Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Resource availability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Long-lived space observatories for astronomy and astrophysics

NASA's plan to build and launch a fleet of long-lived space observatories that include the Hubble Space Telescope (HST), the Gamma Ray Observatory (GRO), the Advanced X Ray Astrophysics Observatory (AXAF), and the Space Infrared Telescope Facility (SIRTF) are discussed. These facilities are expected to have a profound impact on the sciences of astronomy and astrophysics. The long-lived observatories will provide new insights about astronomical and astrophysical problems that range from the presence of planets orbiting nearby stars to the large-scale distribution and evolution of matter in the universe. An important concern to NASA and the scientific community is the operation and maintenance cost of the four observatories described above. The HST cost about $1.3 billion (1984 dollars) to build and is estimated to require $160 million (1986 dollars) a year to operate and maintain. If HST is operated for 20 years, the accumulated costs will be considerably more than those required for its construction. Therefore, it is essential to plan carefully for observatory operations and maintenance before a long-lived facility is constructed. The primary goal of this report is to help NASA develop guidelines for the operations and management of these future observatories so as to achieve the best possible scientific results for the resources available. Eight recommendations are given.

Savage, Blair D.↗

Developing integrated parametric planning models for budgeting and managing complex projects

The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.

Etnyre, Vance A.↗

Report of the NASA lunar energy enterprise case study task force

The Lunar Energy Enterprise Cast Study Task Force was formed to determine the economic viability and commercial business potential of mining and extracting He-3 from the lunar soil for use in earth-based fusion reactors. In addition, the Solar Power Satellite (SPS) and the Lunar Power Station (LPS) were also evaluated because they involve the use of lunar materials and could provide energy for lunar-based activities. The Task Force considered: (1) the legal and liability aspects of the space energy projects; (2) the long-range terrestrial energy needs and options; (3) the technical maturity of the three space energy projects; and (4) their commercial potential. The use of electricity is expected to increase, but emerging environmental concerns and resource availability suggest changes for the national energy policy. All three options have the potential to provide a nearly inexhaustible, clean source of electricity for the U.S. and worldwide, without major adverse impacts on the Earth's environment. Assumption by industry of the total responsibility for these energy projects is not yet possible. Pursuit of these energy concepts requires the combined efforts of government and industry. The report identifies key steps necessary for the development of these concepts and an evolving industrial role.

Source record↗

Human task animation from performance models and natural language input

Graphical manipulation of human figures is essential for certain types of human factors analyses such as reach, clearance, fit, and view. In many situations, however, the animation of simulated people performing various tasks may be based on more complicated functions involving multiple simultaneous reaches, critical timing, resource availability, and human performance capabilities. One rather effective means for creating such a simulation is through a natural language description of the tasks to be carried out. Given an anthropometrically-sized figure and a geometric workplace environment, various simple actions such as reach, turn, and view can be effectively controlled from language commands or standard NASA checklist procedures. The commands may also be generated by external simulation tools. Task timing is determined from actual performance models, if available, such as strength models or Fitts' Law. The resulting action specification are animated on a Silicon Graphics Iris workstation in real-time.

Esakov, Jeffrey↗

Space Station Freedom Pre-Workshop Session

This is a report of a pre-workshop session held before the 1988 Space Station Workshop; it details space station opportunities for commercial users and providers. Aspects covered are: an overview of commercial uses of space; and overview of the Space Station Freedom Program; attributes of space and some practical uses of them; a description of commercial space activities by country, including various statistics; information on each of NASA's Centers for Commercial Development; and monetary and other resources available to help support commercial ventures in space.

Source record↗

Performance-based workload assessment: Allocation strategy and added task sensitivity

The preliminary results of a research program investigating the use of added tasks to evaluate mental workload are reviewed. The focus of the first studies was a reappraisal of the traditional secondary task logic that encouraged the use of low-priority instructions for the added task. It was believed that such low-priority tasks would encourage subjects to split their available resources among the two tasks. The primary task would be assigned all the resources it needed, and any remaining reserve capacity would be assigned to the secondary task. If the model were correct, this approach was expected to combine sensitivity to primary task difficulty with unintrusiveness to primary task performance. The first studies of the current project demonstrated that a high-priority added task, although intrusive, could be more sensitive than the traditional low-priority secondary task. These results suggested that a more appropriate model of the attentional effects associated with added task performance might be based on capacity switching, rather than the traditional optimal allocation model.

