Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SCADA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

OPSAID Initial Design and Testing Report.

Process Control System (PCS) security is critical to our national security. Yet, there are a number of technological, economic, and educational impediments to PCS owners implementing effective security on their systems. OPSAID (Open PCS Security Architecture for Interoperable Design), a project sponsored by the US Department of Energy's Office of Electricity Delivery and Reliability, aims to address this issue through developing and testing an open source architecture for PCS security. Sandia National Laboratories, along with a team of PCS vendors and owners, have developed and tested this PCS security architecture. This report describes their progress to date.2 AcknowledgementsThe authors acknowledge and thank their colleagues for their assistance with the OPSAID project.Sandia National Laboratories: Alex Berry, Charles Perine, Regis Cassidy, Bryan Richardson, Laurence PhillipsTeumim Technical, LLC: Dave TeumimIn addition, the authors are greatly indebted to the invaluable help of the members of the OPSAID Core Team. Their assistance has been critical to the success and industry acceptance of the OPSAID project.Schweitzer Engineering Laboratory: Rhett Smith, Ryan Bradetich, Dennis GammelTelTone: Ori Artman Entergy: Dave Norton, Leonard Chamberlin, Mark AllenThe authors would like to acknowledge that the work that produced the results presented in this paper was funded by the U.S. Department of Energy/Office of Electricity Delivery and Energy Reliability (DOE/OE) as part of the National SCADA Test Bed (NSTB) Program. Executive SummaryProcess control systems (PCS) are very important for critical infrastructure and manufacturing operations, yet cyber security technology in PCS is generally poor. The OPSAID (Open PCS (Process Control System) Security Architecture for Interoperable Design) program is intended to address these security shortcomings by accelerating the availability and deployment of comprehensive security technology for PCS, both for existing PCS and inherently secure PCS in the future. All activities are closely linked to industry outreach and advisory efforts.Generally speaking, the OPSAID project is focused on providing comprehensive security functionality to PCS that communicate using IP. This is done through creating an interoperable PCS security architecture and developing a reference implementation, which is tested extensively for performance and reliability.This report first provides background on the PCS security problem and OPSAID, followed by goals and objectives of the project. The report also includes an overview of the results, including the OPSAID architecture and testing activities, along with results from industry outreach activities. Conclusion and recommendation sections follow. Finally, a series of appendices provide more detailed information regarding architecture and testing activities.Summarizing the project results, the OPSAID architecture was defined, which includes modular security functionality and corresponding component modules. The reference implementation, which includes the collection of component modules, was tested extensively and proved to provide more than acceptable performance in a variety of test scenarios. The primary challenge in implementation and testing was correcting initial configuration errors.OPSAID industry outreach efforts were very successful. A small group of industry partners were extensively involved in both the design and testing of OPSAID. Conference presentations resulted in creating a larger group of potential industry partners.Based upon experience implementing and testing OPSAID, as well as through collecting industry feedback, the OPSAID project has done well and is well received. Recommendations for future work include further development of advanced functionality, refinement of interoperability guidance, additional laboratory and field testing, and industry outreach that includes PCS owner education. 4 5 --This page intentionally left blank --

Hurd, Steven A.↗

Frequency Response Analysis Tool

Frequency response has received a lot of attention in recent years at the national level, which culminated in the development and approval of North American Electricity Reliability Corporation (NERC) BAL-003-1 Frequency Response and Frequency Bias Setting Reliability Standard. This report is prepared to describe the details of the work conducted by Pacific Northwest National Laboratory (PNNL) in collaboration with the Bonneville Power Administration and Western Electricity Coordinating Council (WECC) Joint Synchronized Information Subcommittee (JSIS) to develop a frequency response analysis tool (FRAT). The document provides the details on the methodology and main features of the FRAT. The tool manages the database of under-frequency events and calculates the frequency response baseline. Frequency response calculations are consistent with frequency response measure (FRM) in NERC BAL-003-1 for an interconnection and balancing authority. The FRAT can use both phasor measurement unit (PMU) data, where available, and supervisory control and data acquisition (SCADA) data. The tool is also capable of automatically generating NERC Frequency Response Survey (FRS) forms required by BAL-003-1 Standard.

