At least 181 records · Page 10

Building confidence in models for complex barrier systems for radionuclides

The modeling and simulation of the Cement-clay Interaction-Diffusion field (CI-D) experiment at the Mont Terri site in Switzerland presented here demonstrates that it is possible to capture the multiscale physical and chemical features of natural and engineered barrier systems for radionuclides. The simulations are successfully carried out with the newly developed CrunchODiTi high-performance computing software that accounts for multiple continua, including a continuum representing the electrical double layer (EDL) developed along negatively charged clay particles in clay rock. The simulation also accounts for both the complex three-dimensional (3D) geometry, expected as the norm in a geological waste repository, and the anisotropy of the geological formation. In addition, the high resolution of the model makes it possible to include "skin effects" developed at the interface between highly reactive materials, in this case between the high pH cement and the circumneutral but electrostatic Opalinus Clay. The successful history matching with the field experiment demonstrates that the distinct geochemical and physical properties of the cement and the Opalinus Clay in the CI-D experiment can be accounted for. Such analyses are essential for developing a defensible safety case for the underground storage of radioactive waste.

Sarsenbayev, Dauren↗

ANDRA's Underground Research Laboratory in Bure: Major Role in the Cigeo Development - 20005

The Industrial Center for Geological Disposal, also called Cigeo, is the deep geological disposal facility project developed by Andra since 1991. It is intended for the final disposal of High-Level Waste (HLW) and Intermediate Level Waste-Long Lived (ILW-LL) generated in France by the nuclear industry. Cigeo is located in the east of France (Meuse/Haute-Marne site). The disposal will be implemented in a 140 to 160 m thick clay layer at about 500 m depth. The license application file will be submitted in 2020. If the license is granted, the construction of the pilot phase of Cigeo (ramp, shafts, drifts, initial disposal vaults) could start in 2025 at the earliest. Since 2000, the development of the safety case of Cigeo for post closure has been supported by a three-stage construction, design, and scientific and technological experiment program performed in the French Underground Research Laboratory (URL) in Bure. These stages of the URL activities supported the iterative interactions between the knowledge acquired by scientific and technological R and D program, the design process and the safety assessment. The stages focused on assessing the suitability of the disposal concept, providing the basis for safety options and construction design, and preparing for licensing using large scale demonstrations. Recently, Andra launched the fourth development stage of the URL to implement a new set of technological experiments aiming at consolidating the design options of disposal cells and galleries for the pilot phase of Cigeo and at assessing monitoring technologies. Recently, Andra launched the fourth development stage of the URL to implement a new set of technological experiments aiming at consolidating the design of the pilot phase of Cigeo and at assessing design options and monitoring technologies. Removal of a segment ring, construction of an X drift crossing, improved construction techniques for HLW vaults, and construction of an ILW-LL prototype disposal vault are example activities during the fourth phase. In the future, the URL in Bure will remain a unique location to carry out research on promising technical solutions, to reduce Cigeo's construction and operation risks and strengthen the long-term safety assessment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Fukushima Safety Enhancement Activities in Canada

