Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SHUTDOWN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Development and experimental qualification of novel disruption prevention techniques on DIII-D

Novel disruption prevention solutions spanning a range of control regimes are being developed and tested on DIII-D to enable ITER success. First, a new real-time control algorithm has been developed and tested for regulating nearness to stability limits and maintaining safety-margins. Its first application has been for reliable prevention of vertical displacement events (VDEs) by adjusting plasma elongation (κ) and the inner-gap between the plasma and inner-wall in response to real- time open-loop VDE growth rate (γ) estimators. VDEs were robustly prevented up to average open-loop growth rates of 800 rad/s with initial tunings, with only applying shape modification when near safety limits. Second, the disruption risk during fast, emergency shutdown after large tearing and locked modes can be significantly improved by transitioning to a limited topology during shutdown. More than 50% of emergency limited shutdowns after locked modes reach a final normalized current I_N < 0.3 before terminating, scaling to the 3 MA ITER requirement. Furthermore, this is in contrast to diverted shutdowns, the majority of which disrupt at I_N > 0.8. Despite improvements, these results highlight the critical importance of early prevention. Third, a novel emergency shut down method has been developed which excites instabilities to form a warm, helical core post-thermal quench. The current quench extends to ~100ms and avoids VDEs and runaway electron generation. Novel real-time machine learning disruption prediction has been integrated with the DIII-D proximity controller, and a real- time compatible multi-mode MHD spectroscopy technique has been developed. Results presented here were enabled by a focused effort, the Disruption Free Protocol, in DIII-D’s 2019-20 campaign to complement disruption prevention experiments with a large piggy-back program. In addition to testing novel techniques, it is estimated to have helped avoid 32 potential disruptions in piggyback operations with rapid, early shutdowns after large rotating n=1 or locked modes.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Development and experimental qualification of novel disruption prevention techniques on DIII-D

Novel disruption prevention solutions spanning a range of control regimes are being developed and tested on DIII-D to enable ITER success. First, a new real-time control algorithm has been developed and tested for regulating nearness to stability limits and maintaining safety-margins. Its first application has been for reliable prevention of vertical displacement events (VDEs) by adjusting plasma elongation (κ) and the inner-gap between the plasma and inner-wall in response to real- time open-loop VDE growth rate (γ) estimators. VDEs were robustly prevented up to average open-loop growth rates of 800 rad/s with initial tunings, with only applying shape modification when near safety limits. Second, the disruption risk during fast, emergency shutdown after large tearing and locked modes can be significantly improved by transitioning to a limited topology during shutdown. More than 50% of emergency limited shutdowns after locked modes reach a final normalized current I N < 0.3 before terminating, scaling to the 3 MA ITER requirement. This is in contrast to diverted shutdowns, the majority of which disrupt at I N > 0.8. Despite improvements, these results highlight the critical importance of early prevention. Third, a novel emergency shut down method has been developed which excites instabilities to form a warm, helical core post-thermal quench. The current quench extends to ~100ms and avoids VDEs and runaway electron generation. Novel real-time machine learning disruption prediction has been integrated with the DIII-D proximity controller, and a real- time compatible multi-mode MHD spectroscopy technique has been developed. Results presented here were enabled by a focused effort, the Disruption Free Protocol, in DIII-D’s 2019-20 campaign to complement disruption prevention experiments with a large piggy-back program. In addition to testing novel techniques, it is estimated to have helped avoid 32 potential disruptions in piggyback operations with rapid, early shutdowns after large rotating n=1 or locked modes.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Computational Analyses in Support of Sub-scale Diffuser Testing for the A-3 Facility: Unsteady Analyses and Risk Assessment - Part 2

