At least 181 records · Page 10

Annual Performance Assessment and Composite Analysis Review for the ICDF Landfill FY 2008

This report addresses low-level waste disposal operations at the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility (ICDF) landfill from the start of operations in Fiscal Year 2003 through Fiscal Year 2008. The ICDF was authorized in the Operable Unit 3-13 Record of Decision for disposal of waste from the Idaho National Laboratory Site CERCLA environmental restoration activities. The ICDF has been operating since 2003 in compliance with the CERCLA requirements and the waste acceptance criteria developed in the CERCLA process. In developing the Operable Unit 3-13 Record of Decision, U.S. Department of Energy Order (DOE) 435.1, 'Radioactive Waste Management', was identified as a 'to be considered' requirement for the ICDF. The annual review requirement under DOE Order 435.1 was determined to be an administrative requirement and, therefore, annual reviews were not prepared on an annual basis. However, the landfill has been operating for 5 years and, since the waste forms and inventories disposed of have changed from what was originally envisioned for the ICDF landfill, the ICDF project team has decided that this annual review is necessary to document the changes and provide a basis for any updates in analyses that may be necessary to continue to meet the substantive requirements of DOE Order 435.1. For facilities regulated under DOE Order 435.1-1, U.S. DOE Manual 435.1-1, 'Radioactive Waste Management', IV.P.(4)(c) stipulates that annual summaries of low-level waste disposal operations shall be prepared with respect to the conclusions and recommendations of the performance assessment and composite analysis. Important factors considered in this review include facility operations, waste receipts, and results from monitoring and research and development programs. There have been no significant changes in operations at the landfill in respect to the disposal geometry, the verification of waste characteristics, and the tracking of inventories against total limits that would affect the results and conclusions of the performance assessment. Waste receipts to date and projected waste receipts through Fiscal Year 2012 are both greater than the inventory assessed in the performance assessment and composite analysis. The waste forms disposed of to the landfill are different from the waste form (compacted soil) assessed in the performance assessment. The leak detection system and groundwater monitoring results indicate the landfill has not leaked. The results of the performance assessment/composite analysis are valid (i.e., there is still a reasonable expectation of meeting performance objectives) but the new information indicates less conservatism in the results than previously believed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Baseline Survey Report for the Title Transfer of the K-792 Switchyard Complex at the East Tennessee Technology Park, Oak Ridge, Tennessee

This environmental baseline survey (EBS) documents the baseline environmental conditions of the U. S. Department of Energy's (DOE's) K-792 Switchyard Complex, which includes the former K-792 Switchyard, the K-79 1-B building, the K-796-A building, and the K-792 Northern Expansion Area located in the northwestern portion of the East Tennessee Technology Park (ETTP). The total area of the property is approximately 19.91 acres. DOE is proposing to transfer the title of this land area and buildings to the Heritage Center, LLC (Heritage Center), a subsidiary corporation of the Community Reuse Organization of East Tennessee (CROET). This report provides supporting information for the transfer of this government-owned facility at ETTP to a non-federal entity. The area proposed for title transfer includes the former K-792 Switchyard, the K-792 Northern Expansion Area, Bldg. K-791-B, Bldg. K-796-A, and the underlying property known as the underlying fee. Located within the K-792 Switchyard footprint but not included in the transfer are Bldg. K-131 0-MP and Bldg. K- 131 0-MQ, two buildings owned by a private company that leases space in the northern portion of the Switchyard. The transfer footprint is bounded by Perimeter Road to the north and west, the parking area for Portal 8 to the south, and primarily the former K-792 Powerhouse Complex and Avenue 'U' North to the east; however, the eastern boundary along the Northern Expansion area has no physical features associated with it. Zone 2 remedial action objectives were developed by the DVS to support the future use of ETTP as a mixed-use commercial and industrial park. Therefore, remediation criteria were designed for the protection of the future industrial worker under the assumption the worker normally would not have the potential for exposure to soils at depths below 10 ft below ground surface (bgs). Accordingly, land use controls (LUCs) have been established to restrict disturbance of soils below 10 ft deep and to limit future land use to industriallcornmercial activities. Where the need for LUCs below 10 ft bgs is not warranted, this is so stated and explained. Once all actions associated with the DVS for Zone 1 and Zone 2 are completed and the data support it, there will be a re-evaluation with EPA and TDEC for the restriction on excavation below 10 ft. The DVS process and the preparation of this report included visual and physical inspections of the property and adjacent properties, a detailed records search, sampling and analysis of soils, radiological walkover surveys, and a risk evaluation. Resources evaluated as part of the records search included Federal Government records, title documents, aerial photographs that may reflect prior uses, and interviews with current and former employees 1 involved in the operations on the real property to identify any areas on the property where hazardous substances and petroleum products, or their derivatives, and acutely hazardous wastes were stored for one year or more, known to have been released, or disposed of. In addition, radiological surveys of Bldgs. K-791-B and K-796-A were conducted to assess the buildings radiological condition. Soil vapor sampling and polychlorinated biphenyl (PCB) swipe sampling also were conducted within the buildings. Based on the U. S. Department of Energy's (DOE's) review of the existing information, including discussions and interviews referenced herein, and evaluation of the data gathered in preparation of the environmental baseline survey (EBS) for the K-792 Switchyard Complex, DOE recommends the following: Due to the uncertainty associated with the nature of the on-site groundwater and the need to evaluate and possibly address groundwater in the future, DOE recommends that the transfer of the K-792 Switchyard Complex be achieved by a covenant deferral per the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) Sect. 120(h)(3)(c). Land use restrictions associated with the covenant deferral are described.

