Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Solar Industrial Process Heat”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

170 records · Page 10

Improved Performance of Cu(InGa)(SeS) 2 PV Modules Using the Reaction of Metal Precursors. Final Report

This project “Improved Performance of Cu(InGa)(SeS) 2 PV Modules using the Reaction of Metal Precursors” was a partnership led by the Institute of Energy Conversion (IEC) at the University of Delaware with Columbia University and the Molecular Foundry at the Lawrence Berkeley National Laboratory. The aim was to develop pathways to improve Cu(InGa)(SeS) 2 (CIGSS) thin film photovoltaic modules using processes compatible with low manufacturing cost. The CIGSS approach investigated was a two-step process including deposition of metal precursor films following by reaction in hydride gases utilizing IEC’s novel reactor. The process was similar to that under commercial development by the project’s industry partner Stion. When Stion went out of business mid-project the focus changed to a rapid thermal process considered more commercially viable. Approaches to improve the performance of solar cells using the reacted films focused on two material innovations. First, the overall Ga content was increased to increase the operating voltage, which is desirable for scale-up to commercial modules. Second, the processing and performance advantages arising from Ag alloying were investigated. Advanced characterization guided process and material development including control of relative composition gradients. Research on the formation of Cu-Ga-In metal precursors utilized sputtering deposition which is normally used in commercial applications. The work resulted in processes for deposition of precursor stacks with increased relative Ga content and effects of deposition parameters on morphology and phase composition were established. It was shown that the metal precursor films have comparable phase composition and morphology so subsequent reaction follows from the same starting point. The addition of Ag to the metal precursors gave more uniform morphology and improved adhesion of reacted films which enable higher reaction temperature for faster processing. A novel outcome was the discovery of a previously undocumented material phase in sputter-deposited and evaporated Ag-Cu-In-Ga thin films. Hydride gas reaction processes including time-temperature-concentration profiles were developed for different precursor compositions. This enables control of composition profiles to engineer through-film gradients for solar cell optimization with characterization and simulations used to correlate measured film composition profiles to measurements of devices. In particular, the gradient of sulfur at the front of the CIGSS film was found to be critical. The simulations guided process development leading to improved reproducibility of devices improved performance with higher Ga content and higher voltage. With Ag-alloyed precursors, the reaction pathways leading were determined. A significant finding was that Ag-alloying increases the reaction rate to completely convert precursor films to the final chalcopyrite which could enable reduced reaction time to benefit manufacturability. To maintain potential commercial viability, the process under investigation was refocused to a rapid thermal process that could potentially be incorporated into an in-line process for manufacturing. Precursors with different composition were capped with an extra selenium layer and reacted in hydrogen sulfide 5-15 minutes, compared to typically 2 hours in the previous multi-step batch process. Critical RTP parameters were identified to control the reaction. Further optimization would be needed for high efficiency solar cells but pathways to high quality devices with further optimization and improved heating uniformity were developed. The project also developed new optoelectronic characterization approaches with a focus on development and application of spatial- and time-resolved photoluminescence and a custom mapping photoluminescence microscope built. It was shown how critical electronic transport properties strongly depend on the chemical composition of the material and that a wide range of samples show inhomogeneity on a length scale larger than the grains in the films. Additionally, two-photon excitation capability was developed to distinguish bulk vs surface losses. The project advances the state-of-the -art for precursor reaction processes in several ways that could impact manufacturing. This includes validation of approaches to increase voltage and establishment of model-guided control to form optimal composition profiles. The application of process control approaches with knowledge of phase formation and reaction pathways can be critically valuable in designing a large-scale process.

14 SOLAR ENERGY↗

Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine (Final Report)