In the immediate aftermath of the common-cause seismic and tsunami events that triggered the Fukushima Daiichi nuclear accident on March 11, 2011, the nuclear regulator, the Canadian Nuclear Safety Commission (CNSC), requested that all Cass I nuclear facilities re-examine the safety cases for their nuclear facilities. Lessons-learned task forces were established by the CNSC, and the nuclear utilities, Ontario Power Generation (OPG), Bruce Power (BP), and New Brunswick Power (NBP). The purposes of these independent task forces was to develop relevant lessons learned issues for the Candu nuclear power plants operating in Canada and to identify actions that could enhance safety. Subsequently, a CNSC Integrated Action Plan was developed to address the recommendations arising from the CNSC Task Force Report, and the licensees aligned their actions with this plan. The actions were grouped into four categories, as follows. 1. Strengthening defence in depth; Actions included re-assessment of a site-specific external hazards using PSA; physical plant changes to add further cooling water make-up capability to heat sinks; development of new Canadian standards and updated regulatory documents that address requirements for Beyond Design Basis Accidents (BDBA), Probabilistic Safety Assessment (PSA) and Period Safety Review (PSR); development of a new and novel methodology for assessing multi-unit risk that is consistent with the IAEA construct of defence-in-depth (including a safety goal hierarchy and complementary risk analysis methods that address 'Black Swan' events); enhanced management of hydrogen combustion challenges; and enhanced Severe Accident Management Guidelines (SAMG). 2. Enhancing emergency response; Actions included provision of Emergency Mitigation Equipment (EME) such as transportable diesel-driven pumps or fire engines, transportable diesel generators for AC and instrument power; pre-installed connections to in-plant equipment via easily accessible and protected quick-connect points for water and electrical power; upgraded emergency response centres; enhanced communication systems and protocols; and enhanced emergency response programs, training and exercises. 3. Improving the regulatory framework and processes; 4. Enhancing international collaboration. Actions assigned under categories 3 and 4 were placed upon the regulator. This presentation will focus on the assigned actions in categories 1 and 2. The underlying motivation, objectives, and safety benefits associated with the actions will be described within the context of broader aspects of severe accident mitigation in water-cooled reactors. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Analysis of the likelihood of post-closure criticality in a geological disposal facility - 14349

Radioactive Waste Management (RWM) is responsible for implementing geological disposal of the UK's higher activity radioactive wastes. These wastes include significant quantities of fissile nuclides and, therefore, demonstration of the criticality safety of the wastes under disposal conditions forms an important component of RWM's disposal system safety case. At the time of disposal, controls will ensure that all waste packages are sub-critical, and the containment provided by the engineered barrier system of a geological disposal facility (GDF) will ensure that criticality is prevented for some time after disposal. However, as waste packages begin to degrade, fissile and other materials may be mobilised, which could affect the potential for criticality. Therefore, the possibility for the evolution of conditions in a GDF to result in criticality requires assessment. RWM established the 'Likelihood of Criticality' research project to develop qualitative and quantitative arguments to demonstrate that criticality after closure of a GDF is unlikely. The project included consideration of the criticality safety of disposal concepts for intermediate and high level waste, spent fuel, separated plutonium and highly-enriched uranium in different generic geological settings. The results are underpinned by the construction of post-closure criticality scenarios that have been evaluated using high-level judgments about scenario credibility as well as modelling of evolving conditions in a GDF. In the latter case, a probabilistic modelling approach has been undertaken to address uncertainty in the calculation of concentrations and masses of fissile material that could occur at potential accumulation sites. The potential for criticality has been judged based on comparisons of the calculated fissile masses with minimum values required for criticality at different locations in the barrier system. This paper explains the novel approach taken to evaluating the likelihood of criticality in a GDF based on the probabilistic modelling of waste package evolution and plutonium and uranium migration. The role of this research in RWM's work to demonstrate the criticality safety of a GDF in the UK is presented in a companion paper, which also draws on the results of a parallel research project that demonstrates that, even if a criticality were to occur, then its consequences would be insignificant to GDF performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Problems Related to Temperature-Induced Processes in Long-Term Repositories for Nuclear Waste - 17514

Concepts for the final disposal of high level radioactive waste in deep geological formations must consider the heat pulse produced from radioactive decay during operations and in the post-closure phase as an important factor for the integrity of barrier systems. Several safety cases in different countries limit the maximum temperature at the boundary between the technical barrier/canister surface to the host rock/buffer material to 100 C. Increases in maximum temperature have very diverse effects with respect to the type, intensity and range of the heat pulse. These depend, among other factors, on i) the amount of heat emitted, ii) the type of host rock including site-specific characteristics, iii) the safety and repository concept and further site-specific boundary conditions. The German Commission on the Disposal of High-level Radioactive Waste (Commission) recommended, for precautionary reasons, that the temperature limit at the outer surface of waste containers should not exceed 100 C. Higher temperatures could only be considered if the maximum physically possible temperatures in the respective host rock have been reliably set as a result of research findings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tailoring of the care concept for practicality, safety and robustness

