Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Tanks”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Commercial Submersible Mixing Pump For SRS Tank Waste Removal - 15223

The Savannah River Site Tank Farms have 45 active underground waste tanks used to store and process nuclear waste materials. There are 4 different tank types, ranging in capacity from 2839 m 3 to 4921 m 3 (750,000 to 1,300,000 gallons). Eighteen of the tanks are older style and do not meet all current federal standards for secondary containment. The older style tanks are the initial focus of waste removal efforts for tank closure and are referred to as closure tanks. Of the original 51 underground waste tanks, six of the original 24 older style tanks have completed waste removal and are filled with grout. The insoluble waste fraction that resides within most waste tanks at SRS requires vigorous agitation to suspend the solids within the waste liquid in order to transfer this material for eventual processing into glass filled canisters at the Defense Waste Processing Facility (DWPF). SRS suspends the solid waste by use of recirculating mixing pumps. Older style tanks generally have limited riser openings which will not support larger mixing pumps, since the riser access is typically 58.4 cm (23 inches) in diameter. Agitation for these tanks has been provided by four long shafted standard slurry pumps (SLP) powered by an above tank 112KW (150 HP) electric motor. The pump shaft is lubricated and cooled in a pressurized water column that is sealed from the surrounding waste in the tank. Closure of four waste tanks has been accomplished utilizing long shafted pump technology combined with heel removal using multiple technologies. Newer style waste tanks at SRS have larger riser openings, allowing the processing of waste solids to be accomplished with four large diameter SLPs equipped with 224KW (300 HP) motors. These tanks are used to process the waste from closure tanks for DWPF. In addition to the SLPs, a 224KW (300 HP) submersible mixer pump (SMP) has also been developed and deployed within older style tanks. The SMPs are product cooled and product lubricated canned motor pumps designed to fit within available risers and have significant agitation capabilities to suspend waste solids. Waste removal and closure of two tanks has been accomplished with agitation provided by 3 SMPs installed within the tanks. In 2012, a team was assembled to investigate alternative solids removal technologies to support waste removal for closing tanks. The goal of the team was to find a more cost effective approach that could be used to replace the current mixing pump technology. This team was unable to identify an alternative technology outside of mixing pumps to support waste agitation and removal from SRS waste tanks. However, the team did identify a potentially lower cost mixing pump compared to the baseline SLPs and SMPs. Rather than using the traditional procurement using an engineering specification, the team proposed to seek commercially available submersible mixer pumps (CSMP) as alternatives to SLPs and SMPs. SLPs and SMPs have a high procurement cost and the actual cost of moving pumps between tanks has shown to be significantly higher than the original estimates that justified the reuse of SMPs and SLPs. The team recommended procurement of “off-the-shelf” industry pumps which may be available for significant savings, but at an increased risk of failure and reduced operating life in the waste tank. The goal of the CSMP program is to obtain mixing pumps that could mix from bulk waste removal through tank closure and then be abandoned in place as part of tank closure. This paper will present the development, progress and relative advantages of the CSMP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Commercial submersible mixing pump for SRS tank waste removal - 15223

The Savannah River Site Tank Farms have 45 active underground waste tanks used to store and process nuclear waste materials. There are 4 different tank types, ranging in capacity from 2839 m{sup 3} to 4921m{sup 3} (750,000 to 1,300,000 gallons). Eighteen of the tanks are older style and do not meet all current federal standards for secondary containment. The older style tanks are the initial focus of waste removal efforts for tank closure and are referred to as closure tanks. Of the original 51 underground waste tanks, six of the original 24 older style tanks have completed waste removal and are filled with grout. The insoluble waste fraction that resides within most waste tanks at SRS requires vigorous agitation to suspend the solids within the waste liquid in order to transfer this material for eventual processing into glass filled canisters at the Defense Waste Processing Facility (DWPF). SRS suspends the solid waste by use of recirculating mixing pumps. Older style tanks generally have limited riser openings which will not support larger mixing pumps, since the riser access is typically 58.4 cm (23 inches) in diameter. Agitation for these tanks has been provided by four long shafted standard slurry pumps (SLP) powered by an above tank 112 kW (150 HP) electric motor. The pump shaft is lubricated and cooled in a pressurized water column that is sealed from the surrounding waste in the tank. Closure of four waste tanks has been accomplished utilizing long shafted pump technology combined with heel removal using multiple technologies. Newer style waste tanks at SRS have larger riser openings, allowing the processing of waste solids to be accomplished with four large diameter SLPs equipped with 224 kW (300 HP) motors. These tanks are used to process the waste from closure tanks for DWPF. In addition to the SLPs, a 224 kW (300 HP) submersible mixer pump (SMP) has also been developed and deployed within older style tanks. The SMPs are product cooled and product lubricated canned motor pumps designed to fit within available risers and have significant agitation capabilities to suspend waste solids. Waste removal and closure of two tanks has been accomplished with agitation provided by 3 SMPs installed within the tanks. In 2012, a team was assembled to investigate alternative solids removal technologies to support waste removal for closing tanks. The goal of the team was to find a more cost effective approach that could be used to replace the current mixing pump technology. This team was unable to identify an alternative technology outside of mixing pumps to support waste agitation and removal from SRS waste tanks. However, the team did identify a potentially lower cost mixing pump compared to the baseline SLPs and SMPs. Rather than using the traditional procurement using an engineering specification, the team proposed to seek commercially available submersible mixer pumps (CSMP) as alternatives to SLPs and SMPs. SLPs and SMPs have a high procurement cost and the actual cost of moving pumps between tanks has shown to be significantly higher than the original estimates that justified the reuse of SMPs and SLPs. The team recommended procurement of 'off-the-shelf' industry pumps which may be available for significant savings, but at an increased risk of failure and reduced operating life in the waste tank. The goal of the CSMP program is to obtain mixing pumps that could mix from bulk waste removal through tank closure and then be abandoned in place as part of tank closure. This paper will present the development, progress and relative advantages of the CSMP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Failure Analysis for Molten Salt Thermal Energy Storage Tanks for In-Service CSP Plants

