Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “US DOE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Panel Session 117: Panel: Operational Excellence Through a Strong Safety Culture (R9.1)

This panel focused on the what the Department of Energy (DOE) and its contractors are doing to promote safety and excellence. The Integrated Safety Management System (ISMS) is crucial, but additional support provided by the Energy Facility Contractors Group (EFCOG), DOE, and environmental, safety, and health (ES and H) professionals in the field are equally imperative. The panelists discussed the importance of sharing lessons learned as well as are developing performance metrics to track operational and safety successes. This panel focused on current trends in building a strong operational safety culture and will include results from recent national workshops. Safety culture is the foundation of strong operational performance. Panel discussion included best practices from industry, DOE, and US NRC and also review tools being used to measure and evaluate safety culture programs. Panelists with presentations: Strong Safety Culture Promotes Operational Excellence (Kliss McNeel, Patricia Hughes); Safety Culture (Patricia Allen); DOE Safety Culture Improvement (Julie Goeckner); Supporting Safety Culture on the Front Line (Jan Preston); Interdependence of Safety Culture and Organizational Performance (Rizwan Shah)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Probabilistic Multi-Hazard Performance Assessment of Concrete Structures in Nuclear Installations

Concrete structures in nuclear installations are subject to time-dependent degradation mechanisms that can deteriorate their physical and mechanical properties, potentially exacerbating the risk of structural failure under external forces such as a seismic event. Previous research has extensively investigated the seismic response of nuclear concrete structures and the associated risk, as well as their effect on structural components safety margins. However, substantial work is still necessary to incorporate concrete aging effects into such evaluations. In fact, most models in the literature assume pristine concrete conditions and do not account for the impact of aging on the structural components’ fragility curves. This work identifies relevant time-dependent degradation mechanisms and provides simplified models to predict the the evolution of key material properties based on data from the literature. Namely, this work focuses on the aging effects of corrosion, alkali–silica reaction (ASR), and irradiation on reinforced concrete within US Department of Energy (DOE) nuclear facilities and nuclear power plants (NPP) structures. Furthermore, degradation models based on literature data are presented that define the relationship between probabilistic material properties and the concrete’s age. In this work, sampled material properties served as input for a simplified finite element model (FEM) of a critical nuclear structural system, with the output of the FEM being the seismic response for a given ground motion. The results of the FEM were then used within a probabilistic performance assessment with a statistically significant number of samples. The research presented herein addresses the detrimental effects of hazards caused by natural phenomena on deteriorated concrete elements of nuclear installations. This work directly benefits the safety analysis performed on US DOE/ National Nuclear Security Administration (NNSA) nuclear facilities located in areas prone to seismic activity. The results presented herein could aid in the improvement of DOE-STD-1020, the DOE Standard that addresses seismic risk analysis and capacity evaluation in DOE facilities. DOE-STD-1020 refers to the requirements in American Society of Civil Engineers (ASCE) 4-98, now superseded by ASCE 4-16, that shall be met in performing dynamic response analyses and generating in-structure response spectra, provided that such requirements are consistent with the requirements of ASCE/Structural Engineering Institute (SEI) 43-05. Moreover, the results presented herein could also aid in the updating of section C3.1.1. of ASCE 4-16 to account for the effects of aging on the stiffness of reinforced elements and American Concrete Institute (ACI) 349.3R-18, “Report on Evaluation and Repair of Existing Nuclear Safety-Related Concrete Structures.” Ultimately, this work can assist the risk assessment of potential lifetime extension of the existing US commercial nuclear fleet (light water reactors) and the safety analysis of the emerging advanced nuclear reactors. The proposed proof-of-concept methodology employs open-source DOE computational tools and is transferable to commercial software commonly used by engineering firms.

