Lessons Learned for Construction and Waste Water Management at Radioactive Waste Closure Site

Environmental remediation of three different radioactive waste closure sites each required exhaustive characterization and evaluation of sampling and analytical information in resolving regulatory and technical issues that impact cleanup activities. One of the many regulatory and technical issues shared by all three and impacting the cleanup activities is the compliant management and discharge of waste waters generated and resulting from the remediation activities. Multiple options were available for each closure site in resolving waste water management challenges depending upon the base regulatory framework defined for the cleanup or closure of the site. These options are typically regulated by the federal Clean Water Act (CWA), with exemptions available under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Superfund Amendments and Reauthorization Act of 1986 (SARA) or Memorandum of Understanding (MOU) between regulatory agencies. In general, all parties must demonstrate equivalent compliance when concerns related to the protection of the general public and the environment. As such, all options for management of waste water resulting from closure activities must demonstrate compliance to or equivalent actions under the CWA. The CWA provides for the National Pollution Discharge Elimination System (NPDES) that is typically maintained by individual states through permitting process to generators, public utilities, and more recently, construction sites. Of the three sites, different compliance strategies were employed for each. The approach for the Columbus Closure Project (CCP) was to initiate full scale compliance to the Ohio EPA General Construction Permit No. OHC000002. The CCP provided Notice of Intent (NOI) to the Ohio EPA to discharge under the general permit according to the regulator approved Storm Water Pollution Prevention Plan. For the second site, the Li Tungsten Superfund Site in Glen Cove, New York, the option was to manage and discharge waste water under a due diligence process to New York State General Permit No. GP-02-01. For the third site, the Middlesex Sampling Plant in Middlesex, New Jersey, the options was to manage and discharge waste water to the Publicly Owned Treatment Works (POTW). Each option has resulted in a safe, cost-effective, and compliant approach to managing discharging waste waters from the site closure activities. (authors)

54 ENVIRONMENTAL SCIENCES↗

Challenges for Lithuania: Ignalina NPP Early Closure

As a condition of accession into the European Union (EU), Lithuania is committed to the closure and decommissioning of Ignalina NPP comprising two RBMK-1500 reactor units (Fig. 1). It was agreed in a special protocol to the Accession Treaty that, in return for adequate EU financial assistance, Unit 1 would be closed before 2005 and Unit 2 by the end of 2009. The first unit was duly shut down on December 31, 2004. Lithuania, which has borders with Russia (Kaliningrad territory), Poland, Latvia and Belarus, spent fifty years as part of the Soviet Union and was deeply integrated into its economy and electrical infrastructure. At the break-up of the USSR, Lithuania inherited electricity generating capacity designed to supply the north-west region including ownership of Ignalina NPP located in the north-east of the country. Ignalina NPP Unit 1 was commissioned in 1983, Unit 2 in 1987; the planned lifespan of each unit was 30 years. Construction of a third unit was started but never completed. Since Lithuania became independent in 1990, Ignalina NPP has typically contributed more than 70% of national power supply. The town of Visaginas (population approx. 30,000) was purpose built to serve the plant and staff were brought in from throughout the USSR. With 3200 direct employees, Ignalina NPP remains by far the largest employer. Although there are pockets of Russian-language speakers in communities throughout Lithuania, Visaginas is the only example on a whole-town scale. Thus closure of Ignalina NPP within the restricted timescale required by the EU Accession Treaty commitment set an exceptional challenge to Lithuania. However, since the preparatory phase of decommissioning started in 2000, notable progress has been made, experience gained and lessons learnt. At present Unit 1 remains partially fueled in a state of care and maintenance. Partly burnt fuel is being transferred from Unit 1 to Unit 2 for further irradiation in order to minimize the commitment of new fuel thereby reducing operating costs and the final quantity of spent fuel. Design and construction of the facilities for spent fuel storage, waste processing and free-release is ongoing. The siting of the Near Surface Repository is now in the final stages of approval and construction of the landfill facility is under tendering. In order to facilitate the approval process and minimize the transport of waste, both disposal facilities will be within the boundary of the NPP site. Approximately 450 staff are employed at the shutdown Unit 1 for the safe maintenance of essential systems. The total staffing level at the plant is currently being reduced by around 200 each year, with a larger release to take place at the closure of Unit 2. It is envisaged that 2000 staff will be required for the dismantling operations. Although Ignalina NPP is still in the early stages of closure and decommissioning, some important lessons have already been learnt: Firstly, the importance considering social and financial issues as well as technical factors in deciding the decommissioning strategy. This should be done before the preparation is started of the FDP. The same broad consideration should also be given to the economic restructuring of the local area. Consultation is necessary with local and national authorities, and other stakeholders up to ensure a common vision. At Ignalina NPP it was considered essential to staff morale and the maintenance of a strong safety culture to guarantee the special social and employment benefits to dismissed staff in law [9]. At the same time, measures were also adopted to encourage certain key personnel to remain at the plant until closure. The case of Lithuania, which at independence had no legislative framework or management infrastructure for radioactive waste, may be exceptional; however, for all decommissioning projects it is necessary to have, from the outset, a clear strategy on waste storage and disposal. Finally, coordination at all levels must be assured, especially with the involvement of the nuclear regulators and other regulatory authorities, to achieve a smooth progression from operation into decommissioning.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Evaluation of Robotic Systems to Carry Out Traverse Execution, Opportunistic Science, and Landing Site Evaluation Tasks