Thermal Energy Storage (TES) is a fundamental component in concentrating solar power (CSP) plants to increase the plant's dispatchability, capacity factor, while reducing the levelized cost of electricity. In central receivers CSP plants, nitrate molten salts have been used for several years for operation temperatures of up to 565 degrees C. Despite many efforts to advance nitrate salt to higher operation temperatures (even considering a replacement with molten chloride salts) to achieve higher energy conversion efficiencies, the 565 degrees C temperature is currently considered the state-of-the art. Although molten salt tanks have been broadly deployed in commercial CSP plants worldwide, several failures have been reported in these tanks after a few months or years of operation, causing significant economic loss and mistrust in CSP technologies. Most of these failures are associated with the infancy of the technology and multiple issues related to tank design, fabrication, commissioning, and aggressive operation. A technical standard dedicated to the design and fabrication of molten nitrate TES tanks does not exist today. Current in-service molten salt tanks have been generally designed based on the American Petroleum Institute's (API) 650 and ASME Section II standards. The API 650 code provides guidelines for dimensions and fabrication for oil storage tanks up to 260 degrees C. The ASME standard provides allowable stress values for various materials at a range of temperatures and conditions. Both standards seem to be limited for molten salt TES tanks where high temperatures, thermal cycling, and transient conditions are expected. In 2020, NREL released the Concentrating Solar Power Best Practices Study (NREL/TP-5500-75763) that summarized multiple issues in CSP plants, along with potential alternatives and recommendations to address those issues based on information collected from participants representing about 80% of operating CSP plants in the world. One of the recommendations from this study was the development of accurate and validated models to evaluate the plant's transient operation, capable of capturing the effect of short-term clouds and operator response, while being flexible in being adapted to various spatial and temporal resource data. The "Failure Analysis for Molten Salt Thermal Energy Tanks for In-Service CSP Plants" project was inspired on this recommendation and was focused on (1) the development and validation of a physics-based model for a representative, commercial-scale molten salt tank, (2) performing simulations to evaluate the behavior of the tank as a function of typical plant operation conditions, (3) understanding tank failures mechanisms, (4) determining the residual stress and distortion in the tank floor after welding fabrication and evaluating their impact in the stresses developed in the tank during operation, (5) assessing the impact of key operation parameters on the temperature and stress distribution, (6) conduct a preliminary evaluation of design features to reduce stress and improve tank's reliability, and (7) estimate the tank's service life based on the stress developed under diverse operation scenarios. From the analysis conducted in the project and presented in this report, it was found that maximum stresses surpassing the yield strength point of the stainless steel (SS) 347H are developed on the tank floor near the perimeter. These large stresses are strongly influenced by the initial residual stresses and distortion of the tank floor after welding fabrication. During operation, large stresses are developed in the tank floor at high operation temperatures with large salt inventory levels during transient operation. High stresses are also related to elevated temperature gradients in the tank floor that could be attributed to insufficient mixing within the salt inflow and the salt inventory. Based on the analysis, creep is the predominant failure mechanism. However, the large stress levels could favor the plastic deformation into buckles, and crack formation due to stress relaxation cracking during cycle operation. A lifetime below 3 years was estimated for the typical plant operation conditions and a specific initial residual stress and deformation distribution of the tank floor. The estimated life agrees with the service time to failure reported in several commercial molten salt tanks. Desing and operation guidelines can be extracted from the analysis presented in this report, which could be adopted by tank manufacturers and CSP operators to advance toward an ultimate solution for tank failures by reducing residual and operational stresses to achieve a tank service life of more than 30 years. Addressing failures in molten salt TES tanks is fundamental for the CSP industry's survivability, but it is also important for other industrial and power generation applications using this technology, including nuclear and concentrating solar thermal.

14 SOLAR ENERGY↗

Utilizing Commercial Submersible Mixer Pumps for Sludge Removal in Savannah River Site's Tank 26 - 20289

The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization and CST Batch Contact Equilibrium Testing of Modified Tank 9H Process Supernate Samples in Support of TCCR

The Tank Closure Cesium Removal (TCCR) system uses ion exchange columns filled with crystalline silicotitanate (CST) media to process radioactive waste solutions for the removal of ¹³⁷Cs. TCCR currently focuses on dissolving Savannah River Site (SRS) radioactive tank waste (primarily sodium saltcake solids) within Tank 10H followed by at-tank ion exchange column treatment. Two supernate batches from Tank 10H have been processed through the TCCR unit and processing of a third batch is expected soon. After processing of this supernate batch, plans are to replace the CST columns and process dissolved salt solution from Tank 9H through Tank 10H and then through the new CST columns installed in the TCCR unit. The new columns are expected to contain either a media similar to an archived CST batch (IE-911) or the R9120-B CST media used in the current TCCR columns (the two materials are fundamentally the same; just different specifications, product names, and preconditioning steps). Samples of Tank 9H dissolved saltcake were received at the Savannah River National Laboratory (SRNL) and characterized. The Tank 9H supernate contained a high sodium concentration (~9.6 M Na⁺) and will require dilution to near 6 M [Na⁺] prior to processing through the TCCR unit. The cesium concentration in Tank 9H is currently significantly higher than was observed with Tank 10H. Three dilutions of the Tank 9H supernate were conducted to mimic possible dilutions that could be conducted in the tank farm prior to TCCR processing using inhibited water, sodium hydroxide, and sodium nitrate solutions. Dilution #1 was prepared by diluting the Tank 9H supernate by a factor of 1.6 with inhibited water, Dilution #2 was prepared by diluting the Tank 9H supernate by a factor of 3.7 with a mixed sodium hydroxide/sodium nitrate diluent, and Dilution #3 was prepared by also diluting by a factor of 3.7 but with sodium hydroxide only. All three dilutions have similar Na⁺ concentrations (~6 M), but Dilutions #2 and #3 contain significantly less cesium. Major and key minor components of the diluted Tank 9H supernate samples are provided in Table ES-1. Batch contact equilibrium tests were conducted with the Tank 9H dilutions and the two different CST media batches being considered for use in the new TCCR columns. Results are summarized in Table ES-2 and compared to ZAM model predictions. The highest cesium distribution coefficient and percent removal were observed with Dilution #3. IE-911 CST (an archived CST media batch) was more effective at removing cesium than the more recently prepared R9120-B CST media, though both media samples removed >88% of the cesium and the differences may not be statistically different considering the overall uncertainty. Based on the results, maximum cesium loadings were calculated for each CST media type and Tank 9H dilution. In general, maximum cesium loadings from dilutions of this supernate batch are quite high (approaching 0.1 mmol total Cs⁺/g CST for Dilution #1). The highest calculated maximum ¹³⁷Cs loading for the Tank 9H dilutions using the ZAM model with input of the tank compositions and batch contact results was 207 Ci/kg CST (Dilution #1 with IE-911 CST). In all cases, higher maximum cesium loading values were predicted for IE-911 CST versus R9120-B, although the differences varied considerably between the dilutions. The maximum loading value for IE-911 CST with Tank 9H Dilution #1 was only 7% higher than the maximum loading for R9120-B. The maximum loading value for IE-911 CST with Dilution #3 was 24% higher than the maximum loading for R9120-B. Dilution #2 was intermediate between these values. Note that these maximum loading values are the theoretical calculated values, and actual operating conditions will cause differences. A CST binder dilution (correction) factor near 0.7 (relative to pure powder CST) was required for each batch contact test with IE-911 engineered CST using the three Tank 9H dilutions. Correction factors calculated for R9120-B CST ranged from 0.56 to 0.66 for the three dilutions. Following the batch contact tests, the CST samples were isolated from the Tank 9H solution, washed, dried, and digested in acid following established procedures. The analysis results are provided in Table ES-3. Total cesium loading values determined by CST digestion were similar to the calculated loading values based on solution analysis (Table ES-2) for all samples. In addition, the CST was observed to load calcium (R9120-B sample only), iron, strontium, lead, uranium, and plutonium after contact with the waste supernate, as has been observed previously.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Technology Development (Tank Farms) - 12509