42 ENGINEERING↗

Lessons Learned from Demolition of Hanford's Plutonium Finishing Plant - 20507

U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC), a Jacobs owned company, is making significant progress demolishing the Plutonium Finishing Plant (PFP), which has long been known as one of the most hazardous buildings in the DOE Environmental Management Complex (DOE Complex). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut down in 1996, and material processing was completed in 2004. After approximately 25 years of demolition preparations, open-air demolition of the main portions of the Hazard Category II nuclear facility began in November 2016. To prepare the PFP for demolition, CHPRC employees performed some of the most hazardous work across the DOE Complex. In addition to extensive demolition preparations, including a wide-reaching communication strategy across the Hanford Site, CHPRC implemented robust controls and monitoring during demolition, and when necessary, adjusted demolition practices and sequence to maintain employee safety and project efficiency. Demolition of the main PFP building began in November 2016. The technical complexity, high hazards and radiological concerns have all led to a difficult demolition environment. Following a spread of contamination at the project site beyond the radiological boundaries in December 2017, work was halted and a recovery plan was generated to allow the demolition work to continue. After the implementation of additional controls and concurrence from regulatory agencies and DOE, the demolition was ready to resume work and reinitiated in August 2018. There are a number of lessons learned from the demolition activities and recovery plan process. This paper allows CHPRC and DoE's Richland Operations Office (RL) to share lessons learned and progress to date with other challenging and hazardous projects across the DOE Complex. Understanding the risk acceptance level is critical to execution of any open-air demolition project and is unique to each facility. Four key lessons learned from this project include: 1) plan execution issues, 2) stakeholder communication issues, 3) watching for summit fever and 4) minimizing exposed contaminated surfaces during demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 56: Enhanced Performance Through Joint Assurance Review

This panel focused on the benefits of recent DOE-EM efforts to conduct joint oversight reviews. These reviews enhance partnering and alignment and represent an efficient and cost-effective way to identify and prioritize needed project performance improvements. Panelists with presentations: Enhanced Performance Through Joint Assurance Reviews (Jan Preston)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Mixed Waste Treatment Project Overcomes Challenges to Complete Treatment of Debris Waste - 20616

The Advanced Mixed Waste Treatment Project (AMWTP), operated by Fluor Idaho for the Department of Energy Idaho Operations Office, completed the last of its debris waste treatment in the fall of 2019. Concluding that work-scope was certainly not without its challenges. Fluor Idaho and its employees had to adapt to treating extremely challenging waste types, such as high-fissile gram materials and potentially pyrophoric and reactive wastes coming down the stretch. It also had to complete the sizing of large waste boxes from Mound Laboratories in inner-contamination enclosures designed to capture the extremely fine, 'flighty' plutonium-238 in its high-efficiency particulate air filters. Very few waste treatment facilities in the DOE Complex have completed their missions. In fact, most large-scale waste treatment facilities are still under construction with many months or years remaining before 'hot operations' begin. AMWTP is unique because it functioned as a 'one-stop shop.' Transuranic and low-level waste characterization, treatment, certification, and shipping all occurred there. AMWTP concluded the most challenging part of its mission and will continue to ship material out of the state of Idaho for the next decade. This paper will provide a background of the AMWTP mission, and the adaptations to its operating permit, equipment, or treatment processes to address challenging waste types. AMWTP will leave behind a legacy of being one of the most successful waste treatment facilities in the history of the DOE Complex. The facility was well-conceived, well-constructed, and well-executed; it was done right from start to finish. During the course of its waste treatment mission, the facility was required to adapt to changing conditions by treating extremely challenging waste types. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Hanford's Direct Feed Low Activity Waste Program - 20002

The Office of River Protection (ORP) is responsible for the management and completion of the River Protection Project (RPP) mission, which comprises both the Hanford Site tank farms operations and the completion and operation of the Waste Treatment and Immobilization Plant Project. The RPP mission is to safely retrieve, treat, and immobilize Hanford's high-level and low-activity tank waste and close the tank farms to protect the Columbia River. The Direct-Feed Low-Activity Waste (DFLAW) Program is a major subset of the overall RPP mission, providing disposition of low-activity waste. The scope is to retrieve, treat, and immobilize the low-activity waste at the Low-Activity Waste Facility. DFLAW will begin operations no later than December 2023. The DFLAW Program overarches a suite of individual projects, activities, and infrastructure upgrades. The major projects and activities include multiple contractors under both ORP and the Richland Operations Office, underscoring the need for effective integration, coordination, and collaboration. The objectives of the DFLAW Program leadership team are to: - Effectively coordinate and integrate the projects that comprise the DFLAW Program - Manage the interfaces between the projects so that the integrated DFLAW Program is completed successfully - Ensure the DFLAW portfolio of projects operate as required without gaps or conflicts at the interfaces. DOE is accomplishing these objectives through a newly established leadership model that integrates the DOE and contractor work streams and promotes a teamwork model to enable collaborative success. Long considered one of the most formidable cleanup challenges at Hanford, the Department of Energy and its contractors are on the verge of achieving a cleanup commitment that has been decades in the making. DOE is preparing to vitrify (turn to glass) Hanford's chemical and radioactive tank waste using the DFLAW process. The Modified Consent Decree milestone for completing hot commissioning of the Hanford Site's Low- Activity Waste Facility is Dec. 31, 2023. While this milestone may seem distant under normal project management circumstances, it is a relatively short period of time for the operational and cultural transformation necessary to successfully begin treating tank waste at Hanford. Direct feed means separating the waste at a tank farm to remove the more radioactive portion (i.e., solids and cesium) so that the resulting low-activity (less radioactive) waste can be fed directly to the Waste Treatment and Immobilization Plant's Low-Activity Waste Facility. Starting DFLAW will require a singular, intensive leadership focus, along with a sustained, collective commitment to excellence and teamwork by the Department and its contractors. Major upgrades to Hanford's infrastructure will occur prior to startup. Supporting DFLAW operations requires significant integration between the DFLAW facilities - the Waste Treatment Plant, Hanford's tank farms, effluent treatment facilities, disposal facilities - and between all of the site contractors to achieve success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Removing the Cloak of Secrecy from Legacy Cleanup at Los Alamos national Laboratory - 20395