The Cavern Retrievable (CARE) concept was originally developed to provide flexibility in tailoring disposal of vitrified HLW to small volunteer host sites, where high emplacement density leads to significant challenges in terms of the management of radiogenic heat. Including an extended storage period in underground caverns prior to sealing solved the heat issue, but also provided benefits in terms of a slow decision-making process that provided more opportunities to engage stakeholders. Recently, direct disposal of spent fuel is being considered in Japan and this gives more severe challenges for heat management, even for conventional disposal concepts. Due to great uncertainties in the future of nuclear power in Japan, this may also be associated with a desire to preserve the option of retrieval for extended periods. The basic CARE concept has thus been re-assessed to consider these aspects - and also the need to be able to develop a robust safety case that can be readily communicated to stakeholders, who are more sensitive to nuclear issues than they were in the past. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evidence Arguments for Using Formal Methods in Software Certification

We describe a generic approach for automatically integrating the output generated from a formal method/tool into a software safety assurance case, as an evidence argument, by (a) encoding the underlying reasoning as a safety case pattern, and (b) instantiating it using the data produced from the method/tool. We believe this approach not only improves the trustworthiness of the evidence generated from a formal method/tool, by explicitly presenting the reasoning and mechanisms underlying its genesis, but also provides a way to gauge the suitability of the evidence in the context of the wider assurance case. We illustrate our work by application to a real example-an unmanned aircraft system- where we invoke a formal code analysis tool from its autopilot software safety case, automatically transform the verification output into an evidence argument, and then integrate it into the former.

Argumentation↗

Prospective Safety Analysis and the Complex Aviation System

Fatal accident rates in commercial passenger aviation are at historic lows yet have plateaued and are not showing evidence of further safety advances. Modern aircraft accidents reflect both historic causal factors and new unexpected "Black Swan" events. The ever-increasing complexity of the aviation system, along with its associated technology and organizational relationships, provides fertile ground for fresh problems. It is important to take a proactive approach to aviation safety by working to identify novel causation mechanisms for future aviation accidents before they happen. Progress has been made in using of historic data to identify the telltale signals preceding aviation accidents and incidents, using the large repositories of discrete and continuous data on aircraft and air traffic control performance and information reported by front-line personnel. Nevertheless, the aviation community is increasingly embracing predictive approaches to aviation safety. The "prospective workshop" early assessment tool described in this paper represents an approach toward this prospective mindset-one that attempts to identify the future vectors of aviation and asks the question: "What haven't we considered in our current safety assessments?" New causation mechanisms threatening aviation safety will arise in the future because new (or revised) systems and procedures will have to be used under future contextual conditions that have not been properly anticipated. Many simulation models exist for demonstrating the safety cases of new operational concepts and technologies. However the results from such models can only be as valid as the accuracy and completeness of assumptions made about the future context in which the new operational concepts and/or technologies will be immersed. Of course that future has not happened yet. What is needed is a reasonably high-confidence description of the future operational context, capturing critical contextual characteristics that modulate both the likelihood of occurrence of hazards, and the likelihood that those hazards will lead to negative safety events. Heuristics extracted from scenarios, questionnaires, and observed trends from scanning the aviation horizon may be helpful in capturing those future changes in a way conducive to safety assessment. What is also needed is a checklist of potential sources of emerging risk that arise from organizational features that are frequently overlooked. The ultimate goal is to develop a pragmatic, workable method for using descriptions of the future aviation context, to generate valid predictions of safety risks.

prospection↗

Development of a Regulatory Strategy for Post Operational Clean Out Activities at Sellafield Limited Nuclear Licensed Site - 20273

