Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SERVICE MODULE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

COMET: First mission progress

The COMmercial Experiment Transporter (COMET) is a set of hardware and related infrastructure used to support orbital experiments of the Commerical Centers for the Development of Space (CCDS's) and their industrial partners. During the three years since the program started, contracts have been signed, design reviews conducted on all components, experiments selected for the first mission, all hardware has been manufactured, the first phase of integrated testing of the satellite, the experiments, and the Launch Facility have all been completed. The program experienced several delays in 1993. A component failure in the Service Module during preparation for environmental testing in January resulted in an eight-week delay for the Service Module part of the FreeFlyer. Discovery of large overruns of the mass budget required a major revision of the mission profile for COMET 1. In the spring of 1993, Space Industries Incorporated (SII) and Westinghouse stopped work because of a lack of funds. EER continued to work toward completion of their launch systems. SII and Westinghouse resumed work in September 1993. Since resumption of work, a technical review of all systems to ascertain their state of readiness has been completed. No major problems were discovered. All systems are proceeding toward a launch date in the first quarter of 1994.

Pawlick, Joseph F., Jr.↗

Acoustic Analysis and Design of the E-STA MSA Simulator

The Orion European Service Module Structural Test Article (E-STA) Acoustic Test was completed in May 2016 to verify that the European Service Module (ESM) can withstand qualification acoustic environments. The test article required an aft closeout to simulate the Multi-Purpose Crew Vehicle (MPCV) Stage Adapter (MSA) cavity, however, the flight MSA design was too cost-prohibitive to build. NASA Glenn Research Center (GRC) had 6 months to design an MSA Simulator that could recreate the qualification prediction MSA cavity sound pressure level to within a reasonable tolerance. This paper summarizes the design and analysis process to arrive at a design for the MSA Simulator, and then compares its performance to the final prediction models created prior to test.

acoustics↗

High-Data-Rate Quadrax Cable Microwave Characterization at the NASA Glenn Structural Dynamics Laboratory

An experiment was performed to determine the degradation in the bit-error-rate (BER) in the high-data-rate cables chosen for the Orion Service Module due to extreme launch conditions of vibrations with a magnitude of 60g. The cable type chosen for the Orion Service Module was no. 8 quadrax cable. The increase in electrical noise induced on these no. 8 quadrax cables was measured at the NASA Glenn vibration facility in the Structural Dynamics Laboratory. The intensity of the vibrations was set at 32g, which was the maximum available level at the facility. The cable lengths used during measurements were 1, 4, and 8 m. The noise measurements were done in an analog fashion using a performance network analyzer (PNA) by recording the standard deviation of the transmission scattering parameter S(sub 21) over the frequency range of 100 to 900 MHz. The standard deviation of S(sub 210 was measured before, during, and after the vibration of the cables at the vibration facility. We observed an increase in noise by a factor of 2 to 6. From these measurements we estimated the increase expected in the BER for a cable length of 25 m and concluded that these findings are large enough that the noise increase due to vibration must be taken in to account for the design of the communication system for a BER of 10(exp -8).

Theofylaktos, Onoufrios↗

STS-106 Crew Activities Report/Flight Day 07 Highlights

On this seventh day of the STS-106 Atlantis mission, the flight crew, Commander Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Daniel C. Burbank, Edward T. Lu, Richard A. Mastracchio, Yuri Ivanovich Malenchenko, and Boris V. Morukov are seen participating in several outfitting activities. Burbank and Morukov remove and replace a fourth battery in Zarya. Lu and Malenchenko finish installing the third and final battery and other electrical equipment inside the Zvezda Service Module. While Altman and Wilcutt perform a series of jet firings, Altman is shown as he narrates a tour of the Zvezda Service Module. Scenes also include Lu and Malenchenko unpacking the Russian-made Orlan space suits, Burbank and Wilcutt participating in an interview, and a beautiful night shot of the International Space Station (ISS) and Atlantis complex above the Earth.