With the establishment in 2018 of the Los Alamos Legacy Cleanup Contract, the Department of Energy's (DOE) Environmental Management Los Alamos Field Office (EM-LA) and its contractor Newport News Nuclear BWXT Los Alamos (N3B) embarked on an expansive program to engage a broad range of local and regional stakeholders in the decision-making process for cleanup of legacy wastes (pre-1999) at the Los Alamos National Laboratory (LANL). From the inception of LANL during the Manhattan Project until the issuance of the new cleanup contract, the site was managed by a single management and operations (M and O) contactor whose main focus was national security. Segmenting from laboratory operations a separate cleanup contract managed by DoE's Office of Environmental Management (EM) brought new opportunities for the cleanup of legacy waste. That change likewise has opened new opportunities for engaging the community on legacy cleanup decisions. The new legacy cleanup contract - an unclassified contract - emphasizes public outreach, marking a cultural shift in how stakeholders in Los Alamos and throughout northern New Mexico are engaged. Without the constraints of classified work, EM-LA and N3B have increased the level of transparency with the public regarding cleanup activities. EM-LA and N3B have crafted an approach that best meets the values, priorities and needs of the neighboring communities by adapting the model successfully employed at Rocky Flats. Through enhanced stakeholder involvement, EM-LA will implement decisions that have considered broad input and deliver a safe and efficient cleanup of the site. EM-LA and N3B began the expanded stakeholder outreach program in January 2019, leading up to four Environmental Management Cleanup Forums held in the summer of 2019. EM-LA and N3B are now in the process of initiating a series of meetings with various stakeholder groups to determine their 'values' as they relate to cleanup using a novel approach that elicits and records values. The entire process is documented, ensuring that should questions arise about how, when and why decisions were made, they can be easily addressed. In addition to other public meetings to present cleanup scenarios and solicit active public involvement in cleanup decisions, the EM-LA and N3B approach involves discussions with stakeholders who want to explore specific technical issues and cleanup discussions in depth. EM-LA and N3B are also evaluating and implementing a variety of communications tools to help ensure the engagement plan sets the gold standard for transparency in legacy cleanup and stakeholder involvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparative genomics of Aspergillus nidulans and section Nidulantes

Aspergillus nidulans is an important model organism for eukaryotic biology and the reference for the section Nidulantes in comparative studies. In this study, we de novo sequenced the genomes of 25 species of this section. Whole-genome phylogeny of 34 Aspergillus species and Penicillium chrysogenum clarifies the position of clades inside section Nidulantes. Comparative genomics reveals a high genetic diversity between species with 684 up to 2433 unique protein families. Furthermore, we categorized 2118 secondary metabolite gene clusters (SMGC) into 603 families across Aspergilli, with at least 40 % of the families shared between Nidulantes species. Genetic dereplication of SMGC and subsequent synteny analysis provides evidence for horizontal gene transfer of a SMGC. Proteins that have been investigated in A. nidulans as well as its SMGC families are generally present in the section Nidulantes, supporting its role as model organism. The set of genes encoding plant biomass-related CAZymes is highly conserved in section Nidulantes, while there is remarkable diversity of organization of MAT-loci both within and between the different clades. This study provides a deeper understanding of the genomic conservation and diversity of this section and supports the position of A. nidulans as a reference species for cell biology.

