Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TELESCOPES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

A study of the sensitivity of an imaging telescope (GRITS) for high energy gamma-ray astronomy

When a gamma-ray telescope is placed in Earth orbit, it is bombarded by a flux of cosmic protons much greater than the flux of interesting gammas. These protons can interact in the telescope's thermal shielding to produce detectable gamma rays, most of which are vetoed. Since the proton flux is so high, the unvetoed gamma rays constitute a significant background relative to some weak sources. This background increases the observing time required to pinpoint some sources and entirely obscures other sources. Although recent telescopes have been designed to minimize this background, its strength and spectral characteristics were not previously calculated in detail. Monte Carlo calculations are presented which characterize the strength, spectrum and other features of the cosmic proton background using FLUKA, a hadronic cascade program. Several gamma-ray telescopes, including SAS-2, EGRET and the Gamma Ray Imaging Telescope System (GRITS), are analyzed, and their proton-induced backgrounds are characterized. In all cases, the backgrounds are either shown to be low relative to interesting signals or suggestions are made which would reduce the background sufficiently to leave the telescope unimpaired. In addition, several limiting cases are examined for comparison to previous estimates and calibration measurements.

Yearian, Mason R.↗

Applying artificial intelligence to the control of space telescopes (extended abstract)

The field of astronomy has recently benefited from the availability of space telescopes. The Hubble Space Telescope (HST), for instance, despite its problems, provides a unique and valuable view of the universe. However, unlike HST, a telescope need not be in low Earth orbit to escape our thickening atmosphere: it is currently technologically feasible to put a telescope on the moon, and there are excellent reasons for doing this. Either in low Earth orbit or on the moon, a space telescope represents an expensive and sought-after resource. Thus, the planning, scheduling, and control of these telescopes is an important problem that must be seriously studied.

Drummond, Mark↗

The application of linear actuators for telescope pointing control

A study team at MSFC has conceptually designed two lunar-based telescopes, a 16 m aperture Large Lunar Telescope (LLT) and a 4 m Cluster Telescope Experiment (CTE). The CTE serves as a technology tested for the LLT. The CTE utilizes a hexapod telescope mount to obtain a small gimbal angle that significantly extends the viewing space and observation time from that of a stationary transit telescope. This paper addresses the applicability of six linear actuators to provide limited gimbal rotation of the CTE telescope assembly. Kinematic constraint equations for the hexapod mount have been applied to a six degree-of-freedom rigid body model. Static equilibrium equations have been solved to address configuration design issues, and a feedback tracking control system has been designed and simulated.

Carrington, C. K.↗

Optical design considerations for next-generation space and lunar telescopes

The paper discusses the optical requirements for future large space or lunar telescopes and their influence upon the fundamental system parameters. Two telescope concepts, a four-reflection three-mirror telescope, and a spherical-primary four-mirror telescope are introduced. Both have the potential for extreme high performance, and both use four reflections to accomplish this. Considering the present available coating capabilities, the reflectivity loss in the lower UV region due to the additional reflections, compared to a two-mirror system, seriously affects the utility of four-mirror telescopes for this part of the spectrum. Separate telescopes for the UV and for longer wavelengths may therefore be a practical solution, unless significant advances in coating technology are made in the foreseeable future.