Simulation technology can play an important role in rocket engine test facility design and development by assessing risks, providing analysis of dynamic pressure and thermal loads, identifying failure modes and predicting anomalous behavior of critical systems. This is especially true for facilities such as the proposed A-3 facility at NASA SSC because of a challenging operating envelope linked to variable throttle conditions at relatively low chamber pressures. Design Support of the feasibility of operating conditions and procedures is critical in such cases due to the possibility of startup/shutdown transients, moving shock structures, unsteady shock-boundary layer interactions and engine and diffuser unstart modes that can result in catastrophic failure. Analyses of such systems is difficult due to resolution requirements needed to accurately capture moving shock structures, shock-boundary layer interactions, two-phase flow regimes and engine unstart modes. In a companion paper, we will demonstrate with the use of CFD, steady analyses advanced capability to evaluate supersonic diffuser and steam ejector performance in the sub-scale A-3 facility. In this paper we will address transient issues with the operation of the facility especially at startup and shutdown, and assess risks related to afterburning due to the interaction of a fuel rich plume with oxygen that is a by-product of the steam ejectors. The primary areas that will be addressed in this paper are: (1) analyses of unstart modes due to flow transients especially during startup/ignition, (2) engine safety during the shutdown process (3) interaction of steam ejectors with the primary plume i.e. flow transients as well as probability of afterburning. In this abstract we discuss unsteady analyses of the engine shutdown process. However, the final paper will include analyses of a staged startup, drawdown of the engine test cell pressure, and risk assessment of potential afterburning in the facility. Unsteady simulations have been carried out to study the engine shutdown process in the facility and understand the physics behind the interactions between the steam ejectors, the test cell and the supersonic diffuser. As a first approximation, to understand the dominant unsteady mechanisms in the engine test cell and the supersonic diffuser, the turning duct in the facility was removed. As the engine loses power a rarefaction wave travels downstream that disrupts the shock cell structure in the supersonic diffuser. Flow from the test cell is seen to expand into the supersonic diffuser section and re-pressurizes the area around the nozzle along with a upstream traveling compression wave that emanates from near the first stage ejectors. Flow from the first stage ejector expands to the center of the duct and a new shock train is formed between the first and second stage ejectors. Both stage ejectors keep the facility pressurized and prevent any large amplitude pressure fluctuations from affecting the engine nozzle. The resultant pressure loads the nozzle experiences in the shutdown process are small.

Ahuja, Vineet↗

Network Flow Simulation of Fluid Transients in Rocket Propulsion Systems

Fluid transients, also known as water hammer, can have a significant impact on the design and operation of both spacecraft and launch vehicle propulsion systems. These transients often occur at system activation and shutdown. The pressure rise due to sudden opening and closing of valves of propulsion feed lines can cause serious damage during activation and shutdown of propulsion systems. During activation (valve opening) and shutdown (valve closing), pressure surges must be predicted accurately to ensure structural integrity of the propulsion system fluid network. In the current work, a network flow simulation software (Generalized Fluid System Simulation Program) based on Finite Volume Method has been used to predict the pressure surges in the feed line due to both valve closing and valve opening using two separate geometrical configurations. The valve opening pressure surge results are compared with experimental data available in the literature and the numerical results compared very well within reasonable accuracy (< 5%) for a wide range of inlet-to-initial pressure ratios. A Fast Fourier Transform is preformed on the pressure oscillations to predict the various modal frequencies of the pressure wave. The shutdown problem, i.e. valve closing problem, the simulation results are compared with the results of Method of Characteristics. Most rocket engines experience a longitudinal acceleration, known as "pogo" during the later stage of engine burn. In the shutdown example problem, an accumulator has been used in the feed system to demonstrate the "pogo" mitigation effects in the feed system of propellant. The simulation results using GFSSP compared very well with the results of Method of Characteristics.

Bandyopadhyay, Alak↗

Analysis of Second Target Station Target Removal Dose Rates

The Second Target Station (STS) project at Oak Ridge National Laboratory’s spallation neutron source is a crucial initiative for maintaining U.S. leadership in neutron sciences. The STS aims to create the world’s brightest pulsed cold neutron source, enabling cutting-edge research across various scientific disciplines. To ensure safe and efficient maintenance operations, understanding the effects of shutdown dose rates from activated components within the STS target systems is essential. This study establishes a computational framework for calculating decay gamma sources and subsequent shutdown dose rates utilizing advanced methods to account for all activation channels, including high-energy interactions down to thermal neutron capture. This study describes a novel integration of multiple tools and provides an effective means of analyzing activation and shutdown dose rates at spallation neutron facilities. A custom-developed script automates the decay gamma source generation process, ensuring proper sampling during the variance reduction phase, which is critical for accurate predictions of shutdown dose rates.