The mission of the Department of Energy's Office of River Protection (ORP) is to safely retrieve and treat the 56 million gallons of Hanford's tank waste and close the Tank Farms to protect the Columbia River. The millions of gallons of tank waste are a byproduct of decades of plutonium production. After irradiated fuel rods were taken from the nuclear reactors to the processing facilities at Hanford they were exposed to a series of chemicals designed to dissolve away the rod, which enabled workers to retrieve the plutonium. Once those chemicals were exposed to the fuel rods they became radioactive and extremely hot. They also couldn't be used in this process more than once. Because the chemicals are caustic and extremely hazardous to humans and the environment, underground storage tanks were built to hold these chemicals until a more permanent solution could be found. One key part of the ongoing work at Hanford is retrieving waste from the single-shell tanks, some of which have leaked in the past, and transferring that waste to the double-shell tanks - none of which have ever leaked. The 56 million gallons of radioactive tank waste is stored in 177 underground tanks, 149 of which are single-shell tanks built between 1943 and 1964. The tanks sit approximately 250 feet above the water table. Hanford's single-shell tanks are decades past their 20-year design life. In the past, up to 67 of the single-shell tanks are known or suspected to have leaked as much as one million gallons of waste to the surrounding soil. Starting in the late 1950's, waste leaks from dozens of the single-shell tanks were detected or suspected. Most of the waste is in the soil around the tanks, but some of this waste is thought to have reached groundwater. The Vadose Zone Project was established to understand the radioactive and chemical contamination in the soil beneath the tanks as the result of leaks and discharges from past plutonium-production operations. The vadose zone is the area of soil between the ground surface and the water table 200-to-300 feet below. The project tracks and monitors contamination in the soil. Technologies are being developed and deployed to detect and monitor contaminants. Interim surface barriers, which are barriers put over the single-shell tanks, prevent rain and snow from soaking into the ground and spreading contamination. The impermeable barrier placed over T Farm, which was the site of the largest tank waste leak in Hanford's history, is 60,000 square feet and sloped to drain moisture outside the tank farm. The barrier over TY Farm is constructed of asphalt and drains moisture to a nearby evaporation basin. Our discussion of technology will address the incredible challenge of removing waste from Hanford's single-shell tanks. Under the terms of the Tri-Party Agreement, ORP is required to remove 99 percent of the tank waste, or until the limits of technology have been reached. All pumpable liquids have been removed from the single-shell tanks, and work now focuses on removing the non-pumpable liquids. Waste retrieval was completed from the first single-shell tank in late 2003. Since then, another six single-shell tanks have been retrieved to regulatory standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cathodic Protection Modeling for Hanford Underground Double-Shell Tank Farms

Hanford stores millions of gallons of radioactive and chemically hazardous waste from the production of weapon materials in tank farms consisting of underground carbon-steel storage tanks surrounded by reinforced concrete. Six of these Hanford tank farms use double-shell storage tanks (DSTs). The DST farms were constructed from 1968 to 1986 with a planned 40–50 year design life, so some are already operating beyond their initial life expectancy. Ultrasonic testing (UT) has indicated significant thinning on the bottom of the secondary (outer) liner of these tanks, believed to arise from groundwater intrusion driving concrete side corrosion. There is no direct access to the steel/concrete interface between the tank and the concrete pad, making it difficult to apply a chemical-based mitigation strategy or to conduct repairs, but cathodic protection (CP) is a possible method to inhibit further concrete-side corrosion. Hanford already uses CP to protect below grade steel piping within the tank farms and connected to the tanks, but this system was not designed to protect the tank bottoms. CP design must account for the structures surrounding the DSTs, including the steel reinforcing bars (rebar) within the concrete pad and vault, various process lines, and the existing CP system. In this study, finite element analysis (FEA) modeling was carried out to simulate CP protection of 1) a single tank and CP anode to develop options for modeling the rebar and to compare to a simpler circuit model and 2) the entire Hanford AN tank farm as a representative example consisting of seven tanks, associated piping, and both existing and new CP anodes. Both circuit and FEA models predict that significant protective current could be delivered to the bottoms of the tanks with the addition of tank-protection anodes below the depth of the tanks. Simulations with only the existing pipe-protection anodes active confirmed that only a very small current to the tank bottoms is predicted under present conditions. Multiple simplified representations of the dome and wall rebar were tested to reduce the computational complexity of the tank-farm simulations, resulting in modeling the rebar as edge elements with a prescribed effective circumference that matches the real rebar surface area. The geometry of the rebar is also simplified into horizontal hoops around the tank walls and radial rebar over the dome with increased effective circumference to retain the target surface area. This simplification was found to greatly reduce the complexity and solution time of the models without large changes in current distributions, especially to the tank bottom. A range of values were tested for model parameters such as soil and concrete resistivities and polarization resistance to investigate their impact on the current and electric potential distributions. Depending on the parameters used, FEA simulations predict some risk of overprotection, particularly on the piping system; since overprotection can also lead to surface damage associated with hydrogen gas generation at the interface (e.g. hydrogen embrittlement or damage to coatings), this needs to be considered when refining the design of the new CP system. Comparison between the FEA models and the circuit model representation demonstrated that the circuit model could not match the predicted FEA current distribution, even when using the exact same surface areas. This discrepancy appeared to be at least partly attributable to the impact of the relative positions of the tank components and anodes to each other and to the ground surface. The FEA model accounts for the relative positions since it solves the governing equations in three dimensions, but the circuit model cannot account for the positioning. In particular, the circuit model underpredicts the current to the tank bottom and overpredicts the current to the dome compared to FEA for the baseline geometry. The FEA models omitted the electrically isolated rebar in the bottom concrete slab. However, a circuit based stray current model estimated that only 2.1% of the total current through the slab would stray into the rebar, corresponding to ~0.21 A for a target current density of 2 mA/ft2 to the tank bottom. The estimated corrosion driven by this amount of stray current is predicted to yield a lifetime of >400 years for the minimum rebar diameter, assuming an acceptable cross-section area loss of 10%.

