Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical Program Elements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Reusable launch vehicle development research

NASA has generated a program approach for a SSTO reusable launch vehicle technology (RLV) development which includes a follow-on to the Ballistic Missile Defense Organization's (BMDO) successful DC-X program, the DC-XA (Advanced). Also, a separate sub-scale flight demonstrator, designated the X-33, will be built and flight tested along with numerous ground based technologies programs. For this to be a successful effort, a balance between technical, schedule, and budgetary risks must be attained. The adoption of BMDO's 'fast track' management practices will be a key element in the eventual success of NASA's effort.

Source record↗

High-Performance, Radiation-Hardened Electronics for Space and Lunar Environments

The Radiation Hardened Electronics for Space Environments (RHESE) project develops advanced technologies needed for high performance electronic devices that will be capable of operating within the demanding radiation and thermal extremes of the space, lunar, and Martian environment. The technologies developed under this project enhance and enable avionics within multiple mission elements of NASA's Vision for Space Exploration. including the Constellation program's Orion Crew Exploration Vehicle. the Lunar Lander project, Lunar Outpost elements, and Extra Vehicular Activity (EVA) elements. This paper provides an overview of the RHESE project and its multiple task tasks, their technical approaches, and their targeted benefits as applied to NASA missions.

Keys, Andrew S.↗

Exploration Mission Tasks: A Technical Manual

This technical manual is an abridgement of the Generalizable Skills and Knowledge for Exploration Missions (NASA/CR-2018-22045) report (Stuster et al., 2019), describing research conducted under Cooperative Agreement 80NSSC18K0042 for the Human Factors and Behavioral Performance Element, Human Research Program, located at the National Aeronautics and Space Administration’s (NASA) Johnson Space Center. The research identified tasks that will be conducted by human crew during an expedition to Mars, and the abilities, skills, and knowledge that will be required of crew members. The 3-year study uses research methods that were developed to analyze the work performed by a variety of civilian and military occupational specialties and is consistent with Human Factors methods. The work began by developing a comprehensive inventory of 1,125 tasks that are likely to be performed during the 12 phases of the first human expeditions to Mars, from launch to landing 30 months later. Sixty subject matter experts (SMEs) rated expedition tasks in terms of (likely) frequency of performance, difficulty to learn, and importance to mission success; a fourth metric (criticality), was derived by summing the mean ratings of the three dimensions. Seventy-two SMEs placed the physical, cognitive, and social abilities necessary to perform the tasks in order of importance for specialist domains identified by the task analysis. The research team then identified: 1) Abilities, skills, and knowledge that can be retained and generalized across tasks and 2) Implications for crew size and composition. Study results also led to recommendations concerning equipment, habitats, and procedures for exploration-class space missions. Note: The full-mission task inventory was developed during a comprehensive review of documentation and concepts of operations. It was understood by the study team that the tasks were based on currently available information, and that the tools, equipment, propulsion methods, and/or other aspects of actual human expeditions to Mars might be different from those described here, as a consequence of technological development and evolving Mars Design Reference Missions. The purpose and scope of this technical manual is to present the core, actionable information that resulted from this research. The abridged format is intended to address the needs of development and research teams to quickly access, discern, and use the information in the course of their exploration-related work.

Brandin Munson↗

Communications for UAS Integration in the NAS Phase 2 Satellite Communications and Terrestrial Extension

In order to provide for the safe integration of unmanned aircraft systems (UAS) into the National Airspace System, the command and control communications link connecting the ground-based pilot with the unmanned aircraft must be highly reliable and robust, with national and international standards to enable interoperability and certification. Both line-of-sight (LOS) links using terrestrial-based communications and beyond-line-of-sight (BLOS) links using satellite communications, supported by national and international standards, are required for integrated UAS operations. The National Aeronautics and Space Administration (NASA) has undertaken an extensive technology development and test program in order to provide the required technical data needed to enable C2 standards development. NASAs UAS Integration in the National Airspace System (NAS), or UAS in the NAS Project, included as a major element the Command and Control Communications (C2) Subproject, based at NASAs Glenn Research Center. The successful first phase of the C2 Subproject, completed during 2012-2016, focused primarily on line-of-sight communications. Accomplishments included air-ground channel propagation characterization and modeling; CNPC prototype radio development; CNPC radio flight testing; satellite communications spectrum study and interference analysis; and development of C2 LOS communications standards development. The second phase of the C2 Subproject will focus primarily on beyond-line-of-sight communications, although a follow-on activity for terrestrial LOS communications, known as Terrestrial Extension, is also included. In addition to the terrestrial element, Phase 2 also includes technology development and testing activities for Ka-Band BLOS C2 Satellite Communications; Ku-Band BLOS C2 Satellite Communications; Ku-Band Interference and Propagation; and C-Band Satellite Communications. This paper will provide brief overviews of the C2 Subproject and its Phase I accomplishments, followed by a description of the plans for the C2 Subproject Phase 2.