Source record↗

ISS General Resource Reel

This video is a collection of computer animations and live footage showing the construction and assembly of the International Space Station (ISS). Computer animations show the following: (1) ISS fly around; (2) ISS over a sunrise seen from space; (3) the launch of the Zarya Control Module; (4) a Proton rocket launch; (5) the Space Shuttle docking with Zarya and attaching Zarya to the Unity Node; (6) the docking of the Service Module, Zarya, and Unity to Soyuz; (7) the Space Shuttle docking to ISS and installing the Z1 Truss segment and the Pressurized Mating Adapter (PMA); (8) Soyuz docking to the ISS; (9) the Transhab components; and (10) a complete ISS assembly. Live footage shows the construction of Zarya, the Proton rocket, Unity Node, PMA, Service Module, US Laboratory, Italian Multipurpose Logistics Module, US Airlock, and the US Habitation Module. STS-88 Mission Specialists Jerry Ross and James Newman are seen training in the Neutral Buoyancy Laboratory (NBL). The Expedition 1 crewmembers, William Shepherd, Yuri Gidzenko, and Sergei Krikalev, are shown training in the Black Sea and at Johnson Space Flight Center for water survival.

Source record↗

Crew Exploration Vehicle Ascent Abort Trajectory Analysis and Optimization

The Orion Crew Exploration Vehicle is the first crewed capsule design to be developed by NASA since Project Apollo. Unlike Apollo, however, the CEV is being designed for service in both Lunar and International Space Station missions. Ascent aborts pose some issues that were not present for Apollo, due to its launch azimuth, nor Space Shuttle, due to its cross range capability. The requirement that a North Atlantic splashdown following an abort be avoidable, in conjunction with the requirement for overlapping abort modes to maximize crew survivability, drives the thrust level of the service module main engine. This paper summarizes 3DOF analysis conducted by NASA to aid in the determination of the appropriate propulsion system for the service module, and the appropriate propellant loading for ISS missions such that crew survivability is maximized.

Falck, Robert D.↗

Artemis II Mission Performance of the Orion Active Thermal Control System

The Orion spacecraft has recently completed Artemis II, the first crewed mission around the moon in 54 years. This test flight demonstrated vehicle capability as the foundation for all future missions under the Artemis program. As a major system of Orion, the Active Thermal Control System (ATCS) successfully managed crew and vehicle heat loads to provide adequate cooling and thermal comfort for the duration of the Artemis II mission. Thermal control on the Orion vehicle is managed through two redundant cooling loops in the Crew Module (CM) that absorb heat loads from the cabin and Air Revitalization System (ARS) heat exchangers, the Liquid Cooling Garment (LCG) heat exchanger, and the avionics cold plates, and then transfer those heat loads to the Service Module (SM) radiator loops and/or the Phase Change Material (PCM) and ammonia boilers when required through thermal configuration or mission phase. During Artemis II, Orion did not necessitate any supplemental cooling from ammonia boilers until service module separation, allowing the maximum availability of ammonia cooling prior to entry. This presentation will provide an overview of the Orion ATCS major subsystems, highlight the performance during key mission phases, and comment on the applicability of the observed thermal response to future Artemis missions.

Ellie Thurston↗

Octafluoropropane Concentration Dynamics on Board the International Space Station

Since activating the International Space Station s (IS9 Service Module in November 2000, archival air quality samples have shown highly variable concentrations of octafluoropropane in the cabin. This variability has been directly linked to leakage from air conditioning systems on board the Service Module, Zvezda. While octafluoro- propane is not highly toxic, it presents a significant chal- lenge to the trace contaminant control systems. A discussion of octafluoropropane concentration dynamics is presented and the ability of on board trace contami- nant control systems to effectively remove octafluoropro- pane from the cabin atmosphere is assessed. Consideration is given to operational and logistics issues that may arise from octafluoropropane and other halo- carbon challenges to the contamination control systems as well as the potential for effecting cabin air quality.