d'Entremont, Anna [Savannah River National Laborat↗

Radio-Frequency Tank Eigenmode Sensor for Propellant Quantity Gauging

Although there are several methods for determining liquid level in a tank, there are no proven methods to quickly gauge the amount of propellant in a tank while it is in low gravity or under low-settling thrust conditions where propellant sloshing is an issue. Having the ability to quickly and accurately gauge propellant tanks in low-gravity is an enabling technology that would allow a spacecraft crew or mission control to always know the amount of propellant onboard, thus increasing the chances for a successful mission. The Radio Frequency Mass Gauge (RFMG) technique measures the electromagnetic eigenmodes, or natural resonant frequencies, of a tank containing a dielectric fluid. The essential hardware components consist of an RF network analyzer that measures the reflected power from an antenna probe mounted internal to the tank. At a resonant frequency, there is a drop in the reflected power, and these inverted peaks in the reflected power spectrum are identified as the tank eigenmode frequencies using a peak-detection software algorithm. This information is passed to a pattern-matching algorithm, which compares the measured eigenmode frequencies with a database of simulated eigenmode frequencies at various fill levels. A best match between the simulated and measured frequency values occurs at some fill level, which is then reported as the gauged fill level. The database of simulated eigenmode frequencies is created by using RF simulation software to calculate the tank eigenmodes at various fill levels. The input to the simulations consists of a fairly high-fidelity tank model with proper dimensions and including internal tank hardware, the dielectric properties of the fluid, and a defined liquid/vapor interface. Because of small discrepancies between the model and actual hardware, the measured empty tank spectra and simulations are used to create a set of correction factors for each mode (typically in the range of 0.999 1.001), which effectively accounts for the small discrepancies. These correction factors are multiplied to the modes at all fill levels. By comparing several measured modes with the simulations, it is possible to accurately gauge the amount of propellant in the tank. An advantage of the RFMG approach of applying computer simulations and a pattern-matching algorithm is that the Although there are several methods for determining liquid level in a tank, there are no proven methods to quickly gauge the amount of propellant in a tank while it is in low gravity or under low-settling thrust conditions where propellant sloshing is an issue. Having the ability to quickly and accurately gauge propellant tanks in low-gravity is an enabling technology that would allow a spacecraft crew or mission control to always know the amount of propellant onboard, thus increasing the chances for a successful mission. The Radio Frequency Mass Gauge (RFMG) technique measures the electromagnetic eigenmodes, or natural resonant frequencies, of a tank containing a dielectric fluid. The essential hardware components consist of an RF network analyzer that measures the reflected power from an antenna probe mounted internal to the tank. At a resonant frequency, there is a drop in the reflected power, and these inverted peaks in the reflected power spectrum are identified as the tank eigenmode frequencies using a peak-detection software algorithm. This information is passed to a pattern-matching algorithm, which compares the measured eigenmode frequencies with a database of simulated eigenmode frequencies at various fill levels. A best match between the simulated and measured frequency values occurs at some fill level, which is then reported as the gauged fill level. The database of simulated eigenmode frequencies is created by using RF simulation software to calculate the tank eigenmodes at various fill levels. The input to the simulations consists of a fairly high-fidelity tank model with proper dimensions and including internal tank harare, the dielectric properties of the fluid, and a defined liquid/vapor interface. Because of small discrepancies between the model and actual hardware, the measured empty tank spectra and simulations are used to create a set of correction factors for each mode (typically in the range of 0.999 1.001), which effectively accounts for the small discrepancies. These correction factors are multiplied to the modes at all fill levels. By comparing several measured modes with the simulations, it is possible to accurately gauge the amount of propellant in the tank. An advantage of the RFMG approach of applying computer simulations and a pattern-matching algorithm is that the

Zimmerli, Gregory A.↗

Numerical Simulation of No Vent Chill and Fill of a Large Liquid Hydrogen Tank

On orbit transfer of cryogenic liquids is necessary for many future space missions. The techniques required to transfer cryogens in micro gravity are quite different from ground system applications. In normal gravity, cryogenic tanks are usually filled from the bottom at nearly atmospheric pressure. The vapor generated due to heat transfer from warm tank walls, is allowed to vent from the top of the tank while the tank is being filled. If the normal gravity technique is used on orbit, the uncertainty of liquid and vapor distributions in unsettled condition may result in dumping of large amounts of liquid propellant overboard. The Vented Chill and No Vent Fill (VCNVF) process is a methodology [1] used to reduce propellant loss by holding the vent valve open during initial wall chilldown, preventing over-pressurization of the tank and stalling of the incoming flow, but closing the tank vent valve after chilling the tank wall sufficiently. An accurate simulation of no vent tank chill and fill is necessary to estimate the amount of propellant necessary to chill the tank, determine the maximum sustainable flowrate to fill the tank without stalling, and establish a timeline for the filling process. Numerical modeling of filling a cryogenic tank is complex because the flow is two-phase and the process involves both boiling and condensation with heat transfer between solid and fluid. In recent years, progress has been made to develop a numerical modeling technique [2,3,4] that has been verified by comparing with the test data from a small flight tank using liquid nitrogen [5]. The purpose of the present paper is to apply this technique in a larger tank with liquid hydrogen and compare with the test data of Chato [1]. The K-site Test Facility [1], shown in Figure 1, consists of a Test Tank, spray system, instrumentation, and the vacuum chamber. The test tank selected was ellipsoidal with an 87 inch major diameter and a 1.2 to 1 major to minor axis ratio. The two ends are joined by a short 1.5 inch cylindrical section. The tank is made of 2219 aluminum chemically milled to a nominal thickness of 0.087 inches. The tank weighs 329.25 pounds, and the tank volume is 175 ft 3 . The GFSSP model of the Test Tank is shown in Figure 2. Node 13 is a boundary node that represents the supply tank which is supplying liquid hydrogen at a given pressure and temperature. The total measured flowrate is evenly distributed through Branches 131 through 139. Nodes 1 through 9 represent the test tank and they are connected with metal solid nodes 14 through 22 through fluid-to-solid conductors that allow convective heat transfer between the solid and fluid nodes. The predicted tank pressure, filling rate, wall temperature and fluid temperature will be compared with test data.