Korsch, Dietrich↗

Control-structure-thermal interactions in analysis of lunar telescopes

The lunar telescope project was an excellent model for the CSTI study because a telescope is a very sensitive instrument, and thermal expansion or mechanical vibration of the mirror assemblies will rapidly degrade the resolution of the device. Consequently, the interactions are strongly coupled. The lunar surface experiences very large temperature variations that range from approximately -180 C to over 100 C. Although the optical assemblies of the telescopes will be well insulated, the temperature of the mirrors will inevitably fluctuate in a similar cycle, but of much smaller magnitude. In order to obtain images of high quality and clarity, allowable thermal deformations of any point on a mirror must be less than 1 micron. Initial estimates indicate that this corresponds to a temperature variation of much less than 1 deg through the thickness of the mirror. Therefore, a lunar telescope design will most probably include active thermal control, a means of controlling the shape of the mirrors, or a combination of both systems. Historically, the design of a complex vehicle was primarily a sequential process in which the basic structure was defined without concurrent detailed analyses or other subsystems. The basic configuration was then passed to the different teams responsible for each subsystem, and their task was to produce a workable solution without requiring major alterations to any principal components or subsystems. Consequently, the final design of the vehicle was not always the most efficient, owing to the fact that each subsystem design was partially constrained by the previous work. This procedure was necessary at the time because the analysis process was extremely time-consuming and had to be started over with each significant alteration of the vehicle. With recent advances in the power and capacity of small computers, and the parallel development of powerful software in structural, thermal, and control system analysis, it is now possible to produce very detailed analyses of intermediate designs in a much shorter period of time. The subsystems can thus be designed concurrently, and alterations in the overall design can be quickly adopted into each analysis; the design becomes an iterative process in which it is much easier to experiment with new ideas, configurations, and components. Concurrent engineering has the potential to produce efficient, highly capable designs because the effect of one subystem on another can be assessed in much more detail at a very early point in the program. The research program consisted of several tasks: scale a prototype telescope assembly to a 1 m aperture, develop a model of the telescope assembly by using finite element (FEM) codes that are available on site, determine structural deflections of the mirror surfaces due to the temperature variations, develop a prototype control system to maintain the proper shape of the optical elements, and most important of all, demonstrate the concurrent engineering approach with this example. In addition, the software used for the finite element models and thermal analysis was relatively new within the Program Development Office and had yet to be applied to systems this large or complex; understanding the software and modifying it for use with this project was also required. The I-DEAS software by Structural Dynamics Research Corporation (SDRC) was used to build the finite element models, and TMG developed by Maya Heat Transfer Technologies, Ltd. (which runs as an I-DEAS module) was used for the thermal model calculations. All control system development was accomplished with MATRIX(sub X) by Integrated Systems, Inc.

Thompson, Roger C.↗

Providing hydrogen maser timing stability to orbiting VLBI radio telescope observations by post-measurement compensation of linked frequency standard imperfections

Orbiting VLBI (OVLBI) astronomical observations are based upon measurements acquired simultaneously from ground-based and earth-orbiting radio telescopes. By the mid-1990s, two orbiting VLBI observatories, Russia's Radioastron and Japan's VSOP, will augment the worldwide VLBI network, providing baselines to earth radio telescopes as large as 80,000 km. The challenge for OVLBI is to effectuate space to ground radio telescope data cross-correlation (the observation) to a level of integrity currently achieved between ground radio telescopes. VLBI radio telescopes require ultrastable frequency and timing references in order that long term observations may be made without serious cross-correlation loss due to frequency source drift and phase noise. For this reason, such instruments make use of hydrogen maser frequency standards. Unfortunately, space-qualified hydrogen maser oscillators are currently not available for use on OVLBI satellites. Thus, the necessary long-term stability needed by the orbiting radio telescope may only be obtained by microwave uplinking a ground-based hydrogen maser derived frequency to the satellite. Although the idea of uplinking the frequency standard intrinsically seems simple, there are many 'contaminations' which degrade both the long and short term stability of the transmitted reference. Factors which corrupt frequency and timing accuracy include additive radio and electronic circuit thermal noise, slow or systematic phase migration due to changes of electronic circuit temporal operating conditions (especially temperature), ionosphere and troposphere induced scintillations, residual Doppler-incited components, and microwave signal multipath propagation. What is important, though, is to realize that ultimate stability does not have to be achieved in real-time. Instead, information needed to produce a high degree of coherence in the subsequent cross-correlation operation may be derived from a two-way coherent radio link, recorded and later introduced as compensations adjunct to the VLBI correlation process. Accordingly, this paper examines the technique for stable frequency/time transfer within the OVLBI system, together with a critique of the types of link degradation components which must be compensated, and the figures of merit known as coherence factors.