Perry, J. L.↗

Autonomous rendezvous and docking: A commercial approach to on-orbit technology validation

SpARC, in conjunction with its corporate affiliates, is planning an on-orbit validation of autonomous rendezvous and docking (ARD) technology. The emphasis in this program is to utilize existing technology and commercially available components wherever possible. The primary subsystems to be validated by this demonstration include GPS receivers for navigation, a video-based sensor for proximity operations, a fluid connector mechanism to demonstrate fluid resupply capability, and a compliant, single-point docking mechanism. The focus for this initial experiment will be ELV based and will make use of two residual Commercial Experiment Transporter (COMET) service modules. The first COMET spacecraft will be launched in late 1992 and will serve as the target vehicle. After the second COMET spacecraft has been launched in late 1994, the ARD demonstration will take place. The service module from the second COMET will serve as the chase vehicle.

Tchoryk, Peter, Jr.↗

Autonomous rendezvous and docking: A commercial approach to on-orbit technology validation

The Space Automation and Robotics Center (SpARC), a NASA-sponsored Center for the Commercial Development of Space (CCDS), in conjunction with its corporate affiliates, is planning an on-orbit validation of autonomous rendezvous and docking (ARD) technology. The emphasis in this program is to utilize existing technology and commercially available components whenever possible. The primary subsystems that will be validated by this demonstration include GPS receivers for navigation, a video-based sensor for proximity operations, a fluid connector mechanism to demonstrate fluid resupply capability, and a compliant, single-point docking mechanism. The focus for this initial experiment will be expendable launch vehicle (ELV) based and will make use of two residual Commercial Experiment Transporter (COMET) service modules. The first COMET spacecraft will be launched in late 1992 and will serve as the target vehicle. The ARD demonstration will take place in late 1994, after the second COMET spacecraft has been launched. The service module from the second COMET will serve as the chase vehicle.

Tchoryk, Peter, Jr.↗

Critical Software for Human Spaceflight

The NASA Orion vehicle that will fly to the moon in the next years is propelled along its mission by the European Service Module (ESM), developed by ESA and its prime contractor Airbus Defense and Space. This paper describes the development of the Propulsion Drive Electronics (PDE) Software that provides the interface between the propulsion hardware of the European Service Module with the Orion flight computers, and highlights the challenges that have been faced during the development. Particularly, the specific aspects relevant to Human Spaceflight in an international cooperation are presented, as the compliance to both European and US standards and the software criticality classification to the highest category A. An innovative aspect of the PDE SW is its Time- Triggered Ethernet interface with the Orion Flight Computers, which has never been flown so far on any European spacecraft. Finally the verification aspects are presented, applying the most exigent quality requirements defined in the European Cooperation for Space Standardization (ECSS) standards such as the structural coverage analysis of the object code and the recourse to an independent software verification and validation activity carried on in parallel by a different team.

Preden, Antonio↗

An Overview of the Concept of Operations for Assembly, Integration, Testing and Ground Servicing Developed for the MPCV-ESM Propulsion System

A concept of operations for the Assembly, Integration and Testing (AIT) and the Ground Systems Development Operations (GSDO) of the European Service Module (ESM) propulsion system has been developed. The AIT concept of operations covers all fabrication, integration and testing activities in both Europe and in the United States. The GSDO Program develops the facilities, equipment, and procedures for the loading of hypergolic propellants, the filling of high-pressure gases, and contingency de-servicing operations for the ESM. NASA and ESA along with the Lockheed Martin and Airbus Space and Defense are currently working together for the EM-1 and EM-2 missions in which the ESM will be flown as part of the Orion Multi-Purpose Crew Vehicle (MPCV). The NASA/ESA SM propulsion team is collaborating with the AIT personnel from ESA/Airbus and NASA/Lockheed Martin to ensure successful integration of the European designed Service Module propulsion system, the Lockheed Martin designed Crew Module Adapter and the heritage Space Shuttle Orbital Maneuvering System Engines (OMS-E) being provided as Government Furnished Equipment (GFE). This paper will provide an overview of the current AIT and GSDO concept of operations for the ESM propulsion system.