As the nation continues to encourage, through market structures and financial incentives, the proliferation of intermittent renewable electricity, how to optimize the ever-changing electric grid and identify means to retain and improve resilience, while ensuring continued reductions in GHG emissions, will be critical. According to Bloomberg, wind & solar generated 10.5% of US electricity in 2020 and that percentage continues to grow. In support of expanding renewable energy use, and to address its intermittent nature, this project will develop the Hydrogen Storage for Flexible Fossil Fuel Power Generation platform that is dispatchable, reliable, repeatable and have the ability to produce zero or negative carbon power while interfacing with geology capable of CO2 and hydrogen storage. GTI Energy (GTIE) and team members Illinois State Geological Survey (ISGS), Mitsubishi Heavy Industries America (MHIA), Ameren Illinois, Hexagon Purus, and the Low Carbon Resources Initiative (LCRI) completed a Phase I Conceptual Study under contract DE-FE0032012 for Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine. The Hydrogen Storage for Flexible Fossil Fuel Power Generation platform addresses the intermittent nature of the expanding use of Variable Renewable Energy (VRE) generation. The low cost of the electricity (COE) generated results in greater dispatch and more operation at higher power levels (higher efficiency), fewer short intervals, and fewer start/stop cycles. The reliable, resilient system can produce zero carbon power and store hydrogen. It will demonstrate hydrogen storage in geologic formations like those used in natural gas underground storage thus enabling large scale storage of hydrogen in sedimentary strata across the United States rather than in geographically restricted salt caverns. The Phase I study confirmed the system is feasible and generates power at lower cost than other low carbon approaches. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production. The study advanced the maturity of the H 2 storage-based system with flexible power generation by completing a Pre-FEED study (Phase II). The Pre-FEED focused on the selected Energy Farm on the University of Illinois Urbana-Champaign (UIUC) site that includes above ground and underground hydrogen storage, low-carbon hydrogen production (GTI’s Compact Hydrogen Generator, CHG) with underground CO2 sequestration, and a 40-MW class gas turbine. The Pre-FEED addressed the entire system and its interconnection to the natural gas and electric grid and mitigation of key risks, such as storage behavior, load-following, and system operation. During Phase 1 of the project, the team completed key tasks, which moved the entire demonstration project, specific components and approaches closer to commercialization. These Phase I Accomplishments include: Completing System Requirements Review; Completing System Layout and Modeling - Heat & Mass Balance and Process Flow Diagram; Completing modelling of 9 turbine performance cases; Evaluating rock strata for underground storage of hydrogen and sequestration of carbon dioxide; Completing initial modelling of underground storage of hydrogen and withdrawal with evaluation of loss and water production; Identifying roadable storage for above ground hydrogen storage; Identifying existing electrical infrastructure for receiving/delivering electricity; Identifying existing gas supply infrastructure for receiving natural gas; Document concept design/development plans in required reports. Conclusions: The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and generates power at lower cost than other low carbon approaches and even lower cost than the reference NGCC plant without carbon capture when taking advantage of 45Q carbon credits. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via the system requirements review with the whole team. These requirements were then incorporated into and iterated with our Heat & Mass Balance process model and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Large scale non-salt geologic storage of hydrogen is an enabling technology for a hydrogen-fired turbine that can be retrofitted into large-scale electric generating units (EGU). Our demonstration will include 428 MWh or ~4 hours full load of hydrogen storage (above and underground). Carbon capture inherent to the CHG process can capture 90% CO 2 (with upgrades to >98%). This system provides a COE of 23% savings relative to an NGCC with a post combustion amine system. Our proposed storage system decouples carbon capture and hydrogen production from power production; therefore, we expect our proposed system’s efficiency and variable COE to be superior resulting in overall higher dispatch and reduced deep cycling. Our demonstration will be full to multi-day hydrogen storage and has the potential for longer (seasonal) duration commercially. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production.

03 NATURAL GAS↗

High-Temperature Active Magnetic Bearing Development for Supercritical CO 2 Machinery Applications

