Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk Assessment Tool”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Simulation for Prediction of Entry Article Demise (SPEAD): An Analysis Tool for Spacecraft Safety Analysis and Ascent/Reentry Risk Assessment

For the purpose of performing safety analysis and risk assessment for a potential off-nominal atmospheric reentry resulting in vehicle breakup, a synthesis of trajectory propagation coupled with thermal analysis and the evaluation of node failure is required to predict the sequence of events, the timeline, and the progressive demise of spacecraft components. To provide this capability, the Simulation for Prediction of Entry Article Demise (SPEAD) analysis tool was developed. The software and methodology have been validated against actual flights, telemetry data, and validated software, and safety/risk analyses were performed for various programs using SPEAD. This report discusses the capabilities, modeling, validation, and application of the SPEAD analysis tool.

Ling, Lisa↗

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗

Security Risks: Management and Mitigation in the Software Life Cycle

A formal approach to managing and mitigating security risks in the software life cycle is requisite to developing software that has a higher degree of assurance that it is free of security defects which pose risk to the computing environment and the organization. Due to its criticality, security should be integrated as a formal approach in the software life cycle. Both a software security checklist and assessment tools should be incorporated into this life cycle process and integrated with a security risk assessment and mitigation tool. The current research at JPL addresses these areas through the development of a Sotfware Security Assessment Instrument (SSAI) and integrating it with a Defect Detection and Prevention (DDP) risk management tool.

securiy↗

Risk

Speaking up, i.e. expressing ones concerns, is a critical piece of effective communication. Yet, we see many situations in which crew members have concerns and still remain silent. Why would that be the case? And how can we assess the risks of speaking up vs. the risks of keeping silent? And once we do make up our minds to speak up, how should we go about it? Our workshop aims to answer these questions, and to provide us all with practical tools for effective risk assessment and effective speaking-up strategies..

speaking up↗

Wabash CarbonSAFE (Subtask 3.1 - Application of the NRAP Tools to the Wabash CarbonSAFE Site for Risk Assessment Associated with Geologic Carbon Storage Activities)

This report documents a risk assessment of CO 2 containment loss and induced shear failure due to geologic carbon storage at the Wabash CarbonSAFE site. The operator, Wabash Valley Resources, has proposed adapting the onsite integrated gasification combined cycle (IGCC) facilities to produce hydrogen and injecting the byproduct CO 2 stream into the subsurface Potosi dolomite formation. The purpose of this study is to assess (1) CO 2 sequestration performance relative to the CarbonSAFE goals of storing 50 Mt over 30 years, (2) the risk of containment loss due to leakage along a wellbore and into an overlying aquifer, and (3) the state of stress and risk of reactivating existing fractures. This study relied upon the initial site characterization work performed by the Illinois State Geologic Survey (ISGS) along with analogue data collected from other carbon sequestration projects in the region.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Modeling of Commercial Turbofan Engine With Ice Crystal Ingestion: Follow-On