The Thermal Oxide Reprocessing Plant (THORP) at the Sellafield nuclear licensed site carried out its final commercial shear of spent nuclear fuel in November 2018, since when the facility has undergone rundown prior to cessation of operations. The Magnox Reprocessing Facility (MRF) is also due to cease operating, around the end of 2020. Following the cessation of spent fuel reprocessing, the facilities and supporting infrastructure will transition into Post Operational Clean Out (POCO), which will become an increasingly significant portion of Sellafield Limited's (SL) activities. POCO is defined as the set of activities undertaken directly after a nuclear facility comes to the end of its operational life, in order to place the plant in a suitable state for the subsequent decommissioning steps. The decommissioning strategy at SL is for deferred dismantling of these facilities, which will be subject to a period of Surveillance and Maintenance (S and M) following completion of POCO. This paper outlines the development and implementation of a regulatory strategy for POCO activities at the Sellafield site by the Office for Nuclear Regulation (ONR), the independent nuclear safety, transport and security regulator in the United Kingdom. The paper also describes how this regulatory strategy is applied to nuclear installations undergoing transition into POCO and subsequent decommissioning. ONR works jointly with the Environment Agency, as the environmental regulators in England, to ensure that matters relevant to them have been duly considered. In developing a regulatory strategy, ONR has taken a site-wide approach, moving away from regulation on a facility-by-facility basis, to promote consistency, as well as maximising efficiency and effectiveness. The aim of this integrated approach was to prevent complications during future decommissioning and dismantling that have been experienced previously at similar facilities in France. The strategy recognised that once reprocessing operations are concluded, the hazard present will be reduced significantly, which provides the opportunity for ONR to consider how best to deliver a proportionate approach to regulatory interventions. Once POCO has been completed and the facility has transitioned into a period of S and M, the scale and frequency of ONR's interventions will reduce, commensurate with the safety case covering the remaining hazard and activities associated with maintaining the facility prior to final decommissioning. This approach allows ONR to consider risks holistically, considering the full life cycle of the facility and by taking due account of the interdependencies between facilities across the site. The strategy also aligns with existing regulation of high hazard and risk reduction activities, which remain ONR's top priority. As SL progresses with POCO activities in THORP and across the rest of the site, ONR will review its regulatory strategy to ensure that the intended safety benefits are realised. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Numerical Modelling of Radionuclide Migration in the Context of a Near-Surface LILW Disposal Facility - 18618

The reference solution for the management of low and intermediate level short-lived waste (LILW) in France consists in their emplacement in concrete vaults built at the near-surface. The corresponding disposal facility under operation by the French waste management organization (Andra), is located in North-eastern France and planned to be closed in 2060. The safety case developed by Andra has to show the evidence that, amongst other aspects, the radionuclide transfer through the confinement barriers will occur in such a way that the human and environmental exposure will be as low as reasonably achievable (ALARA) and in accordance with the dose constraints. For this purpose, modelling is used to integrate uncertainties about the characteristics of concrete components, waste and water table and their evolution in time and space. At last, modelling is finally used to investigate the radiological impact of specific scenarios in which the failure of safety barriers occurs. In the frame of its technical review of the safety assessment, the French Institute for Radiological Protection and Nuclear Safety (IRSN) also performs such kind of numerical modelling of radionuclide fate from the waste to the hydrogeological outlets, in order to check whether the assessment performed by Andra takes into account sufficiently conservative assumptions. The present work aims to evaluate the role of components of the vaults on radionuclide transport during the post-closure period over a few thousand years. For this purpose, IRSN carries out numerical calculations with MELODIE software, which simulates water flow and transport of species, in order to simulate radionuclide migration from waste packages emplaced in a concrete vault to the surrounding groundwater. The developed transport model focuses on 3-H radionuclide and integrates Andra's main assumptions (release model from the waste packages, chemical and hydraulic properties of the vault components, shrinkage and cracks in concrete components). An adaptive mesh method, based on an a posteriori error estimator, was used to model the cracks and the consideration of a strong heterogeneity in the hydraulic and transport parameters values in the different components of the model. This method shows an improvement of results of about 40 times, whereas the mesh size was increased by only 2%. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A systematic approach to the analysis of double faults within design basic accident methodology - 14501