Transmutation↗

Stranded Fuel, Orphan Sites, Dead Plants: Transportation Planning Considerations After the BRC Report - 13393

The author explores transportation, packaging and storage questions related to a primary recommendation of the Blue Ribbon Commission on America's Nuclear Future; i.e., that fuel from shutdown plants be removed to consolidated storage as soon as possible to enable final decommissioning and beneficial re-use of those sites. The paper discusses the recommendations of the BRC, the implications and challenges that implementing those recommendations present, and provides recommended solutions for beginning the multi-year planning, coordination, material acquisition, and communications processes that will be needed to move fuel from shutdown plants when a destination site becomes available. Removal of used nuclear fuel from shutdown reactor sites (which are serving no other purpose other than storing SNF and GTCC, at considerable expense) was a central recommendation of the BRC, for a number of reasons. This recommendation was one of the most widely acclaimed that the Commission put forward. However, there are significant challenges (such as availability of fuel canister overpacks, lack of infrastructure, handling constraints and others) that will need to be addressed, apart from the critically important identification of a suitable and workable storage destination site. Resolving these logistical challenges will need to begin even before a destination site is identified, given the long lead-times required for planning and procurement. Based on information available today, it is possible to make informed predictions about what will be needed to modify existing contractual arrangements with utilities, address equipment and infrastructure needs, and begin working with states, tribes and local governments to start initial preparation needs. If DOE, working with industry and other experienced parties, can begin planning and acquisition activities in the near term, overall schedule risk can be reduced and potential cost avoidance achieved. The most immediate benefit will accrue to the operators of the shutdown plants, but beginning to accept fuel as required under the NWPA will reduce the liability to the federal government, and also offer some assurance to other utilities and the public that DOE (or another entity if one is established) is capable of meeting its obligations under the NWPA. The indirect benefits, therefore, will be quite broad. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulatory Framework for Permanent Shut-down and Decommissioning of Nuclear Power Plant in Korea - 18101

Kori Unit 1, the first commercial NPP in Korea which was commissioned in 1978, was put on permanent shutdown for decommissioning on June 2017, after 40 years of operation. For permanent shutdown of the Kori Unit 1, an operation change permit was submitted in 2016 prior to the expiration since the NSA (Nuclear Safety Act) recognizes permanent shutdown as one of the operation stage. In preparation for the decommissioning of Kori Unit 1, the NSA related to decommissioning was revised and promulgated in 2015. The lower statues including Enforcement Decree and Regulation of the NSA, etc. were promptly revised to reflect decommissioning related requirements and procedures accordingly. For new NPPs, preliminary decommissioning plan is submitted and is being reviewed in the course of license review. Operating NPPs are also planning to submit the decommissioning plan by 2018 and receive approvals from Nuclear Safety and Security Commission. In case that an operator intends to decommission a nuclear installation, the operator shall apply for decommissioning and receive an approval from the NSSC. As discussed, framework for permanent shutdown and decommissioning of nuclear facilities have been well formatted by successful revision of NSA in Korea. Further detailed technical standards and regulatory guides on decommissioning will be developed to facilitate the relevant activities and ensure the nuclear safety. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Unsteady State Gas Transport Model in Matrix Laboratory (MATLAB) for PWR Gas Management

