Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “UPS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Sorption heat pump and control method

A method operates an absorption heat pump system, specifically the flow of hydronic cooling fluid through the condenser during system start-ups, or when the cooling fluid temperature is low. To minimize the time for an absorption heat pump to reach full cooling or heating capacity, it is desirable for the high side pressure to increase as fast as possible, and the low side pressure to decrease as fast as possible. Since the high side pressure is a function of the temperature of the refrigerant exiting the condenser, if the condenser cooling fluid temperature is low, the corresponding high side pressure will be low, which may not permit adequate working fluid flow rates from the high pressure side of the system to the low pressure side.

Garrabrant, Michael A.↗

Hazmat Incident in New Mexico: Sulfur Dioxide Alarm

Sandia National Laboratories (SNL) is a multimission laboratory located in Albuquerque, New Mexico, and is one of three National Nuclear Security Administration research and development laboratories located in the United States. Recently, SNL’s Emergency Response Team (ERT) responded to an incident involving a sulfur dioxide (SO2)-fixed monitor, setting off the alarm inside a laboratory and in the adjacent hallway. The potential sources for the alarm were various experiments involving batteries and an uninterrupted power supply (UPS) in the immediate area.

99 GENERAL AND MISCELLANEOUS↗

Single-Bar SMT Creep-Fatigue Testing on Alloy 617 with Software Controls on elastic Follow-Up Feedback in Support of New Creep-Fatigue Design Methodology

The Simplified Model Test (SMT) is one of the alternative ways to calculate the creep-fatigue damage of elevated temperature components. The SMT approach unifies the creep and fatigue damage, simplifying the damage calculation process with improved accuracy. Traditionally, SMT tests has have been conducted through the two bars: first is the driver bar and second is the test bar. The driver bar stays elastic and imposes the confinement to the second bar. This experimental procedure requires two test frames and a large test specimen, which limits the test parameter range and accessibility of this testing procedures. Hence, a single-bar SMT (SB-SMT) tests has been developed to simplify complexity in SMT experiment setup. The software-controlled SB-SMT test process has been introduced which completely replaces the driver bar. This paper discusses the single-bar SMT (SB-SMT) test procedure with software controls. The challenges and critical parameters in the software-controlled SB-SMT procedure are addresses addressed and recommendations are provided. A scoping test with a set of wider strain range, elastic follow-ups and dwell time validated the proposed test procedure.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Challenges and Solutions in Operation and Lay-Up of the Modular Caustic- Side Solvent Extraction Unit - 20078

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) was designed and constructed to provide interim salt waste processing so that the Liquid Waste Disposition Program (LWDP) could continue waste removal and tank closure until start-up of the Salt Waste Processing Facility (SWPF). MCU processes Clarified Salt Solution (CSS), or salt solution (SS) that has undergone actinide removal/filtration, to produce two waste streams: the cesium laden Strip Effluent (SE), which is incorporated into glass at the Defense Waste Processing Facility (DWPF), and the cesium depleted Decontaminated SS (DSS), which is incorporated into grout at the Saltstone Production Facility (SPF). MCU completed start-up in 2008 with an initial operating life of 3 years and design life of 5 years. Prior to reaching the end of the design life, multiple critical components were upgraded and/or replaced to mitigate risks associated with any delays in SWPF start-up. During the remainder of operation (until June 2019), MCU was challenged to maximize processing with minimal additional modifications to repair/improve aging infrastructure, while maintaining low levels of risk to workers and the environment. Notable challenges during the extended operating life of the facility involved both mechanical and operational issues. Two of the most significant issues were the increased frequency of Process Vessel Ventilation (PVV) High Efficiency Particulate Air (HEPA) filter change-outs and the biofouling of the SE coalescer (SEC). The major impacts of both issues were that replacement of these components 1) resulted in high exposure to workers, and 2) required substantial downtime, thus hindering achievement of processing goals. PVV HEPA filter replacements are required based on dose rate and differential pressure (dP) limits. After introducing a higher-curie feed to MCU, the operating time between change outs was reduced by approximately half. SEC replacements are required based on dP limits. After restarting from an extended outage, the operating life of the SEC was significantly reduced by more than half due to biofouling. As a result of extensive troubleshooting and process improvements, the facility was able to recover performance and extend the operating life of the PVV HEPA filters and the SEC media. Through troubleshooting both of these issues, the facility was also able to learn from prior experience and adapt in order to minimize down time and maintain throughput. Although the facility took advantage of short periods of downtime to perform nonintrusive troubleshooting and minor corrective/preventative maintenance activities, longer outages were periodically required for corrective maintenance involving process cell entry. During these outages, remote tools and specialized shield plates were employed to minimize dose to workers. Mock-ups of non-routine maintenance activities were critical to early identification of potential issues and improvements, which shortened outage duration. Consistent with the facility's operational strategy, evolutions needed for MCU layup were identified and sequenced to ensure safe conditions within the facility, meet pre-defined criteria for lay-up configuration, and protect workers, while minimizing the impact to SWPF integration. De-inventory and flushing of process areas was prioritized so that the total residual inventory was reduced as efficiently as possible. This paper discusses lessons learned and best practices from troubleshooting unique issues, performing complex maintenance activities, and implementing a layup strategy that best supports the overall system mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Retrieval of Transuranic Drums with Deflagration to Detonation Potential from a Vault at the Oak Ridge National Laboratory - 20207

