Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Science Gateways”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

165 records · Page 10

The Southern Ocean Carbon and Climate Observations and Modeling (SOCCOM) Project: A Review

The Southern Ocean serves as the primary gateway through which the intermediate, deep, and bottom waters of the ocean interact with the surface ocean (and thus the atmosphere), and it has a profound influence on the oceanic uptake of anthropogenic carbon and heat as well as nutrient resupply from the abyss to the surface. Yet it has been the least observed and understood region of the world ocean. The Southern Ocean Carbon and Climate Observations and Modeling (SOCCOM) project was implemented in 2014 with a goal to help remedy this deficit in observations and understanding. The SOCCOM project is based on two major advances that have the potential to transform understanding of the Southern Ocean. The first is the development of new biogeochemical sensors mounted on autonomous profiling floats that allow sampling of ocean biogeochemistry in 3-dimensional space. Floats may detect processes with a temporal resolution that ranges from hours to years. The second is that the climate modeling community finally has the computational resources and physical understanding to develop fully coupled climate models that can represent crucial, mesoscale processes in the Southern Ocean, as well as corresponding models that assimilate observations to produce a state estimate. The observational component, based on deployment of profiling floats with oxygen, nitrate, pH and bio-optical sensors, is generating vast amounts of new biogeochemical data that provide a year-round view of the Southern Ocean from the surface to 2000 m. The modeling effort is applying these observations and enhancing our understanding of the current ocean, and reducing uncertainty in projections of future carbon and nutrient cycles and climate. After nine years of operation, including a project renewal in the sixth year, the SOCCOM project has deployed more than 260 profiling floats. These floats have collected over 27,000 vertical profiles throughout the Southern Ocean. A data-assimilating biogeochemical state estimate model has been implemented. Here, the design of the SOCCOM project is reviewed and the scientific results that have been obtained are described. The project’s capability to help meet the observing system priorities outlined for a notional UN Decade for Ocean Sciences Southern Ocean observing system is assessed.

Jorge L. Sarmiento↗

Localization of Ad-Hoc Lunar Constellations in Communication Failure Modes for Distributed Spacecraft Autonomy

