Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Rover”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

The Mars Exploration Rovers : hitting the road on Mars

Since the beginning of time, people have been fascinated by Mars. From the earliest mission to now-Mars has been (and is) a challenging destination. The Rovers were developed at a breakneck pace in 3 years and landed successfully on Mars in January 2004. This paper will discuss how the Mars Rover mission fits into the overall Mars Program and NASA's program of planetary exploration. Building the rovers in such a short time period created some difficult design challenges that were mainly schedule driven. in addition, it will cover the process of selecting the rover landing sites as well as the engineering challenges faced in the entry, descent and landing process. The rovers have a great deal of autonomous control ability on the surface and the process of developing and testing those was part of the challenge of doing this in 3 years.

training↗

Small-RPS Enabled Mars Rover Concept

Both the MER and the Mars Pathfinder rovers operated on Mars in an energy-limited mode, since the solar panels generated power during daylight hours only. At other times the rovers relied on power stored in batteries. In comparison, Radioisotope Power Systems (RPS) offer a power-enabled paradigm, where power can be generated for long mission durations (measured in years), independently from the Sun, and on a continuous basis. A study was performed at PL to assess the feasibility of a small-RPS enabled MER-class rover concept and any associated advantages of its mission on Mars. The rover concept relied on design heritage from MER with two significant changes. First, the solar panels were replaced with two single GPHS module based small-RPSs. Second, the Mossbauer spectroscope was substituted with a laser Raman spectroscope, in order to move towards MEPAG defined astrobiology driven science goals. The highest power requirements were contributed to mobility and telecommunication type operating modes, hence influencing power system sizing. The resulting hybrid power system included two small-RPSs and two batteries. Each small-RPS was assumed to generate 50We of power or 62OWh/sol of energy (BOL), comparable to that of MER. The two 8Ah batteries were considered available during peak power usage. Mission architecture, power trades, science instruments, data, communication, thermal and radiation environments, mobility, mass issues were also addressed. The study demonstrated that a new set of RPS-enabled rover missions could be envisioned for Mars exploration within the next decade, targeting astrobiology oriented science objectives, while powered by 2 to 4 GPHS modules.

Mars exploration↗

Performance Testing of Lithium Li-ion Cells and Batteries in Support of JPL's 2003 Mars Exploration Rover Mission

In early 2004, JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling > 300 million miles over a 6-7 month period. In order to operate for extended duration on the surface of Mars, both Rovers are equipped with rechargeable Lithium-ion batteries, which were designed to aid in the launch, correct anomalies during cruise, and support surface operations in conjunction with a triple-junction deployable solar arrays. The requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20(super 0)C to +40(super 0)C), withstand long storage periods (e.g., including pre-launch and cruise period), operate in an inverted position, and support high currents (e.g., firing pyro events). In order to determine the inability of meeting these requirements, ground testing was performed on a Rover Battery Assembly Unit RBAU), consisting of two 8-cell 8 Ah lithium-ion batteries connected in parallel. The RBAU upon which the performance testing was performed is nearly identical to the batteries incorporated into the two Rovers currently on Mars. The primary focus of this paper is to communicate the latest results regarding Mars surface operation mission simulation testing, as well as, the corresponding performance capacity loss and impedance characteristics as a function of temperature and life. As will be discussed, the lithium-ion batteries (fabricated by Yardney Technical Products, Inc.) have been demonstrated to far exceed the requirements defined by the mission, being able to support the operation of the rovers for over three years, and are projected to support an even further extended mission.

low temperature electrolytes↗

Rover Attitude and Pointing System Simulation Testbed

The MER (Mars Exploration Rover) Attitude and Pointing System Simulation Testbed Environment (RAPSSTER) provides a simulation platform used for the development and test of GNC (guidance, navigation, and control) flight algorithm designs for the Mars rovers, which was specifically tailored to the MERs, but has since been used in the development of rover algorithms for the Mars Science Laboratory (MSL) as well. The software provides an integrated simulation and software testbed environment for the development of Mars rover attitude and pointing flight software. It provides an environment that is able to run the MER GNC flight software directly (as opposed to running an algorithmic model of the MER GNC flight code). This improves simulation fidelity and confidence in the results. Further more, the simulation environment allows the user to single step through its execution, pausing, and restarting at will. The system also provides for the introduction of simulated faults specific to Mars rover environments that cannot be replicated in other testbed platforms, to stress test the GNC flight algorithms under examination. The software provides facilities to do these stress tests in ways that cannot be done in the real-time flight system testbeds, such as time-jumping (both forwards and backwards), and introduction of simulated actuator faults that would be difficult, expensive, and/or destructive to implement in the real-time testbeds. Actual flight-quality codes can be incorporated back into the development-test suite of GNC developers, closing the loop between the GNC developers and the flight software developers. The software provides fully automated scripting, allowing multiple tests to be run with varying parameters, without human supervision.