This report covers the execution of and results from the activities proposed and approved in Exploration Analogs and Mission Development (EAMD) Field Test Protocol HMP2010: Evaluation of Robotic Systems to carry out Traverse Execution, Opportunistic Science, and Landing Site Evaluation Tasks. The field tests documented in this report examine one facet of a larger program of planetary surface exploration. This program has been evolving and maturing for several years, growing from a broad policy statement with a few specified milestones for NASA to an international effort with much higher fidelity descriptions of systems and operations necessary to accomplish this type of exploration.

Hoffman, Stephen J.↗

The French Geological Repository Project Cigeo - 12023

The French Agency for Radioactive Waste Management, ANDRA, was launched by law in 1991 to perform and develop the research programme for managing high level and intermediate level long-lived radioactive waste generated by the French nuclear fleet. After a 15-year intensive research programme, including the study of alternative solutions, an overall review and assessment of the results was organized, including a national public debate. As a result, the Parliament passed a Planning Act on radioactive waste management in 2006. Commissioning of a geological repository by 2025 was one of the most important decisions taken at that time. To reach this goal, a license application must be submitted and reviewed by the competent authorities by 2015. A detailed review and consultation process is, as well, defined in the Planning Act. Beside the legal framework the project needs to progress on two fronts. The first one is on siting. A significant milestone was reached in 2009 with the definition of a defined area to locate the underground repository facilities. This area was approved in March 2010 by the Government, after having collected the opinions and positions of all the interested parties, at both National and local levels. A new phase of dialogue with local players began to refine the implementation scenarios of surface facilities. The final site selection will be approved after a public debate planned for 2013. The second one is the industrial organization, planning and costing. The industrial project of this geological repository was called Cigeo (Centre Industriel de Stockage Geologique). Given the amount of work to be done to comply with the given time framework, a detailed organization with well-defined milestones must be set-up. Cigeo will be a specific nuclear facility, built and operated underground for over a hundred years. The consequence of this long duration is that the development of the repository facilities will take place in successive operational phases. The characteristics of the first waste packages received will determine the work and the corresponding investments by 2025 on the repository site. One of the main challenges will be to accommodate both activities of mining and nuclear operations at the same time and at the same location. From the technical standpoint, ventilation and fire risk cannot be managed through a simple transposition from current nuclear industry practices. The reversibility demand also leads to concrete proposals with regard to repository management flexibility and waste package retrievability. These proposals contribute to the dialogue with stakeholders to prepare for the public debate and a future law which will determine the reversibility conditions. New design developments are expected to be introduced in the application from the current studies conducted until 2014. The possibility of optimization beyond 2015 will be kept open taking into account the one hundred years operating time as well as the capability to integrate feedback gained from the first construction and operation works. The industrial committed work aims to reach the application stage by 2015. The license application procedure was defined by the 2006 Act. Subject to authorization, the construction might begin in 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Uranium Impacted Sediments in a Watercourse - 12486