As lunar missions increase in complexity inspired by NASA’s Artemis Program, they will require reliable and sufficient capability of the Position, Navigation, and Timing (PNT) system to support their scientific objectives. In addition, NASA's Commercial Lunar Payload Services (CLPS) program initiates the proliferation of public and private exploration partnerships using small satellites from commercial and private organizations, expanding traditionally confined low Earth orbit to be used for missions beyond geosynchronous orbit (Zucherman et al., 2022). Therefore, the Lunar PNT system is also required to provide navigation services compatible with the smaller platforms being sent by the public and private sectors, like CubeSats. However, traditional approaches to deep space missions’ navigation based on ground radio facilities have difficulties in providing sufficient support for the increasing number of users and communication at a distance from the Earth (Kaplev et al., 2022). In particular, the existing Lunar navigation technologies such as weak signal global positioning system (GPS) and deep space network (DSN) are not able to ensure operations of the upcoming small-scale Lunar missions due to their limitations in localization performance as well as capacity aspects. Another way to provide Lunar PNT service is to create a dedicated Lunar global navigation satellite system (GNSS) constellation, like GNSS systems on Earth. Space agencies like NASA, ESA, and JAXA are now developing the lunar communications relay and navigation systems (LCRNS) and Lunar navigation satellite systems (LNSS). In their systems, satellites will be deployed in moon orbits to provide the communication, positioning, navigation, and timing (CPNT) service at the lunar south pole region where the Artemis base camp will be expected (Murata et al., 2022). Meanwhile, common challenges considered in lunar PNT research arise from poor geometry of the terrestrial GNSS satellites when seen from the lunar user, highly perturbed lunar orbits, and limitations in power, size, and cost of the equipment on lunar satellites (Iiyama et al., 2023). It is also not clear if there will be enough Lunar users to support the cost and resources this would require as the Low-cost surface missions may not be able to support the large power, mass, and weight requirements that these navigation solutions entail (Niemoeller et al., 2022). As an alternative, existing Lunar science and exploration assets could be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions (Hagenau et al., 2021). Introducing the non-dedicated and ad-hoc Lunar navigation constellation gives a way to provide PNT services on-demand. The non-dedicated swarm assets of Lunar constellations are designed to localize themselves with minimal interaction with Earth by adding cooperative autonomous localization to lunar missions, freeing up valuable bandwidth and ground segment resources. An autonomous localization of Lunar constellations is based on the concept of the decentralized PNT system with a distributed extended Kalman filter (DEKF) approach to state estimation for minimal onboard operating costs. In the distributed data processing algorithm, computation is broken down and assigned to each satellite, resulting in a considerably decreased computational amount while maintaining the accuracy of the orbit ephemeris and clock offsets as the result of centralized data processing (Wen et al., 2019). The DEKF requires spacecraft to perform two-way ranging operations with each other to communicate simultaneously, leveraging neighbor two-way intersatellite link (ISL) measurements such as pseudoranges to, and relative velocities between, visible satellites as sensor values (Frank et al., 2021). The Lunar autonomous PNT simulation (LAPS) demonstrated the feasibility of orbital asset localization among ad-hoc Lunar small-sat constellations based on the DEKF in Hagenau et al. (2021) and evaluated the matching algorithm proposed by Frank et al. (2021) in scheduling position estimation updates. In previous papers, all assets and measurements are assumed to be always available without consideration of the impact of intermittent and permanent communication failure. This study presents localization performance with increasing levels of network degradation for swarm assets and users to demonstrate the robustness of the decentralized Lunar PNT service in more realistic scenarios. Main issues arising from communication failure include spacecraft permanent or transient loss, antenna failures, message delays, etc. We tested four possible reasons for network degradation for 7 days in 21 satellites frozen with an altitude of 5500 km, evenly spaced around 3 circular, 40 inclination orbital planes where each spacecraft has two directional antennas. As anchor nodes with an independent estimate of their position are required in the DEKF approach, two ground nodes in each pole and one node in the gateway were implemented in the simulation. First, the most probable failure scenario involves the loss of a single spacecraft due to solar interference and technical malfunctions of the assets. Losing the availability of a single spacecraft means losing the two-way ISL measurement of the asset in the DEKF update. In order to provide the best possible quality of PNT service with limited time and resources, the distributed Lunar constellations must schedule the communication activities. The scheduler leverages mixed-integer linear programming (MILP) for the coordination and scheduling of the desired “as-needed” localization service (Niemoeller et al., 2022). We assume the scheduler has completely excluded the spacecraft information before the DEKF update in the failure scenario. When a random spacecraft has been turned off at a specific time, the robustness of the autonomous Lunar PNT system is evaluated. The simulation results give an 11.5% degradation in median position accuracy compared to the idealized performance excluding the asset loss. Second, a large number of assets may vanish due to major hardware problems or meteor strikes around the moon. A multiple spacecraft loss can degrade the localization performance very fast by losing the communication ability to do cross-plane measurements and in-plane measurements in a 3-plane constellation. When the matching-based scheduler is aware of ISL availability, we investigate a large number of in-plane and cross-plane asset vanishments both in close proximity and equally spaced throughout the orbital plane. According to the simulations, the loss of in-plane measurements gives 40.2% degradation while cross-plane measurements degrade 50.5% of asset localization performance among available assets. Therefore, it is concluded that cross-plane measurements are more important in improving the position estimation accuracy. Third, spacecraft failure information can be lost due to the internal message delay, resulting in the DEKF update scheduler to solve the matching problem with unavailable assets. The DEKF update cycle is comprised of network setup, communication, and computations where a global broadcast network and a 2-way ISL network setup take 6 minutes in total (Frank et al., 2021). Once the broadcast network successfully transmits and receives information, a random spacecraft may lose its availability right before solving the matching problem. This means the matching solution is no longer optimal, resulting in degradation in the localization performance. A numerical assessment shows the matching-based scheduler with knowing failure holds 11.5% of position accuracy degradation, whereas the scheduler without knowing failure gives 34% degraded localization performance without asset loss. Fourth, a transient loss of a single or multiple spacecraft may occur due to their antenna outages. After losing the two-way ISL availability for a few DEKF update cycles, the availability of spacecraft can easily be recovered as their states have been independently updated using measurements from anchor nodes. It is likely that the longer failure will result in worse localization performance. We have tested the transient failure of a random single asset for 30 min in the simulation, which is losing 3 update cycles in the DEKF system. From the simulation results, the position accuracy has been degraded to 4.84% which is better than the degraded localization performance of 11.5% from the permanent loss scenario among available assets. In conclusion, the autonomous Lunar PNT system based on the DEKF approach shows the ability to maintain resilience and robustness in the possible communication failure scenarios, ensuring that localization accuracy is preserved across various network degradation and outages. Future studies on investigating user localization performance near the South Pole and the broadcast network system will be continued in the following months.