97 MATHEMATICS AND COMPUTING↗

Brigham City Hydro Generation Project

Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction from Jerome, Idaho for the Upper Power Plant construction. A kickoff meeting was June 24, 2014 and demolition was immediately started on building. Because of a delivery delay of Turbine, Generator and Equipment from Canyon Brigham City had to request another extension for the final date of completion. DOE awarded modification (.007) to Brigham City with a new completion date of August 1, 2015. The Turbine has had a few adjustments to help with efficiency; but the Generator had a slight vibration when generator got hot so Canyon Industries had U S Motor’s that manufactured the generator come to check out the issue. The other Equipment seems to be running normal. Brigham City, Sunrise Engineering and Canyon Industries met to determine what the vibration in the generator was and how to solve the issue Us Motor’s found some welds that failed: they have been repaired. U S Motor’s delivered the repaired generator Feb. 17, 2015. Canyon Industries arranged for a crane to installed generator in Power Plant. U S Motor’s balanced and wired generator. Plant Operators put the generator back on line. Canyon Industries returned and gave their approval to keep Hydro online. After Hydro was put back into operations it kept going off line because of overheating issues. Canyon Industries returned and replaced sensors and adjusted them to the proper settings for normal operations. Brigham City added additional steel screens to windows to increase air flow in Power Plant Building. After construction phase of the Upper Hydro Plant some landscaping has been restored around the building additional gravel brought in and leveled out and the road that was cut through for conduits to run wires. A retaining wall was installed to protect penstock. The Upper Hydro Plant is complete and in full operations. The final reimbursement was submitted.

13 HYDRO ENERGY↗

Technical Analysis of SSP-21 Protocol

As part of the California Energy Systems for the Twenty-First Century (CES-21) program, in December 2016 San Diego Gas and Electric (SDG&E) contracted with Lawrence Livermore National Laboratory (LLNL) to perform an independent verification and validation (IV&V) of a white paper describing their Secure SCADA Protocol for the Twenty-First Century (SSP-21) in order to analyze the effectiveness and propriety of cryptographic protocol use within the SSP-21 specification. SSP-21 is designed to use cryptographic protocols to provide (optional) encryption, authentication, and nonrepudiation, among other capabilities. The cryptographic protocols to be used reflect current industry standards; future versions of SSP-21 will use other advanced technologies to provide a subset of security services.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Eagle Take Minimization System

Laufer Wind (LW) has developed a prototype Eagle Take Minimization System that shows capabilities for autonomously detecting, tracking, and visually identifying eagles and other protected avians out to approximately 1 km range with no human-in-the-loop. This type of detection system is important for animals that fly too close to facilities that can harm them, such as large wind turbine farms. The Eagle Take Minimization System consists of networked and sensor-fused commercial-off-the-shelf (COTS) X-band radars, PZT visible cameras and a Central Controller computer that can be interfaced with a wind facility SCADA. The intended design of the Eagle Take System is to detect and reliably identify eagles at far enough range so that proximate turbines can be stopped to greatly reduce the risk of eagle injury or death. These curtailed turbines would be released when eagles have moved away. Other wind turbines that are not in close proximity to eagles would continue producing electricity as usual throughout the process.

17 WIND ENERGY↗

Foresee the Future: Using Machine Learning, Climate, and Site Characteristics to Predict PV Solar Plant Generation

Accurately predicting power generation for PV sites is critical for prioritizing relevant operations & maintenance activities, thereby extending the lifetime of a system and increasing the amount of revenue generated. Machine learning techniques can help us in this regard by providing more accurate predictions of PV power production, such that the forecasts take into account not only a site's system design characteristics, but also important weather and climate information. This type of research is important because we can leverage the vast amounts of SCADA data we collect to build more effective, accurate models that can help improve our performance management.