Ground Servicing↗

An Overview of the Concept of Operations for Assembly, Integration, Testing and Ground Servicing Developed for the MPCV-ESM Propulsion System

A concept of operations for the Assembly, Integration and Testing (AIT) and the Ground Systems Development Operations (GSDO) of the European Service Module (ESM) propulsion system has been developed. The AIT concept of operations covers all fabrication, integration and testing activities in both Europe and in the United States. The GSDO Program develops the facilities, equipment, and procedures for the loading of hypergolic propellants, the filling of high-pressure gases, and contingency de-servicing operations for the ESM. NASA and ESA along with the Lockheed Martin and Airbus Space and Defense are currently working together for the EM-1 and EM-2 missions in which the ESM will be flown as part of the Orion Multi-Purpose Crew Vehicle (MPCV). The NASA/ESA SM propulsion team is collaborating with the AIT personnel from ESA/Airbus and NASA/Lockheed Martin to ensure successful integration of the European designed Service Module propulsion system, the Lockheed Martin designed Crew Module Adapter and the heritage Space Shuttle Orbital Maneuvering System Engines (OMS-E) being provided as Government Furnished Equipment (GFE). This paper will provide an overview of the current AIT and GSDO concept of operations for the ESM propulsion system.

Propulsion↗

Eleven Countries, an Integrated Spacecraft: the Story of International Collaboration that Built the Orion Spacecraft and Powered the Success of the Artemis I Mission

The quest to return humans to the Moon in the next step towards humanity's exploration of space is more alive than ever. After a great deal of achievements, failures, and lessons learned, the Artemis I mission set o to the Moon on November 16, 2022, with the goal of testing a new rocket, the Space Launch System, and a new spacecraft, Orion: designed, assembled, and tested across two continents, and 11 countries. Behind this mission, decades of experience with the International Space Station, Autonomous Transfer Vehicle operations, and many other program collaborations built the know-how on how to succeed together in the toughest environment | deep space. The Artemis I mission proved to be an incredible success, meeting 161 total mission objectives, including 21 developed during the flight based on outperforming spacecraft. It was also a case-study in international collaboration, given that ESA, NASA, and industry partners Airbus and Lockheed Martin for the first time had to design, build, test, and fly a fully integrated human-rated spacecraft, with most critical functions dependent and interconnected across U.S. and European systems. The U.S.-built Orion Crew Module and Crew Module Adapter and European-built European Service Module (ESM) shared critical interfaces and commodities, from propulsion, avionics, active/passive thermal, electrical power generation, storage and distribution to the software that managed it all. In this paper, we will describe relevant aspects of the integrated spacecraft design, providing context for the challenges that the team faced in all phases required to get Orion ready to fly, and provide a direct account of how the joint team formed, trained, and supported the operations of the successful Artemis I mission. We will also explore the evolution of the partnerships, given that these allow a multi-national e ort to sustain the program production, share costs, leverage a broader base of engineering expertise, and build more diverse capabilities over the long haul to support the Artemis goals and objectives. Lastly, we will cover critical lessons learned and how the Orion Program has implemented these in preparation of the next Artemis missions to repeat the success of Artemis I. The purpose of this paper is to document knowledge we gained and lessons we learned through the development of an integrated Orion spacecraft, since it is imperative we build on this now, at the dawn of the Artemis Program, an international endeavor to push human space exploration.

Deep Space Exploration↗

Expedition 1 Crew Resource Reel

This video shows footage of the Expedition 1 crew, William Shepherd, Yuri Gidzenko, and Sergei Krikalev, training for their stay on the International Space Station. Shepherd is seen training in the Soyuz spacecraft and inspecting the Service Module and Node 1. The three crewmembers are seen training for winter survival and extravehicular activity (in the Neutral Buoyancy Lab). They are taught how to use the fire extinguishers and extravehicular activity tools. Scenes show Gidzenko training in the crew compartment trainer and on the Mir Space Station and Krikalev on the STS-60 mission. A computer animation shows the Soyuz spacecraft docking with the Service Module.