During the final phase of a long-term project, a total of 80 TRU waste drums at ORNL have been retrieved from a below-grade storage vault in which they have remained untouched for about 25 years. The drums, which house material generated from past ORNL operations, are now stored and ready for eventual transfer to the Transuranic Waste Processing Center, located on Highway 95 in Oak Ridge. The Transuranic Waste Processing Center will process and ship the drums to WIPP in Carlsbad, New Mexico, for disposal. Workers lifted the drums one-by-one from the underground storage vault with a 110-ton crane over a one-week period in October 2017. Although the physical work was performed in one week, years of detailed planning preceded the fieldwork. A key obstacle needed to be overcome before the project could safely proceed. This obstacle involved the need to ensure controls were developed for the Deflagration to Detonation Transition (DDT) potential. DDT refers to a phenomenon in ignitable mixtures of a flammable gas and air (or oxygen) when a sudden transition takes place from a deflagration type of combustion to a detonation type of explosion. Basically, these drums, under certain circumstances, have a potential to detonate and overpressurize. Extensive analysis of the drums verified that detonation, while unlikely, was possible. Of the total 103 drums that were retrieved or moved in preparation for retrieval, 18 had DDT potential. Extensive security requirements were also necessary, due to the nature of the material, and this added another layer of complexity to the fieldwork. Prior to retrieving the drums from the underground storage vault, space needed to be made for them within the various above-grade facilities. Inventory and security requirements dictated what could be stored where, and the first step of the field work involved a number of drum movements in preparation for storage of the newly retrieved drums. This effort involved moving 21 drums already in the storage area to facilitate the addition of the newly retrieved ones. The retrieval project required a total of 107 critical lifts using the 110-ton crane, under 3 critical lift plans. The TRU waste storage facility is a Category 2 Nuclear Facility and is managed under an extensive Documented Safety Analysis. The TRU retrieval project was conducted in accordance with DOE Order 425.1D and included three Implementation Verification Reviews, two Management Assessments, one Readiness Assessment, and seven mock-ups in preparation for the field work. Despite being stored for 25 years, the drums were in good shape due to the integrity of the facilities where the drums were stored. Of the 80 drums that were retrieved, 12 were placed in special containers called 'overpacks' based on their content. The drums were removed safely and without incident, thanks to a lot of preparation and the efforts of a highly skilled team. Lessons learned through the DDT control development and the drum retrieval and overpacking process could be beneficial to others having to manage similar drums of TRU waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of Process Emissions during Thermal Cutting of Clad Metals from the Nuclear Sector - 20183