Yeji Kim↗

Future Homes in Space: Development of Concepts for Exploration Space Habitats

NASA’s Artemis campaign seeks to return humans to the moon and establish a sustained presence on the lunar surface. This session will emphasize how habitation capabilities on the moon and in cislunar space can potentially contribute to the sustainability objectives of Artemis. Habitable elements represent opportunities to enable longer duration stays, increase the number of crew members present, enhance science and utilization activities, drive technology development for future Mars exploration, perform analog missions, and fuel economic opportunities for US industry. Panelists include Paul Kessler (NASA Marshall Space Flight Center, deputy lead for lunar surface habitation); Andrew Choate (NASA Marshall Space Flight Center, Mars habitation lead); Krystofer Dudzinski (NASA Marshall Space Flight Center, a space architect within the MSFC Advanced Concepts Office); and Larry Toups (retired from NASA Johnson Space Center, currently an adjunct professor at University of Houston in space architecture). The panel is moderated by Tracie Prater (NASA Marshall Space Flight Center, Habitation Systems Development Office). The panel will begin with an overview of the history of habitation concepts and an academic perspective on general considerations in space habitat design (Larry Toups). Paul Kessler and Andrew Choate will introduce NASA’s principle of “architecting from the right” to help define objectives for Artemis missions, needs/characteristics, use cases, and functions (as published in the agency’s Architecture Definition Document) and provide perspective on how this principle informs habitation concept development work. NASA panelists will discuss key engineering challenges identified for developing, deploying, and operating habitable assets on the lunar surface and/or in deep space. These may include dust mitigation, outfitting of inflatable softgoods (for concepts which may use softgoods as a primary structural material), survival in lunar darkness, human health and performance considerations, maintenance/repair/sparing, and autonomy. These identified challenges represent risks for habitation systems development and relate closely to capability gaps identified by the agency. While the work of NASA Marshall Space Flight Center’s habitation development office is primarily focused on habitats which are launched from earth pre-integrated (referred to as Class I in the framework previously developed by NASA space architects Kennedy/Cohen) or launched from earth and deployed at the point of use (Class II), there is also extensive work in NASA, academia, and companies on constructed habitats, which would be built on a planetary surface using indigenous resources (Class III habitats). Panelist Krystopher Dudzinski will discuss potential evolutionary pathways from Class I and Class II habitats to Class III habitats, unique and common architectural challenges within each habitat class, and key gaps in implementing Class III habitats from an architectural perspective. NASA panelists and the moderator will also provide an overview of partnership opportunities and avenues for further engagement to advance habitation systems for the SpaceCom audience. NASA is currently developing notional concepts for a lunar surface habitat and Mars transit habitat, which will be discussed during this panel session and used as examples. These concepts represent options for habitation system design and are a point of departure. They do not represent a final plan or formal recommendation on the part of the agency. Based on the most recent analysis cycle, NASA’s lunar surface habitat (SH) concept nominally supports two crew members for 30 days, with the capacity to support four crew during a surge period where crew will swap between the SH and another surface asset, such as a pressurized rover. This example design has a metallic airlock for ingress/egress and the upper portion is an inflatable material system which serves as the habitation module. The notional interior of the habitat is a three-deck layout/configuration which supports all crew mission functions, including exercise, stowage, extravehicular activity (EVA), sleep, hygiene waste collection, maintenance and repair, and meal preparation. Under analysis assumptions for habitation, the Mars Transit Habitat (TH) concept would support four crew on an up to 1,200 day Mars mission. One option for the concept is to initially dock Transit Habitat at Gateway, where it can be used to increase the duration of crew stays in cislunar space and perform shakedown and analog missions prior to a Mars departure. One challenge in longer duration missions which involve both surface exploration and transit is understanding crew adaptation when transitioning between partial gravity and microgravity environments. TH at Gateway offers an opportunity to study this transition and in doing so reduce risks associated with future Mars exploration. Like lunar SH, the most recent analysis cycle concept of a Mars TH is a hybrid structure design, with a metallic section supporting EVAs, axial/radial docking, and Safe Haven capabilities, and an inflatable softgoods structure for the primary habitation function. Interior layouts to optimize crew usability and livability are currently under trade. The panel will include presentation material, but also seeks to engage the audience in a highly interactive conversation regarding the potential role for habitation in future exploration initiatives. Potential topics for discussion include the influence of the crew experience on habitation systems design and livability/usability considerations, the benefits of space habitation development in terrestrial applications, and challenges and opportunities in “feeding forward” lunar surface habitation systems development to Mars exploration.

space habitats↗