Hermetic machinery utilizing gas bearings for MW-scale supercritical CO 2 (sCO 2 ) machinery applications can have significantly lower power loss and enable improved cycle efficiency compared to conventional machinery with oil-lubricated bearings. Active magnetic bearings (AMBs) are another option anticipated to have similar power loss and load capacity to gas bearings as well as offering larger mechanical tolerances, the ability to tune properties, and high reliability due to lack of mechanical wear. AMBs also have proven commercial experience at MW-scale, though environments for high-temperature sCO 2 power cycle machinery conditions are novel. Besides the potential impact of AMBs for sCO 2 turbomachinery, the technology also offers promising benefits for steam and gas turbines for power generation, compressors and expanders for industrial heat and power, and in other oil and gas and space applications. The goals of this project were to conceptual design an AMB and perform material testing. Conceptual designs for radial and thrust AMBs were produced based on a hermetically-sealed sCO 2 machinery waste-heat recovery (WHR) application for sizing and loads, and choosing a target design temperature of 540°C useful for high-temperature sCO 2 turbines for concentrating solar power (CSP) applications. Conceptual designs were initially developed for multiple radial and thrust AMBs with spreadsheet-based calculations before selecting one of each to develop further using higher-fidelity design methods for magnetic and structural performance. It was found that the radial AMB at 540°C was feasible, but the thrust AMB needed to be limited to 315°C for high-speed operation. The decision for a reduced-temperature thrust AMB was the result of several significant conclusions: 1) Hiperco 50A, originally chosen for good magnetic performance at high temperature, had insufficient strength for high-speed operation, so it was replaced with 17-4 PH. 2) The reduced magnetic performance from 17-4 PH yielded a larger bearing size, reducing the strength margin. 3) This ultimately led to a creative design implementing a more-compact E-core topology, compared to the original (conventional) C-core, and an integral shaft-disk with Hirth joint connection. These conceptual designs are unique for the size and temperature in CO 2 , relevant for MW-scale CSP applications. Long term, high temperature test data was generated for several materials, filling a void in the current body of literature. Corrosion and magnetic performance measurements were produced for PM materials (Alnico 5-7C, Alnico 9C, and SmCo) with and without nickel-coating for environments of high-temperature CO 2 up to 550°C at atmospheric pressure and 450°C at 103 bar for up to 6,000 hours. Corrosion measurements were also produced for Hiperco 50, a SM material relevant for AMB laminations, with and without C5 coating. Comparisons were also made for 450°C and 550°C, atmospheric pressure air exposures up to 5,000 hours. Results generally show that coatings can be effective at improving oxidation resistance of the bare materials, and Alnicos generally outperformed SmCo after high-temperature exposure. In addition to technical feasibility demonstrated by the design, economic feasibility was demonstrated by updating the TEA from the reference machine, re-evaluating it with CAPEX and OPEX to reflect estimated changes from process-lubricated bearings to AMBs. AMBs were shown to be comparable in performance to process-lubricated bearings, still showing a notable improvement over conventional machinery architecture with oil-lubricated bearings.

42 ENGINEERING↗

Upgrading Biogas through in situ Conversion of Carbon Dioxide to Biomethane in Anaerobic Digesters

Organic waste streams generated by wastewater treatment plants, agricultural operations, and food processing industries represent an important yet underutilized opportunity for renewable energy production in the United States. Through anaerobic digestion, these waste streams can produce biogas, a mixture primarily composed of methane (CH4) and carbon dioxide (CO2), that can be upgraded to pipeline-quality natural gas. However, most existing upgrading technologies remove CO2 from biogas rather than utilizing it, leaving a significant portion of the potential energy unused. This project investigates a novel biological upgrading approach that converts CO2 into additional CH4 by supplying hydrogen (H2) to specialized microorganisms capable of performing hydrogenotrophic methanation. The main challenges associated with biological biogas upgrading are related to hydrogen supply, gas-liquid mass transfer, and process stability. First, due to the high cost of hydrogen gas, it is preferable that H2 be produced on-site using renewable energy sources such as wind or solar power. Second, hydrogen has low solubility in liquids, which limits its availability to microorganisms and requires strategies to improve gas dissolution and transfer within the reactor. Third, process inhibition may occur as a result of increased pH caused by CO2 consumption or elevated H2 partial pressure, both of which can negatively affect methanogenic activity. Although research in these areas has advanced during the course of this project, these challenges have not yet been fully resolved. To date, the biological systems that have achieved the highest methane concentrations are typically ex-situ reactors, where operational conditions can be more easily controlled. For this reason, the findings of the present project remain highly relevant. The project goal was to develop an innovative system that can accomplish biogas upgrading via biological conversion of CO2 to CH4, in a novel hybrid approach that combines the advantages of both in-situ and ex-situ systems. The proposed system employs a three-phase upflow anaerobic bioreactor with H2 delivery through a gas-permeable membrane, enabling efficient hydrogen transfer and microbial conversion. Under optimized operating conditions, the system achieved 99% H2 consumption and 90% CO2 conversion. A subsequent gas cleaning stage was implemented to further improve gas quality and meet target purity standards. The upgraded gas composition reached 97.7% CH4, 2.2% CO2, and 0.97% O2, while H2S concentrations remained below detection limits. In addition, a flue gas-driven inorganic thermoelectric generator (TEG) system was designed and experimentally validated as a potential source of electricity for H2 production. The system consisted of six TEG modules connected in series and achieved an open-circuit voltage of 4.5 V and a maximum power output of 224 mW at a temperature difference of approximately 53.5 °C, demonstrating effective conversion of waste heat into electrical power under simulated flue gas conditions. Finally, a comprehensive techno-economic analysis was completed to evaluate the capital and operating costs associated with the proposed system. The results provide important insights to guide future scale-up, optimization, and potential deployment of integrated biological biogas upgrading technologies.