54 ENVIRONMENTAL SCIENCES↗

Y-12 National Security Complex Biological Monitoring and Abatement Program 2007 Calendar Yeare Report

The National Pollutant Discharge Elimination System (NPDES) permit issued for the Oak Ridge Y-12 National Security Complex (Y-12 Complex) which became effective May 1, 2006, continued a requirement for a Biological Monitoring and Abatement Program (BMAP). The BMAP was originally developed in 1985 to demonstrate that the effluent limitations established for the Y-12 Complex protected the classified uses of the receiving stream (East Fork Poplar Creek: EFPC), in particular, the growth and propagation of aquatic life (Loar et al. 1989). The objectives of the current BMAP are similar, specifically to assess stream ecological conditions relative to regulatory limits and criteria, to assess ecological impacts as well as recovery in response to Y-12 operations, and to investigate the causes of continuing impacts. The BMAP consists of three tasks that reflect complementary approaches to evaluating the effects of the Y-12 Complex discharges on the biotic integrity of EFPC. These tasks include: (1) bioaccumulation monitoring, (2) benthic macroinvertebrate community monitoring, and (3) fish community monitoring. As required by the NPDES permit, the BMAP benthic macroinvertebrate community monitoring task includes studies to annually evaluate the receiving stream's biological integrity in comparison to TN Water Quality Criteria. BMAP monitoring is currently being conducted at five primary EFPC sites, although sites may be excluded or added depending upon the specific objectives of the various tasks. Criteria used in selecting the sites include: (1) location of sampling sites used in other studies, (2) known or suspected sources of downstream impacts, (3) proximity to U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR) boundaries, (4) appropriate habitat distribution, and (5) access. The primary sampling sites include upper EFPC at kilometers (EFKs) 24.4 and 23.4 [upstream and downstream of Lake Reality (LR) respectively]; EFK 18.7 (also EFK 18.2 and 19), located off the ORR and below an area of intensive commercial and light industrial development; EFK 13.8, located upstream from the Oak Ridge Wastewater Treatment Facility (ORWTF); and EFK 6.3 located approximately 1.4 km below the ORR boundary (Fig. 1.1). Actual sampling locations on EFPC may differ slightly by task according to specific requirements of the task. Brushy Fork (BF) at kilometer (BFK) 7.6 and Hinds Creek at kilometer (HCK) 20.6 are the most commonly used reference sites for the Y-12 BMAP. Additional sites off the ORR are also occasionally used for reference, including Beaver Creek, Bull Run, Cox Creek, and Paint Rock Creek (Fig. 1.2). Summaries of the sampling designs for the three primary tasks of the Y-12 Complex BMAP for EFPC are presented in Tables 1.1-1.3. This report covers the 2007 study period, although data collected outside this time period are included as appropriate. To address the biological monitoring requirements for Bear Creek and McCoy Branch, CERCLA-funded data is summarized in Appendix A (for Bear Creek) and Appendix B (for McCoy Branch). Data for these two watersheds is provided herein to address Section IX of the NPDES Permit for Y-12, where 'Results of these CERCLA programs can be used to meet the biological monitoring requirements of this permit'. For potential comparison with instream biological measures, a summary of the toxicity testing results for Y-12 outfalls into upper EFPC is provided in Appendix C (these results have been previously reported).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Slug Test Characterization Results for Multi-Test/Depth Intervals Conducted During the Drilling of CERCLA Operable Unit OU ZP-1 Wells 299-W11-43, 299-W15-50, and 299-W18-16

