Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Scheduling and planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Robust and Opportunistic Planning for Planetary Exploration

This slide presentation discusses the use of robust planning for rover vehicles to enable planetary exploration. The objective of this work is to use onboard planning, scheduling and execution techniques to enable a rover to take autonomous action to take advantage of new opportunities, and to respond to unexpected problems, and to improve the overall utilization of rover resources.

onboard science analysis↗

A Comparison of Probabilistic and Deterministic Campaign Analysis for Human Space Exploration

Human space exploration is by its very nature an uncertain endeavor. Vehicle reliability, technology development risk, budgetary uncertainty, and launch uncertainty all contribute to stochasticity in an exploration scenario. However, traditional strategic analysis has been done in a deterministic manner, analyzing and optimizing the performance of a series of planned missions. History has shown that exploration scenarios rarely follow such a planned schedule. This paper describes a methodology to integrate deterministic and probabilistic analysis of scenarios in support of human space exploration. Probabilistic strategic analysis is used to simulate "possible" scenario outcomes, based upon the likelihood of occurrence of certain events and a set of pre-determined contingency rules. The results of the probabilistic analysis are compared to the nominal results from the deterministic analysis to evaluate the robustness of the scenario to adverse events and to test and optimize contingency planning.

Merrill, R. Gabe↗

Exploring Cognition Using Software Defined Radios for NASA Missions

NASA missions typically operate using a communication infrastructure that requires significant schedule planning with limited flexibility when the needs of the mission change. Parameters such as modulation, coding scheme, frequency, and data rate are fixed for the life of the mission. This is due to antiquated hardware and software for both the space and ground assets and a very complex set of mission profiles. Automated techniques in place by commercial telecommunication companies are being explored by NASA to determine their usability by NASA to reduce cost and increase science return. Adding cognition the ability to learn from past decisions and adjust behavior is also being investigated. Software Defined Radios are an ideal way to implement cognitive concepts. Cognition can be considered in many different aspects of the communication system. Radio functions, such as frequency, modulation, data rate, coding and filters can be adjusted based on measurements of signal degradation. Data delivery mechanisms and route changes based on past successes and failures can be made to more efficiently deliver the data to the end user. Automated antenna pointing can be added to improve gain, coverage, or adjust the target. Scheduling improvements and automation to reduce the dependence on humans provide more flexible capabilities. The Cognitive Communications project, funded by the Space Communication and Navigation Program, is exploring these concepts and using the SCaN Testbed on board the International Space Station to implement them as they evolve. The SCaN Testbed contains three Software Defined Radios and a flight computer. These four computing platforms, along with a tracking antenna system and the supporting ground infrastructure, will be used to implement various concepts in a system similar to those used by missions. Multiple universities and SBIR companies are supporting this investigation. This paper will describe the cognitive system ideas under consideration and the plan for implementing them on platforms, including the SCaN Testbed. Discussions in the paper will include how these concepts might be used to reduce cost and improve the science return for NASA missions.

transmitters receivers↗

Artificial intelligence techniques for scheduling Space Shuttle missions

Planning and scheduling of NASA Space Shuttle missions is a complex, labor-intensive process requiring the expertise of experienced mission planners. We have developed a planning and scheduling system using combinations of artificial intelligence knowledge representations and planning techniques to capture mission planning knowledge and automate the multi-mission planning process. Our integrated object oriented and rule-based approach reduces planning time by orders of magnitude and provides planners with the flexibility to easily modify planning knowledge and constraints without requiring programming expertise.

Henke, Andrea L.↗

Graph-Based Modeling and Decomposition of Hierarchical Optimization Problems

We present a graph-theoretic modeling approach for hierarchical optimization that leverages the OptiGraph abstraction implemented in the Julia package Plasmo.jl. We show that the abstraction is flexible and can effectively capture complex hierarchical connectivity that arises from decision-making over multiple spatial and temporal scales (e.g., integration of planning, scheduling, and operations in manufacturing and infrastructures). We also show that the graph abstraction facilitates the conceptualization and implementation of decomposition and approximation schemes. Specifically, we propose a graph-based Benders decomposition (gBD) framework that enables the exploitation of hierarchical (nested) structures and that uses graph aggregation/partitioning procedures to discover such structures. In addition, we provide a Julia implementation of gBD, which we call PlasmoBenders.jl. We illustrate the capabilities using examples arising in the context of energy and power systems.