14 SOLAR ENERGY↗

Recovery of Rare Earth Elements (REEs) from Coal Mine Drainage, Phase 2

Phase 1 research identified a two-step refining train, acid leaching of AMD precipitate feed followed by solvent extraction (SX), to produce a 2% TREE product. For the Phase 2 bench scale system, the objective was to get the acid leaching step to operate in batch-mode with sufficient storage capacity to feed an aqueous, enriched REE liquor to a pilot SX plant operating in continuous-mode at a feed rate capable of producing 3 g/hr 2% TREE. Important process variables included feed rate, extractant makeup, flowsheet configuration, and stripping conditions. Operating parameters were optimized through a feedback-capable SCADA system configured for the SX bench scale plant. These conditions were met and exceeded. TREE grades approaching 90% were produced while our Techno-Economic Assessment indicated highly favorable economic returns. The project led to the design of a pilot facility for producing roughly 500 kg/TREE/year. That plant is now in the procurement stage with constructed expected to begin in late 2020.

01 COAL, LIGNITE, AND PEAT↗

Recovery of Rare Earth Elements (REEs) from Coal Mine Drainage, Phase 2

Phase 1 research identified a two-step refining train, acid leaching of AMD precipitate feed followed by solvent extraction (SX), to produce a 2% TREE product. For the Phase 2 bench scale system, the objective was to get the acid leaching step to operate in batch-mode with sufficient storage capacity to feed an aqueous, enriched REE liquor to a pilot SX plant operating in continuous-mode at a feed rate capable of producing 3 g/hr 2% TREE. Important process variables included feed rate, extractant makeup, flowsheet configuration, and stripping conditions. Operating parameters were optimized through a feedback-capable SCADA system configured for the SX bench scale plant. These conditions were met and exceeded. TREE grades approaching 90% were produced while our Techno-Economic Assessment indicated highly favorable economic returns. The project led to the design of a pilot facility for producing roughly 500 kg/TREE/year. That plant is now in the procurement stage with constructed expected to begin in late 2020.

01 COAL, LIGNITE, AND PEAT↗

Real Time Applications Using Linear State Estimation Technology (RTA/LSE)

Electric Power Group, LLC (EPG) was awarded DOE OE0000849 to design, develop, and demonstrate three real-time applications for monitoring power system stability. The applications use phasor measurements and processing by a linear state estimator (LSE) to improve system visibility and accuracy. These applications leverage the large and expanding phasor measurement systems being deployed by utilities throughout the world, and specifically in the United States. Phasor measurements provide a much more detailed view of the power systems than traditional SCADA systems, so can provide better visibility of events and an early warning of developing problems. These three applications are real-time contingency analysis (RTCA), area angle monitoring (AAM), and a voltage stability index (VSI). The project was fully completed as proposed. All three applications were successfully implemented and demonstrated. There were challenges the caused project delays, however. While the RTCA is based on well-known concepts and readily available tools, its deployment using phasor measurements meant it needed to be adapted to sometimes sparse measurements and limited coverage areas. EPG met these challenges with extensive modeling and testing. The AAM is based on unproven research, so EPG had to deal with a lot of unknowns and develop additional methods for practical implementation. These activities took more time than anticipated, so required extra time for development. In addition, there was difficulty getting adequate measurement locations for successful deployment and utility installation delays. Consequently, the project required a time extension to complete. These three real-time applications, RTCA, AAM, and VSI, use only phasor measurement input. Since they do not require the EMS or other measurement systems, they can serve as a backup and security check for the EMS. Phasor measurements are validated and extended by an LSE. The LSE will always produce an output even when some inputs are impaired, so the RT applications will operate even when the EMS state estimator does not converge and the applications it supports cannot function. Consequently, these RT applications can provide valuable additional reliability for control center operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integration of a DER Management System in Riverside. Final report