Theobald, Sebastian [Technical University of Denma↗

Enhanced coercivity in Fe5C2/SiO2 core/shell nanocrystals

Rod-shaped Fe5C2 and core/shell Fe5C2/SiO2 nanocrystals were synthesized via a solution-based chemical method. Structural analysis confirmed the monoclinic phase of Fe5C2 with space group C2/c. Zero-field-cooling (ZFC) and field-cooling (FC) magnetization curves revealed distinct magnetic behaviors: uncoated Fe5C2 exhibited a low-temperature FC plateau indicative of strong dipolar interactions, while Fe5C2/SiO2 showed a monotonic increase in FC magnetization, suggesting reduced dipolar interactions due to SiO2 surface passivation. Isothermal remanent magnetization (IRM) and DC demagnetization (DCD) measurements supported this trend, with δM plots confirming weaker dipolar interactions in the coated sample. Bloch’s law fitting of temperature-dependent saturation magnetization showed a smaller Bloch’s constant for pure Fe5C2 and a larger value for Fe5C2/SiO2, reflecting enhanced surface disorder and reduced exchange coupling in the latter. Notably, Fe5C2/SiO2 demonstrated increased coercivity, attributed to decreased dipolar interaction and elevated surface anisotropy. Kneller’s law fitting yielded higher blocking temperatures for Fe5C2 (476 K) than Fe5C2/SiO2 (456 K), highlighting the impact of dipolar interactions on magnetic relaxation. These findings illustrate how SiO2 coatings effectively modulate dipolar interactions and enhance coercivity in Fe5C2 nanocrystals.

Joshi, Pramanand [Department of Physics, Universit↗

Role of Si substitution in modulating the coercivity and magnetic anisotropy in Fe3CoB2 nanocrystallites

In this work, we report the impact of Si substitution on the structural and magnetic properties of Fe3CoB2 nanocrystallites as a rare-earth-free hard-magnet candidate. X-ray diffraction confirmed the formation of the tetragonal phase with an average crystallite size of ∼40 nm, while the transmission electron microscopy image revealed nanosized crystallites embedded in an amorphous matrix. Room-temperature Mössbauer spectra exhibited two sextets and two doublets, indicating magnetically ordered Fe sites in the tetragonal phase along with high-spin paramagnetic FeIII species in disordered regions. ZFC–FC magnetization curves displayed field-dependent blocking behavior, consistent with paramagnetic Fe species. Singular point detection measurements revealed a high anisotropy field of ∼10.7 kOe in the pristine Fe3CoB2, and systematically decreased with Si substitution. Magnetization measurements revealed a monotonic decrease in saturation magnetization with Si content, while coercivity was observed to increase, likely due to microstructural refinement. These results establish Fe3CoB2 as a rare-earth-free material with strong magnetic anisotropy, ideal for hard magnets.

Abbas, Hur [Department of Physics, University of T↗

Sister Rod Destructive Examinations (FY20) Appendix A: Full Length Rod Heat Treatments (FHT)

As a part of the US DOE-NE High Burnup Spent Fuel Data Project, ORNL is performing destructive examinations (DEs) of high burnup (HBU) (>45 gigawatt days per metric ton uranium) spent nuclear fuel (SNF) rods from the North Anna Nuclear Power Station operated by Dominion Energy. The SNF rods, called the “sister rods,” are all HBU and include four different kinds of fuel rod cladding: standard Zircaloy-4, low-tin Zircaloy-4, ZIRLO®, and M5®. The DEs are being conducted to obtain a baseline of the HBU rod’s condition prior to dry storage and are focused on understanding overall SNF rod strength and durability. Both composite fuel and empty cladding are being tested. While the data generated can be used for multiple purposes, a primary goal for obtaining the post-irradiation examination data will support SNF dry storage licensing and relicensing activities.This report documents the status of the ORNL Phase 1 DE activities related to full length rod heat treatments (FHT) applied to selected sister rods in Phase 1 of the sister rod test program. The results of this work and detailed examinations are summarized in the Sister Rod DE Status Report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sister Rod Destructive Examinations (FY20) Appendix B: Segmentation, Defueling, Metallograhic Data and Total Cladding Hydrogen