The occurrence of ice accretion within commercial high bypass aircraft turbine engines has been reported under certain atmospheric conditions. Engine anomalies have taken place at high altitudes that have been attributed to ice crystal ingestion, partially melting, and ice accretion on the compression system components. The result was degraded engine performance, and one or more of the following: loss of thrust control (roll back), compressor surge or stall, and flameout of the combustor. As ice crystals are ingested into the fan and low pressure compression system, the increase in air temperature causes a portion of the ice crystals to melt. It is hypothesized that this allows the ice-water mixture to cover the metal surfaces of the compressor stationary components which leads to ice accretion through evaporative cooling. Ice accretion causes a blockage which subsequently results in the deterioration in performance of the compressor and engine. The focus of this research is to apply an engine icing computational tool to simulate the flow through a turbofan engine and assess the risk of ice accretion. The tool is comprised of an engine system thermodynamic cycle code, a compressor flow analysis code, and an ice particle melt code that has the capability of determining the rate of sublimation, melting, and evaporation through the compressor flow path, without modeling the actual ice accretion. A commercial turbofan engine which has previously experienced icing events during operation in a high altitude ice crystal environment has been tested in the Propulsion Systems Laboratory (PSL) altitude test facility at NASA Glenn Research Center. The PSL has the capability to produce a continuous ice cloud which is ingested by the engine during operation over a range of altitude conditions. The PSL test results confirmed that there was ice accretion in the engine due to ice crystal ingestion, at the same simulated altitude operating conditions as experienced previously in flight. The computational tool was utilized to help guide a portion of the PSL testing, and was used to predict ice accretion could also occur at significantly lower altitudes. The predictions were qualitatively verified by subsequent testing of the engine in the PSL. In a previous study, analysis of select PSL test data points helped to calibrate the engine icing computational tool to assess the risk of ice accretion. This current study is a continuation of that data analysis effort. The study focused on tracking the variations in wet bulb temperature and ice particle melt ratio through the engine core flow path. The results from this study have identified trends, while also identifying gaps in understanding as to how the local wet bulb temperature and melt ratio affects the risk of ice accretion and subsequent engine behavior.

Jorgenson, Philip C. E.↗

Modeling of Commercial Turbofan Engine with Ice Crystal Ingestion; Follow-On

The occurrence of ice accretion within commercial high bypass aircraft turbine engines has been reported under certain atmospheric conditions. Engine anomalies have taken place at high altitudes that have been attributed to ice crystal ingestion, partially melting, and ice accretion on the compression system components. The result was degraded engine performance, and one or more of the following: loss of thrust control (roll back), compressor surge or stall, and flameout of the combustor. As ice crystals are ingested into the fan and low pressure compression system, the increase in air temperature causes a portion of the ice crystals to melt. It is hypothesized that this allows the ice-water mixture to cover the metal surfaces of the compressor stationary components which leads to ice accretion through evaporative cooling. Ice accretion causes a blockage which subsequently results in the deterioration in performance of the compressor and engine. The focus of this research is to apply an engine icing computational tool to simulate the flow through a turbofan engine and assess the risk of ice accretion. The tool is comprised of an engine system thermodynamic cycle code, a compressor flow analysis code, and an ice particle melt code that has the capability of determining the rate of sublimation, melting, and evaporation through the compressor flow path, without modeling the actual ice accretion. A commercial turbofan engine which has previously experienced icing events during operation in a high altitude ice crystal environment has been tested in the Propulsion Systems Laboratory (PSL) altitude test facility at NASA Glenn Research Center. The PSL has the capability to produce a continuous ice cloud which is ingested by the engine during operation over a range of altitude conditions. The PSL test results confirmed that there was ice accretion in the engine due to ice crystal ingestion, at the same simulated altitude operating conditions as experienced previously in flight. The computational tool was utilized to help guide a portion of the PSL testing, and was used to predict ice accretion could also occur at significantly lower altitudes. The predictions were qualitatively verified by subsequent testing of the engine in the PSL. In a previous study, analysis of select PSL test data points helped to calibrate the engine icing computational tool to assess the risk of ice accretion. This current study is a continuation of that data analysis effort. The study focused on tracking the variations in wet bulb temperature and ice particle melt ratio through the engine core flow path. The results from this study have identified trends, while also identifying gaps in understanding as to how the local wet bulb temperature and melt ratio affects the risk of ice accretion and subsequent engine behavior.