Alok Majumdar↗

Vented Chill / No-Vent Fill of Cryogenic Propellant Tanks

Architectures for extended duration missions often include an on-orbit replenishment of the space vehicle's cryogenic liquid propellants. Such a replenishment could be accomplished via a tank-to-tank transfer from a dedicated tanker or a more permanent propellant depot storage tank. Minimizing the propellant loss associated with transfer line and receiver propellant tank thermal conditioning is essential for mass savings. A new methodology for conducting tank-to-tank transfer while minimizing such losses has been demonstrated. Charge-Hold-Vent is the traditional methodology for conducting a tank-to-tank propellant transfer. A small amount of cryogenic liquid is introduced to chill the transfer line and propellant tank. As the propellant absorbs heat and undergoes a phase change, the tank internal pressure increases. The tank is then vented to relieve pressure prior to another charge of cryogenic liquid being introduced. This cycle is repeated until the transfer lines and tank are sufficiently chilled and the replenishment of the propellant tank is complete. This method suffers inefficiencies due to multiple chill and vent cycles within the transfer lines and associated feed system components. Additionally, this system requires precise measuring of cryogenic fluid delivery for each transfer, multiple valve cycling events, and other complexities associated with cycled operations. To minimize propellant loss and greatly simplify on-orbit operations, an alternate methodology has been designed and demonstrated. The Vented Chill / No Vent Fill method is a simpler, constant flow approach in which the propellant tank and transfer lines are only chilled once. The receiver tank is continuously vented as cryogenic liquid chills the transfer lines, tank mass and ullage space. Once chilled sufficiently, the receiver tank valve is closed and the tank is completely filled. Interestingly, the vent valve can be closed prior to receiver tank components reaching liquid saturation temperature. An incomplete fill results if insufficient energy is removed from the tank's thermal mass and ullage space. The key to successfully conducting the no vent fill is to assure that sufficient energy is removed from the system prior to closing the receiver tank vent valve. This paper will provide a description of the transfer methodology and test article, and will provide a discussion of test results.

Rhys, Noah O.↗

Evaluation of Electrical Resistivity Tomography to Monitor the Transport of Past Releases Beneath Tank Farms

Underground storage tanks at the Hanford Site, in southeastern Washington State, hold radioactive waste generated from four decades of plutonium production. The 149 single-shell tanks and the 28 double-shell tanks have all exceeded their initial design life of approximately 25 years. At least 67 tanks are assumed to have leaked in the past, resulting in radioactive releases into the vadose zone. Gamma ray logging within dry monitoring wells is currently the primary method for tracking the migration of leaked tank waste through the vadose zone. While this approach provides an accurate assessment of radioactive contamination, that information is only provided near (within ~1m) the borehole, leaving most of the vadose zone unmonitored, particularly the important region directly beneath the tank. This report describes a numerical study that investigates the feasibility and performance of time-lapse 3D electrical resistivity tomography (ERT) for long-term monitoring of a hypothetical tank waste location and migration through the vadose zone. ERT is a method of remotely imaging the bulk electrical conductivity (EC) of the subsurface, which is significantly impacted by the presence of conductive solid and liquid tank waste. The release of liquid tank wastes increases subsurface fluid conductivity and saturation over time, creating a target to use time-lapse ERT for long-term monitoring. Although the presence of metallic infrastructure can cause ERT interference, recent advancements in ERT data processing enable the deleterious effects of buried metallic infrastructure (e.g. pipes, wellbore casings, tanks) to be removed to better determine the liquid tank waste migration over time. Three hypothetical realistic scenarios were simulated in the ERT evaluation. The first two scenarios assume the same leak amount and rate (i.e., between 1/1/1951 and 12/31/1951 at the rate of 347 m 3 per year) but different leaky tanks. Scenario 1 assumes leaks under tank B-102, which is located on the edge of the B-tank farm and surrounded by a few metallic infrastructure including cased pipes/wells/tanks. Scenario 2 assumes leaks under tank B-108, which is located near the center of the B-tank farm and surrounded by larger amount of metallic infrastructure than B-102. Scenario 3 assumes the same metallic infrastructure as B-102, with a more recent contaminant leak that was simulated to have occurred between 1/1/2018 and 12/31/2023 at a rate of 1.89 m 3 per year. The leak time in Scenarios 1 and 2 corresponds to a historical overfill event in 1951 and Scenario 3 corresponds to a recent found tank leak in 2019. In each scenario, a “true” bulk EC model vs. time reflecting contaminant migration was generated. ERT data was simulated from these “true” bulk EC models and a time-lapse ERT inversion produced “imaged” bulk EC vs. time. Three electrode configurations in two, four and eight boreholes surrounding the leak tank were used in the ERT simulations in each scenario. These borehole configurations were considered logistically feasible and cost-effective for monitoring. The hypothetical ERT boreholes are assumed to have non-metallic casing. By comparing the “imaged” bulk EC with the “true” bulk EC, it was demonstrated that the three configurations of wells used (two, four, and eight wells) were able to successfully monitor the migration of tank leaks through the vadose zone, with bulk EC resolution increasing with the number of down borehole ERT arrays for all scenarios. Therefore, the use of eight boreholes to perform ERT monitoring beneath the tanks provided the best spatiotemporal information.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Refinement of Modeling Techniques for the Structural Evaluation of Hanford Single-Shell Nuclear Waste Storage Tanks - 12288

