High-Voltage DC MULTI-terminal SIMulation (HVDC MULTISIM): Technical Program Summary

Expansion of the power grid in the USA is essential to fulfilling the rising energy demand of the country. In particular, the transmission grid, a network of electrical energy corridors that enable the flow of large amounts of energy from the point of generation to the point of consumption, needs significant expansion to cater to this growth of electrification. The current infrastructure is also dated, and any new transmission corridor should be based on a vision of building a modern infrastructure that is futureproof. High voltage DC (HVDC) transmission technology falls in this category: it is the most economical way to build large transmission lines and relies on sophisticated electronics and flexible controls, rather than just passive components like switchgear and transformers. This project is aimed at establishing the technical and economic feasibility of a network of HVDC lines that are interconnected to form a multi-terminal DC network. HVDC transmission is not a new technology and United States has a number of such lines; however, these are point to point transmissions and do not form a DC grid. Modeling and analyzing DC grids is challenging since there are no established modeling tools and the traditional ways of modeling AC grids fall short of providing the fidelity required the fast dynamics of the DC grid. This project aims to build a software-in-the-loop simulator for a multi-terminal HVDC grid, called MULTISIM and, establish new control and protection algorithms to operate such a connected DC system. NLR, a key partner, established the core framework of the MULTISIM simulator and validated its functionality. The GE Vernova team, created a full-scale model of a four-terminal HVDC network using PSCAD (Power Systems Computer Aided Design) software and established the baseline performance of the system during normal and fault operation. The project was started on 10/12024 with a kick-off meeting held on 12/11/2024 and ran through two quarters till termination. All the tasks, milestones and deliverables during this period were met. Several interim reports detailing the various tasks were submitted. The following sections provide details on the completed tasks till the project pause and termination after Q2.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A National Infrastructure for Artificial Intelligence on the Grid (NI4AI) (Final Scientific/Technical Report)

Electric utilities have traditionally taken a very pragmatic yet myopic approach with grid sensors and the resulting collected data. Sensors are purchased and deployed to solve a specific, known problem that has risen to sufficient awareness as to justify the effort of deploying sensors and the needed capital investment. This sensor data flows into proprietary software packages with limited functionality intended only to address the initial problem. This approach aligns with the financial incentives of the utility to deploy capital into fixed hardware assets for which the corporations earn a rate of return. This mentality stands in stark contrast to the big data revolution that started nearly 25 years ago with the rise of Google. In this worldview, data is a fundamental business asset; successful organizations collect, store, explore, merge, and exploit as much data as possible to not only solve problems well understood today but also to tackle new problems that will inevitably rise tomorrow. The ARPA-E Open Innovation 2018 project entitled A National Infrastructure for Artificial Intelligence on the Grid or NI4AI for short was designed to demonstrate this alternative paradigm for using data. To do this, the project was composed of three key thrust areas. The first major component deployed a variety of high-frequency grid sensors and captured terabytes of both wide-scale and localized grid measurements, generating high-value datasets for grid research and algorithm development. The second aspect made available PingThings’ PredictiveGridTM, a horizontally scalable, cloud-based data management and AI platform built for time series data to explore and exploit the collected data. Finally, the project fostered a diverse and open research community composed of experts from numerous fields through focused educational content, code sharing, and data science competitions. Shifting away from “single use” sensors and closed data silos within electric utilities is a major benefit to the public at large. This legacy approach to data is incredibly (1) capital intensive (new sensors must be deployed for each new problem and problems tend to arise continuously) and (2) painfully slow (new problems must be identified first and then new sensors must be deployed to collect data to begin to address the issue). The transition to a carbon neutral grid requires a massive transformation of the existing grid infrastructure and will continue to challenge the legacy grid in unforeseen ways. The only way to make the energy transition cost effective is for utilities to abandon this dated data paradigm and adopt more contemporary approaches. NI4AI has shown that it is technically possible and economically feasible to ingest, explore, and exploit grid data collected from even very high frequency sensing, such as continuous point on wave sensors collecting measurements 10,000 times a second. In fact, the PredictiveGrid platform used is commercially available and deployed at several utilities in the United States. Project accomplishments were numerous and included (1) making available a state of the art time series platform to the community, (2) collecting over 520 streams of time series data from grid sensors totaling over 1 trillion grid measurements, and (3) developing and nurturing a community within the industry focused on the use of data to create value for utilities and, ultimately, end consumers.

97 MATHEMATICS AND COMPUTING↗

Medium and Heavy Duty Vehicle Powertrain Electrification and Fleet Demonstration

The Contract Award Grant # EE0007513 dated 2 June, 2016 is for the design, development and demonstration of medium duty package delivery vehicles that will result in a 100% increase in fuel economy as measured in miles per gallon. The project was proposed in 3 phases over two budget periods. The Phases were: 1. Modeling and Simulation – This phase was completed and formed the basis of the specifications for the design and build of the physical systems. The modeling and simulation was conducted by AVL and used real world package delivery routes that AVL mapped. The motors, battery pack, range extender and balance of plant support systems were modeled and iterated until a system with the desired fuel economy improvement was realized. Early design of the major subsystems using the actual vehicle space constraints was also completed. This phase was successfully completed in May of 2017. 2. 1st Build and FE Confirmation - This phase was completed and resulted in the final design, release, procurement and build of all major vehicle systems for commissioning into the first vehicle. The work was a partnered effort between McLaren and AVL. McLaren built the eAxle system while AVL built the range extender and integrated the range extender, battery and balance of plant sub-systems into the first vehicle with a control system to make it operate. Prior to the end of this phase a real world HIL system test gave evidence that the fuel economy improvement would be achieved in the real world. This phase was exited with a 7 month delay due mostly to procurement and supply base issues and ended in May, 2018. 3. Final Build and Demonstration - This phase included the final build and commissioning of the four program vehicles and the operation of a demonstration on a set of routes near San Diego California. During this phase, a multitude of issues arose in different systems in the vehicle. These issue resolution exercises were quite complex and caused repeated delays but were all successfully completed. It should also be noted that an early commercialization analysis resulted in the conclusion that the complexity of the system would not make it cost effective, leading to the start of a follow-on design that used newly available component technologies to specify a more cost effective system. This design will be repurposed and put into demonstration on a separately (non-DOE) funded program. It was decided and agreed with DOE that this phase should be considered completed. The knowledge and know-how gained on this program has been incorporated into and transferred to the new program. This phase and the entire program was considered closed on June 1, 2021.