Typically, reactor pressure vessels as well as steam generators comprising low alloyed steel with a cladding of stainless steel. Recently the permissible values for Cr (VI) in the air of the working areas have been reduced in Germany from 100 μg/m{sup 3} to 1 μg/m{sup 3} air. This results in the danger that even with low-alloy steel with claddings these limit values would be exceeded when using flame cutting technologies. In order to ensure compliance with the permissible limit values, exhaust gas systems with gas cleaning measures are provided. The process emission test shall replace the assumptions required for the design of these systems with measured values. NUKEM Technologies Engineering Services GmbH (NUKEM) has chosen autogenous flame cutting as an example of a thermal cutting system for process emission testing, as there are no proven values in the literature for the Cr (VI) and NiOx emissions produced. The autogenous flame cutting can be used for a variety of cutting tasks within decommissioning projects. In order to simulate the material to be cut, mock ups were generated and cut from information about the material specification for the reactor pressure vessel from existing nuclear power plants including possible claddings. The cutting length needed for analysis in the test will be maximum 100 mm. The airborne emissions from the thermal cutting process will be captured and analyzed as follows: - Dust emission: The generated particles will be collected by a hood equipped with strong suction device and suitable filter elements. The resulting filter is gravimetrically measured before and after the tests. - Particle Size Distribution: The airborne particle size distribution measurement will result in figures for the size and number of particles arising from the thermal cutting process. - Gas Analysis: The gas analysis enables the determination of e.g. CO{sub 2}, CO, O{sub 3}, NO, NO{sub 2}. - Cr (VI) and NiOx Analysis: For the Cr (VI) and NiOx analysis, samples of the filter residue will be taken. As a result Cr (VI) in relation to total Cr as well as the Ni content will be determined by ICP-optically emission spectroscopy and put in relation to the total dust amount. The process emissions test itself as well as the necessary gas analyses and spectroscopic analyses were carried out at the Institute of Materials Science (IW) of Leibniz Universitaet Hannover (LUH). The results of the process emission tests are used to confirm the design of the gas cleaning systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SULI Project Report: Mu2e otsdaq Documentation and Analytics

This report outlines the history of the CLFV puzzle, gives an overview of the Mu2e Experiment, and details the results of the DOE (Department of Energy)-funded SULI (Science Undergraduate Laboratory Internship) research completed over the summer 2024 on site at Fermilab. The project focused on the otsdaq software responsible for data acquisition. The project included drafting updated documentation for new users, including new procedures relevant for the Alma- Linux 9 operating system update, and the UPS package managing system replacement with Spack (scientific software package manager). A new art module (ReadTriggerCounts) to track trigger rates was created, with compatibility to be displayed via a Grafana server. The author also assisted in calorimeter cable installation in the detector hall.

Saarinen, Talia↗

Factors Influencing Grid-connected Heat Pump Water Heater Performance in the Southeast U.S.

Grid-connected heat pump water heaters (HPWH) can shift electrical load while minimizing impacts to hot water availability for occupants. This capability provides a flexible grid resource to utilities seeking to manage peak loads Such load control also can feasibly improve renewable utilization within the utility electric production mix, for instance using off-peak generation during periods with high renewable energy generation. It also offers lower electric bills to customers through increased energy efficiency of HPWH and cuts greenhouse gas emissions. In particular, the Southeast U.S. due to its high penetration of electric water heating presents a promising opportunity for grid-connected HPWHs. This paper builds upon the results of an extensive HPWH load shifting field study conducted in 51 occupied homes in Florida using EcoPort technology (Butzbaugh et al, 2022). In 2022, only an initial evaluation was available. Here, long term load results are available as well as examination of various control strategies and influences. Analysis is conducted for HPWH energy use and load shifting performance based on home occupancy (i.e., low and high) and water heater location (i.e., conditioned and unconditioned) across different temperature profiles. An unexpected outcome of this analysis was the poor performance of HPWHs located in conditioned spaces, possibly because of inadequate air volume from improper installation. We did find higher demand reductions from 2-hour load ups and slightly improved for critical peak signals in the afternoon control periods. As expected, higher occupancy households showed great load reductions.