Vanelli, Charles A.↗

Rover Slip Validation and Prediction Algorithm

A physical-based simulation has been developed for the Mars Exploration Rover (MER) mission that applies a slope-induced wheel-slippage to the rover location estimator. Using the digital elevation map from the stereo images, the computational method resolves the quasi-dynamic equations of motion that incorporate the actual wheel-terrain speed to estimate the gross velocity of the vehicle. Based on the empirical slippage measured by the Visual Odometry software of the rover, this algorithm computes two factors for the slip model by minimizing the distance of the predicted and actual vehicle location, and then uses the model to predict the next drives. This technique, which has been deployed to operate the MER rovers in the extended mission periods, can accurately predict the rover position and attitude, mitigating the risk and uncertainties in the path planning on high-slope areas.

Yen, Jeng↗

An Environmental Control and Life Support System Concept for a Pressurized Lunar Rover

Pressurized rovers can add many attractive capabilities to a human lunar exploration campaign, most notably by extending the reach of astronauts far beyond the immediate vicinities of lunar landers and fixed assets such as habitats. Effective campaigns will depend on an efficient allocation of environmental control and life support system (ECLSS) equipment amongst mobile rovers and fixed habitats such that widespread and sustainable exploration can be achieved. This paper will describe some of the key drivers that influence the design of an ECLSS for a pressurized lunar rover and a conceptual design that has been formulated to address those drivers. Opportunities to realize programmatic and operational efficiencies through commonality of rover ECLSS and extravehicular activity (EVA) equipment have also been explored and will be described. Plans for the inclusion of ECLSS functionality in prototype lunar rovers will be summarized

Bagdigian, Robert M.↗

Simulating Operation of a Planetary Rover

Simulating Operation of a Planetary Rover Rover Analysis, Modeling, and Simulations (ROAMS) is a computer program that simulates the operation of a robotic vehicle (rover) engaged in exploration of a remote planet. ROAMS is a roverspecific extension of the DARTS and Dshell programs, described in prior NASA Tech Briefs articles, which afford capabilities for mathematical modeling of the dynamics of a spacecraft as a whole and of its instruments, actuators, and other subsystems. ROAMS incorporates mathematical models of kinematics and dynamics of rover mechanical subsystems, sensors, interactions with terrain, solar panels and batteries, and onboard navigation and locomotion-control software. ROAMS provides a modular simulation framework that can be used for analysis, design, development, testing, and operation of rovers. ROAMS can be used alone for system performance and trade studies. Alternatively, ROAMS can be used in an operator-in-the-loop or flight-software closed-loop environment. ROAMS can also be embedded within other software for use in analysis and development of algorithms, or for Monte Carlo studies, using a variety of terrain models, to generate performance statistics. Moreover, taking advantage of realtime features of the underlying DARTS/Dshell simulation software, ROAMS can also be used for real-time simulations.

Jain, Abhinandan↗

Acquisition of Skill Proficiency Over Multiple Sessions of a Novel Rover Simulation