In 2009, remediation was initiated for a non-operational fuel cycle facility previously used for government contract work. Between 2009 and the spring of 2011, remediation efforts were focused on demolition of contaminated buildings and removal of contaminated soil. In the late spring of 2011, the last phase of remediation commenced involving the removal of contaminated sediments from portions of a 1,200 meter long gaining stream. Planning and preparation for remediation of the stream began in 2009 with submittal of permit applications to undertake construction activities in a wetland area. The permitting process was lengthy and involved securing permits from multiple agencies. However, early and frequent communication with stakeholders played an integral role in efficiently obtaining the permit approvals. Frequent communication with stakeholders throughout the planning and remediation process also proved to be a key factor in timely completion of the project. The remediation of the stream involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation and disposal. Many safeguards were employed to protect several species of concern in the work area, water management during project activities, challenges encountered during the project, methods of Final Status Survey, and stream restoration. The planning and permitting effort for the Site Brook remediation began in May 2009 and permits were approved and in place by February 2011. The remediation and restoration of the Site Brook began in April 2011 and was completed in November 2011. The remediation of the Site Brook involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation, disposal, FSS, and restoration. Early and frequent communications with stakeholders proved to be a key factor in timely completion of the project. Challenges encountered during the remediation effort were overcome by proper planning and having preparedness procedures in place prior to executing the work. With the remediation and restoration successfully completed, the only remaining task is to monitor/maintain the restoration for 10 years. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Pennsylvania and Delaware Energy Code Field Studies (Final Technical Report (FTR)

Led by Northeast Energy Efficiency Partnerships (NEEP) in partnership with Performance Systems Development (PSD), the project aimed to conduct energy code compliance field studies for single-family residential buildings in Pennsylvania and Delaware, as well as multifamily and commercial buildings in Pennsylvania. Using U.S. Department of Energy (DOE) approved methodologies, trained field teams conducted on-site observations and testing to document compliance with key energy efficiency measures, including building envelope insulation, air sealing, duct leakage, windows, and mechanical systems. Data from these studies would then be analyzed to identify construction trends and compliance gaps. The goals included published baseline data for each study, and a training roadmap tailored to each state’s needs. This roadmap would have guided outreach and training for builders, code officials, and other stakeholders on the specific code requirements that offered the greatest opportunity for improvement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Narrowband Propagation Statistics of Aeronautical Mobile-Ground Links in the L- and C-Bands

To provide for the safe integration of unmanned aircraft systems (UAS) into the National Airspace System (NAS), command and control (C2) links must be highly reliable. Hence, protected aviation spectrum is required to support such links for UAS that are integrated into controlled non-segregated airspace. For air-ground (i.e., non-satellite) links, protected aviation spectrum to support C2 links is available in the 960-1164 MHz (L) and 5030-5091 MHz (C) bands. The performance of any C2 system is critically dependent upon the characteristics of the air-ground (AG) channel. Therefore, as part of its UAS Integration in the NAS (UAS in the NAS) project, the U.S. National Aeronautics and Space Administration (NASA) performed a series of air-ground propagation flight tests to collect AG channel data for model development and analysis of potential C2 communications links capable of providing the required reliability. NASA's Glenn Research Center (GRC) conducted an extensive air-ground channel propagation measurement campaign (at altitude) for frequencies in the 960-977 MHz and 5030-5091 MHz ranges, for seven different terrain environments. The measurements were conducted in 2013, and produced the largest set of AG channel data ever gathered to date. This data was subsequently processed to develop models for the AG channel. The statistics collected enabled the derivation of channel model parameters for both narrowband and wideband channels. In order to make the propagation data widely available, the resulting narrowband statistics were processed and submitted to the International Telecommunications Union - Radiocommunication Sector (ITU-R) Study Group 3 Data Banks. Formats for data tables were developed, and tables of the aggregate narrowband propagation statistics for the seven ground site terrain environments were prepared, submitted to, and approved by, the ITU-R Study Group 3. This paper provides brief background on the measurement campaign, collection and processing of data, and development of the narrowband data tables. It further provides examples of the data and its use.