Fenaughty, Karen↗

Microwave-assisted catalytic conversion of waste biomass and plastic feedstocks via thermochemical routes

Microwave-assisted catalytic conversion of waste feedstocks to fuels and value-added chemicals shows incredible promise as an efficient pathway to support the U.S. Department of Energy’s vision toward strengthening the nation’s energy independence. Microwave-heated systems have the potential to outperform conventional technologies through energy-efficient heating and improved product selectivity. This chapter emphasizes microwave-assisted catalytic approaches for waste conversion, allowing maximum energy recovery and extraction of valuable chemicals from waste feedstock such as biomass and plastics while reducing undesired byproducts. A gap remains in understanding how microwaves interact with materials to enable rapid and selective heating, which is crucial for improving catalytic efficiency. This chapter attempts to address this knowledge gap by proposing mechanisms that explain the microwave-catalytic interactions for efficient conversion of biomass-plastic wastes. In addition, comparisons with conventional catalytic technologies as well as the potential for scale ups and future commercialization of microwave-catalytic waste conversion technologies are also discussed.

microwave-assisted catalytic conversion↗

Data Centers and Digital Assurance Workshop 3 – Mitigations for Digital Assurance Risks

The third session of the TADA (Technical Assistance for Digital Assurance) Data Centers Cohort, held on November 18, 2025, focused on developing mitigation strategies for digital assurance risks identified in previous workshops. Hosted by Idaho National Laboratory (INL) and ScottMadden, the session emphasized the application of Cyber-Informed Engineering (CIE) to data center infrastructure, particularly at the utility–data center interface. Participants revisited and ranked key digital assurance risks, including architecture and interface weaknesses, governance gaps, and AI-enabled threats. The workshop introduced the 12 principles of CIE, advocating for consequence-focused design, engineered controls, and secure information architecture to proactively reduce cyber-physical vulnerabilities. These principles were applied to critical data center systems such as power distribution, UPS, cooling, SCADA/BMS, and grid-forming batteries. The session also addressed governance challenges at the interconnection boundary, highlighting the need for clear roles in telemetry sharing, firmware management, and trip settings. Special attention was given to emerging risks from behind-the-meter (BTM) generation, including reverse-power flow and the integration of small modular reactors (SMRs), which shift data centers from large loads to complex generation nodes. Participants explored how interconnection agreements can serve as enforceable instruments for digital assurance, and reviewed gaps in current standards such as NERC CIP, IEC 62443, and IEEE 1547. The workshop concluded with pathways to standardization, including model agreement language, state-level programs, and expanded NERC guidance. INL also presented tools and frameworks for secure procurement and supplier risk management, reinforcing the need for integrated engineering and policy solutions to secure the evolving data center–grid ecosystem. Session 3 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Mesoscale Convective Systems Tracking Method Intercomparison (MCSMIP): Application to DYAMOND Global km‐Scale Simulations

Abstract Global kilometer‐scale models represent the future of Earth system modeling, enabling explicit simulation of organized convective storms and their associated extreme weather. Here, we comprehensively evaluate tropical mesoscale convective system (MCS) characteristics in the DYAMOND (DYnamics of the atmospheric general circulation modeled on non‐hydrostatic domains) simulations for both summer and winter phases. Using 10 different feature trackers applied to simulations and satellite observations, we assess MCS frequency, precipitation, and other key characteristics. Substantial differences (a factor of 2–3) arise among trackers in observed MCS frequency and their precipitation contribution, but model‐observation differences in MCS statistics are more consistent across trackers. DYAMOND models are generally skillful in simulating tropical mean MCS frequency, with multi‐model mean biases ranging from −2%–8% over land and −8%–8% over ocean (summer vs. winter). However, most DYAMOND models underestimate MCS precipitation amount (23%) and their contribution to total precipitation (17%). Biases in precipitation contributions are generally smaller over land (13%) than over ocean (21%), with moderate inter‐model variability. While models better simulate MCS diurnal cycles and cloud shield characteristics, they overestimate MCS precipitation intensity and underestimate stratiform rain contributions (up to a factor of 2), particularly over land, albeit observational uncertainties exist. Additionally, models exhibit a wide range of precipitable water in the tropics compared to reanalysis and satellite observations, with many models showing exaggerated sensitivity of MCS precipitation intensity to precipitable water. The MCS metrics developed here provide process‐oriented diagnostics to guide future model development.