09 BIOMASS FUELS↗

Integrated protonic ceramic electrochemical cell for sustainable energy economy using water-energy nexus framework

Reliance on fossil fuels will continue for the next decades even though there are global pushes away from it to mitigate the overarching climate challenge, most especially by its highest consumers and availability. While there is a hastening global shift away from fossil fuel, integrating its assets into this technology helps limit the risk and future losses of stranded assets and reduce the cost of investment in the new technologies. Moreover, the generation of electricity from intermittent renewable sources like solar and wind has witnessed a significant surge in recent years, leading to a pressing demand for practical energy storage systems. Electrical energy storage is anticipated to play a pivotal role in the future global energy system, facilitating load-leveling operations to support the greater integration of renewable and distributed generation. Reversible electrochemical cells (RECs) offer a promising option for addressing the fossil fuel assets integration and energy storage challenges through the interconversion between electrical and chemical energy and concurrent utilizing carbon emission. In their electrolysis mode, the RECs convert electricity into durable, storable, and portable valuable chemical fuels such as syngas and methane. Conversely, the produced chemical fuels can be used as reactants in the fuel cell mode to generate electricity on demand with minimal (hydrocarbons) or zero when H2 or NH3 is used emissions. However, a challenging goal for this type of technology remains to achieve optimal operation and high roundtrip efficiencies, which has hindered the deployment of previous electrochemical cells. This dissertation demonstrates how reversible protonic ceramic electrochemical cells (RePCECs) can be integrated with fossil fuel power plants and renewable energy sources as a potential energy storage system. In this work, integrated RePCEC systems are designed and examined using computational modeling at scales to determine appropriate system configurations and operating conditions that achieve high roundtrip efficiencies. Cell level design of the PCEC is the first approach, several cells are assembled for the stack level model that is integrated into combined cycle powerplant and solar photovoltaic for the system level model. After critical literature review, this answered the operational and integration research questions proposed to address these challenges. The designed systems perform two functions, utilizing captured CO2 and storing renewable energy through co-electrolysis of steam and CO2. The co-electrolysis reaction involves endothermic water electrolysis and exothermic methanation reaction. To enhance high roundtrip efficiency, there is a need for thermal balance and management in the electrolysis mode. This involves operating the RePCEC stack under conditions that favor methane production to balance out heat needed by water electrolysis, it crucial for the RePCEC system operation. Methanation is enhanced by low temperatures. Leveraging on fabricated BCZYYb-electrolyte RePCEC, the cell model designed revealed that the optimum temperature for methane production is 450℃ at atmospheric pressure. Thus, to achieve optimum system performance, operating in the temperature range 450-525℃ is recommended at the given configuration, combining between the optimum temperature for methane production and temperature for the optimum stack roundtrip efficiency. Configuration with carbon capture system and purge stream is the optimum configuration from the seven conceptualized and evaluated. The modeling outcomes include a thermodynamic examination of integrated RePCEC systems, calibration of cell and stack level models, and steady-state simulation and integration into a 600MW combined cycle power plant retrofitted with two two-stage membrane-based carbon capture system and a wastewater treatment and recovery unit. At 100% powerplant loading, the stack and system roundtrip efficiencies are 72% and 51.37% respectively. Adding a purge stream for produced hydrogen at the system downstream improves the efficiencies to 74 and 55.48% respectively. At atmospheric pressure and 525℃, the system model suggests that a stack roundtrip of 82% is achievable, and overall system efficiency increases by reducing the energy consumption by the balance of plant components for steam generation and storage. Economic analysis of the process gives levelized cost of methane as $2.24/MMBtu lower than the conventional production route that range between $3.46/MMBtu and $9.85/MMBtu. The lifecycle analysis shows that the global warming potential for the production of methane and hydrogen from the RePCEC system is 3.83 kg CO2 eq which is lower than 9.35 kg CO2 eq emission during steam methane reforming for hydrogen production. This answered both the environmental and economic concerns in the raised research question. The proposed RePCEC configuration and analysis carried out in this dissertation to address the surge in renewable energy and challenges with PCEC technology hold significant potential in achieving large-scale energy storage while simultaneously reducing carbon emissions. These advancements, coupled with suitable governmental policies and incentive programs, have the potential to economically disrupt the natural gas industries by using RePCEC systems for methane production, thereby making them more favorable for eventual implementation and commercialization.

25 ENERGY STORAGE↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