Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ROOM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Radiometric Testing of Germicidal UV Products, Round 1: UV-C Towers and Whole-Room Luminaires (CALiPER Summary Report)

This summary report analyzes the independently tested performance of 13 germicidal ultraviolet (GUV) products purchased between February and July 2022. A companion full report provides additional information and discussion of the tested products, test methods, and results. The products were of three different types: • Seven portable, consumer-oriented GUV towers designed to be placed on the floor or a desk of an unoccupied room to disinfect air and surfaces. Five of these products used LED sources and two products used low-pressure mercury (LPM) sources. • One non-portable GUV whole-room luminaire designed to be installed on a ceiling to disinfect air when a room is occupied. This product used an LED source. • Five non-portable GUV troffer or high-bay style whole-room luminaires designed to be installed in or suspended from a ceiling to disinfect air and surfaces when a room is unoccupied. All five used LPM sources. Radiometric and electrical performance was evaluated for all 13 products. Photobiological safety was also assessed for two of the products because their documentation included testable claims. The test results were compared across products and to manufacturer or vendor claims. The testing identified many issues related to the accuracy of reported GUV product performance. Claims were often untestable, contradictory, ambiguous, or used incorrect units and/or terminology. And when claims were testable, they often did not match test results. For example, three products that claimed to emit UV-C emitted only UV-A. These product claim issues were more numerous with consumer-oriented tower products, but problems with accurate performance claims were found across all products. The UV-C radiant efficiency of the products varied widely, even among similar products using the same source technologies. For example, the UV-C radiant efficiency of LPM products varied by greater than a factor of three for the same product type, indicating a large potential energy savings opportunity for products that are better designed for efficiency. LED products had orders-of-magnitude lower UV-C radiant efficiency than LPM products. Several testing challenges and limitations were identified. Most significant among these is the capability to accurately test and report the performance of larger GUV products. Integrating spheres require a specialized and costly coating to test UV, and the testing laboratory for this round of products had only a 20-inch diameter hemisphere with this capability. Only 2 of the 10 UV-C emitting products could be tested in this sphere. Goniometer testing had a different size limitation in that mirrors typically used to increase goniometer test distance to the far field are not reflective of UV and therefore could not be used to increase test distance. As a result, 7 of 13 products could not be tested far field. The implication is that electronic files of UV-C intensity data typically imported into design software for designing GUV applications may not be reliable for predicting irradiance at arbitrary far-field distances. It is currently unclear if these are industry-wide testing laboratory limitations, and what solutions may exist to address them. Specifiers and buyers of GUV products will need accurate performance claims and data to safely and effectively deploy GUV technology to reduce the transmission of diseases in buildings. This CALiPER GUV Round 1 report demonstrates the significant education and training that is needed for manufacturers and vendors to accurately test and report the performance of their GUV products. Further standards and guidelines are needed to improve test methods, address testing limitations, and improve reporting of product performance. Additionally, the wide range in UV-C radiant efficiency of GUV products means there is a large energy-savings opportunity for more energy efficient GUV products.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Microbiological aspects of clean room technology as applied to surgery, with special reference to unidirectional airflow systems

The microbiological aspects of clean room technology as applied to surgery were reviewed. The following pertinent subject areas were examined: (1) clean room technology per se and its utilization for surgery, (2) microbiological monitoring of the clean room surgical environment, (3) clean rooms and their impact on operating room environmental microbiology, and (4) the effect of the technology on surgical wound infection rates. Conclusions were drawn for each topic investigated.

Wardle, M. D.↗

ATP as a biomarker of viable microorganisms in clean-room facilities

A new firefly luciferase bioluminescence assay method that differentiates free extracellular ATP (dead cells, etc.) from intracellular ATP (viable microbes) was used to determine the viable microbial cleanliness of various clean-room facilities. For comparison, samples were taken from both clean-rooms, where the air was filtered to remove particles >0.5 microm, and ordinary rooms with unfiltered air. The intracellular ATP was determined after enzymatically degrading the sample's free ATP. Also for comparison, cultivable microbial populations were counted on nutrient-rich trypticase soy agar (TSA) plates. Both the cultivable and ATP-based determinations indicate that the microbial burden was lower in clean-room facilities than in ordinary rooms. However, there was no direct correlation between the two sets of measurements because the two assays measured very different populations. A large fraction of the samples yielded no colony formers on TSA, but were positive for intracellular ATP. Subsequently, genomic DNA was isolated directly from selected samples and 16S rDNA fragments were cloned and sequenced, identifying nearest neighbors, many of which are known to be noncultivable in the media employed. It was concluded that viable microbial contamination can be reliably monitored by measurement of intracellular ATP, and that this method may be considered superior to cultivable colony counts due to its speed and its ability to report the presence of viable but noncultivable organisms. When the detection of nonviable microbes is of interest, the ATP assay can be supplemented with DNA analysis.