The following report presents test descriptions and analysis results for multiple, stress level slug tests that were performed at selected test/depth intervals within three Operable Unit (OU) ZP-1 wells: 299-W11-43 (C4694/Well H), 299-W15-50 (C4302/Well E), and 299-W18-16 (C4303/Well D). These wells are located within south-central region of the Hanford Site 200-West Area (Figure 1.1). The test intervals were characterized as the individual boreholes were advanced to their final drill depths. The primary objective of the hydrologic tests was to provide information pertaining to the areal variability and vertical distribution of hydraulic conductivity with depth at these locations within the OU ZP-1 area. This type of characterization information is important for predicting/simulating contaminant migration (i.e., numerical flow/transport modeling) and designing proper monitor well strategies for OU and Waste Management Area locations.

54 ENVIRONMENTAL SCIENCES↗

Annual Report for 2008 - 2009 Detection Monitoring at the Environmental Management Waste Management Facility, Oak Ridge, Tennessee

This annual Environmental Monitoring Report (EMR) presents results of environmental monitoring performed during fiscal year (FY) 2009 (October 1, 2008 - September 30, 2009) at the Environmental Management Waste Management Facility (EMWMF). The EMWMF is an operating state-of-the-art hazardous waste landfill located in Bear Creek Valley (BCV) west of the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee (Appendix A, Fig. A.1). Opened in 2002 and operated by a DOE prime contractor, Bechtel Jacobs Company LLC (BJC), the EMWMF was built specifically to accommodate disposal of acceptable solid wastes generated from Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial actions for former waste sites and buildings that have been impacted by past DOE operations on the ORR and at DOE sites off the ORR within the state of Tennessee. Environmental monitoring at the EMWMF is performed to detect and monitor the impact of facility operations on groundwater, surface water, stormwater, and air quality and to determine compliance with applicable or relevant and appropriate requirements (ARARs) specified in governing CERCLA decision documents. Annually, the EMR presents an evaluation of the groundwater, surface water, stormwater, and air monitoring data with respect to the applicable EMWMF performance standards. The purpose of the evaluation is to: (1) identify monitoring results that indicate evidence of a contaminant release from the EMWMF to groundwater, surface water, stormwater, or air, and (2) recommend appropriate changes to the associated sampling and analysis requirements, including sampling locations, methods, and frequencies; field measurements; or laboratory analytes that may be warranted in response to the monitoring data. Sect. 2 of this annual EMR provides background information relevant to environmental monitoring at the landfill, including short descriptions of the facility, the hydrogeologic setting, CERCLA decision document requirements for environmental monitoring, and a summary of the EMWMF monitoring history to date. Sect. 3 identifies the respective groundwater, surface water, stormwater, and air monitoring locations at the EMWMF and outlines the associated sampling frequencies, field measurements, and laboratory analytes. Sect. 4 presents a concise technical evaluation of the groundwater, surface water, stormwater, and air monitoring data. Sect. 5 summarizes key monitoring results and data evaluation conclusions along with any recommended changes to groundwater, surface water, stormwater, or air monitoring at the EMWMF. Sect. 6 lists the documents and other technical reports referenced in the preceding narrative sections. Maps and other illustrations referenced in the narrative sections of this annual EMR are in Appendix A. Referenced summary tables of FY 2009 environmental monitoring data are in Appendix B (Groundwater), Appendix C (Surface Water), Appendix D (Stormwater), and Appendix E (Ambient Air).