Within the UK there is a general trend towards adopting Design Basis Accident (DBA) methodology for the assessment of radiological hazards, including criticality. DBA is a single fault methodology and comprises identifying the initiating event, its frequency and consequence. A fault with a very low initiating event frequency will not require further analysis. A fault sequence that terminates in a sub-critical configuration would also not require further analysis; although the identified passive features ensuring sub-criticality are subjected to engineering substantiation. Where faults do not pass this initial screening, two safety measures are generally required to ensure the fault does not progress to a criticality incident. This methodology provides a robust approach to single faults ensuring that an appropriate level and range of plant measures are identified and subjected to appropriate substantiation. However, a criticality is a cliff-edge effect and is dependent on multiple parameters. It is entirely possible under DBA to evaluate several single fault sequences and conclude that no measures are required because the single faults terminate in a sub-critical configuration. Importantly, for criticality safety, under DBA, there is no requirement to prevent important parameters from deviating from normal or upper bound 'safe' levels leaving the plant at greater risk in the event that further faults initiate. The combination of two faults could lead to a criticality incident but there is no current driver within DBA methodology to analyze these coincident or double faults. There is, therefore, potential to significantly under estimate the risk of criticality. This understanding is embodied within other methodologies such as the Double Contingency Principle. However, within the UK the DBA methodology has so significantly improved the analysis of single faults that, in some instances, consideration of double faults has taken a back seat. This is despite the UK regulator stating that 'criticality safety cases should employ the double contingency approach'. This paper presents a systematic approach to ensure that the potential for double faults or multiple parameter deviations to result in a criticality is effectively evaluated within the wider DBA methodology. The methodology determines which faults may be screened out from double fault analysis on the grounds of being 'unlikely' to initiate and being present for a 'short' duration. For those faults screened into double fault analysis, this guidance sets out the potential means of determining acceptable risk. These means include the specific evaluation of the risk of two criticality control parameters deviating simultaneously, the definition of additional safety measures and the definition of the boundary of safety for multiple parameters and the risk of exceeding this boundary. (authors)

42 ENGINEERING↗

Diagnostic systems in DEMO: Engineering design issues

The diagnostic systems of DEMO that are mounted on or near the torus, whether intended for the monitoring and control functions of the engineering aspects or the physics behaviour of the machine, will have to be designed to suit the hostile nuclear environment. This will be necessary not just for their survival and correct functioning but also to satisfy the pertinent regulatory bodies, especially where any of them relate to machine protection or the prevention or mitigation of accidents foreseen in the safety case. This paper aims to indicate the more important of the reactor design considerations that are likely to apply to diagnostics for DEMO, drawn from experience on JET, the provisions in hand for ITER and modelling results for the wall erosion and neutron damage effects in DEMO.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of a process for remediation of enriched uranium coolant tanks at AWE Aldermaston - 14520

Machining processes involving Enriched Uranium (EU) at the UK Atomic Weapons Establishment have historically required the use of a liquid coolant to ensure product quality and to provide protection against hazards associated with ignition of the EU swarf in the non-inert gloved air box atmosphere. This coolant is typically provided by closed circuit re-circulating systems utilising large volume tanks to contain the bulk coolant. Small losses of EU to the coolant tank are experienced during the machining process leading to accumulation over time. This is expected and appropriate measures are put in place to control such accumulations to ensure criticality safety during the operational phase. The original design intent made no specific provision for recovery of the EU as it was not expected to be required based on the anticipated losses and design lifetime of the tanks. However, in support of ongoing operations it has become necessary to develop a process to remediate out of service coolant tanks to recover the EU and to replace the coolant and some of the end-of-life tank components. Detailed optioneering has been undertaken to develop a process that addresses all the relevant hazards, including nuclear criticality safety. Non-destructive assay techniques have been developed to help determine the inventory of EU present and consequently the level of control required during the remediation process. This has led to the selection of favourable geometry collection vessels that not only afford significant defence-in-depth against criticality hazards during the remediation work but also satisfy interim storage requirements. These vessels may also be of interest to other operators. This paper presents an overview of the history of operation of the coolant tanks and proposed remediation process and provides an overview of the criticality safety case that has been developed to support it. It is anticipated that the remediation work will be undertaken before 2019 allowing the findings and lessons learnt (including validation of non-destructive assay results on expected hold up) to be reported at the next ICNC. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Reactor Fundamentals Handbook