NASA Discipline Environmental Health↗

Directionally Solidified NiAl-Based Alloys Studied for Improved Elevated-Temperature Strength and Room-Temperature Fracture Toughness

Efforts are underway to replace superalloys used in the hot sections of gas turbine engines with materials possessing better mechanical and physical properties. Alloys based on the intermetallic NiAl have demonstrated potential; however, they generally suffer from low fracture resistance (toughness) at room temperature and from poor strength at elevated temperatures. Directional solidification of NiAl alloyed with both Cr and Mo has yielded materials with useful toughness and elevated-temperature strength values. The intermetallic alloy NiAl has been proposed as an advanced material to extend the maximum operational temperature of gas turbine engines by several hundred degrees centigrade. This intermetallic alloy displays a lower density (approximately 30-percent less) and a higher thermal conductivity (4 to 8 times greater) than conventional superalloys as well as good high-temperature oxidation resistance. Unfortunately, unalloyed NiAl has poor elevated temperature strength (approximately 50 MPa at 1027 C) and low room-temperature fracture toughness (about 5 MPa). Directionally solidified NiAl eutectic alloys are known to possess a combination of high elevated-temperature strength and good room-temperature fracture toughness. Research has demonstrated that a NiAl matrix containing a uniform distribution of very thin Cr plates alloyed with Mo possessed both increased fracture toughness and elevated-temperature creep strength. Although attractive properties were obtained, these alloys were formed at low growth rates (greater than 19 mm/hr), which are considered to be economically unviable. Hence, an investigation was warranted of the strength and toughness behavior of NiAl-(Cr,Mo) directionally solidified at faster growth rates. If the mechanical properties did not deteriorate with increased growth rates, directional solidification could offer an economical means to produce NiAl-based alloys commercially for gas turbine engines. An investigation at the NASA Glenn Research Center at Lewis Field was undertaken to study the effect of the directional solidification growth rate on the microstructure, room temperature fracture toughness, and strength at 1027 C of a Ni-33Al-31Cr-3Mo eutectic alloy. The directionally solidified rates varied between 7.6 and 508 millimeters per hour Essentially fault-free, alternating (Cr, Mo)/NiAl lamellar plate microstructures (left photograph) were formed during growth at and below 12.7 mm/hr, whereas cellular microstructures (right photograph) with the (Cr, Mo) phase in a radial spokelike pattern were developed at faster growth rates. The compressive strength at 1027 C continuously increased with increasing growth rate and did not indicate a maxima as was reported for directionally solidified Ni-33Al-34Cr. Surprisingly, samples with the lamellar plate microstructure (left photograph) possessed a room-temperature fracture toughness of approximately 12 MPa(sup square root of m), whereas all the alloys with a cellular microstructure had a toughness of about 17 MPa(sup square root of m). These results are significant since they clearly demonstrate that Ni-33Al-31Cr-3Mo can be directionally solidified at much faster growth rates without any observable deterioration in its mechanical properties. Thus, the potential to produce strong, tough NiAl-based eutectics at commercially acceptable growth rates exists. Additional testing and alloy optimization studies are underway.

Whittenberger, J. Daniel↗

Magnetic Properties of Fe-49Co-2V Alloy and Pure Fe at Room and Elevated Temperatures