Springett, James C.↗

Alt-Az Spacewatch Telescope

This grant funded about one third of the cost of the construction of a telescope with an aperture 1.8 meters in diameter to discover asteroids and comets and investigate the statistics of their populations and orbital distributions. This telescope has been built to the PI's specifications and installed in a dome on Kitt Peak mountain in Arizona. Funds for the dome and building were provided entirely by private sources. The dome building and telescope were dedicated in a ceremony at the site on June 7, 1997. The attached abstract describes the parameters of the telescope. The telescope is a new item of capital property. It is permanently located in University of Arizona building number 910 in the Steward Observatory compound on Kitt Peak mountain in the Tohono O'odham Nation, Arizona. fts property tag number is A252107. This grant did not include funds for the coma corrector lens, instrument derotator, CCD detector, detector electronics, or computers to acquire or process the data. It also did not include funds to operate the telescope or conduct research with it. Funds for these items and efforts are pending from NASA and other sources.

Gehrels, Tom↗

The Next Generation Space Telescope

In Space Science in the Twenty-First Century, the Space Science Board of the National Research Council identified high-resolution-interferometry and high-throughput instruments as the imperative new initiatives for NASA in astronomy for the two decades spanning 1995 to 2015. In the optical range, the study recommended an 8 to 16-meter space telescope, destined to be the successor of the Hubble Space Telescope (HST), and to complement the ground-based 8 to 10-meter-class telescopes presently under construction. It might seem too early to start planning for a successor to HST. In fact, we are late. The lead time for such major missions is typically 25 years, and HST has been in the making even longer with its inception dating back to the early 1960s. The maturity of space technology and a more substantial technological base may lead to a shorter time scale for the development of the Next Generation Space Telescope (NGST). Optimistically, one could therefore anticipate that NGST be flown as early as 2010. On the other hand, the planned lifetime of HST is 15 years. So, even under the best circumstances, there will be a five year gap between the end of HST and the start of NGST. The purpose of this first workshop dedicated to NGST was to survey its scientific potential and technical challenges. The three-day meeting brought together 130 astronomers and engineers from government, industry and universities. Participants explored the technologies needed for building and operating the observatory, reviewed the current status and future prospects for astronomical instrumentation, and discussed the launch and space support capabilities likely to be available in the next decade. To focus discussion, the invited speakers were asked to base their presentations on two nominal concepts, a 10-meter telescope in space in high earth orbit, and a 16-meter telescope on the moon. The workshop closed with a panel discussion focused mainly on the scientific case, siting, and the programmatic approach needed to bring NGST into being. The essential points of this panel discussion have been incorporated into a series of recommendations that represent the conclusions of the workshop. Speakers were asked to provide manuscripts of their presentation. Those received were reproduced here with only minor editorial changes. The few missing papers have been replaced by the presentation viewgraphs. The discussion that follows each speaker's paper was derived from the question and answer sheets, or if unavailable, from the tapes of the meeting. In the latter case, the editors have made every effort to faithfully represent the discussion.

Bely, Pierre-Yves↗

The Associate Principal Astronomer for AI Management of Automatic Telescopes

This research program in scheduling and management of automatic telescopes had the following objectives: 1. To field test the 1993 Automatic Telescope Instruction Set (ATIS93) programming language, which was specifically developed to allow real-time control of an automatic telescope via an artificial intelligence scheduler running on a remote computer. 2. To develop and test the procedures for two-way communication between a telescope controller and remote scheduler via the Internet. 3. To test various concepts in Al scheduling being developed at NASA Ames Research Center on an automatic telescope operated by Tennessee State University at the Fairborn Observatory site in southern Arizona. and 4. To develop a prototype software package, dubbed the Associate Principal Astronomer, for the efficient scheduling and management of automatic telescopes.