54 ENVIRONMENTAL SCIENCES↗

Environmental Baseline Survey Report for the Title Transfer of Land Parcel ED-4 at the East Tennessee Technology Park, Oak Ridge, Tennessee

This environmental baseline survey (EBS) report documents the baseline environmental conditions of a land parcel referred to as 'ED-4' (ED-4) at the U. S. Department of Energy's (DOE's) East Tennessee Technology Park (ETTP). DOE is proposing to transfer the title of this land to the Heritage Center, LLC. Parcel ED-4 is a land parcel that consists of two noncontiguous areas comprising a total of approximately 18 acres located east of the ETTP. The western tract of ED-4 encompasses approximately 8.5 acres in the northeastern quadrant of the intersection of Boulevard Road and Highway 58. The eastern tract encompasses an area of approximately 9.5 acres in the northwestern quadrant of the intersection of Blair Road and Highway 58 (the Oak Ridge Turnpike). Aerial photographs and site maps from throughout the history of the ETTP, going back to its initial development in the 1940s as the Oak Ridge Gaseous Diffusion Plant (ORGDP), indicate that this area has been undeveloped woodland with the exception of three support facilities for workers constructing the ORGDP since federal acquisition in 1943. These three support facilities, which were located in the western tract of ED-4, included a recreation hall, the Town Hall Camp Operations Building, and the Property Warehouse. A railroad spur also formerly occupied a portion of Parcel ED-4. These former facilities only occupied approximately 5 percent of the total area of Parcel ED-4. This report provides supporting information for the transfer of this government-owned property at ETTP to a non-federal entity. This EBS is based upon the requirements of Sect. 120(h) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). In order to support a Clean Parcel Determination (CPD) in accordance with CERCLA Sect. 120(h)(4)(d), groundwater and sediment samples were collected within, and adjacent to, the Parcel ED-4 study area. The potential for DOE to make a CPD for ED-4 is further supported by a No Further Investigation (NFI) determination made on land that adjoins ED-4 to the east (DOE 1997a) and to the south (DOE 1997b).

54 ENVIRONMENTAL SCIENCES↗

Slug Test Characterization Results for Multi-Test/Depth Intervals Conducted During the Drilling of CERCLA Operable Unit OU UP-1 Wells 299-W19-48, 699-30-66, and 699-36-70B

This report presents test descriptions and analysis results for multiple, stress-level slug tests that were performed at selected test/depth intervals within three Operable Unit (OU) UP-1 wells: 299-W19-48 (C4300/Well K), 699-30-66 (C4298/Well R), and 699-36-70B (C4299/Well P). These wells are located within, adjacent to, and to the southeast of the Hanford Site 200-West Area. The test intervals were characterized as the individual boreholes were advanced to their final drill depths. The primary objective of the hydrologic tests was to provide information pertaining to the areal variability and vertical distribution of hydraulic conductivity with depth at these locations within the OU UP-1 area. This type of characterization information is important for predicting/simulating contaminant migration (i.e., numerical flow/transport modeling) and designing proper monitor well strategies for OU and Waste Management Area locations.

54 ENVIRONMENTAL SCIENCES↗

Waste Isolation Pilot Plant Biennial Environmental Compliance Report

This biennial environmental compliance report (BECR), the eighth to be issued, documents United States (U.S.) Department of Energy (DOE) compliance with environmental regulations at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste and mixed TRU waste. TRU waste is radioactive waste that contains alpha-emitting radionuclides of atomic number greater than 92, with half lives longer than 20 years, and which are present in concentrations greater than 100 nanocuries per gram of waste. The BECR meets the requirements of the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201, WIPP Land Withdrawal Act Amendments of 1996.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Biennial Environmental Compliance Report

This biennial environmental compliance report (BECR), the ninth to be issued, documents United States (U.S.) Department of Energy (DOE) compliance with environmental regulations at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste and mixed TRU waste. TRU waste is radioactive waste which contains alpha-emitting radionuclides of atomic number greater than 92, with half lives longer than 20 years, and which are present in concentrations greater than 100 nanocuries per gram of waste. The BECR meets the requirements of the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201, WIPP Land Withdrawal Act Amendments of 1996).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Groundwater Impacts to Support the National Environmental Policy Act Environmental Assessment for the INL Remote-Handled Low-Level Waste Disposal Project