The tasks in this project covered various aspects, including algorithm development, algorithm integration into a commercial Active Network Management (ANM) platform, hardware-in-the-loop (HIL) testing in an industry-standard testing platform, pilot demonstration in Riverside, California, and also cost and benefit analysis. The DERMS platform in this project can host different algorithms developed on different platforms (e.g., MATLAB and Python) and it can interact with different hardware devices (e.g., different PV inverters, battery inverters, and different sensors). The DER control solution are based on an advanced model-free, layered, and clustered DER control paradigm. At the core of the DER control algorithms was the concept of Extremum Seeking (ES), which is a model-free probing-based control technique. The ES-based control algorithms were tested on major real-world inverters; both individually and in a cluster. It was shown that even legacy equipment (or when paired with a few additional advanced equipment) can support such advanced control. The monitoring algorithms utilize a heterogeneous set of legacy and advanced sensor measurements, such as behind-the-meter DER sensors, distribution-level Phase Measurement Units, distribution-substation Supervisory Control and Data Acquisition (SCADA), and line current sensors, with their limited availability; in order to infer practical network conditions. Sensor data are utilized to achieve resource forecasting, phase identification, and distribution system state estimation. The technology that was developed and demonstrated in this project could be transformational to utilities, including the smaller municipal utilities such as in Riverside, which may not have the resources to deploy advanced distribution system and DERMS solutions in order to support high penetration of solar power integration. This project created a real-world prototype to provide utilities with an assessment of smart grid monitoring and control technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cybersecurity for Grid Connected eXtreme Fast Charging (XFC) Station (CyberX) (Final Scientific/Technical Report)

This report summarizes the activities conducted under the DOE VTO funded project DE- EE0008451, where ABB Inc. (ABB), in collaboration with Idaho National Laboratory (INL), APS Global (APS), and XOS Trucks (XOS) pursued the development of a cyber-resilient extreme fast charging (XFC) management system. This project entitled Cybersecurity for Grid Connected eXtreme Fast Charging (XFC) Station (CyberX) focuses on a resilient architecture for smart charging EV Supply Equipment (EVSE) device control and Coordinated Anomaly Detection System (CADS) features that can be added at the charging site depot level to increase cybersecurity. The project was split into two budget periods focused first on developing the threat model and resilient control concepts and second on testing, improving, and validating those developed resilient control algorithms and features with a focus on key vulnerabilities identified during the threat assessment portion of the project. During the first budget period of the CyberX project, the ABB led team focused on activities to identify, model, and quantitatively prioritize high-impact attack scenarios with potential cyber-physical effects while also modeling and developing concepts for a resilient control system that could securely address integration of DERs and other resources with EV charging. Development of the security focused XFC management system (XMS) was accomplished first by offline simulation using a developed XFC station or depot with 480V input level and simulating measurement inputs to monitoring and control systems in concept development. A representative distribution grid model was developed supporting an EV charging site model with BESS and 6 general EV charging models. These EV charging models allowed multiple configurations of charging level, multiple connected protection and measurement devices, and simulation function to show general compromise of EV, BESS, and protection features based on parallel threat analysis. During the second budget period, the EV site and supporting systems model was developed in more detail and converted from offline model to real-time to real-time with EV charging hardware in the loop (HIL). The resilient control architecture developed as concept in the first part of the project was further tested and validated for integration of local energy resources and XFC charging station site equipment while maintaining cybersecure operating principles. The proposed resilient architecture for smart charging and cybersecurity features consists of two main concepts developed and tested within the project. The first concept is an XFC management system (XMS) consisting of a hardware gateway, software platform, and Supervisory Control and Data Acquisition (SCADA) or Distribution Management System integration components. The second concept is a Coordinated Anomaly Detection System (CADS) which forms a primarily software-related subsystem of the total CyberX solution focused on monitoring system measurements, estimation of measurement states, and predicting current at the utility point of interaction based on machine learning for anomaly detection.

33 ADVANCED PROPULSION SYSTEMS↗

Beyond DERMS: Demonstration of Automated Grid Services, Mode Transition, and Resilience

This report describes the results of more advanced use cases including Ancillary Services, Black-sky-day operation, and Mode Switching from Phase 3 of the “Beyond DERMS” project aiming to build, deploy, and demonstrate a holistic platform that supports the integrated operation and planning of future power distribution networks with bi-directional power flows, many diverse distributed energy resources (DERs), and inverter-based resources. These test results demonstrated how a Beyond DERMS platform can fuse together AMI, SCADA, and DER data to provide a utility with deep insights into distribution network operations and planning, extending the value of DERMS and BTM DER resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Consolidated Hydropower Data Repository: Value and Opportunities