Henry, Gregory W.↗

Fabrication, Metrology and Modeling of the Space-Based Lidar Telescope for SPARCLE

Over the past 7 years, NASA Marshall Space Flight Center (MSFC) through the Global Hydrology and Climate Center (GHCC) has been working; in collaboration with the University of Alabama in Huntsville (UAH) Center for Applied Optics (CAO), and others; towards demonstrating a solid state coherent Doppler lidar instrument for space-based global measurement of atmospheric winds. The Space Readiness Coherent Lidar Experiment (SPARCLE) was selected by NASA's New Millennium Program to demonstrate the feasibility and technology readiness of space-based coherent wind lidar. The CAO was responsible for the design, development, integration, and testing of the SPARCLE optical system. Operating at 2-micron wavelength, SPARCLE system performance is dominated by the optical quality of the transmitter/receiver optical system. The stringent optical performance requirements coupled with the demanding physical and environmental constraints of a space-based instrument necessitate extensive characterization of the telescope optical performance that is critical to predicting the lidar system efficiency and operation in space. Individual components have been measured prior to assembly and compared to the designed specifications. Based on the individual components, the telescope design was optimized to produce a suitable telescope. Once the telescope is completed, it will be tested and evaluated and the data shall be used to anchor computer based models of the optical system. Commercial optical modeling codes were used to evaluate the performance of the telescope under a variety of anticipated on-orbit environments and will eventually be compared to environmental tests conducted in the course of qualifying the telescope for flight. Detailed analysis using the "as built" data will help to reduce uncertainties within the lidar system model and will increase the accuracy of the lidar performance predictions.

Peters, Bruce R.↗

An Infrared Telescope for Planet Detection and General Astrophysics

NASA plans to launch a Terrestrial Planet Finder (TPF) mission in 2014 to detect and characterize Earth-like planets around nearby stars, perform comparative planetology studies, and obtain general astrophysics observations. During our recently completed a TPF Mission Architecture study for NASA/JPL we developed the conceptual design for a 28-meter telescope with an IR Coronagraph that meets these mission objectives. This telescope and the technology it embodies are directly applicable to future Far-IR and Submillimeter space missions. The detection of a 30th magnitude planet located within 50 milli-arc-seconds of a 5th (Visual) magnitude star is an exceptionally challenging objective. Observations in the thermal infrared (7-17 microns) are somewhat easier since the planet is "only" 15(sup m) fainter than the star at these wavelengths, but many severe challenges must still be overcome. These challenges include: 1. Designing a coronagraph for star:planet separations less than or equal to lambda/D. 2. Developing the deployment scheme for a 28m space telescope that can fit in an existing launch vehicle payload fairing. 3. Generating configuration layouts for the IR telescope, coronagraph, spacecraft bus, sunshade, solar array, and high-gain antenna. 4. Providing: Structural stability to within 10 microns to support the optics. Thermal control to achieve the necessary structural stability, as well as providing a stable (approx. 30K) thermal environment for the optics. Dynamics isolation from potential jitter sources. 5. Minimizing launch mass to provide the maximum payload for the science mission Interfacing to an EELV Heavy launch vehicle, including acoustic and stress loads for the launch environment. 6. Identifying the key technologies (which can be developed by 2009) that will enable TPF mission to be performed. 7. Generating a manufacturing plan that will permit TPF to be developed at a reasonable cost and schedule. Many of these design challenges result in inherently conflicting requirements on the design of TPF. Drawing on our experience with large space telescopes such as the Chandra X-ray Observatory and the Next Generation Space Telescope, we have created a conceptual design for TPF that successfully meets these challenging requirements. This paper describes our solution to these challenges.

Lillie, C. F.↗

Development of High Resolution Hard X-Ray Telescope with Multi-Layer Coatings

This is the annual report for the third year of a three-year program. Previous annual reports have described progress achieved in the first and second years. The major objective of this program is the development of a focusing hard X-ray telescope with moderately high angular resolution, i.e. comparable to the telescopes of XMM-Newton. The key ingredients of the telescope are a depth graded multilayer coatings and electroformed nickel substrates that are considerably lighter weight than those of previous missions such as XMM-Newton, which have had conventional single metal layer reflective coatings and have operated at much lower energy X-rays. The ultimate target mission for this technology is the Hard X-Ray Telescope (HXT) of the Constellation X-Ray Mission. However, it is applicable to potential SMEX and MIDEX programs as well. We are building upon technology that has proven to be successful in the XMM-Newton and SWIFT missions. The improvements that we are adding are a significant reduction in mass without much loss of angular resolution and an order of magnitude extension of the bandwidth through the use of multilayer coatings. The distinctive feature of this approach compared to those of other hard X-ray telescope programs is that we expect the angular resolution to be superior than telescopes made by other methods thanks to the structural integrity of the substrates. They are thin walled complete cylinders of revolution with a Wolter Type 1 figure; the front half is a parabola, the rear half a hyperbola.

