Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RESOURCE POTENTIAL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Near-Infrared Monitoring of Volatiles in Frozen Lunar Simulants While Drilling

In Situ Resource Utilization (ISRU) focuses on using local resources for mission consumables. The approach can reduce mission cost and risk. Lunar polar volatiles, e.g. water ice, have been detected via remote sensing measurements and represent a potential resource for both humans and propellant. The exact nature of the horizontal and depth distribution of the ice remains to be documented in situ. NASA's Resource Prospector mission (RP) is intended to investigate the polar volatiles using a rover, drill, and the RESOLVE science package. RP component level hardware is undergoing testing in relevant lunar conditions (cryovacuum). In March 2015 a series of drilling tests were undertaken using the Honeybee Robotics RP Drill, Near-Infrared Volatile Spectrometer System (NIRVSS), and sample capture mechanisms (SCM) inside a 'dirty' thermal vacuum chamber at the NASA Glenn Research Center. The goal of these tests was to investigate the ability of NIRVSS to monitor volatiles during drilling activities and assess delivery of soil sample transfer to the SCMs in order to elucidate the concept of operations associated with this regolith sampling method.

Neutron Spectrometer System↗

Concept Study: Exploration and Production in Environmentally Sensitive Arctic Areas

The Alaska North Slope offers one of the best prospects for increasing U.S. domestic oil and gas production. However, this region faces some of the greatest environmental and logistical challenges to oil and gas production in the world. A number of studies have shown that weather patterns in this region are warming, and the number of days the tundra surface is adequately frozen for tundra travel each year has declined. Operators are not allowed to explore in undeveloped areas until the tundra is sufficiently frozen and adequate snow cover is present. Spring breakup then forces rapid evacuation of the area prior to snowmelt. Using the best available methods, exploration in remote arctic areas can take up to three years to identify a commercial discovery, and then years to build the infrastructure to develop and produce. This makes new exploration costly. It also increases the costs of maintaining field infrastructure, pipeline inspections, and environmental restoration efforts. New technologies are needed, or oil and gas resources may never be developed outside limited exploration stepouts from existing infrastructure. Industry has identified certain low-impact technologies suitable for operations, and has made improvements to reduce the footprint and impact on the environment. Additional improvements are needed for exploration and economic field development and end-of-field restoration. One operator-Anadarko Petroleum Corporation-built a prototype platform for drilling wells in the Arctic that is elevated, modular, and mobile. The system was tested while drilling one of the first hydrate exploration wells in Alaska during 2003-2004. This technology was identified as a potentially enabling technology by the ongoing Joint Industry Program (JIP) Environmentally Friendly Drilling (EFD) program. The EFD is headed by Texas A&M University and the Houston Advanced Research Center (HARC), and is co-funded by the National Energy Technology Laboratory (NETL). The EFD participants believe that the platform concept could have far-reaching applications in the Arctic as a drilling and production platform, as originally intended, and as a possible staging area. The overall objective of this project was to document various potential applications, locations, and conceptual designs for the inland platform serving oil and gas operations on the Alaska North Slope. The University of Alaska Fairbanks assisted the HARC/TerraPlatforms team with the characterization of potential resource areas, geotechnical conditions associated with continuous permafrost terrain, and the potential end-user evaluation process. The team discussed the various potential applications with industry, governmental agencies, and environmental organizations. The benefits and concerns associated with industry's use of the technology were identified. In this discussion process, meetings were held with five operating companies (22 people), including asset team leaders, drilling managers, HSE managers, and production and completion managers. Three other operating companies and two service companies were contacted by phone to discuss the project. A questionnaire was distributed and responses were provided, which will be included in the report. Meetings were also held with State of Alaska Department of Natural Resources officials and U.S. Bureau of Land Management regulators. The companies met with included ConcoPhillips, Chevron, Pioneer Natural Resources, Fairweather E&P, BP America, and the Alaska Oil and Gas Association.