The groundwater impacts have been analyzed for the proposed RH-LLW disposal facility. A four-step analysis approach was documented and applied. This assessment compared the predicted groundwater ingestion dose to the more restrictive of either the 25 mrem/yr all pathway dose performance objective, or the maximum contaminant limit performance objective. The results of this analysis indicate that the groundwater impacts for either proposed facility location are expected to be less than the performance objectives. The analysis was prepared to support the NEPA-EA for the top two ranking of the proposed RH-LLW sites. As such, site-specific conditions were incorporated for each set of results generated. These site-specific conditions were included to account for the transport of radionuclides through the vadose zone and through the aquifer at each site. Site-specific parameters included the thickness of vadose zone sediments and basalts, moisture characteristics of the sediments, and aquifer velocity. Sorption parameters (Kd) were assumed to be very conservative values used in Track II analysis of CERCLA sites at INL. Infiltration was also conservatively assumed to represent higher rates corresponding to disturbed soil conditions. The results of this analysis indicate that the groundwater impacts for either proposed facility location are expected to be less than the performance objectives.

99 GENERAL AND MISCELLANEOUS↗

Y-12 National Security Complex Biological Monitoring And Abatement Program 2008 Calendar Year Report

The National Pollutant Discharge Elimination System (NPDES) permit issued for the Oak Ridge Y-12 National Security Complex (Y-12 Complex) which became effective May 1, 2006, continued a requirement for a Biological Monitoring and Abatement Program (BMAP). The BMAP was originally developed in 1985 to demonstrate that the effluent limitations established for the Y-12 Complex protected the classified uses of the receiving stream (East Fork Poplar Creek: EFPC), in particular, the growth and propagation of aquatic life (Loar et al. 1989). The objectives of the current BMAP are similar, specifically to assess stream ecological conditions relative to regulatory limits and criteria, to assess ecological impacts as well as recovery in response to Y-12 operations, and to investigate the causes of continuing impacts. The BMAP consists of three tasks that reflect complementary approaches to evaluating the effects of the Y-12 Complex discharges on the biotic integrity of EFPC. These tasks include: (1) bioaccumulation monitoring, (2) benthic macroinvertebrate community monitoring, and (3) fish community monitoring. As required by the NPDES permit, the BMAP benthic macroinvertebrate community monitoring task includes studies to annually evaluate the receiving stream's biological integrity in comparison to TN Water Quality Criteria. BMAP monitoring is currently being conducted at five primary EFPC sites, although sites may be excluded or added depending upon the specific objectives of the various tasks. Criteria used in selecting the sites include: (1) location of sampling sites used in other studies, (2) known or suspected sources of downstream impacts, (3) proximity to U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR) boundaries, (4) appropriate habitat distribution, and (5) access. The primary sampling sites include upper EFPC at kilometers (EFKs) 24.4 and 23.4 [upstream and downstream of Lake Reality (LR) respectively]; EFK 18.7 (also EFK 18.2 and 19), located off the ORR and below an area of intensive commercial and light industrial development; EFK 13.8, located upstream from the Oak Ridge Wastewater Treatment Facility (ORWTF); and EFK 6.3 located approximately 1.4 km below the ORR boundary (Fig. 1.1). Actual sampling locations on EFPC may differ slightly by task according to specific requirements of the task. Brushy Fork (BF) at kilometer (BFK) 7.6 and Hinds Creek at kilometer (HCK) 20.6 are the most commonly used reference sites for the Y-12 BMAP. Additional sites off the ORR are also occasionally used for reference, including Beaver Creek, Bull Run, Cox Creek, and Paint Rock Creek (Fig. 1.2). Summaries of the sampling designs for the three primary tasks of the Y-12 Complex BMAP for EFPC are presented in Tables 1.1-1.3. This report covers the 2008 period, although data collected outside this time period are included as appropriate. To address the biological monitoring requirements for Bear Creek and McCoy Branch, CERLCA-funded programs, data are summarized in Appendix A and Appendix B respectively. Data for these two watersheds are provided herein to address Section IX of the NPDES Permit for Y-12, where 'Results of these CERCLA programs can be used to meet the biological monitoring requirements of this permit...'. A summary of the toxicity testing results for Y-12 outfalls into upper EFPC is provided in Appendix C (these results have been previously reported) to provide a more thorough perspective of conditions in the stream. Data summarized in this report are available from the Oak Ridge Environmental Information system (OREIS) in an Arc-GIS usable format (http://www-oreis.bechteljacobs.org/oreis/help/oreishome.html). Per requirements specified in the NPDES permit, data collected following TDEC monitoring protocols (TDEC 2006) is also submitted directly to TDEC in Excel format.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Source apportionment: findings from the US supersites program