radiofrequency spectrum↗

Narrowband Propagation Statistics of Aeronautical Mobile-Ground Links in the L- and C-Bands

To provide for the safe integration of unmanned aircraft systems (UAS) into the National Airspace System (NAS), command and control (C2) links must be highly reliable. Hence, protected aviation spectrum is required to support such links for UAS that are integrated into controlled non-segregated airspace. For air-ground (i.e., non-satellite) links, protected aviation spectrum to support C2 links is available in the 960-1164 MHz (L) and 5030-5091 MHz (C) bands. The performance of any C2 system is critically dependent upon the characteristics of the air-ground (AG) channel. Therefore, as part of its UAS Integration in the NAS (UAS in the NAS) project, the U.S. National Aeronautics and Space Administration (NASA) performed a series of air-ground propagation flight tests to collect AG channel data for model development and analysis of potential C2 communications links capable of providing the required reliability. NASA's Glenn Research Center (GRC) conducted an extensive air-ground channel propagation measurement campaign (at altitude) for frequencies in the 960-977 MHz and 5030-5091 MHz ranges, for seven different terrain environments. The measurements were conducted in 2013, and produced the largest set of AG channel data ever gathered to date. This data was subsequently processed to develop models for the AG channel. The statistics collected enabled the derivation of channel model parameters for both narrowband and wideband channels. In order to make the propagation data widely available, the resulting narrowband statistics were processed and submitted to the International Telecommunications Union Radiocommunication Sector (ITU-R) Study Group 3 Data Banks. Formats for data tables were developed, and tables of the aggregate narrowband propagation statistics for the seven ground site terrain environments were prepared, submitted to, and approved by, the ITU-R Study Group 3. This paper provides brief background on the measurement campaign, collection and processing of data, and development of the narrowband data tables. It further provides examples of the data and its use.

aircraft communications↗

Port Granby Project Overview - 13208

The Port Granby Project is an integral part of the Port Hope Area Initiative (PHAI), and is located approximately 14 kilometres west of the Municipality of Port Hope in the adjacent Municipality of Clarington, Ontario. The principal objective of the project is the excavation and relocation of low-level radioactive waste (LLRW) and marginally contaminated soils, which were deposited at the Port Granby Waste Management Facility (PGWMF) by Eldorado Nuclear Limited during the period 1955 to 1988, to a new, highly engineered above-ground Long-term Waste Management Facility (LTWMF) to be constructed on a nearby site. The Environmental Assessment for the Project was approved in 2009 August and the required Waste Nuclear Substance License was received in 2011 November. Once the detailed engineering design was completed, in 2011 March, the Port Granby Project was divided into three major contracts for construction implementation purposes. The first of these contracts was completed in late 2012 and the second is planned to start in early 2013. The contracting process for the third major contract is also expected to be completed during 2013. This paper provides an overview of the Port Granby Project as well as discussion on the status of the Project, including the regulatory approvals process, the approach to contracting the construction works and an update of work recently completed and soon to get underway. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Disposal Activities and the Unique Waste Streams at the Nevada National Security Site (NNSS)

This slide show documents waste disposal at the Nevada National Security Site. Topics covered include: radionuclide requirements for waste disposal; approved performance assessment (PA) for depleted uranium disposal; requirements; program approval; the Waste Acceptance Review Panel (WARP); description of the Radioactive Waste Acceptance Program (RWAP); facility evaluation; recent program accomplishments, nuclear facility safety changes; higher-activity waste stream disposal; and, large volume bulk waste streams.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Determing Degradation Of Fiberboard In The 9975 Shipping Package By Measuring Axial Gap