The objective of the Knowledge Transfer Workshop is to transfer selected fundamental nuclear energy technology knowledge and experience to the nuclear industry’s next generation of leaders. The course provides the original bases for fundamental safety concepts, design features, and reactor technologies. The course discusses the “why” and the “how” for decisions that led to the current commercial nuclear reactor designs and regulatory framework. Various accidents and their attributes as well as other events that have strongly affected the evolution of the safety case, plant design, and operations are discussed. To prepare the course participant for the topics discussed, this handbook provides a crash course into the current state of commercialized Light Water Reactor technology. The material is introductory for the interested layperson and also serves as a refresher for scientists and engineers that may have studied Light Water Reactors at one time, but are currently not an expert in this field of nuclear engineering. This handbook is a brief tutorial and refresher training material on basic Light Water Reactor (LWR) core physics and plant systems. It is reference material for attendees of the Knowledge Transfer Workshop. There are two types of LWR technologies, Pressurized Water Reactor (PWR) and Boiling Water Reactors (BWR). This handbook discusses fundamental design traits of each providing contrasts between performance and safety features. The intent is to provide the participants with an understanding of nuclear terminology associated with LWR technology, including fundamentals, systems, safety, and regulations. This handbook is not an original textbook. Many authors have contributed collegiate level introduction to nuclear engineering texts. Rather, this material is intended to be a graded summary of important aspects of LWR reactor core and plant systems. It draws heavily on other resources. The interested reader is encouraged to follow citations made in this handbook to more thorough or detailed public references.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Salt Repository Concept for CSNF in 21-PWR Size Canisters