The National Aeronautics and Space Administration (NASA) has a need for soft magnetic materials for fission power and ion propulsion systems. In this work the magnetic properties of the soft magnetic materials Hiperco 50 (Fe-49wt%Cr-2V) and CMI-C (commercially pure magnetic iron) were examined at various temperatures up to 600 C. Toroidal Hiperco 50 samples were made from stacks of 0.35 mm thick sheet, toroidal CMI-C specimens were machined out of solid bar stock, and both were heat treated prior to testing. The magnetic properties of a Hiperco 50 sample were measured at various temperatures up to 600 C and then again after returning to room temperature; the magnetic properties of CMI-C were tested at temperatures up to 400 C. For Hiperco 50 coercivity decreased as temperature increased, and remained low upon returning to room temperature; maximum permeability improved (increased) with increasing temperature and was dramatically improved upon returning to room temperature; remanence was not significantly affected by temperature; flux density at H = 0.1 kA/m increased slightly with increasing temperature, and was about 20% higher upon returning to room temperature; flux density at H = 0.5 kA/m was insensitive to temperature. It appears that the properties of Hiperco 50 improved with increasing temperature due to grain growth. There was no significant magnetic property difference between annealed and aged CMI-C iron material; permeability tended to decrease with increasing temperature; the approximate decline in the permeability at 400 C compared to room temperature was 30%; saturation flux density, B(sub S), was approximately equal for all temperatures below 400 C; B(sub S) was lower at 400 C.

De Groh, Henry C., III↗

Deployment of a Full-Scope Commercial Nuclear Power Plant Control Room Simulator at the Idaho National Laboratory

The INL operates the HSSL to conduct research in the design and evaluation of advanced reactor control rooms, integration of intelligent support systems to assist operators, development and assessment of advanced human performance models, and visualizations to assess advanced operational concepts across various infrastructures. This advanced facility consists of a reconfigurable simulator and a virtual reality capability (known as the Computer-Aided Virtual Environment (CAVE)) (Figure 2). It supports human factors research, including human-in-the-loop performance, HSI, and analog and digital hybrid control displays. It can be applied to the development and evaluation of control systems and displays for complex systems such as existing and advanced NPP control rooms, command and control systems, and advance emergency operations centers. The HSSL incorporates a reconfigurable control room simulator, which is currently housed in the Center for Advanced Energy Studies (CAES), a joint venture of the DOE and the Idaho University System. The simulator is a platform- and plant-neutral environment intended for full-scope and part-task testing of operator performance in various control room configurations. The simulator is not limited to a particular plant or even simulator architecture. It can support engineering simulator platforms from multiple vendors using digital interfaces. Due to its ability to be reconfigured, it is possible to switch the HSI - not just to digital panels but also to different control modalities such as those using greater plant automation or intelligent alarm filtering. The simulator currently includes three operator workstations, each capable of driving up to eight 30-inch monitors. The size and number of monitors varies depending on the particular front-end simulator deployed for a simulator study. These operator workstations would typically be used for the shift supervisor or senior reactor operator, reactor operator, and assistant reactor operator in current US NPPs. In addition to the three workstations, information can be shared between the workstations and further displayed on a large-screen overview display or a panel mimic. An 82-inch high-definition display is commonly used for the overview display.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Business Case for Nuclear Plant Control Room Modernization

This paper presents a generic business case for implementation of technology that supports Control Room Modernization (CRM). The analysis presented in two forms; 1) a standalone technology upgrade, and 2) a technology upgrade that is built upon and incremental to a prior business case created for Mobile Work Packages (MWP). The business case contends that advanced communication and networking and analytical technologies will allow NPP to conduct control room operations with improved focus by reducing human factors and redundant manpower, and therefore operate with fewer errors. While some labor savings can be harvested in terms of overtime, the majority of savings are demonstrated as reduced time to take the plant off line and bring back on line in support of outages. The benefits are quantified to a rough order of magnitude that provides directional guidance to NPPs that are interested in developing a similar business case. This business case focuses on modernization of the operator control room and does not consider a complete overhaul and modernization of a plants instrument and control systems. While operators may be considering such an investment at their plants, the sizable capital investment required is not likely supported by a cost/benefit analysis alone. More likely, it is driven by obsolescence and reliability issues, and requires consideration of mechanical condition of plant systems, capital depreciation, financing, relicensing and overall viability of the plant asset over a 20-year horizon in a competitive market. Prior studies [REF] have indicated that such a modernization of plant I&C systems, alone or as part of a larger modernization effort, can yield very significant reductions in O&M costs. However, the depth of research and analysis required to develop a meaningful business case for a plant modernization effort is well beyond the scope of this study. While CRM as considered in this study can be easily integrated as part of grander plant modernization effort, it can also be considered as a stand-alone project, implemented as a supervisorial layer over and above existing systems. CRM is enabled by a suite of technologies, which are described in further detail in the body of this report. They include: • Modernized control room with interactive displays • High-bandwidth wireless networks • Mobile devices • Component identification technology • Mobile wireless video cameras • Smart or task based operator displays • Computer-Based Procedures (CBP)/Automated Mobile Work Packages (MWP) • Intelligent plant configuration • Advanced data analytics An analysis was conducted to determine how these technologies might impact outage operations at an NPP. The analysis concluded that outage management capabilities would be improved with application of these technologies, and result in annual benefits for the plant. These improved capabilities were identified and described in further detail in this report. • Reduction in need redundant manpower (verification, etc) • Improved critical path shutdown and restart duration during outages • Reduction in human factors and errors • Remote watches • Paperless outage coordination • Bulk work optimization