Reactor Coolant System (RCS) hydrogen gas management can be a challenge at Pressurized Water Reactors (PWRs) during shutdown, startup, and steady state operation. Poor hydrogen control can result in higher general corrosion rates for RCS components and increases in critical path time for shutdown or startup. Also, performance indicator penalties may be accrued by entry into Electric Power Research Institute (EPRI) Action Level conditions or by accrual of Chemistry Effectiveness Index (CEI) penalties established by the Institute of Nuclear Power Operations (INPO). Furthermore, poor hydrogen control may increase industrial safety risk due to the creation of an explosive environment. Part of the hydrogen management difficulty arises from the interaction of several phenomena that require complex simulations to fully understand. While hydrogen gas transport models have been developed, the application of these models is limited by the computational intensity required to accurately model the dynamism inherent in plant shutdown or startup. Subsequently, a gas transport model is developed in a suitable computational program to meet these needs and provide input to an optimized RCS hydrogen management strategy for all operational modes. The gas transport model is used to model RCS hydrogen behavior for an example PWR during an End of Cycle (EOC) Forced Outage (FO) startup, a refueling outage (RFO) shutdown, and during nominal steady state operation. The computational software selected is Matrix Laboratory (MATLAB{sup R})

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Applying AI/ML Techniques to U.S. Nuclear Operating Experience Program

Idaho National Laboratory (INL) has provided technical assistance to the U.S. Nuclear Regulatory Commission (NRC) in reliability and risk analysis including the operating experience (OpE) program since the 1980s. The U.S. nuclear OpE program provides input parameters to the NRC Standardized Plant Analysis Risk models and the industry probabilistic risk assessment (PRA) models. While earlier PRA focuses were on at-power, internal event analysis, the risks from external hazards and during low power shutdown (LPSD) operation could be significant and the needs to develop LPSD PRA and external hazards PRA are on the rise. One issue in developing LPSD PRA is the reasonable estimation of shutdown initiative event (SDIE) frequencies. INL has developed and is maintaining an SDIE database for the NRC. However, this database is based on the reviewing of Licensee Event Reports (LERs), which is believed to be only a subset of “actual” shutdown initiating events occurred in the industry. This paper investigates a new approach to identify and characterize shutdown initiating events from the Institute of Nuclear Power Operations (INPO) industry database using machine learning techniques. The main process in this approach is to find out the relationship between key words in event descriptions and the SDIE categories as in the NRC SDIE database. The relationship can then be applied to the INPO database and search for SDIEs.

99 GENERAL AND MISCELLANEOUS↗

A Method for Projecting Cloud Shadows Onto a Central Receiver Field to Predict Receiver Damage

This work demonstrates methods of mapping high-spatial-resolution direct normal irradiance (DNI) data from satellites, Total Sky Imagers (TSIs), and analogous data sources onto a heliostat field for characterizing the spatial and temporal variation of the incident flux on a central receiver tower during cloud transient events. The mapping methods are incorporated into an optical software module that interfaces with CoPylot–SolarPILOT’s python API– to provide computationally efficient optical simulation of the heliostat field and the solar power tower. Eventually, this optical model will be incorporated into optimization models whereby a plant operator can understand the effects of cloud transient events on overall power production and receiver lifetime due to creep-fatigue damage and therefore make better informed decisions about receiver shutdown events. By more accurately modelling the effects of cloud events on receiver flux maps, this work may determine the magnitude and frequency of thermal cycling on receiver tubes and panels using actual or realistic cloud shapes instead of averaged DNI values–which may undercount the total cycle number. This work may also prevent unnecessary plant shutdowns due to overly precautionary control strategies and characterize the relative impact of various cloud types on receiver life. We plan to eventually integrate this methodology into the System Advisor Model (SAM) to improve performance model accuracy during periods of cloudiness. In this paper, we demonstrate generating DNI maps and mapping them to a solar field in CoPylot using 10 m resolution data from publicly available Sentinel-2 satellite data over the Crescent Dunes plant.