Currently, thousands of model 9975 transportation packages are in use by the US Department of Energy (DOE); the design of which has been certified by DOE for shipment of Type B radioactive and fissile materials in accordance with Part 71, Title 10 Code of Federal Regulations (CFR), or 10 CFR 71, Packaging and Transportation of Radioactive Material. These transportation packages are also approved for the storage of DOE-STD-3013 containers at the Savannah River Site (SRS). As such, the 9975 has been continuously exposed to the service environment for a period of time greater than the approved transportation service life. In order to ensure the material integrity as specified in the safety basis, an extensive surveillance program is in place in K-Area Complex (KAC) to monitor the structural and thermal properties of the fiberboard of the 9975 shipping packages. The surveillance approach uses a combination of Non-Destructive Examination (NDE) field surveillance and Destructive Examination (DE) lab testing to validate the 9975 performance assumptions. The fiberboard in the 9975 is credited with thermal insulation, criticality control and resistance to crushing. During surveillance monitoring in KAC, an increased axial gap of the fiberboard was discovered on selected items packaged at Rocky Flats Environmental Technology Site (RFETS). Many of these packages were later found to contain excess moisture. Savannah River National Laboratory (SRNL) testing has resulted in a better understanding of the relationship between the fiberboard moisture level and compaction of the fiberboard under storage conditions and during transport. In laboratory testing, the higher moisture content has been shown to correspond to higher total compaction of fiberboard material and compaction rate. The fiberboard height is reduced by compression of the layers. This change is observed directly in the axial gap between the flange and the air shield. The axial gap measurement is made during the pre-use inspection or during the annual recertification process and is a screening measurement for changes in the fiberboard.

42 ENGINEERING↗

Ameliorating risk: Culturable and metagenomic monitoring of the 14 year decline of a genetically engineered microorganism at a bioremediation field site

Pseudomonas fluorescens HK44 represented the first genetically engineered microorganism to be approved in the United States for field release for applications related to subsurface soil bioremediation. In October 1996, strain HK44 was introduced into a replicated semi-contained array of soil lysimeters where its luciferase (luxCDABE)-based bioluminescent response to soil-borne polycyclic aromatic hydrocarbon (PAH) contaminants was detected and monitored for the next two years. At the termination of this experiment, it was decided that the lysimeters remain available for future longer-term monitoring efforts, and were thus covered and left essentially undisturbed until the initiation of a large sampling event in 2010, fourteen years after the original release. Although after extensive sampling culturable HK44 cells were not found, additional molecular and metagenomic analyses indicated that genetic signatures of HK44 cells still persisted, with genes diagnostic for the bioluminescent transposon carried by strain HK44 (luxA and tetA) being found at low concentrations (< 5000 copies/g).

54 ENVIRONMENTAL SCIENCES↗

Calculating Dose Release Factors to Obtain the Worst-Case Maximally Exposed Location by Sector