Hydropower is one of several types of generating assets that provides energy, capacity, and services to electric power systems. It does so under rubrics and objectives—market driven and regulated, internal and external to asset and fleet owners—that address reliability, cost, price, and, increasingly, flexibility of output. The aggregation of data from multiple hydropower units can provide insights into asset operations and maintenance practices and needs and assist in meeting hydropower objectives. This paper examines the concept and potential benefits of aggregating hydropower asset data—primarily supervisory control and data acquisition (SCADA) information—with examples of insights developed from data aggregated by the Hydropower Research Institute (HRI). Data aggregation as discussed herein, and as implemented by the HRI, extends beyond multiple units in a powerhouse and beyond multiple hydropower facilities in an electric utility fleet or river system. Examples of research and analytics from such aggregated datasets range from unit load dependency analyses to modeling sensor measurements to detect and diagnose anomalies in assets. These examples showed the benefits of utilizing the entire dataset for insights into how the sensor layout of a single unit or set of units compares to the hydropower industry overall. Such insights include whether additional sensors are needed to complete analyses or to make decisions. In addition, utilizing multiple sensors of the same kind within a unit can provide an indication of possible current or upcoming problems with equipment. Although other analyses are possible, their use requires the development of complex models and, potentially, access to types of data that are currently not included with the example dataset used in this study. However, the examples studied herein confirmed the value of data aggregation in the fleet and unit contexts, and the value extends beyond multiple units in a powerhouse and beyond multiple hydropower facilities in an electric utility fleet or river system. The assessments also provided insights into potential extensions to the data aggregation concept that could further add to their value to the hydropower community, and these are included in this document as a set of recommendations.

13 HYDRO ENERGY↗

Oak Ridge National Laboratory Pilot Demonstration of an Attestation and Anomaly Detection Framework using Distributed Ledger Technology for Power Grid Infrastructure

This report summarizes the design and pilot demonstration of a framework called Grid Guard that was created to provide increased data and device trustworthiness to electric grid devices by leveraging distributed ledger technology (DLT), specifically blockchain. Grid Guard contains a combination of core cryptographic methods such as the secure hash algorithm (SHA), and asymmetric cryptography, private permissioned blockchain, baselining configuration data, consensus algorithm (Raft) and the Hyperledger Fabric (HLF) framework. The system implements a low energy, fast, and robust enhancement to system trustworthiness within and across electric grid systems such as substations, control centers and metering infrastructures. Blockchain is a distributed database structured that provides a practically unalterable (immutable) timeline of stored transactions. By relying on hashing and the Raft consensus algorithm, if an entity tries to illegitimately alter a record at one instance of the database the other ledger nodes are not altered. They work to cross-reference each other and easily locate any incorrectly added data and remove it. The bulk raw data is stored in an off-chain storage (outside of the blockchain ledger) and a hash of this baseline data is stored in the Blockchain ledger via hashing windows of time-series and configuration data, after aggregation and filtering. The bulk off-chain data repository is then considered to be trust-anchored using the hashes stored in the blockchain. To secure the electric grid testbed devices and data, device configuration baselines were compared to those baselines that had been previously stored in the ledger. Statistical baselines for device configurations, network communication patterns, and high-speed sensor data are calculated and then stored off-chain and hashes stored in the ledger. Measurements such as three-phase voltage and current, frequency, breaker status, protection scheme settings, network configuration settings (and other device configuration artifacts) and network traffic features (packet interarrival times) are compared every minute or other selected time windows. During phase 1 of the Grid Guard DLT project different DLT technologies were studies, and an assessment was performed on DLT technology vulnerabilities, uses, and key characteristics. DLT consensus protocols were studies (e.g., RAFT, named after Reliable, Replicated, Redundant, And Fault-Tolerant). Also, cryptography, public, private and permissioned or permissionless systems were assessed. Grid Guard implements a permissioned private DLT. Consensus algorithm selection and choice of DLT implementation depended heavily on the use-case. For this use-case, parameters were selected to measure performance and existing tools for assessment. Benchmarking was performed theoretically and practically. During phase 2 hashed transactions/blocks were inserted into the ledger every second. During phase 2 of the Grid Guard DLT project, a prototype framework was developed and demonstrated for attestation of critical substation devices and data using precision timing systems that use PTP and IRIG-B protocols) on a testbed of operational devices that emulated a distribution substation, control center, and power metering infrastructure using real Operational Technology (OT). The testbed includes OT devices such as protective relays, human machine interfaces (HMI), and power meters. To determine when to collect and compare system and network baselines, an initial examination of an anomaly detection capability to identify malicious manipulation of data streams was conducted. The resulting anomaly detection was demonstrated in a set of experiments and leveraged to trigger device artifact attestation checks. Attestation checks occur against device configuration baselines when compared with the immutable blockchain-stored baselines, which provided a cryptographically supported means by which to store baselines. The electrical substation-grid testbed was created to test the Grid Guard framework. The testbed emulates the operations of a portion of a power grid and SCADA systems as closely as possible. The testbed integrates real protocols, mainly IEC 61850 standard protocols, such as the Sampled Value (SV) and the GOOSE protocols. The testbed also supports DNP3 and other layer 2 and layer 3 protocols such as Telnet, SSH, SFTP/FTP and other proprietary protocols needed to connect to industrial control system equipment. The testbed emulates real power conditions using the OpalRT hardware-in-the-loop (HIL) device which can create fault situations that cannot be easily tested on real systems. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that electrical utilities commonly use.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Emerging Threats and Technology Investigation: Industrial Internet of Things - Risk and Mitigation for Nuclear Infrastructure