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Baseline Study Methodology for Future Phases of Research on Nuclear Power Plant Control Room Technologies

In order to provide a basis for industry adoption of advanced technologies, the Control Room Upgrades Benefits Research Project will investigate the benefits of including advanced technologies as part of control room modernization This report describes the background, methodology, and research plan for the first in a series of full-scale studies to test the effects of advanced technology in NPP control rooms. This study will test the effect of Advanced Overview Displays in the partner Utility’s control room simulator

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Information Foraging in Nuclear Power Plant Control Rooms

nformation foraging theory articulates the role of the human as an 'informavore' that seeks information and follows optimal foraging strategies (i.e., the 'information scent') to find meaningful information. This paper briefly reviews the findings from information foraging theory outside the nuclear domain and then discusses the types of information foraging strategies operators employ for normal and off-normal operations in the control room. For example, operators may employ a predatory 'wolf' strategy of hunting for information in the face of a plant upset. However, during routine operations, the operators may employ a trapping 'spider' strategy of waiting for relevant indicators to appear. This delineation corresponds to information pull and push strategies, respectively. No studies have been conducted to determine explicitly the characteristics of a control room interface that is optimized for both push and pull information foraging strategies, nor has there been empirical work to validate operator performance when transitioning between push and pull strategies. This paper explores examples of control room operators as wolves vs. spiders and con- cludes by proposing a set of research questions to investigate information foraging in control room settings.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Baseline Evaluations to Support Control Room Modernization at Nuclear Power Plants

For any major control room modernization activity at a commercial nuclear power plant (NPP) in the U.S., a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model. These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—intended to catalog final products—rather than formative—intended to guide the overall modernization process. In this paper, we highlight two crucial formative sub-elements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two sub-elements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomics baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and subsequent summative benchmarking activities that help ensure that control room modernization represents a successful evolution of the control system.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Pilot Study Investigating the Effects of Advanced Nuclear Power Plant Control Room Technologies: Methods and Qualitative Results

Control room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. Nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Upgrades in the U.S. do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The goal of the control room upgrade benefits research is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes a pilot study to test upgrades to the Human Systems Simulation Laboratory at INL.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Baseline Human Factors and Ergonomics in Support of Control Room Modernization at Nuclear Power Plants

As part of control room modernization at a nuclear power plant, a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model . These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—meant to catalog final products—rather than formative—meant to guide the overall modernization process. In this report, we highlight two crucial formative subelements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two subelements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomic baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and help ensure that control room modernization represents the successful evolution of the control system.

99 GENERAL AND MISCELLANEOUS↗

The Strategic Value of Human Factors Engineering in Control Room Modernization

Control room modernization is one of the most challenging and complex upgrade projects that a nuclear power plant can undertake. It can have almost as big an impact on operations as, for example, turbine replacement. The challenges of migrating an analog control system to a distributed control system are already well known and a number of nuclear utilities have embarked upon various levels of effort to upgrade some of the systems in the control room. When planning for control room upgrades, plants have to deal with a multitude of engineering, operational, and regulatory impacts. This will inevitably include several human factors considerations, such as workstation ergonomics, viewing angles, lighting, seating, new interaction modalities, new communication requirements, and new concepts of operation. In helping nuclear power utilities to deal with these challenges, the United States Department of Energy researchers located at Idaho National Laboratory (INL) have developed research-based human factors design and evaluation methods to be used in the development of end-state concepts for modernized control rooms and to manage the various phases of the upgrade life cycle. The methodology includes interactive sessions with operators in INL’s Human System Simulation Laboratory, three-dimensional modeling to visualize control board changes and operator-system interaction, and development of human-system prototypes to evaluate various aspects of proposed modifications. This methodology has been applied at a number of U.S. nuclear power plants where modernization projects are underway, including Exelon’s Braidwood and Byron plants, and Arizona Public Service's Palo Verde plant. It was demonstrated that including this methodology in the plant’s engineering process helps to ensure an integrated and cohesive outcome that is consistent with human factors engineering principles and provide substantial improvement in operator performance.