The single-shell tanks at the Hanford Site (in Washington State, USA) were constructed between 1943 and 1964 and are well beyond their estimated 25 year design life. This article discusses the structural analysis approach and modeling challenges encountered during the ongoing analysis of record for evaluating the structural integrity of the single-shell tanks. There are several geometrical and material nonlinearities and uncertainties to be dealt with while performing the modern finite element analysis of these tanks. The analysis takes into account the temperature history of the tanks and allowable mechanical operating loads for proper estimation of creep strains and thermal degradation of material properties. The loads prescribed in the analysis of record models also include anticipated loads that may occur during waste retrieval and closure. Due to uncertainty in a number of modeling details, sensitivity studies were conducted to address questions related to boundary conditions that realistically or conservatively represent the influence of surrounding tanks in a tank farm, the influence of backfill excavation slope, the extent of backfill and the total extent of undisturbed soil surrounding the backfill. Because of the limited availability of data on the thermal and operating history for many of the individual tanks, some of the data was assumed or interpolated. However, the models developed for the analysis of record represent the bounding scenarios and include the loading conditions that the tanks were subjected to or anticipated. The modeling refinement techniques followed in the analysis of record resulted in conservative estimates for force and moment demands at various sections in the concrete tanks. This article discusses the modeling aspects related to Type-II and Type-III single-shell tanks. The modeling techniques, methodology and evaluation criteria developed for evaluating the structural integrity of single-shell tanks at Hanford are in general applicable to other similar tanks or underground concrete storage structures. This article presented the details of the finite element models and analysis approach followed during the ongoing effort to establish structural integrity of single shell tanks at the Hanford site. The details of the material constitutive models applicable to the underground Hanford concrete tanks that capture the thermal and creep induce degradation are also presented. The thermal profiles were developed based on the available tank temperature data for the Type II and Type III single-shell tanks, and they were chosen to yield conservative demands under the thermal and operating loads analysis of these tanks. Sensitivity studies were conducted to address two issues regarding the soils modeled around the single-shell tanks. The results indicate that excluding the boundary separating the backfill soil from the undisturbed soil will result in conservative demands (plots 14b and 14c green lines for circumferential Demand/Capacity ratios). The radial extent study indicated that the soil model extending to 240 ft gave more conservative results than the model with 62 ft of soil (plots 17a and 17c magenta lines for hoop Demand/Capacity ratios). Based on these results, a 240 ft far-field soil boundary with backfill throughout the lateral extent was recommended and used for the finite element models used in the Type-II and Type-III analyses of record. The modeling effort and sensitivity studies discussed in this article helped in developing bounding models for the structural integrity evaluation of single shell tanks at the Hanford site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cementitious Grout for Closing SRS High Level Waste Tanks - 12315

In 1997, the first two United States Department of Energy (US DOE) high level waste tanks (Tanks 17-F and 20-F: Type IV, single shell tanks) were taken out of service (permanently closed) at the Savannah River Site (SRS). In 2012, the DOE plans to remove from service two additional Savannah River Site (SRS) Type IV high-level waste tanks, Tanks 18-F and 19-F. These tanks were constructed in the late 1950's and received low-heat waste and do not contain cooling coils. Operational closure of Tanks 18-F and 19-F is intended to be consistent with the applicable requirements of the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and will be performed in accordance with South Carolina Department of Health and Environmental Control (SCDHEC). The closure will physically stabilize two 4.92E+04 cubic meter (1.3 E+06 gallon) carbon steel tanks and isolate and stabilize any residual contaminants left in the tanks. Ancillary equipment abandoned in the tanks will also be filled to the extent practical. A Performance Assessment (PA) has been developed to assess the long-term fate and transport of residual contamination in the environment resulting from the operational closure of the F-Area Tank Farm (FTF) waste tanks. Next generation flowable, zero-bleed cementitious grouts were designed, tested, and specified for closing Tanks 18-F and 19-F and for filling the abandoned equipment. Fill requirements were developed for both the tank and equipment grouts. All grout formulations were required to be alkaline with a pH of 12.4 and to be chemically reducing with a reduction potential (Eh) of -200 to -400. Grouts with this chemistry stabilize potential contaminants of concern. This was achieved by including Portland cement and Grade 100 slag in the mixes, respectively. Ingredients and proportions of cementitious reagents were selected and adjusted to support the mass placement strategy developed by Savannah River Remediation (SRR) Closure Operations. Subsequent down selection was based on compressive strength and saturated hydraulic conductivity results. Fresh slurry property results were used as the first level of screening. A high range water reducing admixture and a viscosity modifying admixture were used to adjust slurry properties to achieve flowable grouts. Adiabatic calorimeter results were used as the second level screening. The third level of screening was used to design mixes that were consistent with the fill material parameters used in the F-Tank Farm Performance Assessment which was developed to assess the long-term fate and transport of residual contamination in the environment resulting from the operational closures. The cement and slag contents of a mix selected for filling Tanks 18-F and 19-F should be limited to no more than 125 and 210 lbs/cyd, respectively, to limit the heat generated as the result of hydration reaction during curing and thereby enable mass pour placement. Trial mixes with water to total cementitious materials ratios of 0.550 to 0.580 and 125 lbs/cyd of cement and 210 lbs/cyd of slag met the strength and permeability requirements. Mix LP no.8-16 was selected for closing SRS Tanks 18-F and 19-F because it meets or exceeds the design requirements with the least amount of Portland cement and blast furnace slag. This grout is expected to flow at least 45 feet. A single point of discharge should be sufficient for unrestricted flow conditions. However, additional entry points should be identified as back-up in case restrictions in the tank impede flow. The LP no.8 series of trial mixes had surprisingly high design compressive strengths (2000 to 4000/5000 psi) which were achieved at extended curing times (28 to 90 days, respectively) given the small amount of Portland cement in the mixes (100 to 185 lbs/cyd). The grouts were flowable structural fills containing 3/8 inch gravel and concrete sand aggregate. These grouts did not segregate and require no compaction. They have low permeabilities (≤ 10{sup -9} cm/s) and are consequently expected to be very durable. This series of trial mixes contained by-product materials, i.e., slag and Class F fly ash, and an admixture system initially specified for the grouts used to close Tanks 17-F and 20-F at SRS. The mix designs have low CO{sub 2} footprints because Portland cement contents are very low and can be considered environmentally friendly. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tanks 18 And 19-F Structural Flowable Grout Fill Material Evaluation And Recommendations