Following long-duration exploration transits, adaptive changes in sensorimotor function may impair the crew's ability to safely perform manual control tasks such as operating pressurized rovers. Postflight performance will also be influenced by the level of preflight skill proficiency they have attained. The purpose of this study was to characterize the acquisition of skills in a motion-based rover simulation over multiple sessions, and to investigate the effects of varying the simulation scenarios. METHODS: Twenty healthy subjects were tested in 5 sessions, with 1-3 days between sessions. Each session consisted of a serial presentation of 8 discrete tasks to be completed as quickly and accurately as possible. Each task consisted of 1) perspective-taking, using a map that defined a docking target, 2) navigation toward the target around a Martian outpost, and 3) docking a side hatch of the rover to a visually guided target. The simulator utilized a Stewart-type motion base (CKAS, Australia), single-seat cabin with triple scene projection covering 150 deg horizontal by 50 deg vertical, and joystick controller. Subjects were randomly assigned to a control group (tasks identical in the first 4 sessions) or a varied-practice group. The dependent variables for each task included accuracy toward the target and time to completion. RESULTS: The greatest improvements in time to completion occurred during the docking phase. The varied-practice group showed more improvement in perspective-taking accuracy. Perspective-taking accuracy was also affected by the relative orientation of the rover to the docking target. Skill acquisition was correlated with self-ratings of previous gaming experience. DISCUSSION: Varying task selection and difficulty will optimize the preflight acquisition of skills when performing novel operational tasks. Simulation of operational manual control will provide functionally relevant evidence regarding the impact of sensorimotor adaptation on early surface operations and what countermeasures are needed. Learning Objective: The use of a motion-based simulation to investigate decrements in the proficiency to operate pressurized rovers during early surface operations of space exploration missions, along with the acquisition of skill proficiency needed during the preflight phase of the mission.

Dean, S. L.↗

Multi-Mission Radioisotope Thermoelectric Generator Heat Exchangers for the Mars Science Laboratory Rover

The addition of the Multi-Mission Radioisotope Thermoelectric Generator (MMRTG) to the Mars Science Laboratory (MSL) Rover requires an advanced thermal control system that is able to both recover and reject the waste heat from the MMRTG as needed in order to maintain the onboard electronics at benign temperatures despite the extreme and widely varying environmental conditions experienced both on the way to Mars and on the Martian surface. Based on the previously successful Mars landed mission thermal control schemes, a mechanically pumped fluid loop (MPFL) architecture was selected as the most robust and efficient means for meeting the MSL thermal requirements. The MSL heat recovery and rejection system (HRS) is comprised of two Freon (CFC-11) MPFLs that interact closely with one another to provide comprehensive thermal management throughout all mission phases. The first loop, called the Rover HRS (RHRS), consists of a set of pumps, thermal control valves, and heat exchangers (HXs) that enables the transport of heat from the MMRTG to the rover electronics during cold conditions or from the electronics straight to the environment for immediate heat rejection during warm conditions. The second loop, called the Cruise HRS (CHRS), is thermally coupled to the RHRS during the cruise to Mars, and provides a means for dissipating the waste heat more directly from the MMRTG as well as from both the cruise stage and rover avionics by promoting circulation to the cruise stage radiators. A multifunctional structure was developed that is capable of both collecting waste heat from the MMRTG and rejecting the waste heat to the surrounding environment. It consists of a pair of honeycomb core sandwich panels with HRS tubes bonded to both sides. Two similar HX assemblies were designed to surround the MMRTG on the aft end of the rover. Heat acquisition is accomplished on the interior (MMRTG facing) surface of each HX while heat rejection is accomplished on the exterior surface of each HX. Since these two surfaces need to be at very different temperatures in order for the fluid loops to perform efficiently, they need to be thermally isolated from one another. The HXs were therefore designed for high in-plane thermal conductivity and extremely low through-thickness thermal conductivity by using aluminum facesheets and aerogel as insulation inside a composite honeycomb core. Complex assemblies of hand-welded and uniquely bent aluminum tubes are bonded onto each side of the HX panels, and are specifically designed to be easily mated and demated to the rest of the RHRS in order to ease the integration effort.

Mastropietro, A. J.↗

Managing PV Power on Mars - MER Rovers

The MER Rovers have recently completed over 5 years of operation! This is a remarkable demonstration of the capabilities of PV power on the Martian surface. The extended mission required the development of an efficient process to predict the power available to the rovers on a day-to-day basis. The performance of the MER solar arrays is quite unlike that of any other Space array and perhaps more akin to Terrestrial PV operation, although even severe by that comparison. The impact of unpredictable factors, such as atmospheric conditions and dust accumulation (and removal) on the panels limits the accurate prediction of array power to short time spans. Based on the above, it is clear that long term power predictions are not sufficiently accurate to allow for detailed long term planning. Instead, the power assessment is essentially a daily activity, effectively resetting the boundary points for the overall predictive power model. A typical analysis begins with the importing of the telemetry from each rover's previous day's power subsystem activities. This includes the array power generated, battery state-of-charge, rover power loads, and rover orientation, all as functions of time. The predicted performance for that day is compared to the actual performance to identify the extent of any differences. The model is then corrected for these changes. Details of JPL's MER power analysis procedure are presented, including the description of steps needed to provide the final prediction for the mission planners. A dust cleaning event of the solar array is also highlighted to illustrate the impact of Martian weather on solar array performance

