossible to generate a positive net present value (NPV) over a wide range in key input assumptions. An SPK production cost subsidy of nearly 400/bbl USD over a 20-year plant life would be required to achieve zero NPV under a baseline set of assumptions (including 3% real weighted average cost of capital and a levelized crude oil price of 80/bbl USD). Alternatively, a capital grant in excess of the TPC value would also achieve zero NPV. The poor financial results reflect the small scale of the plant, the design principle to prioritize technical success, the levels of contingencies appropriate for the relatively early stage of project development, and the first-of-a-kind nature of the plant. Technology innovations, learning via construction and operating experience, alternative plant configurations, and larger scale should improve economics of future plants. To help understand these prospects, a preliminary analysis of N th -of-a-kind (NOAK) plants was developed, but with the limitation that plants would use only equipment components that for the most part are already commercial today: consideration of advanced, not-yet-commercial technologies and of R&D-driven improvements in existing technologies were beyond the scope of this analysis. The analysis found that a variety of NOAK plant designs that coprocess lignite and woody biomass to make jet fuel are unlikely to be economically competitive without subsidy even in the presence of a high future carbon tax or equivalent greenhouse gas mitigation policy. This conclusion applies to process configurations and input biomass/lignite ratios that result in net GHG emissions as high as those for petroleum-derived jet fuel and as low as zero. In contrast, encouraging results were found for plants processing only biomass. The economics of these “BECCS” plants (biomass energy with CCS) improve dramatically with the strength of carbon mitigation policies because of their strongly negative net GHG emissions. These findings do not imply that coal/biomass coprocessing strategies for making synfuels with CCS are not economically promising – only that, in the case of lignite, much more than a 25% biomass coprocessing rate would be needed. However, our analysis shows that all such systems are unlikely to be economic in the absence of a strong carbon mitigation policy. Future R&D driven technological innovations could modify this conclusion. Among other R&D priorities, an emphasis on better understanding and reducing plant auxiliary loads is warranted.

09 BIOMASS FUELS↗

System Calibration Including Time Delay Estimation for GNSS/INS-Assisted Pushbroom Scanners Onboard UAV Platforms

Unmanned aerial vehicles (UAVs ) equipped with imaging sensors and integrated global navigation satellite system/inertial navigation system (GNSS/INS ) units are used for numerous applications. Deriving reliable 3D coordinates from such UAVs is contingent on accurate geometric calibration, which encompasses the estimation of mounting parameters and synchronization errors. Through a rigorous impact analysis of such systematic errors, this article proposes a direct approach for spatial and temporal calibration (estimating system parameters through a bundle adjustment procedure) of a GNSS/INS -assisted pushbroom scanner onboard a UAV platform. The calibration results show that the horizontal and vertical accuracies are within the ground sampling distance of the sensor. Unlike for frame camera systems, this article also shows that the indirect approach is not a feasible solution for pushbroom scanners due to their limited ability for decoupling system parameters. This finding provides further support that the direct approach is recommended for spatial and temporal calibration of UAV pushbroom scanner systems.

47 OTHER INSTRUMENTATION↗

Software predicts disaster-driven grid failures

A new, free, open-source software reliably predicts how damage from hurricanes, ice storms, earthquakes, and other extreme events will restrict power delivery from utility grids. The Severe Contingency Solver for Electric Power Transmission is the only software available—commercially or open-source—that reliably supports analysis of extreme events that cause widespread damage.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Real-Time Federated Cyber-Transmission-Distribution Testbed Architecture for the Resiliency Analysis

With the ongoing automation driven by the push toward the smart electric grid and the advancement in associated cyber infrastructure, the interaction between physical [electric transmission and distribution (T&D) systems], cyber (communication, automation, and control), and human (grid operators and decision-makers) is increasingly becoming more complex. This creates the requirement of analyzing the effect of the transmission system on the distribution system and vice versa with consideration of the additional complexity of the cyber infrastructure. Such an integrated testbed will also help with resiliency analysis, where resiliency refers to the ability of the system to continue serving energy to the critical loads even with limited extreme contingencies. Interaction of the physical power grid with the cyber layer can be effectively modeled using real-time (RT) simulator for developing and validating various operational and control algorithms. Testbeds using RT simulators with multiple capabilities have been developed at different institutions. Still, no single existing testbed can offer full scalability while simultaneously meeting high fidelity requirements for resiliency experimentation. Co-simulating federated testbed assets can provide a scalable experimentation platform that can be leveraged for verification and validation. In this article, an architecture is developed for federated cyber-physical testbed. A local federation with two real-time simulators is developed: real-time digital simulator (RTDS) and OPAL-RT have been interfaced using VILLAS framework for end-to-end testing. Also, a real-time linear predictor is developed and integrated here to address the communication latency impact on geographically allocated federated RT simulation. Finally, resiliency analysis tools are formulated and utilized for T&D systems. Finally as an illustrative use case, the resiliency of a T&D test system is simulated, and the results are analyzed. A 179-bus Western Electricity Coordinating Council (WECC) transmission system is developed using OPAL-RT/ HYPERSIM, and a modified IEEE 13 node feeder system is modeled in RTDS/RSCAD and interfaced for resiliency analysis.

42 ENGINEERING↗

Developing Frequency Stability Constraint for Unit Commitment Problem Considering High Penetration of Renewables

As zero-carbon electricity systems become the trend of future grid, the system inertia provided by conventional synchronous generators (SGs) keeps decreasing. The resultant lower system inertia will inevitably cause frequency stability problem, especially in the first few seconds following disturbance. To tackle this challenge, this paper proposes a frequency stability constraint for power systems unit commitment problem by considering the fast frequency responses (FFRs) from inverter-based resources (IBRs). Our developed frequency stability constraint is grounded on an analytical frequency nadir estimation framework that considers both SG and IBR dynamics. The accuracy of our frequency nadir estimation framework is validated by most severe N-1 contingency simulation result in a real island system. Then, the adaptive inertia frequency stability constraint is derived by performing sensitivity analysis with our frequency nadir estimation framework. Finally, we demonstrate the effectiveness of our developed frequency stability constraint with one year day-ahead unit commitment results of the island system.

fast frequency response↗

Distributed Coordination of Networked Microgrids for Voltage Support in Bulk Power Grids

The increasing deployment of distributed energy resources (DERs) and microgrids (MGs) in power distribution systems has enabled the adjustment of reactive power consumption as seen at the substation, which can be used to provide voltage support for the bulk power system (BPS). Leveraging this new capability will provide greater resiliency to the power system as a whole. Here, the goal of this paper is to develop and compare three different algorithms, namely distributed optimal power flow, distributed consensus algorithm, and fully decentralized collaborative autonomy for unbalanced distribution systems for microgrid coordination. These algorithms use networked MGs to support the BPS voltage when a contingency at the bulk grid results in abnormally low voltages, which may be a precursor to voltage collapse. Our comparative analysis includes both qualitative and quantitative assessments of the three algorithms and a discussion of the trade-offs between the decentralized and distributed methods in normal and disrupted conditions. Each algorithm was evaluated on the modified IEEE 13-bus system and a real power distribution system at Chattanooga, Tennessee, that encompasses more than 4500 buses. Each algorithms excels differently and may be suited for different scenarios depending on the condition, operations, and priorities of the power and communication systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