Gorenstein, Paul↗

Cooling Technology for Large Space Telescopes

NASA's New Millennium Program funded an effort to develop a system cooling technology, which is applicable to all future infrared, sub-millimeter and millimeter cryogenic space telescopes. In particular, this technology is necessary for the proposed large space telescope Single Aperture Far-Infrared Telescope (SAFIR) mission. This technology will also enhance the performance and lower the risk and cost for other cryogenic missions. The new paradigm for cooling to low temperatures will involve passive cooling using lightweight deployable membranes that serve both as sunshields and V-groove radiators, in combination with active cooling using mechanical coolers operating down to 4 K. The Cooling Technology for Large Space Telescopes (LST) mission planned to develop and demonstrate a multi-layered sunshield, which is actively cooled by a multi-stage mechanical cryocooler, and further the models and analyses critical to scaling to future missions. The outer four layers of the sunshield cool passively by radiation, while the innermost layer is actively cooled to enable the sunshield to decrease the incident solar irradiance by a factor of more than one million. The cryocooler cools the inner layer of the sunshield to 20 K, and provides cooling to 6 K at a telescope mounting plate. The technology readiness level (TRL) of 7 will be achieved by the active cooling technology following the technology validation flight in Low Earth Orbit. In accordance with the New Millennium charter, tests and modeling are tightly integrated to advance the technology and the flight design for "ST-class" missions. Commercial off-the-shelf engineering analysis products are used to develop validated modeling capabilities to allow the techniques and results from LST to apply to a wide variety of future missions. The LST mission plans to "rewrite the book" on cryo-thermal testing and modeling techniques, and validate modeling techniques to scale to future space telescopes such as SAFIR.

DiPirro, Michael↗

Plans for the Meter Class Autonomous Telescope and Potential Coordinated Measurements with Kwajalein Radars

The National Aeronautics and Space Administration's (NASA) Orbital Debris Program Office is teaming with the US Air Force Research Laboratory's (AFRL) Maui Optical Site to deploy a moderate field-of-view, 1.3 m aperture, optical telescope for orbital debris applications. The telescope will be located on the island of Legan in the Kwajalein Atoll and is scheduled for completion in the Spring of 2011. The telescope is intended to sample both low inclination/high eccentricity orbits and near geosynchronous orbits. The telescope will have a 1 deg diagonal field-of-view on a 4K x 4K CCD. The telescope is expected to be able to detect 10-cm diameter debris at geosynchronous altitudes (5 sec exposure assuming a spherical specular phase function w/ albedo =0.13). Once operational, the telescope has the potential of conducting simultaneous observations with radars operated by the US Army at Kwajalein Atoll (USAKA) and located on the island of Roi-Namur, approximately 55 km to the north of Legan. Four radars, representing 6 frequency bands, are available for use: ALTAIR (ARPA-Long Range Tracking and Instrumentation Radar) operating at VHF & UHF, TRADEX (Target Resolution and Discrimination Experiment) operating at L-band and S-band, ALCOR (ARPA-Lincoln C-band Observables Radar) operating at S-band, and MMW (Millimeter Wave) Radar operating at Ka-band. Also potentially available is the X-band GBRP (Ground Based Radar-Prototype located 25 km to the southeast of Legan on the main island of Kwajalein.