Vidulich, Michael A.↗

Background, current status, and prognosis of the ongoing slush hydrogen technology development program for the NASP

Among the Hydrogen Projects at the NASA Lewis Research Center (NASA LeRC), is the task of implementing and managing the Slush Hydrogen (SLH2) Technology Program for the United States' National AeroSpace Plane Joint Program Office (NASP JPO). The objectives of this NASA LeRC program are to provide verified numerical models of fluid production, storage, transfer, and feed systems and to provide verified design criteria for other engineered aspects of SLH2 systems germane to a NASP. The pursuit of these objectives is multidimensional, covers a range of problem areas, works these to different levels of depth, and takes advantage of the resources available in private industry, academia, and the U.S. Government. A summary of the NASA LeRC overall SLH2 program plan, is presented along with its implementation, the present level of effort in each of the program areas, some of the results already in hand, and the prognosis for the effort in the immediate future.

Dewitt, R. L.↗

Establishing viable task domains for telerobot demonstrations

A suite of telerobotic tasks has been compiled and assessed for the purpose of selecting viable tasks for near and far term laboratory demonstrations. The primary intent of developing the task is to provide some technical guidelines, with supporting data, for focusing laboratory demonstrations toward application domains that address a wide array of potential telerobot tasks and required technologies. This wide application would then result in a rich technology development environment to meet the broad task requirements of a system such as the Flight Telerobot Servicer. The methodology and results of the telerobot task assessment are described, including a ranking of the final select suite of major tasks. The presented along with guidelines for both interpreting the task ranking results and setting programmatic objectives based on these results. Detailed data about the task candidates and their respective levels of complexity, task primitive actions, and the actual relative measures of task worth as associated with key tradeoff variables such as cost, available research resources, technology availability, and importance to the user community are also presented.

Zimmerman, Wayne↗

A collision avoidance system for a spaceplane manipulator arm

Part of the activity in the area of collision avoidance related to the Hermes spaceplane is reported. A collision avoidance software system which was defined, developed and implemented in this project is presented. It computes the intersection between the solids representing the arm, the payload, and the objects. It is feasible with respect to the resources available on board, considering its performance.

Sciomachen, Anna↗

Selective simulation and selective sensor interpretation in monitoring

An approach to selective processing in monitoring is described. The approach is designed to provide informative feedback on whether a system is performing nominally in the current operating context without exceeding available resources for prediction and interpretation. At the center of the approach to selective sensor interpretation and simulation is a causal model of the system being monitored. The architecture of the monitoring system, called PREMON, is described as well as how causal models of physical systems are represented and simulated.

Doyle, Richard J.↗

Using space for technology development - Planning for the Space Station era

Experience with the Shuttle and free-flying satellites as technology test-beds has shown the feasibility and desirability of using space assets as a facility for technology development. Thus, by the time the Space Station era will have arrived, the technologist will be ready for an accessible engineering facility in space. As the 21st century is approached, it is expected that virtually every flight to the Space Station Freedom will be required to carry one or more research, technology, and engineering experiments. The experiments planned will utilize both the pressurized volume, and the external payload attachment facilities. A unique, but extremely important, class of experiments will use the Space Station itself as an experimental vehicle. Based upon recent examination of possible Space Station Freedom assembly sequences, technology payloads may well utilize 20-30 percent of available resources.

Ambrus, Judith H.↗

Space Shuttle Main Engine component assembly, assignment, and scheduling expert system

The SSME's Component Assembly and Life Management Expert System (CALMES) assists the engine assembly and scheduling process, ensuring that these activities utilize available resources with the greatest possible efficiency. On the basis of parts inventories and a proposed flight schedule, CALMES (1) determined how components may be optimally assembled from the parts inventory, (2) assigns components to flights, (3) schedules component testing, and (4) schedules component assembly. A graph-theoretical optimal matching algorithm, based on a modified simplex method, is applied to the major functions required by the SSME component assembly and scheduling processes.