02 PETROLEUM↗

Mars ISRU for Production of Mission Critical Consumables - Options, Recent Studies, and Current State of the Art

In 1978, a ground breaking paper titled, "Feasibility of Rocket Propellant Production on Mars" by Ash, Dowler, and Varsi discussed how ascent propellants could be manufactured on the Mars surface from carbon dioxide collected from the atmosphere to reduce launch mass. Since then, the concept of making mission critical consumables such as propellants, fuel cell reactants, and life support consumables from local resources, commonly known as In-Situ Resource Utilization (ISRU), for robotic and human missions to Mars has been studied many times. In the late 1990's, NASA initiated a series of Mars Human Design Reference Missions (DRMs), the first of which was released in 1997. These studies primarily focused on evaluating the impact of making propellants on Mars for crew ascent to Mars orbit, but creating large caches of life support consumables (water & oxygen) as a backup for regenerative life support systems for long-duration surface stays (>500 days) was also considered in Mars DRM 3.0. Until science data from the Mars Odyssey orbiter and subsequent robotic missions revealed that water may be widely accessable across the surface of Mars, prior Mars ISRU studies were limited to processing Mars atmospheric resources (carbon dioxide, nitrogen, argon, oxygen, and water vapor). In December 2007, NASA completed the Mars Human Design Reference Architecture (DRA) 5.0 study which considered water on Mars as a potential resource for the first time in a human mission architecture. While knowledge of both water resources on Mars and the hardware required to excavate and extract the water were very preliminary, the study concluded that a significant reduction in mass and significant enhancements to the mission architecture were possible if Mars water resources were utilized. Two subsequent Mars ISRU studies aimed at reexamining ISRU technologies, processing options, and advancements in the state-of-the-art since 2007 and to better understand the volume and packaging associated with Mars ISRU systems further substantiated the preliminary results from the Mars DRA 5.0 study. This paper will provide an overview of Mars ISRU consumable production options, the analyses, results, and conclusions from the Mars DRA 5.0 (2007), Mars Collaborative (2013), and Mars ISRU Payload for the Supersonic Retro Propulsion (2014) mission studies, and the current state-of-the-art of Mars ISRU technologies and systems. The paper will also briefly discuss the mission architectural implications associated with Mars resource and ISRU processing options.

Sanders, G. B.↗

A Methodology to Consider Combined Electrical Infrastructure and Real-Time Power-Flow Impact Costs in Planning Large-Scale Renewable Energy Farms

The U.S federal government's strategic vision encouraging renewable energy production has motivated several new energy generation projects. Among them are large-scale renewable energy farm building efforts, where one considers the renewable resource potential along with land, equipment and installation costs. The goal in the planning phase of these efforts is to maximize the return on investment as well as the utilization of resources. The challenge, however, that is specific to integrating new generation is the need to include the operational (both construction as well as run-time) cost of introducing power to the existing infrastructure. In this paper, we propose a methodology to compute and include energy transmission line proximity (a construction time cost) and thermal-overload, and voltage out-of-range (an infrastructure cost) factors. Thus we consider both distance to infrastructure and the power-flow impacts when we plan to tap into an existing infrastructure. We present results for a simulation study over regions in Texas, Kansas, Colorado, New Mexico and Oklahoma and discuss the observations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