Industries supporting the global nuclear infrastructure striving for cost savings, expansions in efficiency, and convenience are likely to adopt components (e.g., hardware, software) that comprise the Internet of Things (IoT) and Industrial Internet of Things (IIoT). These devices offer potential improvements along with security challenges. Modern conveniences achieved through application of technology have propagated through society in the form of interconnected devices, from doorbells to microwave ovens, commonly referred to as IoT. IoT devices are often Internet-connected devices that are designed to send data back to a cloud-based server, where a smart phone application then presents device status and control options. Home-based IoT applications carry a different set of risks when compared to a business or security environment, where there is also a history of convenience and interconnection. Industrial settings have long relied on specifically designed Supervisory Control and Data Acquisition (SCADA) systems for process control where IIoT devices are intended to inform business decisions and augment traditional processes. A recent National Institute of Standards and Technology (NIST) report provides a distinction between process control and IIoT in that traditional process control is not replaced by IIoT, but rather IIoT devices are intended to enhance industrial processes through additional monitoring of various sensors and application of data analytics models using artificial intelligence (AI) and machine learning (ML) (Fagan, Marron, et al. 2021) (Ross, et al. 2021).

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

WISP: Watching grid Infrastructure Stealthily through Proxies (Final Technical Report)

The complex interdependencies of cyber systems (sensors and communications), physical grids and associated electricity market operations make protecting electric power grids a significant challenge. The energy sector is constantly under new, targeted, advanced and dangerous cyber-attacks that have the potential to result in the loss of human life. These threats are further exacerbated by our need to modernize the grid. One focus of cyber security research in smart grids is the securing of the SCADA system through advanced intrusion detection systems (IDS) and bad data detection algorithms in state estimation. These methods either require full knowledge of the system topology and parameters or fail to understand the physical behaviors under attack. WISP (Watching grid Infrastructure Stealthily through Proxies) is designed to provide additional protection to the power grid using only publicly available data. In particular, WISP exploits the spatio-temporal nature of the real time locational marginal prices (LMPs), in conjunction with other information such as bids, weather, outages and load data to analyze anomalous power pricing behaviors and then correlate those observations to localize regions of interest and identify potential cyber events. WISP is non-intrusive as the tool is deployed as a service in the Cloud or on premise and provides reliable information to system operators for enhanced situational awareness, without impeding energy delivery functions. The WISP technology comprises three modules: the data-driven anomaly detection core, the vulnerability and risk analysis and the root cause analysis. The data-driven anomaly detection core performs the tasks of feature selection, anomaly detection and attack region localization. The vulnerability and risk analysis module provides system level information of the vulnerable variables and times, assisting the operators in selecting monitoring and protection nodes. The root cause analysis module takes the detection results and identifies potential operational conditions that contribute to the detected anomalies. In Phase I, we have demonstrated the feasibility and effectiveness of WISP. We developed a realistic electricity market simulator capable of generating normal and attack market data under various operational conditions. We developed a series of cyber-attack detection and analysis algorithms and evaluated them under multiple data sources. Finally, we integrated all modules into an end-to-end software, providing functions for data management, data analytics and visualization. Specifically, we have achieved: (i) real-time data acceptance from external utility interfaces with >99% acceptance rate; (ii) high performance anomaly detection algorithms with >98% detection accuracy and <0.1% false alarm rate; and (iii) ultra-low computing delay <50 milliseconds. Additionally, our