Receptor models are used to identify and quantify source contributions to particulate matter and volatile organic compounds based on measurements of many chemical components at receptor sites. These components are selected based on their consistent appearance in some source types and their absence in others. UNMIX, positive matrix factorization (PMF), and effective variance are different solutions to the chemical mass balance (CMB) receptor model equations and are implemented on available software. In their more general form, the CMB equations allow spatial, temporal, transport, and particle size profiles to be combined with chemical source profiles for improved source resolution. Although UNMIX and PMF do not use source profiles explicitly as input data, they still require measured profiles to justify their derived source factors. The U.S. Supersites Program provided advanced datasets to apply these CMB solutions in different urban areas. Still lacking are better characterization of source emissions, new methods to estimate profile changes between source and receptor, and systematic sensitivity tests of deviations from receptor model assumptions. 154 refs.

02 PETROLEUM↗

USE OF CEMENTITIOUS MATERIALS FOR SRS REACTOR FACILITY IN-SITU DECOMMISSIONING - 11620

The United States Department of Energy (US DOE) concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate in tact, structurally sound facilities that are no longer needed for their original purpose of, i.e., producing (reactor facilities), processing (isotope separation facilities) or storing radioactive materials. The Savannah River Site 105-P and 105-R Reactor Facility ISD requires about 250,000 cubic yards of grout to fill the below grade structure. The fills are designed to prevent subsidence, reduce water infiltration, and isolate contaminated materials. This work is being performed as a Comprehensive Environmental Response, Compensations and Liability Act (CERCLA) action and is part of the overall soil and groundwater completion projects for P- and R-Areas. Cementitious materials were designed for the following applications: (1) Below grade massive voids/rooms: Portland cement-based structural flowable fills for - Bulk filling, Restricted placement and Underwater placement. (2) Special below grade applications for reduced load bearing capacity needs: Cellular portland cement lightweight fill (3) Reactor vessel fills that are compatible with reactive metal (aluminum metal) components in the reactor vessels: Calcium sulfoaluminate flowable fill, and Magnesium potassium phosphate flowable fill. (4) Caps to prevent water infiltration and intrusion into areas with the highest levels of radionuclides: Portland cement based shrinkage compensating concrete. A system engineering approach was used to identify functions and requirements of the fill and capping materials. Laboratory testing was performed to identify candidate formulations and develop final design mixes. Scale-up testing was performed to verify material production and placement as well as fresh and cured properties. The 105-P and 105-R ISD projects are currently in progress and are expected to be complete in 2012. The focus of this paper is to describe the (1) grout mixes for filling the reactor vessels, and (2) a specialty grout mix to fill a selected portion of the P-Reactor Disassembly Basin. Details of the grout mixes designed for ISD of he SRS Reactor Disassembly Basins and below grade portions of the 105-Buildings was described elsewhere. Material property test results, placement strategies, full-scale production and delivery systems will also be described.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Integrating intrusive and nonintrusive characterization methods to achieve a conceptual site model for the SLDA FUSRAP site - 8265.