Mars dust↗

Launch Lock Mechanism for Resource Prospector Rover

The Resource Prospector Rover is being designed to carry the RESOLVE (Regolith Environment Science, and Oxygen Lunar Volatile Extraction) payload on a mission to the Moon to prospect for water ice. This is a joint project between KSC Swamp Works UB-R1 and JSC. JSC is building the Resource Prospector 2015 (RP15) rover and KSC designed and fabricated a Launch-Lock (LL) hold down mechanism for the rover. The LL mechanism will attach and support the rover on a Lunar Lander during launch and transit to the moon, then release the RP15 rover after touchdown on the lunar surface. This report presents the design and development of the LL mechanism and its unique features which make it suitable for this lunar exploration mission. An EDU (engineering development unit) prototype of the LL has been built and tested at KSC which is the subject of this paper.

Lunar Lander↗

A Curious Year on Mars - Long-Term Thermal Trends for Mars Science Laboratory Rover's First Martian Year

By the time of this writing, Curiosity, the Mars Science Laboratory (MSL) Rover, has weathered four seasons in Gale Crater, just south of and approaching the foothills of the 5-km high Aeolis Mons, known as "Mount Sharp," at 4.59 deg south latitude. The mission design included a much broader latitude range of 30 deg north to 30 deg south constraining some of the Rover environmental requirements and operations. To date, Curiosity has relayed over 150 MB of thermal telemetry. Curiosity has relayed over 150 MB of thermal telemetry through four seasons. The trends and idiosyncrasies revealed through four seasons of telemetry from Mars are discussed. The better-characterized thermal environment allows for less conservatism in operational models and increases the amount of science data collection. Examples include: the elimination of overheating concerns for some cameras and the use of the previous sol's temperature telemetry along with the conservative soak temperature curve from the winter thermal model, to produce a custom heating prescription for the upcoming weeks thus increasing operation time and reducing heating times. This paper discusses the lessons learned for Rover operation as well as general idiosyncrasies discovered about the local environment-such as the effect of orientation on subsystem temperature variation, a regular morning and afternoon wind, ground and air microclimates with distinct temperature differences from other terrain, and how the Rover affects the local environment. This paper further documents and explains some of the interesting highs and lows of the temperature telemetry data as well as offers explanations for sudden temperature changes on board the Rover.

HRS↗

Risk-Aware Planetary Rover Operation: Autonomous Terrain Classification and Path Planning

Identifying and avoiding terrain hazards (e.g., soft soil and pointy embedded rocks) are crucial for the safety of planetary rovers. This paper presents a newly developed groundbased Mars rover operation tool that mitigates risks from terrain by automatically identifying hazards on the terrain, evaluating their risks, and suggesting operators safe paths options that avoids potential risks while achieving specified goals. The tool will bring benefits to rover operations by reducing operation cost, by reducing cognitive load of rover operators, by preventing human errors, and most importantly, by significantly reducing the risk of the loss of rovers.

Ono, Masahiro↗

First Results from the Mojave Volatiles Prospector (MVP) Field Campaign, a Lunar Polar Rover Mission Analog

The Mojave Volatiles Prospector (MVP) project is a science-driven field program with the goal to produce critical knowledge for conducting robotic exploration of the Moon. MVP will feed science, payload, and operational lessons learned to the development of a real-time, short-duration lunar polar volatiles prospecting mission. MVP achieves these goals through a simulated lunar rover mission to investigate the composition and distribution of surface and subsurface volatiles in a natural and a priori unknown environment within the Mojave Desert, improving our understanding of how to find, characterize, and access volatiles on the Moon. The MVP field site is the Mojave Desert, selected for its low, naturally occurring water abundance. The Mojave typically has on the order of 2-6% water, making it a suitable lunar analog for this field test. MVP uses the Near Infrared and Visible Spectrometer Subsystem (NIRVSS), Neutron Spectrometer Subsystem (NSS), and a downward facing GroundCam camera on the KREX-2 rover to investigate the relationship between the distribution of volatiles and soil crust variation. Through this investigation, we mature robotic in situ instruments and concepts of instrument operations, improve ground software tools for real time science, and carry out publishable research on the water cycle and its connection to geomorphology and mineralogy in desert environments. A lunar polar rover mission is unlike prior space missions and requires a new concept of operations. The rover must navigate 3-5 km of terrain and examine multiple sites in in just ~6 days. Operational decisions must be made in real time, requiring constant situational awareness, data analysis and rapid turnaround decision support tools. This presentation will focus on the first science results and operational architecture findings from the MVP field deployment relevant to a lunar polar rover mission.