Source record↗

Initial Criticality Assessments to Guide FMEAs on Rocket Engine Hot Fire Testing

Presented is an explanation of the use of the Initial Criticality Assessment (ICA) technique, a triage process for prioritizing required Failure Modes and Effects Analysis (FMEAs), for the European Service Module's main propulsion system's hot-fire test bed at White Sands New Mexico. Rather than instinctively performing many FMEAs of subsystems, or one large system level FMEA where every subcomponent is analyzed, the ICA guided an informed analysis of only the hardware that had a large impact to hazards. The low criticality hardware was documented via the ICA and no FMEA was performed; the work could then focus on the high criticality hardware. Thus a savings of Program resources was achieved. The experiences gained in creating these ICAs for this international collaborative project confirmed that the need for continuous communication across the technical teams is one of the greatest areas of emphasis. The European Space Agency (ESA) is developing the European Service Module (ESM), with its primary contractor, Airbus Defence and Space in Germany, for delivery to the National Aeronautics and Space Administration (NASA). The module will be equipped with a total of 21 engines to support NASA’s Orion spacecraft: one U.S. Space Shuttle Orbital Maneuvering System-Engine (OMS-E), eight auxiliary thrusters and 12 smaller RCS (Reaction Control System) thrusters. The main ESM propulsion system, used for large translational maneuvers, consists of one OMS-E... To qualify the design of the ESM propulsion subsystem (PSS) an all-steel Propulsion Qualification Module (PQM) structure is used to test the propulsion systems on Orion, including “hot firing” of the OMS engine, thrusters, and RCS. The PQM has been developed as a hot-fire test bed to be tested at the NASA White Sands Test Facility (WSTF). One of the objectives of the testing is to assure that the OMS-E can be safely operated with the PQM. Testing will also demonstrate that the PQM can set the proper upstream pressures and temperatures for the OMS-E to operate nominally given the PQM has never been tested in hot-fire operation with OMS-E before. In order to safely conduct the test campaign, hardware such as the engine subassembly, fluid feed lines, valves, electrical power lines, instrumentation, stiff links, installation Ground Support Equipment (GSE), and diffuser [whose objectives are to collect the exhaust of the OMS-E to actively cool down the exhaust gases, reduce thermal exchanges, and create a vacuum at OMS-E level before igniting], had to be analyzed for any hazards and failure modes.

Fault Tolerance↗

International Space Station USOS Waste and Hygiene Compartment Development

The International Space Station (ISS) currently provides human waste collection and hygiene facilities in the Russian Segment Service Module (SM) which supports a three person crew. Additional hardware is planned for the United States Operational Segment (USOS) to support expansion of the crew to six person capability. The additional hardware will be integrated in an ISS standard equipment rack structure that was planned to be installed in the Node 3 element; however, the ISS Program Office recently directed implementation of the rack, or Waste and Hygiene Compartment (WHC), into the U.S. Laboratory element to provide early operational capability. In this configuration, preserved urine from the WHC waste collection system can be processed by the Urine Processor Assembly (UPA) in either the U.S. Lab or Node 3 to recover water for crew consumption or oxygen production. The human waste collection hardware is derived from the Service Module system and is provided by RSC-Energia. This paper describes the concepts, design, and integration of the WHC waste collection hardware into the USOS including integration with U.S. Lab and Node 3 systems.

Link, Dwight E., Jr.↗

Digital autopilot for the SKYLAB orbital assembly.

In Project SKYLAB, the Command and Service Module which ferries astronaut crews to and from the Orbital Workshop is required to have the capability of providing attitude control for the entire Orbital Assembly during docked phases of the mission. A digital autopilot has been designed which meets this requirement. It is a direct descendant of the digital autopilot designed for and used extensively in project Apollo. There is a major difference however. For Apollo, it was reasonable to design an autopilot that treated the roll, pitch, and yaw axes independently. Because of the geometry of the Orbital Assembly, however, it is of considerable advantage to design the jet selection logic for SKYLAB such that the roll and pitch axes are treated as coupled, and also that the roll and yaw axes are treated as coupled. This paper discusses how inter-axis dependence has been incorporated in the Command and Service Module's digital autopilot while working within the limitations of the onboard computer.

Turnbull, J. F.↗