radiofrequency spectrum↗

Communications for UAS Integration in the NAS Phase 2 - Satellite Communications and Terrestrial Extension

In order to provide for the safe integration of unmanned aircraft systems (UAS) into the National Airspace System, the command and control communications link connecting the ground-based pilot with the unmanned aircraft must be highly reliable and robust, with national and international standards to enable interoperability and certification. Both line-of-sight (LOS) links using terrestrial-based communications and beyond-line-of-sight (BLOS) links using satellite communications, supported by national and international standards, are required for integrated UAS operations. The National Aeronautics and Space Administration (NASA) has undertaken an extensive technology development and test program in order to provide the required technical data needed to enable C2 standards development. NASAs UAS Integration in the National Airspace System (NAS), or UAS in the NAS Project, included as a major element the Command and Control Communications (C2) Subproject, based at NASAs Glenn Research Center. The successful first phase of the C2 Subproject, completed during 2012-2016, focused primarily on line-of-sight communications. Accomplishments included air-ground channel propagation characterization and modeling; CNPC prototype radio development; CNPC radio flight testing; satellite communications spectrum study and interference analysis; and development of C2 LOS communications standards development. The second phase of the C2 Subproject will focus primarily on beyond-line-of-sight communications, although a follow-on activity for terrestrial LOS communications, known as Terrestrial Extension, is also included. In addition to the terrestrial element, Phase 2 also includes technology development and testing activities for Ka-Band BLOS C2 Satellite Communications; Ku-Band BLOS C2 Satellite Communications; Ku-Band Interference and Propagation; and C-Band Satellite Communications. This paper will provide brief overviews of the C2 Subproject and its Phase I accomplishments, followed by a description of the plans for the C2 Subproject Phase 2.

radiofrequency spectrum↗

US Coast Guard GPS Information Center (GPSIC) and its function within the Civil GPS Service (CGS)

In 1987, the U.S. Department of Defense (DOD) formally requested that the U.S. Department of Transportation (DOT) take responsibility for providing an office that would respond to nonmilitary user needs for GPS information, data, and assistance. DOT accepted this responsibility and in February 1989, named the Coast Guard as their lead agency for the project. Since that time, the U.S. Coast Guard has worked with the U.S. Space Command to develop requirements and implement a plan for providing the requested interface with the civil GPS community. The Civil GPS Service (CGS) consists of four main elements: GPS Information Center (GPSIC) - provides GPS status information to civilian users of the system: Civil GPS Service Interface Committee (CGSIC) - established to identify civil GPS user technical information needs in support of the CGS program; Differential GPS (DGPS) - Coast Guard Research and Development Project; and PPS Program Office (PPSPO) - (Under development) will administer the program allowing qualified civil users to have access to the PPS signal. Details about the services these organizations provide are described.

Source record↗

Report of the Cost Assessment and Validation Task Force on the International Space Station

The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort. The Program size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap. A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule. The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program. The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required. Completion of ISS assembly is likely to be delayed from one to three years beyond December 2003.

Source record↗

Cost Assessment and Validation Task Force on the International Space Station

The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort; The Program, size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap; A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule; The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program; The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program, growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required; and Completion of ISS assembly is likely to be delayed from, one to three years beyond December 2003.

Source record↗

NASA Glenn Research Center Program in High Power Density Motors for Aeropropulsion

Electric drive of transport-sized aircraft propulsors, with electric power generated by fuel cells or turbo-generators, will require electric motors with much higher power density than conventional room-temperature machines. Cryogenic cooling of the motor windings by the liquid hydrogen fuel offers a possible solution, enabling motors with higher power density than turbine engines. Some context on weights of various systems, which is required to assess the problem, is presented. This context includes a survey of turbine engine weights over a considerable size range, a correlation of gear box weights and some examples of conventional and advanced electric motor weights. The NASA Glenn Research Center program for high power density motors is outlined and some technical results to date are presented. These results include current densities of 5,000 A per square centimeter current density achieved in cryogenic coils, finite element predictions compared to measurements of torque production in a switched reluctance motor, and initial tests of a cryogenic switched reluctance motor.