Cementitious grout will be used to close Tanks 18-F and 19-F. The functions of the grout are to: 1) physically stabilize the final landfill by filling the empty volume in the tanks with a non-compressible material; 2) provide a barrier for inadvertent intrusion into the tank; 3) reduce contaminant mobility by a) limiting the hydraulic conductivity of the closed tank and b) reducing contact between the residual waste and infiltrating water; and 4) providing an alkaline, chemically reducing environment in the closed tank to control speciation and solubility of selected radionuclides. The objective of this work was to identify a single (all-in-one) grout to stabilize and isolate the residual radionuclides in the tank, provide structural stability of the closed tank and serve as an inadvertent intruder barrier. This work was requested by V. A. Chander, High Level Waste (HLW) Tank Engineering, in HLW-TTR-2011-008. The complete task scope is provided in the Task Technical and QA Plan, SRNL-RP-2011-00587 Revision 0. The specific objectives of this task were to: 1) Identify new admixtures and dosages for formulating a zero bleed flowable tank fill material selected by HLW Tank Closure Project personnel based on earlier tank fill studies performed in 2007. The chemical admixtures used for adjusting the flow properties needed to be updated because the original admixture products are no longer available. Also, the sources of cement and fly ash have changed, and Portland cements currently available contain up to 5 wt. % limestone (calcium carbonate). 2) Prepare and evaluate the placement, compressive strength, and thermal properties of the selected formulation with new admixture dosages. 3) Identify opportunities for improving the mix selected by HLW Closure Project personnel and prepare and evaluate two potentially improved zero bleed flowable fill design concepts; one based on the reactor fill grout and the other based on a shrinkage compensating flowable fill mix design. 4) Prepare samples for hydraulic property measurements for comparison to the values in the F- and H- Tank Farm Performance Assessments (PAs). 5) Identify a grout mix for the Tanks 18-F and 19-F Grout Procurement Specification. Results for two flowable zero bleed structural fill concepts containing 3/8 inch gravel (70070 Series and LP#8 Series) and a sand only mix (SO Series) are provided in this report. Tank Farm Engineering and SRNL Project Management selected the 70070 mix as the base case for inclusion in Revision 0 of the Tanks 18-F and 19-F grout procurement specification and requested admixture recommendations and property confirmation for this formulation. Lower cementitious paste mixes were formulated because the 70070 mix is over designed with respect to strength and generates more heat from hydration reactions than is desirable for mass pour application. Work was also initiated on a modification of the recommended mix which included shrinkage compensation to mitigate fast pathways caused by shrinkage cracking and poor physical bonding to the tank and ancillary equipment. Testing of this option was postponed to FY12. Mix, LP#8-16 is recommended for inclusion in the specification for furnishing and delivering tank closure grout for Tanks 18-F and 19-F. A shrinkage compensating variation of this mix, LP#16C, has not been fully developed and characterized at this time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Refinement of Modeling Techniques for the Structural Evaluation of Hanford Single-Shell Nuclear Waste Storage Tanks

Abstract: A total of 149 tanks out of 177 at the Hanford Site (in Washington State, USA) belong to the first generation of underground nuclear waste storage tanks known as single shell tanks (SSTs). These tanks were constructed between 1943 and 1964 and are well beyond their design life. All the SSTs had been removed from active service by November 1980 and have been later interim stabilized by removing the pumpable liquids. The remaining waste in the tanks is in the form of salt cake and sludge awaiting r permanent disposal.. The evaluation of the structural integrity of these tanks is of utmost importance not only for the continued safe storage of the waste until waste retrieval and closure, but also to assure safe retrieval and closure operations. This article discusses the structural analysis approach, modeling challenges and issues encountered during the ongoing analysis of record (AOR) for evaluating the structural integrity of the SSTs. There are several geometrical and material nonlinearities and uncertainties to be dealt with while performing the modern finite element analysis of these tanks. Several studies were conducted to refine the models in order to minimize modeling artifacts introduced by soil arching, boundary effects, concrete cracking, and concrete-soil interface behavior. The analysis takes into account the temperature history of the tanks and allowable mechanical operating loads of these tanks for proper estimation of creep strains and thermal degradation of material properties. The loads imposed in the AOR models also include anticipated loads that these tanks may see during waste retrieval and closure. Due to uncertainty in a number of inputs to the models, sensitivity studies were conducted to address questions related to the boundary conditions to realistically or conservatively represent the influence of surrounding tanks in a tank farm, the influence of backfill excavation slope, the extent of backfill and the total extent of undisturbed soil surrounding the backfill. The article also discusses the criteria and design standards used for evaluating the structural integrity of these underground concrete tanks. Because of the non-availability of complete data on the thermal and operating history for many of the individual tanks, some of the data was assumed or interpolated. However, the models developed for the analysis of record represent the bounding scenarios and include the worst and extreme loading cases that the tanks were subjected to or anticipated. The modeling refinement techniques followed in the AOR resulted in conservative estimates for force and moment demands at various sections in the concrete tanks. The SSTs are classified into 4 types as per their configuration and capacity. This article discusses the modeling aspects related to two types of SSTs that have been analyzed until now. The TOLA results combined with seismic demands from seismic analysis for the analysis of record indicate that the tanks analyzed are structurally stable as per the evaluation criteria established. These results are presented in a separate article. The modeling techniques, methodology and evaluation criteria developed for evaluating the structural integrity of SSTs at Hanford are in general applicable to any similar tanks or underground concrete storage structures.

Single Shell Tank, Structural analysis, Structural↗

Slow Strain Rate Testing of A537 Tank Wall Material

At Savannah River Site (SRS), High-Level Waste is stored in below-grade carbon steel tanks. This waste in part consists of sludge, salt cake, and/or supernate. Preparation of this waste for future processing involves dissolution of the salt cake layer. The salt dissolution process can create conditions that leave the carbon steel tanks susceptible to localized corrosion. The salt to be dissolved contains high concentrations of nitrate, that once released, create an environment that may be conducive to pitting corrosion and/or stress corrosion cracking (SCC) of carbon steel. The salt dissolution process also liberates interstitial liquid trapped between the salt crystals. This liquid is initially high in nitrite and hydroxide concentration. High pH and greater ratios of nitrite to nitrate act as inhibitors to minimize corrosion of carbon steel in high nitrate environments. However, as dissolution proceeds, the concentration of nitrate will increase, while the hydroxide and nitrite concentration of the interstitial liquid will deplete and become insufficient to prevent the onset of corrosion attack. Tank blending and the addition of inhibitors are used to ensure adequate concentrations of hydroxide and nitrite. However, this is not desirable during salt dissolution as it can reduce process efficiency and increase the amount of waste that needs processing. This testing program was designed to examine the risk of SCC associated with utilizing the pitting factor (PF) and nitrite/nitrate (NO 2 - /NO 3 - ) ratio limits for handling dissolved salt solutions at an elevated temperature in the carbon steel waste tanks. The previously identified limits are a PF of 1.2 and an NO 2 - /NO 3 - ratio of 0.15. The results indicate that as long as the NO 2 - /NO 3 - ratio exceeds 0.1 and the PF is above approximately 0.8, there is a discernible safety margin between the open circuit potential (OCP) and the critical cracking potential (CCP) observed during applied potential testing. However, this margin, defined by the difference between the OCP and CCP, is relatively narrow, ranging from 0.1 to 0.25 volts. This small margin raises concerns about potential shifts in OCP during waste retrieval operations, which could inadvertently increase the risk of SCC if the OCP approaches or exceeds the CCP. These results confirm that dissolved salt solutions provide a potent chemistry that, under certain conditions, makes carbon steel susceptible to SCC. The next question to consider is the influence these results have on decisions for storage and retrieval of waste from the tanks. For Type III/IIIA waste tanks, the risk of SCC remains very low. First, and most importantly, the post-weld stress relief of the tanks has reduced the residual stress near the welds. Thus, without the stress component, SCC risk is minimized. The material of construction (A537 Carbon steel) for the Type III/IIIA tanks is superior to the steel in its resistance to SCC than the steel that was utilized for the Type I, II, and IV tanks (A285 carbon steel). From a chemistry control standpoint for a Type III/IIIA tank directly involved with handling dissolved salt solutions, the PF and NO 2 - /NO 3 - ratio limits may be utilized wherein chemistry control provides an extra layer of defense against SCC. Chemistry control for a Type III/IIIA tank minimizes the risk for a tank that may receive the dissolved salt solution, particularly if that tank is a Type I, II, or IV waste tank. On the other hand, if the dissolved salt solution is handled by a Type I, II, or IV waste tank the risk of SCC is real. The potent chemistry, absence of stress relief, and inferior material result in a condition that is conducive to cracking. Efforts should be made to either avoid transferring waste that may not meet the PF and NO 2 - /NO 3 - ratio criteria to one of these tanks or if it is unavoidable, take measures to minimize the consequences of a leak. As shown by these tests, even if the PF and NO 2 - /NO 3 - ratio criteria are met, there is a risk that the tank potential may be disturbed in the positive direction and the risk of SCC increase.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-service Inspection of Radioactive Waste Tanks at the Savannah River Site – 15410