Mullin, Matthew↗

Integrated Solutions for Interim Used Fuel Management: From Pool Unloading to Safe Delivery to Recycling or Repository Facilities - 17235

Safe management of used nuclear fuel (UNF) is key to the survival of the nuclear industry. That is why it is more important than ever to have a consent-based, practical, credible, and sustainable roadmap for managing the back-end of the nuclear cycle. Worldwide UNF Light Water Reactors (LWR) inventories are currently around 200,000 tons and are estimated to grow to more than 350,000 tons by 2030, and operating nuclear reactors in the U.S. continue to discharge UNF every 18 to 24 months. International experience has demonstrated that the development of a permanent geological repository can be a multi-decade process, especially in the face of public acceptance challenges. Meanwhile, the solution for permanent disposal of UNF in the U.S. is moving at a glacial pace. As a result, industrial stakeholders have been forced to find practical interim UNF storage solutions in order to continue safely operating their reactors. Among those interim solutions are the cask- or canister-based dry storage systems that have dramatically increased in the last 10 years as they provide flexibility for expansion with a low up-front investment. With interim dry storage in place for more than 30 years, our industry is entering a new phase as we are forced to prepare for a few more decades before geological repositories begin operating. Consequently, interim dry storage has to be extended for 80 years or more. Thus, new considerations have to be taken into account to ensure the safety of this stored used fuel: - Interim storage systems are aging; - High burn-up fuel behavior overtime is uncertain; - Used fuel is losing its self-protection; - The number of shutdown sites without a fuel transfer facility, such as a pool, is increasing; - Some owners of Independent Spent Fuel Storage installation (ISFSI) at shutdown sites are not nuclear operators anymore. With increasing uncertainties, AREVA TN -- based on its long expertise with used fuel transportation and interim storage systems -- is adapting its portfolio to develop integrated and flexible solutions that will remove the burden of interim used fuel management from nuclear operators. AREVA TN is developing comprehensive solutions to reduce risks including the continued supply of proven safe high-performance dry storage systems; on-site services to safely transfer used fuel from pool to pad; the optimization of fuel heat load in the storage pool and pad; innovative aging management services including inspection, monitoring and repair; a realistic solution for consolidated interim storage with a priority to remove Used Nuclear Fuel stored in dry storage systems from shutdown sites; world-class transport and logistics services to safely move the used fuel from nuclear reactor sites to consolidated storage and repository or recycling as applicable, and turnkey management of shutdown ISFSIs. Due to the lack of an available path for transporting used fuel away from reactors, nuclear operators are faced with many challenges and growing uncertainties. Our presentation will describe the practical solutions developed and being developed in order to manage used fuel on behalf of nuclear operators and allows them to continue focusing on the important job of producing carbon-free clean energy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A New Consolidated Storage Facility for Used Nuclear Fuel in Andrews County, Texas - 16418

On February 6, 2015, Waste Control Specialists LLC (WCS) announced its plan to file a license application with the U.S. Nuclear Regulatory Commission (NRC) to construct and operate a Consolidated Interim Storage Facility (CISF). Upon issuance of the license, WCS would be authorized to receive Used Nuclear Fuel (UNF) and reactor related Greater Than Class C Low Level Radioactive Waste (referred hence forth as UNF) at the CISF in late 2020. WCS based its decision to license a CISF based on strong support from the State of Texas and the local community's willingness to host such a facility in Andrews County, Texas. WCS' decision to license a CISF in a supportive community is consistent with the consent-based licensing approach recommended by the Blue Ribbon Commission on America's Nuclear Future. WCS intends to use existing technology developed by AREVA and NAC International that have already been approved by the NRC to transport UNF from existing commercial nuclear reactors across the nation for interim storage at its 14,000 acre site in Andrew County, Texas. In the pre-application licensing meetings held with the NRC, WCS underscored that UNF would be removed first from the shutdown decommissioned reactor sites and transported to the CISF. Approximately eighty percent of the UNF currently residing at the shutdown decommissioned reactor sites can be safely placed into the storage systems developed by AREVA and NAC International that are currently licensed by the NRC. WCS plans to store up to 40,000 Metric Tons of Heavy Metal (MTHM) at the CISF that would be constructed in eight phases over the next 20 years. WCS intends to submit its license application for the CISF to the NRC by April 2016. The license application will request authorization to possess up to 5,000 MTHM of UNF for Phase One which can accommodate storing the fuel located at over ten shutdown decommissioned reactor sites. As discussed with the NRC, the license application will be developed following NRC regulatory guidance to comply with the technical requirements specified in Title 10 of the Code of Federal Regulations (CFR) Part 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater Than Class C Waste. In addition, to filing the license application, WCS is also seeking legislative changes to the Nuclear Waste Policy Act of 1982 requiring the U.S. Department of Energy (DOE) to take title of the UNF at the commercial nuclear reactor sites. Under such legislative changes, the DOE would also be responsible for the transport of UNF to the CISF. In addition to preparing the CISF License Application, WCS and its partners AREVA and NAC International are prepared to work with DOE to facilitate the development of the UNF transportation infrastructure in the timeframe needed to support CISF operations. The WCS site and technical approach give it several advantages which uniquely position it to become the first successful commercial CISF in the U.S. These advantages include: broad consent-based support at the local, state, and Congressional level; an operating waste disposal site with an existing transportation infrastructure; and the use of already licensed systems to address 80% of the UNF currently in dry storage at shutdown sites in the U.S. WCS firmly believes this initiative will provide an economically viable option for consolidated interim storage of UNF until a permanent geologic repository becomes available. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RBMK Neutron-Physical Characteristics and Nuclear Safety