Jorgenson, Philip C. E.↗

Particle Impact Simulation and Ignition Prediction

An experimentally calibrated tool is needed to predict if a system is susceptible to failure by particle impact ignition (PI) based on use conditions, materials, and flow geometry. This tool will accelerate new components, evaluating existing hardware, and help disposition anomalies. Conduct particle impact testing with in-situ diagnostics and complementary simulations on subset of key engineering materials (IN718, M400, 316L, 6061, Ti64, Zr) to develop a proof-of-concept predictive tool for assessing the risk of PI for idealized geometries (spherical particles) in realistic environments. Assess particle/target interactions (coefficient of restitution, ignition, kindling) using instrumented particle impact rigs while systematically varying key parameters (materials, particle size, environment, target configuration). Determine key field variables (temperature, strain, stress) in particle impacts using Multiphysics finite element and hydrocode simulations validated through comparison with experimental measurements and observations. Synthesize experiments and simulations into constitutive models for PI that can be integrated with existing computational fluid dynamics (CFD) and Debris Transport Analysis (DTA) tools in future efforts

particle impact↗

Particle Impact Simulation and Ignition Prediction

An experimentally calibrated tool is needed to predict if a system is susceptible to failure by particle impact ignition (PI) based on use conditions, materials, and flow geometry. This tool will accelerate new components, evaluating existing hardware, and help disposition anomalies. - Conduct particle impact testing with in-situ diagnostics and complementary simulations on subset of key engineering materials (IN718, M400, 316L, 6061, Ti64, Zr) to develop a proof-of-concept predictive tool for assessing the risk of PI for idealized geometries (spherical particles) in realistic environments. - Assess particle/target interactions (coefficient of restitution, ignition, kindling) using instrumented particle impact rigs while systematically varying key parameters (materials, particle size, environment, target configuration). - Determine key field variables (temperature, strain, stress) in particle impacts using Multiphysics finite element and hydrocode simulations validated through comparison with experimental measurements and observations. - Synthesize experiments and simulations into constitutive models for PI that can be integrated with existing computational fluid dynamics (CFD) and Debris Transport Analysis (DTA) tools in future efforts.

Jonathan Tylka↗

Soyuz Landing Reconstructions

Introduction: Recent data show a landing-attributed injury rate among Soyuz crew members to be higher than predicted in original certification analysis. New vehicles being developed for NASA are being certified using analytical tools to quantify injury risk. This assessment will provide data to allow the Agency to evaluate whether these tools are able to capture true injury risk and allow a comparison between Soyuz landings and upcoming vehicles. Methods: A finite element model (FEM) of the Soyuz descent module (DM) and its landing environment were developed to recreate Soyuz landing conditions. Occupant breakout models composed of the Soyuz seat and Sokol helmet were then developed to evaluate occupant response. These models included both anthropomorphic test device (ATD) and human body model (HBM) surrogates in three anthropometric sizes. A generalized distribution analysis of the Soyuz landing environment was performed using landing variable distributions from available literature. Results were used to identify trends in vehicle landing acceleration with landing conditions and to compare landing model injury risk predictions with those estimated in vehicle certification analysis. Next, historic Soyuz landings identified as inducing occupant injury during were reconstructed using the developed landing model and estimated landing conditions. Results and Discussion: This assessment demonstrated the capability of certification metrics, which include a combination of vehicle- and occupant-level injury risk analysis, to identify elevated injury risk landing conditions. However, the developed landing load predictions were limited by available vehicle and landing condition data. Additional data, particularly landing acceleration data specific to historic Soyuz landing conditions, would greatly enhance this assessment’s findings.

Preston Greenhalgh↗

Using Risk Assessment Methodologies to Meet Management Objectives

Current decision making involves numerous possible combinations of technology elements, safety and health issues, operational aspects and process considerations to satisfy program goals. Identifying potential risk considerations as part of the management decision making process provides additional tools to make more informed management decision. Adapting and using risk assessment methodologies can generate new perspectives on various risk and safety concerns that are not immediately apparent. Safety and operational risks can be identified and final decisions can balance these considerations with cost and schedule risks. Additional assessments can also show likelihood of event occurrence and event consequence to provide a more informed basis for decision making, as well as cost effective mitigation strategies. Methodologies available to perform Risk Assessments range from qualitative identification of risk potential, to detailed assessments where quantitative probabilities are calculated. Methodology used should be based on factors that include: 1) type of industry and industry standards, 2) tasks, tools, and environment 3) type and availability of data and 4) industry views and requirements regarding risk & reliability. Risk Assessments are a tool for decision makers to understand potential consequences and be in a position to reduce, mitigate or eliminate costly mistakes or catastrophic failures.