Liquid radioactive wastes from the Savannah River Site (SRS) separation process are stored in large underground carbon steel tanks. The high level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks will be required to be in service for times exceeding the initial intended life. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. A structural integrity program is in place to maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. In-service inspection (ISI) is an essential element of a comprehensive structural integrity program for the waste tanks at the Savannah River Site (SRS). The ISI program was developed to determine the degree of degradation the waste tanks have experienced due to service conditions. As a result of the inspections, an assessment can be made of the effectiveness of corrosion controls for the waste chemistry, which precludes accelerated localized and general corrosion of the waste tanks. Ultrasonic inspections (UT) are performed to detect and quantify the degree of general wall thinning, pitting and cracking as a measure of tank degradation. The results from these inspections through 2013, for the 27 Type III/IIIA tanks, indicate no reportable in-service corrosion degradation in the primary tank (i.e., general, pitting, or cracking). The average wall thickness for all tanks remains above the manufactured nominal thickness minus 0.25 millimeter and the largest pit identified is approximately 1.70 millimeter deep (i.e., less than 10% through-wall). Improvements to the inspection program were recently instituted to provide additional confidence in the degradation rates. Thickness measurements from a single vertical strip along the accessible height of the primary tank have been used as a baseline to compare historical measurements. Changes in wall thickness and pit depths along this vertical strip are utilized to estimate the rate of corrosion degradation. An independent review of the ISI program methodology, results, and path forward was held in August 2009. The review recommended statistical sampling of the tanks to improve the confidence of the single strip inspection program. The statistical sampling plan required that SRS increase the amount of area scanned per tank. Therefore, in addition to the baseline vertical strip that is obtained for historical comparisons, four additional randomly selected vertical strips are inspected. To date, a total of 104 independent vertical strips along the height of the primary tank have been completed. A statistical analysis of the data indicates that at this coverage level there is a 99.5% confidence level that one of the worst 5% of all the vertical strips was inspected. That is, there is a relatively high likelihood that the SRS inspection program has covered one of the most corroded areas of any of the Type III/IIIA waste tanks. These data further support the conclusion that there are no significant indications of wall thinning or pitting. Random sampling will continue to increase the confidence that one of the worst 5% has been inspected. In order to obtain the additional vertical strips, and minimize budget and schedule impacts, data collection speed for the UT system was optimized. Prior to 2009, the system collected data at a rate of 32 square centimeters per minute. The scan rate was increased to 129 - 160 square centimeters per minute by increasing the scanner step and pixel sizes in the data acquisition set-up. Laboratory testing was utilized to optimize the scan index/pixel size such that the requirements for wall thinning and pit detection were still maintained. SRS continues to evaluate improvements to ultrasonic equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

F-Tank Farm Performance Assessment Updates through the Special Analysis Process at Savannah River Site - 12169

The F-Area Tank Farm (FTF) is owned by the U.S. Department of Energy and operated by Savannah River Remediation, LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF is in the north-central portion of the SRS and occupies approximately 22 acres within F-Area. The FTF is an active radioactive waste storage facility consisting of 22 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. An FTF Performance Assessment (PA) was prepared to support the eventual closure of the FTF underground radioactive waste tanks and ancillary equipment. The PA provides the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified below for final closure of FTF. The FTank Farm is subject to a state industrial waste water permit and Federal Facility Agreement. Closure documentation will include an F-Tank Farm Closure Plan and tank-specific closure modules utilizing information from the performance assessment. For this reason, the State of South Carolina and the Environmental Protection Agency must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. The projected waste tank inventories in the FTF PA provide reasonably bounding FTF inventory projections while taking into account uncertainties in the effectiveness of future tank cleaning technologies. As waste is removed from the FTF waste tanks, the residual contaminants will be sampled and the remaining residual inventory is characterized. In this manner, tank specific data for the tank inventories at closure will be available to supplement the waste tank inventory projections currently used in the FTF PA. For FTF, the new tank specific data will be evaluated through the Special Analysis process. The FTF Special Analyses process will be utilized to evaluate information regarding the final residual waste that will be grouted in place in the FTF Tanks and assess the potential impact the new inventory information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. The purpose of this paper is to discuss the Special Analysis process and share insights gained while implementing this process. An example of an area of interest in the revision process is balancing continuous improvement versus configuration control of agreed upon methodologies. Other subjects to be covered include: 1) defining the scope of the revisions included in the Special Analysis, 2) determining which PA results should be addressed in the Special Analysis, and 3) deciding whether the Special Analysis should utilize more qualitative or quantitative assessments. For the SRS FTF, an FTF PA has been prepared to provide the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of FTF. The FTF Special Analyses process will be utilized to evaluate the impact new information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. In preparing SAs, it is crucial that the scope of the SA be well defined within the SA, since the specific scope will vary from SA to SA. Since the SAs are essentially addendums to the PA, the SA scope should utilize the PA as the baseline from which the SA scope is defined. The SA needs to focus on evaluating the change associated with the scope, and not let other changes interfere with the ability to perform that evaluation by masking the impact of the change. In preparing the SA, it is also important to let the scope determine whether the Special Analysis should utilize more qualitative or quantitative assessments and also which results from the PA should be addressed in the Special Analysis. These decisions can vary from SA and should not be predetermined. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