The neutron-physical characteristics of RBMK at the Kursk, Leningradskaya, and Smolensk NPPs for 2015–2017, as determined from calculations of more than 6000 actual states at nominal power, are presented. The results of computational modeling of shutdown regimes upon actuation of the shutdown systems of the emergency protection and fast power reduction are presented. It is shown that the physical characteristics, efficiency, and fast response of the shutdown systems of the emergency protection and fast power reduction ensure the nuclear safety of RBMK. The effect of repair of the graphite stack with a sharp graphite blocks on the neutron-physical characteristics of the reactor is determined. It is shown that the removal of some of the graphite during the repair of 500–600 graphite columns results in a reduction of the steam coefficient of reactivity and partial or complete removal of additional absorbers from the core while maintaining the neutronic characteristics and nuclear safety of RBMK.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Residual Heat Removal 1998-2014

This report presents an unreliability evaluation of the residual heat removal (RHR) system in two modes of operation (low-pressure injection in response to a large loss-of-coolant accident and post-trip shutdown-cooling) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2014 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period, while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing trends were identified in the RHR results. A highly statistically significant decreasing trend was observed for the RHR injection mode start-only unreliability. Statistically significant decreasing trends were observed for RHR shutdown cooling mode start-only unreliability and RHR shutdown cooling model 24-hour unreliability.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Effect of steam generator configuration in a loss of the RHR during mid-loop operation at PKL facility

The loss of the residual heat removal system in mid-loop conditions may occur with a non-negligible contribution to the plant risk, so the analysis of the accidental sequences and the actions to mitigate the accident are of great interest in shutdown conditions. In order to plan the appropriate measures to mitigate the accident is necessary to understand the thermal-hydraulic processes following the loss of the residual heat removal system during shutdown. Thus, transients of this kind have been simulated using best-estimate codes in different integral test facilities and compared with experimental data obtained in different facilities. In PKL (Primaerkreislauf-Versuchsanlage, primary coolant loop test facility) test facility different series of experiments have been undertaken to analyze the plant response in shutdown. In this context, the E3 and F2 series consist of analyzing the loss of the residual heat removal system with a reduced inventory in the primary system. In particular, the experiments were developed to investigate the influence of the steam generators secondary side configuration on the plant response, what involves the consideration of different number of steam generators filled with water and ready for activation, on the heat transfer mechanisms inside the steam generators U-tubes. This work presents the results of such experiments calculated using, RELAP5/Mod 3.3. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Refinements of a treat model for transient analysis