DeMott, D. L.↗

Thermal Dynamics and Lithium Plating Detection in High‐Power Li‐Ion Batteries for eVTOL Applications

The rapid electrification of aerial transportation is driving the need for high‐performance Li‐ion batteries that can operate reliably under stringent thermal and safety constraints. The unique mission profile of electric Vertical Take‐off and Landing (eVTOL) aircraft necessitates a focused investigation into the thermal behavior and safety characteristics of these batteries. Here, in this study, operando isothermal microcalorimetry is employed to examine the thermal evolution of Li‐ion batteries under cycling conditions representative of eVTOL operations. These findings reveal that high‐power discharge events—such as those during take‐off and landing—shift the thermal response toward exothermic behavior, in contrast to the typically endothermic response expected under near‐equilibrium cycling conditions. Additionally, the results suggest that advanced electrolyte formulations may help suppress excess heat generation, thereby improving battery safety. Notably, the calorimetric results exhibit a distinct thermal signature associated with lithium plating, offering a potential diagnostic for detecting Li plating during eVTOL operation. Overall, this study demonstrates the utility of isothermal microcalorimetry as a valuable tool for assessing thermal risks in Li‐ion batteries for eVTOL applications, and highlights the importance of targeted design strategies to mitigate safety hazards during high‐power demand scenarios.

Li plating↗

Large-scale Hydrogen Storage – Risk Assessment Seattle City Light and Port of Seattle [Abstract]

This CRADA presents the strategy that Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) will take to support Seattle City Light (SCL), and the Port of Seattle (Port) in performing a risk assessment of large-scale hydrogen storage. Risk assessment is often used to ensure that adequate measures are taken to protect workers and the public, the environment, infrastructure, and assets. A detailed risk assessment can also be used to direct funding and upgrades, to specific components and sub-systems in order to mitigate risks to the larger system. In this way risk assessments are often employed as a part of a larger risk management strategy, with the goal of minimizing the occurrence of hazards and to identify means to limit their consequences. Risk assessment is often used to engage and inform regulators, and to communicate how specific regulations are being met. However, it is important to note that the proposed work is not intended for SCL and the Port to use in order to gain regulatory acceptance for their proposed activities. The work performed as a part of this effort will be a preliminary risk assessment for early-stage component and system designs and should be considered research and development (R&D). As such, the proposed work will be performed to a quality level and design maturity consistent with R&D and is not considered appropriate for final safety analysis and regulatory compliance purposes. Previous and on-going work at SCL and the Port demonstrated the utility of deploying hydrogen systems at the Port. The deployment of hydrogen at the Port is a part of a larger vision of using hydrogen to address a range of issues for SCL and the Port. These include large-scale fueling of MD/HD vehicles, cargo-handling equipment (CHE), and harbor vessels to reduce emissions; support of adjacent LD vehicles; support of critical port operations during extreme events (i.e., resiliency); deferral of more capital- and time-intensive electrical distribution system upgrades while still supporting evolving port operations and decarbonization efforts; facilitating electrification by establishing energy storage as a grid resource, starting at strategic port locations; creation of a flexible market resource that can be used by SCL to generate revenue via arbitrage; support of planned future maritime operations that involve heavy use of hydrogen for ocean-going vessels; and future end-use applications involving natural gas pipeline hydrogen injection. Ultimately, the success of these activities is underpinned by the deployed storage capacity. Large-scale deployment of hydrogen systems will require hydrogen storage at a scale that has not been demonstrated. In addition, the ideal location for such multi-use systems is near the end user which will often necessitate deploying into urban and/or industrial areas. A detailed risk assessment using the Port as a test case is necessary to ensure the deployment of large-scale hydrogen is successful. Many technologies have been proposed for hydrogen storage; however, these technologies need to be analyzed as they apply to an actual site. The physical infrastructure and hydrogen use cases for the Port will be analyzed, and a risk assessment for compressed hydrogen, liquified hydrogen, and Liquid Organic Hydrogen Carrier (LOHC) storage will be performed. These risk assessments will be useful for understanding how each of these technologies would perform in terms of facility and public safety. The operating states of the proposed hydrogen systems at the Port will be analyzed and incorporated into the storage risk assessment. Scalability will also be analyzed to understand how future port uses would affect the overall risk assessment. Finally, using the risk assessment as a tool to inform engagement and to gain stakeholder acceptance will be explored.