The aim of this project was to update the SRS Dose Release Factors (DRF's) for the Maximally Exposed Individual (MEI) for 20 area release points onsite. To update, potential MEIs now include onsite locations and modeled stack heights were updated to match onsite operations. The DRF's and MEI locations are used to ensure DOE and EPA compliance is met for dose standards. The Environmental Protection Agency (EPA) requires the use of the computer model CAP88 to estimate doses for demonstrating compliance with 40 CFR 61, the National Emission Standard for Hazardous Air Pollutants (NESHAP). The location of the maximally exposed individual (MEI) by sector and distance is required for execution of CAP88. The worst-case sector is the sector and distance where an offsite individual would receive the highest dose due to a potential release from a designated release location at a facility. The worst-case sector analysis addresses potential ground-level and stack-height releases from 20 areas of Savannah River Site (SRS). Weather patterns were analyzed at each of these areas relative to sixteen compass points. The analysis makes use of recently updated distance data and meteorological data. The computer model, CAP88 is EPA's software system used by the Department of Energy (DOE) to calculate the receptor dose due to routine atmospheric releases via a gaussian plume at the Savannah River Site (SRS). The dose-release factors (DRFs) are used to estimate the offsite and onsite dose from facility-specific releases and represent the dose to a receptor exposed to 1 Ci of a specified radionuclide being released into the atmosphere. The DRFs are simply a ratio of the TED to the release rate and, therefore, are directly scalable. The DRF values listed in the Appendix can be applied to expected release values from each area to estimate the potential dose to an individual adult at each location. NESHAP DRFs have been supplied to Environmental Compliance and Area Closure Projects (EC and ACP) for many years and are periodically updated to include changes in Cap88. estimate the potential dose to an individual adult at each location DRF in mrem Ci{sup -1} are estimated by modeling the total effective dose (TED) in mrem yr{sup -1} assuming an annual atmospheric release rate of 1 Ci yr-1 of the associated radionuclides. TED = Effective Dose (ED) + Committed Effective Dose (CED). TED = DRF/RR. Approach and Methods: Determine possible MEI locations Onsite/Offsite including buildings and farms; Determine the distances from the release area to the possible MEI location and the direction from the release to the MEI location; Using the most recent meteorological data (2007-2011) and parameters, run CAP88 for each release area for each compass sector and previously calculated distances to MEI locations using a 1 Ci release rate for tritium; Use the calculated the air concentration values to determine the MEI for each sector from CAP88. The relationship between air concentration and received dose is directly proportional and can be used to determine which locations to calculate DRF's and a dose for an MEI; The DRFs are found for each compass sector from 20 SRS release areas using CAP88-PC Version 4.0; Each location is calculated with ground level releases evaluated for each area for a list of radionuclides, some with and some without progenies; Compare the DRFs of the potential onsite MEIs to offsite MEIs. Based on the 2018 MEI Report, the Site worst case sector MEI is located 593 mW of B-Area. This MEI location represents a point along the main road that travels through a tract of land leased to the SC National Guard. While this location is estimated to have the highest exposure, minimal radioactivity is released from B-Area. In 2017, SRS requested and was approved by the EPA to change the location for modeling site releases from the Center of Site to H-Area, and to use six stack heights. H-Area emission account for approximately 90% of all radioactive operations onsite. The MEI for H-Area was found to be 11,458 m NNE which locates the Savannah River Ecology Lab Conference Center. Comparisons for 2018 data and 2014 shows the new methods of calculation are more conservative yet still remain well below the DOE 100 mrem limit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Sodium and Lithium Hydride Shields At the Department of Energy's Oak Ridge Reservation - 18412

URS-CH2M Oak Ridge LLC (UCOR) is responsible for cleanup of the U.S. Department of Energy's (DOE) East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Formerly known as the K-25 site, the facility enriched uranium for major defense and energy programs for more than 40 years. DOE is seeking the safest, most environmentally protective and fiscally responsible treatment for its large inventory of radioactive-contaminated metals known as 'shields'. The 66 sodium and lithium shields were constructed for use in experiments at the Tower Shielding Facility (TSF), Oak Ridge National Laboratory (ORNL). The TSF operated from 1954 to 1992 and was designed and built for radiation-shielding studies. The shield containers are constructed of aluminum or stainless steel of varying sizes and shapes that were then filled with either sodium metal or lithium hydride material. The historical records indicate the sodium shields were constructed at the Molten Salt Reactor for use in experiments in the 1971 time frame, while the lithium shields were constructed at the Y-12 site and were used in experiments as early as 1961. A subset of the sodium and lithium shields contain depleted uranium. The sodium and lithium shields were initially used at the TSF to perform in-depth measurements of the neutron transport through the shield materials. Based on process knowledge, the shields are managed as radiologically contaminated containers. Efforts have been made over the last fifteen years to find recycle markets for both the sodium and lithium hydride shields. This includes an onsite operation that was initiated at the East Tennessee Technology Park (ETTP) in 2004. After an operational exothermic reaction incident occurred soon after startup, the onsite ETTP recycling action was discontinued and a search for offsite recycling facilities was initiated. In 2016, the Y-12 National Security Complex was contacted regarding recycle/repurpose of the lithium shields; however, the lithium was determined to not be acceptable for their current repurpose process. To date, no offsite recycling outlets have been identified. Recent progress on the waste disposal actions, a shipment of 22 small sodium shields have been shipped and treated offsite. Therefore, the current shield inventory consists of 29 sodium shields located at ETTP and 15 sodium and lithium hydride shields staged at ORNL. The time period needed to reasonably identify safe disposition or recycling outlets for the shields was expected to exceed the one-year Land Disposal Restrictions storage time limit; therefore, approval was received to add the shields to the Site Treatment Plan (STP) in March, 2017. Until a disposition path is found, the shields will continue to be stored in a safe configuration that is protective of human health and the environment. This engineering evaluation identifies and screens the alternatives for dispositioning the shields at the Oak Ridge(ORR). Four alternatives were evaluated including; (1) macro-encapsulation, (2) deactivation, (3) recycle and (4) leave-in-place. An initial screening was performed, and the alternative passing the initial screening are then evaluated in more detail. The evaluation criteria used included environmental risk, technical feasibility, administrative feasibility, worker safety, nuclear safety, transportation safety, and cost. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closure Report for Corrective Action Unit 121: Storage Tanks and Miscellaneous Sites, Nevada Test Site, Nevada