97 MATHEMATICS AND COMPUTING↗

Release a public version of HERON (HERON 2.0) with improved algorithms for the treatment of energy storage

Integrated energy systems (IESs) are essential for decarbonizing electricity and industrial sectors and fully exploiting these systems requires sophisticated planning, scheduling, and dispatching tools to maximize their socio-economic benefits. The Holistic Energy Resource Optimization Network (HERON) is a generic software plugin for the Risk Analysis Virtual Environment (RAVEN) to perform stochastic technoeconomic analysis of IES with economic drivers. This report summarizes the updates made to HERON 2.0. Particularly, we demonstrate one of the added features, Function-based Control Mechanics, by comparing a price-based dispatch strategy with the original perfect foresight baselines. Our case studies successfully demonstrate that the model is capable to incorporate artificial control algorithm into the dispatch of IES components. In addition, our results from the price-based strategy indicate that the control strategies of IES components are key to the economic and temporal performance of our model; therefore, more sophisticated dispatch strategies are required to improve the model performance.

25 ENERGY STORAGE↗

Space Shuttle Program overview.

The Space Shuttle Program is described in terms of the master planning schedule, design details of the Orbiter vehicle and solid rocket boosters, and payload capabilities of the vehicle for various types of missions. Initial flight tests are described along with subsequent envisioned operational missions. Additional topics include individual phases comprising a complete Space Shuttle mission, typical payload curves for various circular and elliptical orbit missions, details of the payload bay and the remote payload manipulator system, and a general listing of avionics provisions in the vehicle.

Everline, R. T.↗

Payloads.

Approaches to payload definition, design, and planning adopted in the Space Shuttle Program are described. The Space Shuttle offers many new modes of operation featuring reuse of spacecraft, on-orbit checkout and maintenance, sortie experiment missions, and opportunities to trade launch weight and volume for cost savings. In order to take advantage of these new approaches and to accommodate the varying missions, new payload elements have been identified, and new low-cost design approaches are being developed to utilize standardized components and modularized subassemblies that reduce spacecraft buildup and maintenance costs. A new payload planning technique makes use of the computer to provide large-scale planning, scheduling, and costing required for various program options.

Marshall, W. R.↗

The experimental clean combustor program: Description and status

The objectives, program plan, schedule, pollution and performance goals, program approaches to pollution reduction, and status of the project are presented. Advanced supersonic transport and combustion noise programs are also discussed. The phases of the program consist of the following: (1) screening of low pollutant combustors, (2) refinement of the best combustors, and (3) engine demonstration of the best combustors. It is stated that all combustor designs investigated appear capable of achieving the idle pollutant goals with additional development effort.

Niedzwiecki, R. W.↗

The Langley Research Center NASA/PERT TIME III

Program provides practical system for total project management in areas of planning, scheduling, resource control, and reporting. It allows use of existing management and administrative tools and processes and is applicable to many types of projects.

Source record↗

Design definition study of NASA/Navy lift/cruise fan V/STOL aircraft

Assessed are the risks associated with the lift/cruise fan technology V/STOL aircraft program. Three candidate concepts for the technology aircraft design approach are considered: the lowspeed only modification, the full performance modification, and the all new aircraft concepts. Survey results indicate that the lift/cruise fan technology aircraft program is feasible, from the standpoint of technical risk, with some evidence of uncertainty of meeting the planned schedule and relatively minor impact on estimated program costs.

Source record↗

Shuttle payload interface verification equipment study. Volume 2: Technical document, part 1

The technical analysis is reported that was performed during the shuttle payload interface verification equipment study. It describes: (1) the background and intent of the study; (2) study approach and philosophy covering all facets of shuttle payload/cargo integration; (3)shuttle payload integration requirements; (4) preliminary design of the horizontal IVE; (5) vertical IVE concept; and (6) IVE program development plans, schedule and cost. Also included is a payload integration analysis task to identify potential uses in addition to payload interface verification.

Source record↗

Down and up with PERT at Goddard

During the 1960s NASA Goddard Space Flight Center (GSFC) used the Program Evaluation and Review Technique (PERT) as its principal schedule planning and control tool in flight projects. After a temporary replacement of PERT by other techniques, PERT has been reinstituted on all but one of GSFC's flight projects. PERT has been combined with a computer graphics program which makes it possible to produce PERT drawings in only a few hours' time.

Zerega, J. E.↗

Space-based solar power conversion and delivery systems study. Volume 2: Engineering analysis of orbital systems

Program plans, schedules, and costs are determined for a synchronous orbit-based power generation and relay system. Requirements for the satellite solar power station (SSPS) and the power relay satellite (PRS) are explored. Engineering analysis of large solar arrays, flight mechanics and control, transportation, assembly and maintenance, and microwave transmission are included.

Source record↗