08 HYDROGEN↗

Cyber100 Compass User Guide

This document provides an overview of the Cyber100 Compass tool and serves as a guide to users interested in understanding the cybersecurity risks facing their clean energy transition. The National Renewable Energy Laboratory (NREL) developed the Cyber100 Compass tool for cyber risk assessment at the system-of-systems level for system planners trying to reach high levels of renewables. Two offices of the U.S. Department of Energy (DOE) - the Office of Electricity and the Office of Cybersecurity, Energy Security, and Emergency Response-funded NREL to develop this framework that will enable grid system planners to understand and mitigate cybersecurity risk for grids transitioning to high levels of renewable generation, including 100%. Cyber100 Compass can help systems planners apply the principle of security-by-design at scale. Investing in an upfront understanding of system-of-systems (where the constituent systems are operating entities of the different renewable resources) risks from high-renewable grids will result in a more resilient grid at a lower long-term cost.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Preliminary Regional Assessment of Potential Storage Complexes, Including Capacities and Costs, Based on Application of NRAP and SCO2T (Deliverable 3.3) Storage Complexes

The Recipient will assist with the field validation of one or more risk assessment toolsets through: 1) collaborative research; 2) sharing of relevant datasets, information, and technical insights from field efforts; and 3) other modeling and simulation toolsets as they are developed. Collaborative research could include, but is not limited to: 1) demonstrating use of field data for improved leakage pathway characterization, uncertainty reduction, and risk management and uncertainty workflows; 2) testing and validation of a specific National Risk Assessment Partnership (NRAP) tool using site specific data; and 3) improved modeling or reduced-order modeling of geophysical monitoring.

42 ENGINEERING↗

Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

Dickinson, William B.↗

Systems Engineering Metrics: Organizational Complexity and Product Quality Modeling

Innovative organizational complexity and product quality models applicable to performance metrics for NASA-MSFC's Systems Analysis and Integration Laboratory (SAIL) missions and objectives are presented. An intensive research effort focuses on the synergistic combination of stochastic process modeling, nodal and spatial decomposition techniques, organizational and computational complexity, systems science and metrics, chaos, and proprietary statistical tools for accelerated risk assessment. This is followed by the development of a preliminary model, which is uniquely applicable and robust for quantitative purposes. Exercise of the preliminary model using a generic system hierarchy and the AXAF-I architectural hierarchy is provided. The Kendall test for positive dependence provides an initial verification and validation of the model. Finally, the research and development of the innovation is revisited, prior to peer review. This research and development effort results in near-term, measurable SAIL organizational and product quality methodologies, enhanced organizational risk assessment and evolutionary modeling results, and 91 improved statistical quantification of SAIL productivity interests.

Mog, Robert A.↗

Prototype Tool Support for SEI Process and Risk Knowledge

We have developed a prototype of tool support for risk assessment that uses selected components of the Software Engineering Institute (SEI) information, specifically: Capability Maturity Model (CMM) process activities, CMM process goals and the SEI taxonomy of software project risks.

risk management risk assessment SEI CMM software r↗