The US Army Corps of Engineers (USACE) is addressing radiological contamination following Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements at the Shallow Land Disposal Area (SLDA) site, which is a radiologically contaminated property that is part of the Formerly utilized Sites Remedial Action Program (FUSRAP). The SLDA is an 18-hectare (44-acre) site in Parks township, Armstrong County, Pennsylvania, about 37 kilometers (23 miles) east-northeast of Pittsburgh. According to historical record, radioactive wastes were disposed of at the SLDA in a series of trenches by the Nuclear Materials and Equipment Company (NUMEC) in the 1960s. The wastes originated from the nearby Apollo nuclear fuel fabrication facility, which began operations under NUMEC in the late 1950s and fabricated enriched uranium into naval reactor fuel elements. It is believed that the waste materials were buried in a series of pits constructed adjacent to one another in accordance with an Atomic Energy Commission (AEC) regulation that has since been rescinded. A CERCLA remedial investigation/feasibility study (RI/FS) process was completed for the SLDA site, and the results of the human health risk assessment indicated that the radiologically contaminated wastes could pose a risk to human health in the future. There are no historical records that provide the exact location of these pits. However, based on geophysical survey results conducted in the 1980s, these pits were defined by geophysical anomalies and were depicted on historical site drawings as trenches. At the SLDA site, a combination of investigative methods and tools was used in the RI/FS and site characterization activities. The SLDA site provides an excellent example of how historical documents and data, historical aerial photo analysis, physical sampling, and nonintrusive geophysical and gamma walkover surveys were used in combination to reduce the uncertainty in the location of the trenches. The data and information from these sources were used to refine the conceptual site model, complete the RI/FS, and support the ongoing remedial design and action, which will achieve site closure acceptable to all stakeholders.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ESTABLISHING FINAL END STATE FOR A RETIRED NUCLEAR WEAPONS PRODUCTION REACTOR; COLLABORATION BETWEEN STAKEHOLDERS, REGULATORS, AND THE FEDERAL GOVERNMENT - 11052

The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River (SRS) near Aiken, South Carolina. Nuclear weapons material production began in the early 1950s, utilizing five production reactors. In the early 1990s all SRS production reactor operations were terminated. The first reactor closure end state declaration was recently institutionalized in a Comprehensive Environmental Response and Compensation and Liability Act (CERCLA) Early Action Record of Decision. The decision for the final closure of the 318,000 square foot 105-P Reactor was determined to be in situ decommissioning (ISD). ISD is an acceptable and cost effective alternative to off-site disposal for the reactor building, which will allow for consolidation of remedial action wastes generated from other cleanup activities within the P Area. ISD is considered protective by the regulators, U. S. Environmental Protection Agency (US EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC), public and stakeholders as waste materials are stabilized/immobilized, and radioactivity is allowed to naturally decay, thus preventing future exposure to the environment. Stakeholder buy-in was critical in the upfront planning in order to achieve this monumental final decision. Numerous public meetings and workshops were held in two different states (covering a 200 mile radius) with stakeholder and SRS Citizens Advisory Board participation. These meetings were conducted over an eight month period as the end state decision making progressed. Information provided to the public evolved from workshop to workshop as data became available and public input from the public meetings were gathered. ISD is being considered for the balance of the four SRS reactors and other hardened facilities such as the chemical Separation Facilities (canyons).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

ACCELERATED PILOT PROJECT FOR U CANYON DEMOLITION

At the U.S. Department of Energy's Hanford Site in southeast Washington State, CH2M HILL Plateau Remediation Company (CH2M HILL) is underway on a first-of-a-kind project with the decommissioning and demolition of the U Canyon. Following the U.S. Environmental Protection Agency's Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) Record of Decision for the final remediation of the canyon, CH2M HILL is combining old and new technology and techniques to prepare U Canyon for demolition. The selected remedial action called first for consolidating and grouting equipment currently in the canyon into lower levels of the plant (openings called cells), after which the cell galleries, hot pipe trench, ventilation tunnel, drains and other voids below the operating deck and crane-way deck levels will be filled with approximately 20,000 cubic yards of grout and the canyon roof and walls demolished down to the approximate level of the canyon deck. The remaining canyon structure will then be buried beneath an engineered barrier designed to control potential contaminant migration for a 500-year life. Methods and lessons learned from this project will set the stage for the future demolition of Hanford's four other canyon-type processing facilities.