Corrective Action Unit (CAU) 121 is identified in the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended February 2008) as Storage Tanks and Miscellaneous Sites. CAU 121 consists of the following three Corrective Action Sites (CASs) located in Area 12 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 12-01-01, Aboveground Storage Tank; (2) CAS 12-01-02, Aboveground Storage Tank; and (3) CAS 12-22-26, Drums; 2 AST's. CAU 121 closure activities were conducted according to the FFACO and the Streamlined Approach for Environmental Restoration Plan for CAU 121 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007). Field work took place from February through September 2008. Samples were collected to determine the path forward to close each site. Closure activities were completed as defined in the plan based on sample analytical results and site conditions. No contaminants of concern (COCs) were present at CAS 12-01-01; therefore, no further action was chosen as the corrective action alternative. As a best management practice (BMP), the empty aboveground storage tank (AST) was removed and disposed as sanitary waste. At CAS 12-01-02, polychlorinated biphenyls (PCBs) were present above the preliminary action level (PAL) in the soil beneath the AST that could possibly have originated from the AST contents. Therefore, PCBs were considered COCs, and the site was clean closed by excavating and disposing of soil containing PCBs. Approximately 5 cubic yards (yd{sup 3}) of soil were excavated and disposed as petroleum hydrocarbon PCB remediation waste, and approximately 13 yd3 of soil were excavated and disposed as PCB remediation waste. Cleanup samples were collected to confirm that the remaining soil did not contain PCBs above the PAL. Other compounds detected in the soil above PALs (i.e., total petroleum hydrocarbons [TPH] and semi-volatile organic compounds [SVOCs]) were determined to not likely have originated from the tank. Additional sample results showed that the compounds were likely present as a result of degraded asphalt around the adjacent, active water tank and not from the abandoned AST; therefore, they were not considered COCs. As a BMP, the empty AST was removed and disposed as sanitary waste. No COCs were present at CAS 12-22-26; therefore, no further action was chosen as the corrective action alternative. Although TPH was present at concentrations that exceeded the PAL, the volatile organic compound and SVOC hazardous constituents of TPH did not exceed the final action levels (FALs); therefore, TPH was not considered a COC. As a BMP, the empty AST was removed and disposed as sanitary waste. Closure activities generated sanitary waste, petroleum hydrocarbon PCB remediation waste, PCB remediation waste, and hazardous waste. Waste was appropriately managed and disposed. Waste that is currently staged on site is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667

One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can find themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site-specific, enforceable regulatory milestones, they can provide a comprehensive work plan for not only the board, but also regulators, site contractors, and DOE. Because the work plans are reviewed and approved by DOE, they carry some weight in holding local boards of the EM SSAB accountable. This structure provides the basis for local boards to achieve their primary function, to provide DOE with information, advice, and recommendations concerning issues affecting the EM program at the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