In order to prepare for the TREAT reactor being taken off standby, the Gateway for Advanced Modeling and Simulation Lab has used a set of KENO models to simulate certain TREAT temperature- limited transients using the Transient Reactor excursion simulator (T-ReX) code, a hybrid deterministic-stochastic code. These transients are from the M8CAL experiment series, a set of experiments done to calibrate the reactor for the planned M8 series of fuel tests. Recently, the model has been updated in media definitions and geometry. Models were examined and calculations were performed to low uncertainty values to find the k{sub eff} and reactivity insertions. Alterations to modeled values of shutdown and initial transient rod insertion depth were made to create models which had experimental values of reactivity insertion, pre-transient k{sub eff}, or both. It was found that two of the altered media inputs, fuel and Zircaloy-3 cladding, had significant effect on the k{sub eff}. Surprisingly, the Zircaloy-3 composition had a larger effect on k{sub eff}. The reactivity insertions in this model's 2855, 2856 and 2857 temperature-limited transients were found to be above experimental values by a factor of 5.5% to 7%, and that pre-transient k{sub eff} was too high, at 1.002. It was found that increasing shutdown rod insertion by 2 to 2.5 cm decreased pre-transient k{sub eff} to 1.0, and that increasing shutdown rod insertion by 3 to 5 cm and decreasing initial transient rod insertion by 1 to 2 cm gave perfect pre-transient k{sub eff} and total reactivity insertion. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Use of Multi-Attribute Utility Analyses to Assess Transportation Routes from ISFSIs - 20535

With two consolidated interim storage facilities for used nuclear fuel (UNF) having applied for storage licenses, there is the potential need to transport UNF in the U.S. from shutdown reactor sites to complete the site cleanup and from operating reactor sites who may be running out of storage options (e.g., spent fuel pools are nearly full and dry storage facilities are reaching licensed capacity). At some of the shutdown reactor sites, only the independent spent fuel storage installation (ISFSI) exists and often there remains a degraded transportation infrastructure for performing shipments from these sites. At other sites (e.g., operating reactor plants), the existing transportation infrastructure on the site is unchanged and sufficient for moving UNF, but the environment around the route may have changed (e.g., what was once a rural setting has transformed into a more urban setting) and/or local stakeholders want their input taken into consideration in UNF transportation activities. So, although preliminary evaluations have been performed to identify viable modes of transport from these sites using rail, barge, and/or heavy haul truck, if multiple options exist for moving the UNF from the site (e.g., multiple truck routes or a truck and a barge route both exist) then an evaluation that takes input from multiple stakeholders should be considered to identified the preference (e.g., ranking) of routes from a site. Orano has supported the development of several studies examining the viable routes for removing UNF from some of these sites and has utilized a multi-attribute utility analysis (MUA) to establish a ranking of routes and associated modes to move the UNF from the ISFSIs to a Class I rail carrier. The ultimate result from the MUA is a list(s) of the most to the least favored/preferred routes from the site. This paper provides an overview of the MUA methodology and provides an example of its application to a site with a shutdown reactor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated emergency control board including design extended conditions for Krsko NPP - 297

In the aim of implementing post-Fukushima safety measures, Krsko Nuclear Power Plant is developing a Safety Upgrade Program. Krsko NPP is upgrading the remote shutdown capabilities and implementing ways to prevent and mitigate the consequences of potential Severe Accidents. This modification enhances remote shutdown capabilities of the plant to prevent potential severe accidents and improve the ways to mitigate their consequences. Within the set of plant design modifications, addressed the design, construction, and commissioning, of a new Emergency Control Room (EMCB. Tecnatom is the responsible of the design modification of the plant together with Idom, that participates with Tecnatom in the project as a joint venture, who provides a new set of field instrumentation, including its design and the corresponding wiring. EMCB integrates Human- System Interface throughout centralizing capabilities to safety shutdown and cooldown the plant as well as to control the new Design Extension Systems. The process relies on a Human Factors Engineering (HFE) analysis applying a specific methodology based on NUREG-0711 . Tecnatom has developed a specific HFE Program Management Plan to proceed with the analysis in a documented, traceable and reliable way. HFE activities ends with an Integrated System Validation in the actual full scope simulator involving MCR crews. This paper describes different phases of the project, the integrated schedule between HFE and I and C activities, benefits of upgrading main and emergency control rooms beyond design bases and addresses Tecnatom lessons learned obtained during the project execution. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