54 ENVIRONMENTAL SCIENCES↗

HEAVY WATER COMPONENTS TEST REACTOR DECOMMISSIONING

The Heavy Water Components Test Reactor (HWCTR) Decommissioning Project was initiated in 2009 as a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Removal Action with funding from the American Recovery and Reinvestment Act (ARRA). This paper summarizes the history prior to 2009, the major D&D activities, and final end state of the facility at completion of decommissioning in June 2011. The HWCTR facility was built in 1961, operated from 1962 to 1964, and is located in the northwest quadrant of the Savannah River Site (SRS) approximately three miles from the site boundary. The HWCTR was a pressurized heavy water test reactor used to develop candidate fuel designs for heavy water power reactors. In December of 1964, operations were terminated and the facility was placed in a standby condition as a result of the decision by the U.S. Atomic Energy Commission to redirect research and development work on heavy water power reactors to reactors cooled with organic materials. For about one year, site personnel maintained the facility in a standby status, and then retired the reactor in place. In the early 1990s, DOE began planning to decommission HWCTR. Yet, in the face of new budget constraints, DOE deferred dismantlement and placed HWCTR in an extended surveillance and maintenance mode. The doors of the reactor facility were welded shut to protect workers and discourage intruders. In 2009 the $1.6 billion allocation from the ARRA to SRS for site footprint reduction at SRS reopened the doors to HWCTR - this time for final decommissioning. Alternative studies concluded that the most environmentally safe, cost effective option for final decommissioning was to remove the reactor vessel, both steam generators, and all equipment above grade including the dome. The transfer coffin, originally above grade, was to be placed in the cavity vacated by the reactor vessel and the remaining below grade spaces would be grouted. Once all above equipment including the dome was removed, a concrete cover was to be placed over the remaining footprint and the groundwater monitored for an indefinite period to ensure compliance with environmental regulations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

NEW MATERIALS DEVELOPED TO MEET REGULATORY AND TECHNICAL REQUIREMENTS ASSOCIATED WITH IN-SITU DECOMMISSIONING OF NUCLEAR REACTORS AND ASSOCIATED FACILITIES

For the 2010 ANS Embedded Topical Meeting on Decommissioning, Decontamination and Reutilization and Technology, Savannah River National Laboratory's Mike Serrato reported initial information on the newly developed specialty grout materials necessary to satisfy all requirements associated with in-situ decommissioning of P-Reactor and R-Reactor at the U.S. Department of Energy's Savannah River Site. Since that report, both projects have been successfully completed and extensive test data on both fresh properties and cured properties has been gathered and analyzed for a total of almost 191,150 m{sup 3} (250,000 yd{sup 3}) of new materials placed. The focus of this paper is to describe the (1) special grout mix for filling the P-Reactor vessel (RV) and (2) the new flowable structural fill materials used to fill the below grade portions of the facilities. With a wealth of data now in hand, this paper also captures the test results and reports on the performance of these new materials. Both reactors were constructed and entered service in the early 1950s, producing weapons grade materials for the nation's defense nuclear program. R-Reactor was shut down in 1964 and the P-Reactor in 1991. In-situ decommissioning (ISD) was selected for both facilities and performed as Comprehensive Environmental Response, Compensations and Liability Act actions (an early action for P-Reactor and a removal action for R-Reactor), beginning in October 2009. The U.S. Department of Energy concept for ISD is to physically stabilize and isolate intact, structurally robust facilities that are no longer needed for their original purpose of producing (reactor facilities), processing (isotope separation facilities), or storing radioactive materials. Funding for accelerated decommissioning was provided under the American Recovery and Reinvestment Act. Decommissioning of both facilities was completed in September 2011. ISD objectives for these CERCLA actions included: (1) Prevent industrial worker exposure to radioactive or hazardous contamination exceeding Principal Threat Source Material levels; (2) Minimize human and ecological exposure to unacceptable risk associated with radiological and hazardous constituents that are or may be present; (3) Prevent to the extent practicable the migration of radioactive or hazardous contaminants from the closed facility to the groundwater so that concentrations in groundwater do not exceed regulatory standards; (4) Eliminate or control all routes of human exposure to radiological and chemical contamination; and (5) Prevent animal intruder exposure to radioactive and hazardous contamination.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