State Policies Provide Critical Support for Renewable Electricity

Growth in renewable energy in the U.S. over the past decade has been propelled by a number of forces, including rising fossil fuel prices, environmental concerns, and policy support at the state and federal levels. In this article, we review and discuss what are arguably the two most important types of state policies for supporting electricity generation from geothermal and other forms of renewable energy: renewables portfolio standards and utility integrated resource planning requirements. Within the Western U.S., where the vast majority of the nation's readily-accessible geothermal resource potential resides, these two types of state policies have been critical to the growth of renewable energy, and both promise to continue to play a fundamental role for the foreseeable future. In its essence, a renewables portfolio standard (RPS) requires utilities and other retail electricity suppliers to produce or purchase a minimum quantity or percentage of their generation supply from renewable resources. RPS purchase obligations generally increase over time, and retail suppliers typically must demonstrate compliance on an annual basis. Mandatory RPS policies are backed by various types of compliance enforcement mechanisms, although most states have incorporated some type of cost-containment provision, such as a cost cap or a cap on retail rate impacts, which could conceivably allow utilities to avoid (full) compliance with their RPS target. Currently, 27 states and the District of Columbia have mandatory RPS requirements. Within the eleven states of the contiguous Western U.S., all but three (Idaho, Utah, and Wyoming) now have a mandatory RPS legislation (Utah has a more-voluntary renewable energy goal), covering almost 80% of retail electricity sales in the region. Although many of these state policies have only recently been established, their impact is already evident: almost 1800 MW of new renewable capacity has been installed in Western states following the implementation of RPS policies. To date, wind energy has been the primary beneficiary of state RPS policies, representing approximately 83% of RPS-driven renewable capacity growth in the West through 2007. Geothermal energy occupies a distant second place, providing 7% of RPS-driven new renewable capacity in the West since the late 1990s, though geothermal's contribution on an energy (MWh) basis is higher. Looking to the future, a sizable quantity of renewable capacity beyond pre-RPS levels will be needed to meet state RPS mandates: about 25,000 MW by 2025 within the Western U.S. Geothermal energy is beginning to provide an increasingly significant contribution, as evidenced by the spate of new projects recently announced to meet state RPS requirements. Most of this activity has been driven by the RPS policies in California and Nevada, where the Geothermal Energy Association has identified 47 new geothermal projects, totaling more than 2,100 MW, in various stages of development. Additional geothermal projects in Arizona, New Mexico, Oregon, and Washington are also under development to meet those states RPS requirements. The other major state policy driver for renewable electricity growth, particularly in the West, is integrated resource planning (IRP). IRP was first formalized as a practice in the 1980s, but the practice was suspended in some states as electricity restructuring efforts began. A renewed interest in IRP has emerged in the past several years, however, with several Western states (California, Montana, and New Mexico) reestablishing IRP and others developing new rules to strengthen their existing processes. In its barest form, IRP simply requires that utilities periodically submit long-term resource procurement plans in which they evaluate alternative strategies for meeting their resource needs over the following ten to twenty years. However, many states have developed specific requirements for the IRP process that directly or indirectly support renewable energy. The most general of these is an explicit requirement that utilities evaluate renewables, and that they do so on an 'equivalent' or 'comparable' basis to conventional supply-side generation options. Many states also require that utilities include various types of risk analyses within their IRP. For example, utilities are often required to evaluate fuel price risk within their resource plan, which can reveal the value of renewables as a hedge against rising and volatile fuel prices. Of particular importance for supporting renewable energy is the increasingly common requirement that utilities evaluate the potential costs and risks associated with future greenhouse gas regulations. Virtually all of the major Western utilities that prepare IRPs incorporated future carbon dioxide regulations in their analyses of alternative resource strategies in their most recent resource plans.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Review of Feasibility and Cost Drivers for Floating Offshore Wind Energy in Washington State

The state of Washington must double its clean electricity supply by 2050 to meet its clean energy goals and comply with the Clean Energy Transformation Act. With more than 6.6 GW of technical resource potential in federal waters where Bureau of Ocean Energy Management has leasing authority, offshore wind energy could play an important role in diversifying Washington State's clean energy mix, reducing dependence on out-of-state energy sources, and helping meet state decarbonization goals. Decision makers need technology-specific information to assist with long-term energy system planning, so the Bureau of Ocean Energy Management requested that the National Renewable Energy Laboratory provide an overview of several drivers of offshore wind energy feasibility and cost in Washington. This study summarizes some of the existing engagement efforts and perspectives on offshore wind energy in the region and quantifies the offshore wind resources in Washington as well as technology costs and performance of potential projects. Furthermore, this report reviews existing grid and port infrastructure and discusses infrastructure needs along with information gaps. This study also explores opportunities and barriers to Washington entities supporting the broader floating offshore wind energy supply chain along the U.S. West Coast. Note that this study is not part of a formal project planning process or official engagement effort, nor does it assess environmental or economic impacts from potential offshore wind energy development.

17 WIND ENERGY↗

A Conceptual Framework to Describe Energy Efficiency and Demand Response Interactions

Energy efficiency (EE) and demand response (DR) resources provide important utility system and ratepayer benefits. At the same time, the rapid change in the amount and type of variable renewable energy, like solar and wind, is reshaping the role and economic value of EE and DR, and will likely affect time-dependent valuation of EE and DR measures. Utilities are increasingly interested in integrating EE and DR measures and technologies (as well as other distributed energy resources) as a strategic approach to improve their collective cost-effectiveness and performance. However, the specific EE and DR features that may be best integrated, the interplay between changing EE and DR resource potential, and the resulting utility system impacts, are not well understood. We develop a framework to identify the EE and DR attributes, system conditions, and technological factors that are likely to drive interactions between EE and DR. We apply the framework to example measures with different technology specifics (e.g., presence of controls, building type, and targeted end use) in the context of different system conditions (e.g., peak demand, load-building periods during high renewable generation output). Ultimately, the framework defines EE and DR interactions not only by the change in discretionary load (i.e., DR potential) but also by the change in likelihood of participation in EE and DR programs—as well as the change in system need for, and the overall availability of, EE and DR resources. The framework is intended to improve the integration of EE and DR in utility operational and planning activities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Exploring Sustainable Critical Mineral Production in Central Appalachia: A Pathway to Economic Revitalization & Environmental Justice

The Evolve Central Appalachia (Evolve CAPP) project team was formed to explore the sustainability of critical mineral production within the Central Appalachian coal basin, spanning Virginia, West Virginia, Kentucky, and Tennessee in the United States. The initiative is evaluating the rare earth and critical mineral resource potential essential for powering clean energy technologies, while fostering a circular economy throughout the energy transition. Opportunities are being sought to address environmental justice, workforce development and responsible sourcing. By promoting greater resource utilization, the project is identifying downstream value-added industries, further fostering economic revitalization in the region.