The most straightforward concept for disposal of large, heavy packages containing commercial spent nuclear fuel (CSNF) in a repository in bedded salt, would be to emplace them directly on the floor in emplacement tunnels. In-tunnel axially aligned horizontal emplacement would minimize excavated volume and avoid drilling of large-diameter emplacement boreholes. A similar concept was proposed in Germany for direct disposal of POLLUX ® canisters. The repository would be constructed at a depth of 500 to 1,000 m for isolation from the surface, and for sufficient overburden stress to ensure creep reconsolidation of repository openings. It could entail modular panels of emplacement tunnels arranged on headings oriented in cardinal directions from a central core, to accommodate the estimated 140,000 MTU total U.S. CSNF inventory. To do so, the overall area of the repository layout would be approximately 20 km 2 . Many layouts are possible, but the approach should be modular, excavation should be deferred for as long as possible to avoid maintenance, and the emplacement areas should share support facilities and shafts. Vertical shafts would be used in accordance with mining practice in sedimentary basins. Large diameter shafts would be needed for ventilation exhaust and waste transport, with smaller shafts for waste salt removal, men & materials, and ventilation intake. The spacing between disposal tunnels as estimated from thermal modeling, seeks to limit the maximum average areal thermal load in the panels to 11 W/m 2 to control long-term heat buildup in the host rock. Peak salt temperature would occur within a few years and would be dominated by each waste package locally, simplifying thermal management. There would be some flexibility to decrease the package spacing or increase the emplacement thermal power limit Backfilling emplaced waste packages immediately with mine-run crushed salt would provide shielding and expedite reconsolidation. This arrangement would isolate adjacent waste packages from one another by the intervening backfill, especially after it reconsolidates and its properties approach those of intact salt. After the repository is fully loaded and the performance confirmation program is complete, activities to permanently close the repository would be initiated. During closure operations all openings in the host salt would be backfilled, then shafts would be sealed, and boreholes plugged. Plans for the Waste Isolation Pilot Plant (WIPP) show how sealing and plugging could be done. A monitoring program could continue for 50 years or longer after repository closure. With an emplacement thermal power limit of 10 kW per waste package, nearly all the CSNF that is projected to be produced by the current fleet of reactors in the U.S. could be emplaced over a period of approximately 50 years starting in calendar 2048. No barriers to implementation in a reasonable timeframe have been identified from this generic analysis. Engineering challenges include: 1) shaft construction; 2) a very-large capacity shaft hoist; 3) overpack design; 4) a transport-emplacement-vehicle (TEV) for transporting waste packages once they are underground and emplacing them remotely; and 5) remotely operated equipment for emplacing backfill. The method of shaft construction would depend on site-specific conditions, and could involve freezing the subsurface. A shaft hoist with payload capacity of 175 MT seems technically and economically feasible based on development work in Germany, and it would be the largest hoist of its kind. The function of disposal overpacks would be to provide reliable containment during repository operations, which could be accomplished using a corrosion allowance material such as a low-carbon steel. Development effort would be needed to determine overpack thickness (e.g., 7 to 20 cm) that can resist corrosion and loading from salt creep, to rovide containment throughout the repository operational period. The transport-emplacement vehicle (TEV) would be similar to previous concepts, particularly one option proposed for a Yucca Mountain repository. It would move over a rough salt floor on independently driven and steered wheels, and carry heavy shielding in addition to a waste package. By analogy to the safety case for the WIPP in New Mexico, human intrusion is likely to be the dominant mode of radionuclide release from the repository. Treatment of human intrusion for a CSNF repository in salt could depend on promulgation of site-specific changes in the regulations. Radionuclide release and migration would be quite limited for undisturbed conditions. There may be opportunities for improved understanding of salt performance with waste heating, based on future in situ testing in an underground salt research laboratory. This report also discusses a developing area of salt rock mechanics that involves low-stress, low strain-rate creep that might cause large, heavy waste packages to slowly sink. Site-specific sampling, testing, and modeling would be used to determine if the mechanism is important enough to merit consideration in design, or inclusion in performance assessment. Part of engineering design and postclosure safety assessment for a CSNF repository in salt would be to implement a methodology to show that the probability of a criticality event in the repository, when waste packages eventually breach and are flooded, is less than the probability screening threshold for performance assessment. In the methodology, a criticality analysis would be performed for waste packages in the repository, incorporating measures that could be introduced as needed to limit reactivity, for example using fuel selection and loading rules, and crediting the absorption of thermal neutrons by natural chlorine in the environment. A similar analysis has been underway for CSNF stored in dual-purpose canisters. Ideally the strategy would be developed prior to actually loading SNF assemblies into canisters used in waste packages for disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the safety of mobile units for the conditioning of radioactive waste

In Germany mobile units are used to treat and condition radioactive waste. On behalf of the relevant authorities TUV SUD Industrie Service GmbH evaluates their safety. In this paper we outline the general procedure we apply and point out typical results. Generally, a generic safety case evaluates the effects of incidents and accidents and its consequences for the workers and the public. Special care is necessary to define the radioactive inventory, the nuclide composition and the mobility of the radioactive substances. A systems analysis is carried out. Typical aspects to be considered are the handling procedures, the measurement devices and automatic actions. From the various possible malfunctions the critical ones have to be identified. Generally one or only a few scenarios have to be considered in detail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Bukov underground research facility as part of the Czech Republic's DGR development programme - 15644