Brown, Gerald V.↗

Volume I. Introduction to DUNE

The preponderance of matter over antimatter in the early universe, the dynamics of the supernovae that produced the heavy elements necessary for life, and whether protons eventually decay -- these mysteries at the forefront of particle physics and astrophysics are key to understanding the early evolution of our universe, its current state, and its eventual fate. The Deep Underground Neutrino Experiment (DUNE) is an international world-class experiment dedicated to addressing these questions as it searches for leptonic charge-parity symmetry violation, stands ready to capture supernova neutrino bursts, and seeks to observe nucleon decay as a signature of a grand unified theory underlying the standard model. The DUNE far detector technical design report (TDR) describes the DUNE physics program and the technical designs of the single- and dual-phase DUNE liquid argon TPC far detector modules. This TDR is intended to justify the technical choices for the far detector that flow down from the high-level physics goals through requirements at all levels of the Project. Volume I contains an executive summary that introduces the DUNE science program, the far detector and the strategy for its modular designs, and the organization and management of the Project. The remainder of Volume I provides more detail on the science program that drives the choice of detector technologies and on the technologies themselves. It also introduces the designs for the DUNE near detector and the DUNE computing model, for which DUNE is planning design reports. Volume II of this TDR describes DUNE's physics program in detail. Volume III describes the technical coordination required for the far detector design, construction, installation, and integration, and its organizational structure. Volume IV describes the single-phase far detector technology. A planned Volume V will describe the dual-phase technology.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Factors in International Space Station Integration Feasibility Assessments

The International Space Station, ISS, is a growing vehicle. The ISS configuration changes internally and externally with each ISS flight. Each flight adds resources and capabilities such as docking/berthing ports, power, stowage volume, heat rejection, and data processing capability. The configuration, capabilities and performance characteristics of the vehicle will be in flux until assembly complete. At the same time the knowledge about what is required to support humans involved in long duration space flight is also being greatly expanded. In addition to the changes occurring on-orbit, the situation on the ground is also very dynamic. Proposals for new ISS elements, proposed deletions of elements, changes to the ISS requirements, and changes to the planned configuration are always under evaluation. Furthermore, budgetary issues have driven the need to explore alternative options for the ISS . This environment has made the role of the technical integrator in the ISS program unique in that the baseline against which proposals are evaluated is always changing. The nature of the International Space Station Program adds another dimension to the integrators task. ISS program activities are spread across several centers: KSC, MSFC, GRC, DFRC, ARC and JSc. There are six International Partners/participants each with their own unique organizations. The prime contractor is in Texas, California and Alabama. And, the Space Shuttle Program as the launch vehicle provider is another major interface. In spite of the fluidity of the technical baseline, projections and organizational complexity, in the course of evaluating proposals and producing feasibility assessments there are factors, which frequently emerge as significant. These factors tend to be the limiting conditions when they come into play. The finite resources, which tend to limit the options for ISS are: upmass, life support and crew rescue capability, crew time, utilities, exercise equipment, and docking/berthing ports. Upmass requirements need to be developed for each option proposed. Short term and long term impacts to upmass are the result of the implementation and long term operations. The upmass requirements need to be met by the existing launch vehicles and any change in flight rate will be a significant cost driver. In addition, when any item is brought to the ISS careful consideration must be given to the on-board stowage and crew time available to unpack, transfer, stow and use these items. If stowage is not available then something must be returned, use of non-standard stowage negotiated or the item in question stays on the ground. Additional crew time requirements will impact available utilization time or crew off-duty time. When the human element is affected, such as, by increasing the number of crew members or changing the duration of the crew stay (longer or shorter) there is an additional set of factors that come into play. The main considerations are: rescue capability, exercise requirements and availability of equipment, resupply, and life support capability.

Watson, Patricia M.↗

Logistics Operations Management Center: Maintenance Support Baseline (LOMC-MSB)

The Logistics Operations Management Center Maintenance Support Baseline is defined. A historical record of systems, applied to and deleted from, designs in support of future management and/or technical analysis is provided. All Flight elements, Ground Support Equipment, Facility Systems and Equipment and Test Support Equipment for which LOMC has responsibilities at Kennedy Space Center and other locations are listed. International Space Station Alpha Program documentation is supplemented. The responsibility of the Space Station Launch Site Support Office is established.

Kurrus, R.↗

Midcourse Space Experiment Data Certification and Technology Transfer

The University of Alabama in Huntsville contributes to the Technical Management of the Midcourse Space Experiment Program, to the Certification of the Level 2 data produced by the Midcourse Space Experiment's suite of in-orbit imaging radiometers, imaging spectra-radiometers and an interferometer and to the Transfer of the Midcourse Space Experiment Technology to other Government Programs. The Technical Management of the Midcourse Space Experiment Program is expected to continue through out the spacecraft's useful life time, 5 years after its 1996 launch. The Transfer of Midcourse Space Experiment Technology to other government elements is expected to be on a demand basis by the United States Government and other organizations. The University of Alabama Huntsville' contribution specifically supports the nine Ultraviolet Visible Imagers and Spectrographic Imagers (UVISI) and the Pointing and Alignment of all eleven of the science instruments. The science instruments effectively cover the 0.1 to 28 micron spectral region. The Midcourse Space Experiment spacecraft, launched April 24, 1996, is expected to have a 5 year useful lifetime with a 12 month lifetime for the cryogenically cooled IR sensor. A pre-launch, ground based calibration of the instruments provided a basis for the pre-launch certification of the Level 2 data base these instruments produce. With the spacecraft in-orbit the certification of the instruments' Level 2 data base is being extended to the in-orbit environment.