Bishop, Richard↗

Port Gamble S'Klallam Tribe Strategic Energy Plan

The Port Gamble S'Klallam Tribe's Strategic Energy Plan (SEP) details the outcomes and efforts of a 1.5-year Energy Technology Innovation Partnership Program (ETIPP) project. This collaboration involved the Port Gamble S'Klallam Tribe, Spark Northwest, the Pacific Northwest National Laboratory (PNNL), and the National Renewable Energy Laboratory. Project partners supported the Tribe in identifying key energy research focus areas and the Tribe's energy vision. As the technical lead on the project, PNNL led a series of research initiatives to evaluate potential pathways for the Tribe to achieve its energy goals, subsequently providing associated recommendations. The SEP offers a comprehensive analysis encompassing several critical aspects including: -The Tribe's current energy landscape -Availability of renewable resources -Potential microgrid designs, developed by Säzän Group -Critical infrastructure analysis -Electric vehicle integration -An energy workforce development framework, led by Spark Northwest The analysis results come with recommended next steps, categorized by implementation timeframe (short-term, medium-term, long-term) and priority.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hualapai Wind Project Feasibility Report

The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorable conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.

17 WIND ENERGY↗

Long-term basin-scale hydropower expansion under alternative scenarios in a global multisector model

Abstract Hydropower is an important source of renewable, low-carbon energy. Global and regional energy systems, including hydropower, may evolve in a variety of ways under different scenarios. Representation of hydropower in global multisector models is often simplified at the country or regional level. Some models assume a fixed hydropower supply, which is not affected by economic drivers or competition with other electricity generation sources. Here, we implement an endogenous model of hydropower expansion in the Global Change Analysis Model, including a representation of hydropower potential at the river basin level to project future hydropower production across river basins and explore hydropower’s role in evolving energy systems both regionally and globally, under alternative scenarios. Each scenario utilizes the new endogenous hydropower implementation but makes different assumptions about future low-carbon transitions, technology costs, and energy demand. Our study suggests there is ample potential for hydropower to expand in the future to help meet growing demand for electricity driven by socioeconomic growth, electrification of end-use sectors, or other factors. However, hydropower expansion will be constrained by resource availability, resource location, and cost in ways that limit its growth relative to other technologies. As a result, all scenarios show a generally decreasing share of hydroelectricity over total electricity generation at the global level. Hydropower expansion varies across regions, and across basins within regions, due to differences in resource potential, cost, current utilization, and other factors. In sum, our scenarios entail hydropower generation growth between 36% and 119% in 2050, compared to 2015, globally.

54 ENVIRONMENTAL SCIENCES↗

Additional Capacity Value From Synergy of Variable Renewable Energy and Energy Storage

Current capacity markets often consider capacity credits from each resource independently, irrespective of the portfolio of resources, potentially overvaluing or undervaluing the capacity contribution of variable renewable energy (VRE) and energy storage (ES) in the grid. We propose a method for calculating the standalone and integrated capacity value of an added VRE resource with existing ES resources. The difference between the integrated and standalone value is the portfolio effect. This is the additional capacity value gained by the synergy of VRE and the existing fleet. Using chronological dispatch simulations and two different reliability metrics to estimate firm capacity, we demonstrate on a small test system that the portfolio effect can be substantial.

capacity credit↗

Geothermal Energy for New Mexico: Assessment of Potential and Exploratory Drilling