The Czech Republic's deep geological repository (DGR) policy sets out a number of important milestones including the selection of candidate sites by 2018 and the selection of a final site by 2025. The final commissioning of the Czech DGR is planned for 2065. In 2010 a screening process was completed employing geological and other criteria that resulted in the identification of 7 potentially suitable sites, all situated in crystalline - granite host rock environments. The next step of the process will result in a reduction both in the number of sites and the surface area of remaining sites based on preliminary safety evaluations and socioeconomic, political and environmental criteria. In order to better understand the behaviour of crystalline host rock environments for DGR safety case purposes, the Radioactive Waste Repository Authority (RAWRA) made decided to enhance the extent of in-situ measurements and research at a depth corresponding to that of the future DGR. In the second half of 2013, RAWRA commenced the construction of the Bukov Underground Research Facility (Bukov URF) in the southern section of the Rozna uranium mine at a depth of 600 m below the earth's surface in a geologically well-mapped area of a Moldanubic crystalline rock formation which is composed principally of migmatised gneisses, migmatites and granulites. The Bukov URF will be, first and foremost, a research facility at which work will be conducted focusing on the taking of geophysical measurements, petrographic, mineralogic, geochemical research and the in-situ determination of the physical - mechanical, geochemical and hydrogeological properties of the host rock massif. The research results will form input data which will be used to both support and improve the safety of the future DGR. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an Alternative Approach to Demonstrating Environmental Performance in the UK - 19354

European basic safety standards require that exposure of humans to the potentially harmful effects of ionising radiation are optimised so that they are as low as reasonably achievable, taking account of economic and societal factors. In the United Kingdom the responsibility for ensuring that exposures to humans are optimised is split between two regulatory functions. The Office of Nuclear Regulation regulates exposures to workers in all scenarios and to members of the public in the event of an accident. Environmental regulators in each of the four nations comprising the United Kingdom regulate exposures to members of the public from normal operations. Since the early 1990's, all permissions granted to nuclear sites in the UK for the discharge/disposal of radioactive waste to the environment have contained conditions requiring holders to demonstrate that they minimise the generation of radioactive waste, apply appropriate abatement and discharge/dispose of it in a way that minimises impacts on members of the public and the environment. For many years, the industry standard for providing this demonstration, which was heavily influenced by regulatory expectations and feedback, was to undertake one or a series of multi-attribute decision assessments (MADA). Wood's team of environmental specialists has been involved in undertaking such MADA studies for many years. Since the mid-2000's, our team has become increasingly aware of some of the limitations of undertaking MADA to demonstrate environmental performance for large scale new nuclear build projects and, in particular, the next generation of new nuclear power stations that are being planned and implemented in the UK. We have collaborated with the vendors of reactor technologies, the prospective/owner operators of new nuclear power stations and the developers of new facilities on existing sites to develop an alternative approach to demonstrating environmental performance. Our alternative approach comprises three main pillars which are summarised as: - Evolution - benefit from progressive improvements, operational experience and recent permitting activities. Our alternative approach uses the claim, argument, evidence approach which is commonly used for nuclear safety cases and which allows us to 'tell the story' of how environmental performance has been achieved. We have successfully deployed this approach for all new nuclear power stations proposed in the UK. - Integration - ensure that optimisation is integrated into the project programme and forms part of the 'big picture'. Our alternative approach allows environmental performance to be managed better throughout the life cycle of the project and ensures that our outputs are 'living' documents and do not 'sit on the shelf'. We have successfully demonstrated how this can be applied during rationalisation of major schemes and significant design changes on nuclear new build projects. - Opportunity - identify the best time to deliver elements of the programme. Our alternative approach aims to minimise the overall time, trouble and costs associated with demonstrating environmental performance by ensuring that decisions are made at the time when they offer greatest benefit and by minimising unnecessary rework. Our advice has helped to reduce the project costs and minimise delays associated with regulatory queries and interventions. This paper describes the journey that we have taken with our clients in developing our alternative approach to demonstrating environmental performance. We explain the UK regulatory context and explore the need for change. We present a number of case studies related to new nuclear power stations and other new facilities on existing nuclear sites that demonstrate the successful application of our alternative approach. We provide examples of how we have successfully implemented the outputs of our alternative approach into project and corporate management arrangements. Finally, we examine feedback from clients, regulators and other interested parties to propose future refinements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