Stansberry, Gene↗

Far Sidelobes Measurement of the Atacama Cosmology Telescope

The Atacama Cosmology Telescope (ACT) is a 6m telescope designed to map the Cosmic Microwave Background (CMB) simultaneously at 145GHz, 220 GHz and 280 GHz. Its off-axis Gregorian design is intended to minimize and control the off-axis sidelobe response, which is critical for scientific purposes. The expected sidelobe level for this kind of design is less than -50 dB and can be challenging to measure. Here we present a measurement of the 145 GHz far sidelobes of ACT done on the near-field of the telescope. We used a 1 mW microwave source placed 13 meters away from the telescope and a chopper wheel to produce a varying signal that could be detected by the camera for different orientations of the telescope. The source feed was designed to produce a wide beam profile. Given that the coupling is expected to be dominated by diffraction over the telescope shielding structure, when combined with a measurements of the main beam far field response, these measurement can be used to validate elements of optical design and constrain the level of spurious coupling at large angles. Our results show that the diffractive coupling beyond the ground screen is consistently below -75 dB, satisfying the design expectations.

Duenner, Rolando↗

Hartman Testing of X-Ray Telescopes

Hartmann testing of x-ray telescopes is a simple test method to retrieve and analyze alignment errors and low-order circumferential errors of x-ray telescopes and their components. A narrow slit is scanned along the circumference of the telescope in front of the mirror and the centroids of the images are calculated. From the centroid data, alignment errors, radius variation errors, and cone-angle variation errors can be calculated. Mean cone angle, mean radial height (average radius), and the focal length of the telescope can also be estimated if the centroid data is measured at multiple focal plane locations. In this paper we present the basic equations that are used in the analysis process. These equations can be applied to full circumference or segmented x-ray telescopes. We use the Optical Surface Analysis Code (OSAC) to model a segmented x-ray telescope and show that the derived equations and accompanying analysis retrieves the alignment errors and low order circumferential errors accurately.

Saha, Timo T.↗

JWST Telescope Integration and Test Progress

The James Webb Space Telescope (JWST) is a 6.5m, segmented, IR telescope that will explore the first light of the universe after the big bang. The JWST Optical Telescope Element (Telescope) integration and test program is well underway. The telescope was completed in the spring of 2016 and the cryogenic test equipment has been through two optical test programs leading up to the final flight verification program. The details of the telescope mirror integration will be provided along with the current status of the flight observatory. In addition, the results of the two optical ground support equipment cryo tests will be shown and how these plans fold into the flight verification program.

Matthews, Gary W.↗

The Origins Space Telescope

The Universe has never been seen like this before. The window into the infrared opens only above Earth's atmosphere, and humanity has barely glimpsed outside. About half of the light emitted by stars, planets, and galaxies over the lifetime of the Universe emerges in the infrared. With an unparalleled sensitivity increase — up to a factor of 1,000 more than any previous or planned mission — the advance offered by the Origins Space Telescope (OST) is akin to that from the naked eye to humanity's first telescope, or from Galileo's first telescope to the first telescope in space. While key path-finding missions have glimpsed a rich infrared cosmos, extraordinary discovery space awaits; the time for a far-infrared revolution has begun.Are we alone or is life common in the Universe? OST will directly address this long-standing question by searching for signs of life in the atmospheres of potentially habitable terrestrial planets transiting M dwarf stars. How do planets become habitable? OST will trace the trail of cold water from the interstellar medium, through protoplanetary disks and into the outer reaches of our own Solar System. How do stars, galaxies, black holes and the elements of life form, from the cosmic dawn to today? With broad wavelength coverage and fast mapping speeds, OST will map millions of galaxies, simultaneously measuring star formation rates and black hole growth across cosmic time, peering deeper into the far reaches of the Universe than ever before.OST will be maintained at a temperature of 4 K, enabling its tremendous sensitivity gain, and will operate from 5 m to 600 m, encompassing the mid- and far-infrared. OST has two Mission Concepts: Concept 1 with a 9.1-m deployed off-axis primary, and Concept 2, described here, a non-deployed 5.9-m on-axis telescope with the equivalent collecting area of the James Webb Space Telescope (JWST). Concept 2 includes four instruments with capabilities for imaging (large surveys and pointed), spectroscopy (survey and high-resolution modes) and polarimetry, as well as an instrument for high-precision spectroscopy of transiting exoplanets. Concept 2 is optimized for maximum science return and minimal complexity, and offers fast mapping (approximately 60 arcseconds per second). We describe here the three key science themes for OST and the basic mission specifications.

Battersby, Cara↗