99 GENERAL AND MISCELLANEOUS↗

Development and evaluation of the conceptual design for a liquid radiological waste system in an advanced hybrid control room

As the current fleet of nuclear power plants are maintaining outdated or obsolete equipment it is common practice to replace worn-out equipment on an as-needed basis resulting in a series of like-for-like replacements of components on the control boards addressing an immediate need to replace equipment. Such upgrades rarely represent an encompassing or systematic vision for control room modernization and do not add the additional benefit of enhanced support for operators in the control room, which tend to overlook the opportunity to reduce operations and maintenance costs through enhanced efficiency. The purpose of the research is to provide guidance on how to realize these opportunities by designing control room human-system interfaces with advanced capabilities in mind. Further, the research seeks to ensure that control room modernizations are undertaken with a sound understanding of the impacts to human operators and are designed based on state-of-the art human factors principles. This report describes the conceptual design of the liquid radiological waste system and several research activities conducted to inform the design philosophy. The report also provides recommended updates to the original design philosophy (published by the researchers in 2018) based on the findings.

99 GENERAL AND MISCELLANEOUS↗

Radiometric Testing of Germicidal UV Products, Round 2: Upper-Room Luminaires (CALiPER Report)

This report analyzes the independently tested performance of eight germicidal ultraviolet (GUV) upper-room luminaires marketed for use in occupied spaces and purchased between March and June 2023. This type of product is mounted to upper walls or ceilings to treat air in the portion of the room above occupants; this allows for safe use of the room when the device is operating, but requires sufficient air mixing between upper and lower portions of the room. Three of the luminaires used UV-emitting LEDs, and the remaining five luminaires used low-pressure mercury (LPM) lamps. Product testing covered radiometric and electrical performance for each luminaire. Initial performance was measured for all eight products, and four were additionally measured after 100 h and 500 h of operation. Measured performance data allowed for comparison against manufacturer or vendor claims if the tested products included such claims. Some products had no performance data available for a given quantity (e.g., UV-C output power), and only four of the eight luminaires had radiant intensity distribution data files in a standard format (e.g., IES LM-63) available for download from product websites. The lack of publicly available performance data makes it difficult for potential buyers and specifiers to identify suitable products and design GUV systems for their specific applications. When products had performance claims, they were sometimes contradictory (e.g., unexplained differences between multiple power values) or ambiguous (e.g., measurement units conflict with quantity, unclear whether luminaire power or lamp power, unclear whether UV output power or UV-C output power). Three of the eight tested luminaires had claimed output power (i.e., radiant flux) values that exceeded measured values by more than an order of magnitude. There was substantial variation in UV-C radiant efficiency, with a measured range of 0.3–1.9% for LED and 0.4–2.1% for LPM, as shown in Figure 1. For example, the LPM luminaire with 0.4% radiant efficiency would need 5 times the amount of electrical energy used by the LPM luminaire with 2.1% radiant efficiency to produce the same amount of UV-C output power. LPM luminaires that had parabolic reflectors aligned with inclined louvers exhibited substantially higher UV-C radiant efficiency than tested luminaires with other designs, potentially cutting energy use by 75%. These results indicate a substantial opportunity for more energy efficient LPM luminaire designs, while demonstrating that UV LED luminaires can offer comparable UV-C radiant efficiency in this application. This may seem surprising, given that LED emitters have lower UV-C radiant efficiency than LPM lamps, but the efficiency-throttling louvers that are generally required for LPM luminaires typically are not needed for LEDs thanks to their directionality. However, lateral beam angles (which describe beam width as viewed from above) were 41–83° for LED luminaires versus 89–110° for LPM luminaires. More luminaires may be required if their lateral beam angles are relatively small, and coverage may be poor if UV-C radiant intensity distribution (i.e., beam shape) is not considered when designing systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Sensitive and Selective NH3 Monitoring at Room Temperature Using ZnO Ceramic Nanofibers Decorated with Poly(styrene sulfonate)