team developed algorithms to identify the vulnerable variables in electricity market operations and root cause analysis functions to identify major contributors to the price spikes. These ancillary modules are necessary when deploying WISP in real world industry environment. In Phase II, we have demonstrated the effectiveness of WISP software on realistic largescale power systems. We performed red team testing for the Phase I WISP software and identified software vulnerabilities and implemented corresponding mitigation solutions. We adapted the electricity market simulator for the Texas synthetic 2000-bus system and generated datasets for the false data injection attacks. We created database and visualization interfaces for the Texas system and the ISO New England system. We performed software optimization in terms of operation efficiency, computing speed and detection accuracy. Finally, we tested the software on the Texas system and the ISO New England system and evaluated the detection performance. Overall, we achieved above 89% detection rate, below 3% false alarm rate and below 37 seconds of end-to-end detection delay.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Grid Operational Technology Edge-Level Threat Detection

This report presents a deployable solution to improve the cybersecurity situational awareness of the legacy SCADA system infrastructure in power grids. The main goal of this project is to provide system owners and operators a highly trusted, intelligent alarm system and comprehensive situational awareness of ongoing or potential cybersecurity threats on the grid network. The key contributions of this project include: (1) the development of software, the Intrusion Detection Visualizer for the Operational Technology Network (IViz-OT), to visualize and locate intrusions on the grid network; (2) testing the signature-based Hybrid Intrusion Detection for Energy Systems (HIDES) for different types of intrusions; (3) the integration of HIDES and IViz-OT into the visualization dashboard; and (4) real-time testing using a hardware-in-the-loop test bed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Digital Twin for Hydropower System Object Modeling: Alder Dam (FY2023)

Hydropower is the world's largest source of renewable electricity, and hydropower plants are distributed all over the world. Typical major components of a hydropower plant are the governor, excitation, generator, thrust bearing, hydraulic turbine, transformer, the main lead, metering and control, tailwater depression, and dissolved oxygen. For each component, various measures are taken. The measurements are acquired by various heterogeneous systems, including standalone sensors, programmable logic controllers (PLC), Supervisory control and data acquisition (SCADA), Internet of Things (IoT), and data acquisition and integration platforms such as OSI/PI. The measured data are often archived within the plant by a data management platform, and many institutions have cloud-based archive systems, such as Hydropower Research Institution (HRI), U.S. Army Corps of Engineers (USACE), and Columbia River Data Access in Real Time (DART). Object Modeling is a general framework for designing information systems. It focuses on objects, the actions they perform, and the messages they send to one another to cause those actions to be taken. The major differences among object modeling, network modeling, data modeling, and process modeling are that in the first we focus on the actions in response to information, objects which form the system, the actions they perform, and how they pass information to one another, while in the second we concentrate on where, when and how much information is moved, while in the third we focus on what information is moved and where it is moved, while in the last we focus on how it is moved and when it is moved. Object modeling was developed basically as a method to develop object-oriented systems and to support object-oriented programming. It describes the static structure of the system. The object Modeling Technique is easy to draw and use. That is why we choose object modeling to connect physical hydropower plants to Digital Twin. It recognizes the objects and the relationship between them. It identifies the attributes and functions of each class. Dynamic Modeling: It explains how objects respond to events. Functional Modeling indicates the processes executed in an object and how data changes when it moves to objects. It has been used in many applications like telecommunication, transportation, etc.

13 HYDRO ENERGY↗