Pollock, David B.↗

Estimating Return on Investment for Energy Technical Assistance Programs

The U.S. Department of Energy's Office of State and Community Energy Programs engaged the National Laboratory of the Rockies to assess the return on investment (ROI) of technical assistance (TA) programs that support state, local, and Tribal energy planning. Although TA delivers value through capacity building, stakeholder engagement, and knowledge transfer, these benefits are often intangible and challenging to monetize. This study reviews existing ROI frameworks and synthesizes the most relevant elements into a hybrid approach tailored to energy TA programs. The proposed framework integrates monetary and non-monetary outcomes through early logic model development, baseline data collection, and the use of proxies for intangible benefits. As a case study, this paper applies this approach to the Communities Local Energy Action Program (Communities LEAP), demonstrating how ROI can inform program design, data strategy, and performance assessment. Findings underscore that ROI should be applied selectively and planned from the outset to ensure data alignment and attribution accuracy. The framework offers TA practitioners a structured approach that can be leveraged for future programs to evaluate and communicate the multifaceted value of TA investments.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Design and fabrication of solar cell modules

A program conducted for design, fabrication and evaluation of twelve silicon solar cell modules is described. The purpose of the program was to develop a module design consistent with the requirements and objectives of JPL specification and to also incorporate elements of new technologies under development to meet LSSA Project goals. Module development emphasized preparation of a technically and economically competitive design based upon utilization of ion implanted solar cells and a glass encapsulation system. The modules fabricated, tested and delivered were of nominal 2 X 2 foot dimensions and 20 watt minimum rating. Basic design, design rationale, performance and results of environmental testing are described.

Shaughnessy, T. P.↗

Management Approach for NASA's Earth Venture-1 (EV-1) Airborne Science Investigations

The Earth System Science Pathfinder (ESSP) Program Office (PO) is responsible for programmatic management of National Aeronautics and Space Administration's (NASA) Science Mission Directorate's (SMD) Earth Venture (EV) missions. EV is composed of both orbital and suborbital Earth science missions. The first of the Earth Venture missions is EV-1, which are Principal Investigator-led, temporally-sustained, suborbital (airborne) science investigations costcapped at $30M each over five years. Traditional orbital procedures, processes and standards used to manage previous ESSP missions, while effective, are disproportionally comprehensive for suborbital missions. Conversely, existing airborne practices are primarily intended for smaller, temporally shorter investigations, and traditionally managed directly by a program scientist as opposed to a program office such as ESSP. In 2010, ESSP crafted a management approach for the successful implementation of the EV-1 missions within the constructs of current governance models. NASA Research and Technology Program and Project Management Requirements form the foundation of the approach for EV-1. Additionally, requirements from other existing NASA Procedural Requirements (NPRs), systems engineering guidance and management handbooks were adapted to manage programmatic, technical, schedule, cost elements and risk. As the EV-1 missions are nearly at the end of their successful execution and project lifecycle and the submission deadline of the next mission proposals near, the ESSP PO is taking the lessons learned and updated the programmatic management approach for all future Earth Venture Suborbital (EVS) missions for an even more flexible and streamlined management approach.

Guillory, Anthony R.↗

Air Traffic Management Technology Demonstration-1 (ATD-1) Avionics Phase 2 Flight Test Training for Interval Management

Prior to the successful flight test validation of a new avionics prototype, participants from Boeing, Honeywell, and United Airlines underwent group training at NASA Langley Research Center. New prototype software for an algorithm which enables greater efficiency in high-density airspace, called Interval Management, was to be incorporated into Electronic Flight Bags and placed in the cockpit for pilot usage. The goals of the training were to teach the flight test pilots how to operate the new software, establish techniques to simultaneously position three aircraft prior to each test scenario, and ensure a common communication protocol among team members when coordinating the position of aircraft for the next scenario. The multi-tiered interactive training regimen consisted of a process that continually built upon previous foundational material. The primary learning elements were 1) a portable computer-based trainer that was provided to the pilots prior to classroom training sessions, 2) classroom learning, 3) full mock-up simulator training, and 4) refresher training just prior to the flight test. Each part of the regimen was designed to repeat and build upon the previous element. The purpose of this Technical Memorandum is to inform the aviation industry how flight training for Interval Management was conducted at Langley Research Center in order to reduce overall development costs of future Interval Management training programs. Secondly, the paper provides insight regarding the decision-making process when attempting to conduct a flight test.

Roper, Roy D.↗