Ammonia (NH3) gas is a prominent air pollutant that is frequently found in industrial and livestock production environments. Due to the importance in controlling pollution and protecting public health, the development of new platforms for sensing NH3 at room temperature has attracted great attention. In this study, a sensitive NH3 gas device with enhanced selectivity is developed based on zinc oxide nanofibers (ZnO NFs) decorated with poly(styrene sulfonate) (PSS) and operated at room temperature. ZnO NFs were prepared by electrospinning followed by calcination at 500 °C for 3 h. The electrospun ZnO NFs are characterized to evaluate the properties of the as-prepared sensing materials. The loading of PSS to prepare ZnO NFs/PSS composite is also optimized based on the best sensing performance. Under the optimal composition, ZnO NFs/PSS displays rapid, reversible, and sensitive response upon NH3 exposure at room temperature. The device shows a dynamic linear range up to 100 ppm and a limit of detection of 3.22 ppm and enhanced selectivity toward NH3 in synthetic air, against NO2 and CO, compared to pure ZnO NFs. Additionally, a sensing mechanism is proposed to illustrate the sensing performance using ZnO NFs/PSS composite. Therefore, this study provides a simple methodology to design a sensitive platform for NH3 monitoring at room temperature.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Design and Validation of Control Room Upgrades Using a Research Simulator Facility

Since 1981, the United States (U.S.) Nuclear Regulatory Commission (NRC) [1] requires a plant- specific simulator facility for use in training at U.S. nuclear power plants (NPPs). These training simulators are in near constant use for training and qualification of licensed NPP operators. In the early 1980s, the Halden Man-Machine Laboratory (HAMMLab) at the Halden Reactor Project (HRP) in Norway first built perhaps the most well known set of research simulators. The HRP offered a high- fidelity simulator facility in which the simulator is functionally linked to a specific plant but in which the human-machine interface (HMI) may differ from that found in the plant. As such, HAMMLab incorporated more advanced digital instrumentation and controls (I&C) than the plant, thereby giving it considerable interface flexibility that researchers took full advantage of when designing and validating different ways to upgrade NPP control rooms. Several U.S. partners—the U.S. NRC, the Electrical Power Research Institute (EPRI), Sandia National Laboratories, and Idaho National Laboratory (INL) – as well as international members of the HRP, have been working with HRP to run control room simulator studies. These studies, which use crews from Scandinavian plants, are used to determine crew behavior in a variety of normal and off-normal plant operations. The findings have ultimately been used to guide safety considerations at plants and to inform advanced HMI design—both for the regulator and in industry. Given the desire to use U.S. crews of licensed operators on a simulator of a U.S. NPP, there is a clear need for a research simulator facility in the U.S. There is no general-purpose reconfigurable research oriented control room simulator facility in the U.S. that can be used for a variety of studies, including the design and validation of control room upgrades.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The overview in safety review of human factors engineering and control room design in chinese AP1000 nuclear power plant - 174

The first AP1000 nuclear power plant is constructed in Sanmen county in Zhejiang Province in China, which has creative and distinctive design characteristics. Human factors engineering disciplines are applied to the design of the AP1000. In addition to the elements of the program review model(including human factors engineering program management, operating experience review, functional requirements analysis and allocation, task analysis, staffing, integration of human reliability analysis with human factors engineering, human system interface design, procedure development, training program development, human system interface verification and validation, design implementation, human performance monitoring),the minimum inventory of controls, displays, and alarms present in the main control room and at the remote shutdown workstation. These contents mentioned above are reviewed according to standards, rules and regulations. This article introduces review process, and several important issues during the reviewing are described in detail. These issues include many elements, such as operating experience review, task analysis, human system interface design, verification and validation,and so on. This paper emphasizes on the main control room design(including environment and layout). Background noise in the actual main control room may exceed too much to design value. Another important issue is about main control room habitability systems(VES) changes to satisfy post-actuation performance requirements in AP1000 design change proposal. All the wall panel displays will be closed in this design change proposal. Review process and proposal are described in the paper. Since the AP1000 unit in China is the first constructed all over the world, verification and validation are especially important and necessary. The plan of verification and validation, the results summary report of verification and validation, the report of human engineering discrepancies are focus attention. Verification and validation in human factors engineering include HSI task support verification, HFE design verification and integrated system validation. This paper introduces the review process of verification and validation, the issues found in verification and validation. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