As a part of the US DOE-NE High Burnup Spent Fuel Data Project, ORNL is performing destructive examinations (DEs) of high burnup (>45 gigawatt days per metric ton uranium) spent nuclear fuel (SNF) rods from the North Anna Nuclear Power Station operated by Dominion Energy. The SNF rods, called the “sister rods,” are all HBU and include four different kinds of fuel rod cladding: standard Zircaloy-4, low-tin Zircaloy-4, ZIRLO®, and M5®. The DEs are being conducted to obtain a baseline of the HBU rod’s condition prior to dry storage and are focused on understanding overall SNF rod strength and durability. Both composite fuel and empty cladding are being tested. While the data generated can be used for multiple purposes, a primary goal for obtaining the post-irradiation examination data and the associated measured mechanical properties is to support SNF dry storage licensing and relicensing activities.This report documents the status of the ORNL Phase 1 DE activities related to: rough segmentation, defueling, optical microscopy, and cladding total hydrogen measurements for 7 Phase 1 sister rods and outlines the DE tasks performed and the data collected to date. The results of these detailed examinations and others are summarized in the Sister Rod DE Status Report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fuel Debris Monitoring Collaboration and Experiences in Criticality Monitoring

Fukushima Daiichi fuel debris removal provides technical challenges and opportunities for the international criticality safety community. The US DOE-NCSP (Nuclear Criticality Safety Program) and France (IRSN) will support 1F fuel debris efforts through collaboration on real-time criticality monitoring. This work will describe a collaboration that is starting soon and will also describe previous efforts associated with criticality experiments and neutron analysis of unknown systems.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Panel Session 128: Best Practices in Project Communications

This panel focused on a sustainable, holistic and integrated approach to structure nuclear waste management, disposal and remediation decisions. This panel had participation from internal and external stakeholders and demonstrate use of tools and techniques to effectively communicate factors that inform decisions. The desired outcome was to effectively communicate how risk is evaluated at complex sites, highlight holistic site level approaches that are protective of human health and the environment, and incorporate policy and technical concerns related to achieving alternative end points. This discussion included existing decision-making tools in conjunction with case studies. Panelists with presentations: Removing the Cloak of Secrecy from Legacy Cleanup at Los Alamos National Laboratory (David Nickless); Best Practice In Project Communications (Alan Paulley); Stakeholder and Public Engagement (Mark Lesinski); Stakeholder Engaged Structured Decision Making (Kelly Black)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Immobilized Low-Activity Waste Transportation System Testing Results - 20043

The immobilized low-activity waste (ILAW) transportation system is a first-of-a-kind system that is being designed and tested to transport ILAW glass-filled containers from Hanford's Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility to the Integrated Disposal Facility (IDF) burial trench for permanent disposal. A prototype design and fabrication of one transport trailer and four engineered ILAW pallets was completed in mid-2018. Prototype qualification testing to verify adequacy of the design was completed in 2019 by Washington River Protection Solutions (WRPS) and affiliate ATKINS SNC-Lavalin Group. Prototype testing was completed to advance design maturation across all operational and facility interfaces, and under adverse environmental and operating conditions, including thermal assessment of the system at peak projected temperatures. Test design, observation, and feedback was well represented and supported by all ILAW Transportation System interfacing organizations: WTP constructor Bechtel National, Inc.; IDF operator CH2M (CHPRC); transportation contractor Mission Support Alliance (MSA); the U. S. Department of Energy Richland Operations Office (DOE/RL) and Office of River Protection (DOE/ORP); and Washington State Department of Ecology. This paper presents the results of prototype qualification testing and opportunities for design improvements based on testing. Changes to the final design as a result of prototype testing include improvements in safety, ergonomics, operational flexibility, and As-Low-As-Reasonably-Achievable (ALARA) applications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Celeritas: Accelerating Geant4 with GPUs

Celeritas [1] is a new Monte Carlo (MC) detector simulation code designed for computationally intensive applications (specifically, High Lumi- nosity Large Hadron Collider (HL-LHC) simulation) on high-performance heterogeneous architectures. In the past two years Celeritas has advanced from prototyping a GPU-based single physics model in infinite medium to implementing a full set of electromagnetic (EM) physics processes in complex geometries. The current release of Celeritas, version 0.3, has incorporated full device-based navigation, an event loop in the presence of magnetic fields, and detector hit scoring. New functionality incorporates a scheduler to offload electromagnetic physics to the GPU within a Geant4-driven simulation, enabling integration of Celeritas into high energy physics (HEP) experimental frameworks such as CMSSW. On the Summit supercomputer, Celeritas performs EM physics between 6 and 32 faster using the machine’s Nvidia GPUs compared to using only CPUs. When running a multithreaded Geant4 ATLAS test beam application with full hadronic physics, using Celeritas to accelerate the EM physics results in an overall simulation speedup of 1.8–2.3× on GPU and 1.2× on CPU.

Johnson, Seth R.↗