Dietz, W. E.↗

Automated Scheduling Via Artificial Intelligence

Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

Biefeld, Eric W.↗

ATLS: Catheter and tube placement

The specific objectives of this experiment are: to evaluate the rack mounted equipment and medical supplies necessary for medical procedures; to evaluate the attachments, mounting points, and inner drawer assemblies for the medical supplies; and to evaluate the procedures for performing medical scenarios. The resources available in the HMF miniracks to accomplish medical scenarios and/or procedures include: medical equipment mounted in the racks; a patch panel with places to attach tubing and catheters; self contained drawers full of critical care medical supplies; and an ALS 'backpack' for deploying supplies. The attachment lines, tubing and associated medical supplies will be deployed and used with the equipment and a patient mannequin. Data collection is provided by direct observations by the inflight experimenters, and analysis of still and video photography.

Gosbee, John↗

Science strategy and rationale for robotic missions to Mars

The scientific rationale for robotic missions to Mars follows a strategy in which a global data set and general understanding of the planet proceeds to progressively greater detail about specific scientific questions and candidate landing sites. In particular, a global understanding of Mars will be obtained from the Mars Observer mission and the Network Mission. The Site Reconnaissance Orbiter and the Sample Return mission will allow extensive testing and reevaluation of the knowledge about Mars and potential landing sites. Finally, a number of Rovers will provide detailed information on trafficability, resource availability, habitability, and science potential of candidate landing sites. The robotic mission set will also identify important scientific questions that can be addressed at potential landing sites.

Golombek, Matthew↗

In-space technology experiments - Prerequisite for missions of the future

Experience with the Shuttle and free-flying satellites as technology test beds has shown the feasibility and desirability of using space assets as facilities for technology development. Thus, with the arrival of the Space Station Freedom era, technologists will be ready for an accessible engineering facility in space, particularly to support technology development for manned space exploration. As the 21st century is approached, virtually every flight to the Space Station Freedom will carry one or more research, technology and engineering experiments. The experiments planned will utilize both the pressurized volume and the external attachment facilities. A unique class of experiments will use the Space Station itself as an experimental test bed. Based upon recent examination of possible Space Station assembly sequences, technology payloads may utilize upwards of 20 percent of available resources.

Harris, Leonard A.↗

Lunar rover developments at JPL

Results of previous JPL developments are summarized and the current work related to lunar roving missions is discussed. Objectives of a long lunar transverse are reviewed and include lunar resource prospecting and base site surveys. Rover design criteria are presented, noting that payload instrumentation would include both television cameras for driving and cameras producing panoramic facsimile for high-fidelity scientific imaging and landmark navigation, as well as a multipurpose imaging system with multispectral, close-up, and microscopic capabilities. Instrumentation providing for chemical and mineral analysis, a gravimeter, and a magnetometer are also important. Rover performance requirements include a capability to support a 50 kg payload mass with a rover mass of 500 to 600 kg, powering and supporting the payload, managing the on-board resources available to each instrument, and handling all of the mission data. Desert tests of lunar roving navigation and field geology are discussed.

Burke, James D.↗

A 40th deg and order gravitational field model for Mars

Understanding the origin and evolution of major photographic features on Mars, such as the hemispheric dichotomy and Tharsis rise, will require improved resolution of that planet's gravitational and topographic fields. The highest resolution gravity model for Mars published to date was derived from Doppler tracking data from the Mariner 9 and Viking 1 and 2 spacecraft, and is of 18th degree and order. That field has a maximum spatial resolution of approx. 600 km, which is comparable to that of the best topographic model. The resolution of previous gravity models was limited not by data density, but rather by the computational resources available at the time. Because this restriction is no longer a limitation, the Viking and Mariner data sets were reanalyzed and a gravitational field was derived complete to the 40th degree and order with a corresponding maximum spatial resolution of 300 km where the data permit.

Zuber, M. T.↗