54 ENVIRONMENTAL SCIENCES↗

Coupled feldspar dissolution and secondary mineral precipitation in batch systems: 6. Labradorite dissolution, calcite growth, and clay precipitation at 60 °C and pH 8.2–8.4

Here, we conducted experiments on concurrent labradorite dissolution, calcite precipitation, and clay precipitation in batch reactor systems and tracked reaction processes using multiple isotope tracers. Labradorite was chosen for its role as a major and reactive component in basalt; the experiments thus directly impact our understanding of CO 2 storage in basalt aquifers and enhanced rock weathering. We doped initial solutions with 29 Si, 43 Ca, and Ca 13 CO 3 (s). Experiments were conducted at 60 °C and pH ~ 8.3 for up to 840 h, with isotope ratios in the experimental aqueous solutions measured using MC-ICP-MS. Unidirectional rates of labradorite dissolution near equilibrium were approximately two orders of magnitude slower than far-from-equilibrium rates reported in the literature. Calcite growth occurred near equilibrium and the rates were limited by the labradorite dissolution rates. In the steady state phase, the interplay of these three heterogeneous reactions—labradorite dissolution, calcite growth, and clay precipitation—results in a coupled system that approaches a near-equilibrium state. The system does not reach true equilibrium because labradorite continues to dissolve, albeit at a much slower rate near equilibrium. The overall reaction can be approximated as, Na 0.4 Ca 0.6 Al 1.6 Si 2.4 O 8 + 0.6HCO 3 - + 1·.7H 2 O + 0.4H + → 0.4Na + + 0.6CaCO 3(s) + 0.5Al 2 Si 2 O 5 (OH) 4(s) + 0.6Al(OH) 4 - + 1.4SiO 2 o (aq). The experimental results show that using short-term far-from-equilibrium rate constants would lead to an overestimation of feldspar weathering rates at the Earth’s surface (e.g., basalt weathering and enhanced rock weathering) and CO 2 mineralization in basalt aquifers.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

New chronological constraints on the history of the Kalahari Group from the Upper Ugab Valley, Namibia

The sedimentary fill of the Kalahari Basin, which extends across several countries in southern and central Africa, records landscape evolution processes and holds archeological evidence of early hominid occupation. Recent studies have demonstrated that the majority of the Kalahari Group sediments were deposited between the Pliocene and the recent present. However, due to limited access to natural outcrops in the flat Kalahari topography, the chronology of the sequence, mostly its earlier part, is not well constrained.

Cosmogenic nuclides burial dating↗

The Marchantia polymorpha pangenome reveals ancient mechanisms of plant adaptation to the environment

Plant adaptation to terrestrial life started 450 million years ago and has played a major role in the evolution of life on Earth. The genetic mechanisms allowing this adaptation to a diversity of terrestrial constraints have been mostly studied by focusing on flowering plants. Here, we gathered a collection of 133 accessions of the model bryophyte Marchantia polymorpha and studied its intraspecific diversity using selection signature analyses, a genome-environment association study and a pangenome. We identified adaptive features, such as peroxidases or nucleotide-binding and leucine-rich repeats (NLRs), also observed in flowering plants, likely inherited from the first land plants. The M. polymorpha pangenome also harbors lineage-specific accessory genes absent from seed plants. We conclude that different land plant lineages still share many elements from the genetic toolkit evolved by their most recent common ancestor to adapt to the terrestrial habitat, refined by lineage-specific polymorphisms and gene family evolution.

59 BASIC BIOLOGICAL SCIENCES↗

Realizing tunable Fermi level in SnTe by defect control

The tuning of the Fermi level in tin telluride, a topological crystalline insulator, is essential for accessing its unique surface states and optimizing its electronic properties for applications such as spintronics and quantum computing. In this study, we demonstrate that the Fermi level in tin telluride can be effectively modulated by controlling the tin concentration during chemical vapor deposition synthesis. By introducing tin-rich conditions, we observed a blue shift in the x-ray photoelectron spectroscopy core-level peaks of both tin and tellurium, indicating an upward shift in the Fermi level. Further, this shift is corroborated by a decrease in work function values measured via ultraviolet photoelectron spectroscopy, confirming the suppression of Sn vacancies. Our findings provide a low-cost, scalable method to achieve tunable Fermi levels in tin telluride, offering a significant advancement in the development of materials with tailored electronic properties for next-generation technological applications.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