33 ADVANCED PROPULSION SYSTEMS↗

A novel open-source cultivation system helps establish the first full cycle chemosynthetic symbiosis model system involving the giant ciliate Zoothamnium niveum

Symbiotic interactions drive species evolution, with nutritional symbioses playing vital roles across ecosystems. Chemosynthetic symbioses are globally distributed and ecologically significant, yet the lack of model systems has hindered research progress. The giant ciliate Zoothamnium niveum and its sulfur-oxidizing symbionts represent the only known chemosynthetic symbiosis with a short life span that has been transiently cultivated in the laboratory. While it is experimentally tractable and presents a promising model system, it currently lacks an open-source, simple, and standardized cultivation setup. Following the FABricated Ecosystems (EcoFABs) model, we leveraged 3D printing and polydimethylsiloxane (PDMS) casting to develop simple flow-through cultivation chambers that can be produced and adopted by any laboratory. The streamlined manufacturing process reduces production time by 86% and cuts cost by tenfold compared to the previous system. Benchmarking using previously established optimal growth conditions, the new open-source cultivation system proves stable, efficient, more autonomous, and promotes a more prolific growth of the symbiosis. For the first time, starting from single cells, we successfully cultivated the symbiosis in flow-through chambers for 20 days, spanning multiple generations of colonies that remained symbiotic. They were transferred from chamber to chamber enabling long-term cultivation and eliminating the need for continuous field sampling. The chambers, optimized for live imaging, allowed detailed observation of the synchronized growth between the host and symbiont. Highlighting the benefit of this new system, we here describe a new step in the first hours of development where the host pauses growth, expels a coat, before resuming growth, hinting at a putative symbiont selection mechanism early in the colony life cycle. With this simple, open-source, cultivation setup, Z. niveum holds promises for comparative studies, standardization of research and wide adoption by the symbiosis research community.

59 BASIC BIOLOGICAL SCIENCES↗

Evaluation of a Surface Spill Operation to Return Adult Steelhead Overshoots Downstream of McNary Dam

This study, funded by the U.S. Army Corps of Engineers (USACE), was conducted by the Pacific Northwest National Laboratory to evaluate the efficacy of operating one Top Spill Weir (TSW) at McNary Dam outside the normal TSW operation dates for juvenile salmon passage. Of interest is whether the TSW is an effective downstream passage route for adult steelhead overshoots. Overshoots are fish which, having passed upstream at McNary Dam, must pass downstream to return to their natal stream to spawn. This report covers Fall (2019) and Spring (2020) study periods. The study design arranged the available 24 hours of TSW spill per week into weekly blocks with sub-blocks differentiated into day and night operations with TSW discharge periods of 4- and 8-hours duration. Hydroacoustic techniques were used to sample adult fish passage at the TSW and at turbine units 1 and 10. The experimental design contrasted TSW spill periods of differing duration and at different times of the day. The small number of fish detected passing the TSW, and the smaller number of fish detected passing the turbine units, were best suited to an ad hoc, exploratory approach to evaluating the effect of TSW spill. It is worthwhile to note that the operations data obtained for the fall study period had a greater than expected number of gaps and apparent anomalies that we believe were a result of how the data were aggregated. These problems are not particularly problematic for the present study, because the available data still provide a good indication of whether the TSW was operating at each point in time. TSW flows in both fall and spring data sets were able to be cleaned up using the established relationship between forebay elevation and TSW discharge rate. Additional cleanup of operations data would be needed, however, if more quantitative evaluation of dam-wide flow and passage relationships were needed. This study contrasted TSW spill periods of differing duration and at different times of the day. The small number of fish detected passing the TSW, and the smaller number of fish detected passing the turbine units were best suited to an ad hoc, exploratory approach to evaluating the effect of TSW spill. Spring adult steelhead passage numbers estimated using hydroacoustics were notably lower than during the fall study period, and that was consistent with our analysis of PIT tagged fish likely to be in the vicinity during each study period. Detections of fish in BlueView sampling areas upstream of the TSW and powerhouse were not correlated with detections of fish passing hydroacoustic sampling areas, which suggests that fish approaching the face of the dam can move around the forebay before passing. Other fish detected in the forebay in large numbers, such as shad, were able to be filtered out of steelhead passage counts and did not appear to be influencing hydroacoustic passage rate estimates. A pulse of passage at the initial TSW opening was weakly evident, but trends across 4- and 8-hour operational periods did not show a distinct decline in passage over time as TSW operation continued. Our findings do not indicate a reason to choose one 8-hour period over two 4-hour periods, or vice versa. This suggests that the duration of spill periods can be chosen based on operational or other considerations. Passage rates were consistently higher during the daytime TSW discharge periods, relative to nighttime TSW discharge periods. The experimental design of the current study used start times near dawn for day periods and near dusk for night periods.

59 BASIC BIOLOGICAL SCIENCES↗