Heldmann, Jennifer L.↗

Expressing Campaign Intent to Increase Productivity of Planetary Exploration Rovers

Achieving consistently high levels of productivity has been a challenge for Mars surface missions. While the rovers have made major discoveries and dramatically increased our understanding of Mars, they often require a great deal of effort from the operations teams and achieving mission objectives can take longer than anticipated. Missions have begun investigating ways to enhance productivity by increasing the amount of decision-making performed onboard the rovers. Our work focuses on the use of goal-based commanding as a means of more productively operating rovers. In particular, we are working on ways to convey the intent that operations team use to conduct science campaigns to the rover so that it can guide the rover in creating high quality plans and in identifying its own goals based on operator guidance. In addition to informing future surface exploration missions, this work is relevant for a wide range of applications in which operators must interact with limited communication opportunities.

Gaines, Daniel↗

NASA/JPL Tumbleweed Polar Rover

The Tumbleweed Rover, currently under development at the Jet Propulsion Laboratory (JPL) in Pasadena, California, is a large, wind-blown, inflated ball, which carries an instrument payload in its interior. Such rovers offer an effective and simple means of gathering data over large spatial extents of Earth, Mars, and other solar system bodies. Tumbleweeds could prove to be a safe and economical way of deploying instruments such as a ground penetrating radar or a magnetometer in numerous hostile environments. The latest version of the rover was recently deployed in Greenland, where it completed a more than 130 km autonomous traverse across an ice sheet. Communicating via the Iridium satellite network, the rover in question successfully and reliably relayed live GPS, temperature, and pressure data to a ground station at JPL for nearly ten days. The follow-on rover is currently being readied for a traverse from the South Pole to the coast of Antarctica some 2000 km away. The Antarctic test is set to take place in February of 2004 and will serve to verify Tumbleweed as an effective means of harvesting data in extreme and remote settings.

Jones, Jack↗

Surface Deposition of Molecular Contaminants in the Mars 2020 Rover Wake

The Mars 2020 rover has very strict contamination control requirements in order to prepare samples for a potential Mars Sample Return. It is known that the rover will out gas a low-level of molecular contaminant on the surface of Mars, and numerical simulations using STAR-CCM+ are performed in order to predict the magnitude of the contaminant deposition to the Martian surface in the vicinity of the rover. This is done in order to determine whether or not the M2020 rover could self-contaminate a potential sampling site if it were to remain in the same location for a long period of time. Simulations are performed under a variety of surface conditions, and it is determined that the predicted level of molecular contaminant deposition to the surface near the rover will not be a significant factor in the overall sample contamination budget.

Katz, Ira↗

Ground-based Automated Scheduling for Operations of the Mars 2020 Rover Mission

The National Aeronautics and Space Administration’s (NASA) Mars 2020 Rover, named Perseverance, landed on the surface of Mars in Jezero Crater on February 18, 2021. Since the landing, the rover’s activities have been planned with the aid of a ground-based automated scheduling system called Copilot. Automated scheduling is very rare for planetary rover missions. Historically humans have created a schedule manually and ensured that the schedule satisfied all constraints. Higher levels of automation in the system allows science planners to produce schedules for the rover more quickly. In addition to scheduling user-provided activities, Copilot generates and schedules two types of support activities: sleep activities and heating activities. Some activities require the CPU to be on as they execute, so Copilot schedules wakeups and shutdowns of the CPU at the appropriate times. Some activities require areas of the rover to be heated before they can execute, and that heating must be maintained throughout the duration of the activity. Copilot schedules the preheat and maintenance heating activities for the user-provided activities that require them. To facilitate Copilot usage, the Crosscheck tool shows the science planners how Copilot constructed a schedule. For activities that fail to be scheduled, Crosscheck gives information on the constraints that the activity would have violated. This gives the users insight into how to change the input activities and constraints in order to achieve a schedule that satisfies their goals.

Towey, Shannon↗