This report summarizes the drilling operations and subsequent interpretation of thermal and geochemical data from the New Mexico Tech NMT-2GT (OSE RG- 05276 POD) test well. This slim hole was drilled along an elongate heat-flow anomaly at the base of the Socorro Mountains to better assess the geothermal resource potential (Socorro Peak geothermal system) on the western side of the New Mexico Tech campus in Socorro, New Mexico. The reservoir depth, hydraulic properties, temperature and chemistry were unknown prior to drilling. The purpose of the NMT-2GT (OSE RG-05276 POD) well was to explore the feasibility of providing geothermal fluids for a proposed district space heating system on the New Mexico Tech campus. With DOE cost over runs funds we completed NMT-2GT to a depth of 1102 feet at the Woods Tunnel drill site. Temperatures were nearly constant (41 oC ) between a depth of 1102 feet. Above this isothermal zone, a strong temperature gradient was observed (210 oC /km) beneath the water table consistent with vertical convective heat transfer. The existence of a groundwater upflow zone was further supported by measured vertical hydraulic head measurements which varied between about 258 feet at the water table to 155 feet at a depth of 1102 feet yielding a vertical hydraulic a gradient of about 0.1. If the upflow zone is 1 km deep, then a vertical flow rate is about 0.6 m/yr could have produced the observed curvature in the thermal profile. This would suggest that the deep bedrock permeability is about 20 mD. This is much lower than the permeability measured in a specific capacity aquifer test completed in 2009 within fracture Paleozoic sandstones near the water table (3000 D). Flow rates measured during drilling were measured using a v-notch weir. Flow rates were consistently around 1000 gpm. While the temperatures are lower than we had anticipated, this geothermal resource can still be developed to heat the NM Tech campus using heat pump technology.

15 GEOTHERMAL ENERGY↗

Preliminary Geothermal Resource Assessment of the St. Helens Seismic Zone Using the Results from the Geothermal Play-Fairway Analysis of Washington State Prospects

The northern St. Helens Seismic Zone was one of the areas of interest during Phase 2 of the Washington State Play-Fairway analysis. The area is assessed for geothermal resource potential using the volumetric reserve estimation method developed by the US Geological Survey. Multiple hypotheses for reservoir volume are proposed and analyzed based on interpretation of data gathered during Phase 2 within a geothermal lease. Here, the data utilized in the analysis includes new geologic mapping, ground-based gravity survey, magnetotelluric survey, and passive seismic survey. The hypotheses will be tested, and the resource model will be updated after temperature gradient holes are drilled in the area during Phase 3 at sites selected from Phase 2. The analysis also makes use of the prior geologic knowledge of the area, including the increased seismic and geodetic monitoring following the eruption of Mount St. Helens on May 18th, 1980, existing geologic mapping and models developed from seismic and geodetic data, and past geothermal prospecting efforts by the Washington Division of Geology and Earth Resources. The analysis uses reservoir temperature from geochemistry and a single temperature gradient hole for a low value, and a temperature required for steam flash as a high value. Subsurface temperatures, and heat flows are expected to be better constrained after Phase 3 drilling. The preliminary results suggest power generation potential ranging from 65 MWe to 1.5 GWe within the lease area.

geomechanics↗

Human Mars Landing Site and Impacts on Mars Surface Operations

This paper describes NASA's initial steps for identifying and evaluating candidate Exploration Zones (EZs) and Regions of Interests (ROIs) for the first human crews that will explore the surface of Mars. NASA's current effort to define the exploration of this planet by human crews, known as the Evolvable Mars Campaign (EMC), provides the context in which these EZs and ROIs are being considered. The EMC spans all aspects of a human Mars mission including launch from Earth, transit to and from Mars, and operations on the surface of Mars. An EZ is a collection of ROIs located within approximately 100 kilometers of a centralized landing site. ROIs are areas relevant for scientific investigation and/or development/maturation of capabilities and resources necessary for a sustainable human presence. The EZ also contains one or more landing sites and a habitation site that will be used by multiple human crews during missions to explore and utilize the ROIs within the EZ. With the EMC as a conceptual basis, the EZ model has been refined to a point where specific site selection criteria for scientific exploration and in situ resource utilization can be defined. In 2015 these criteria were distributed to the planetary sciences community and the in situ resource utilization and civil engineering communities as part of a call for EZ proposals. The resulting "First Landing Site/Exploration Zone Workshop for Human Missions to the Surface of Mars" was held in October 2015 during which 47 proposals for EZs and ROIs were presented and discussed. Proposed locations spanned all longitudes and all allowable latitudes (+/- 50 degrees). Proposed justification for selecting one of these EZs also spanned a significant portion of the scientific and resource criteria provided to the community. Several important findings resulted from this Workshop including: (a) a strong consensus that, at a scale of 100 km (radius), multiple places on Mars exist that have both sufficient scientific interest to sustain multiple crews of exploring astronauts, AND potential resource deposits for ISRU indicating the current EZ definition is viable and should be retained for now, (b) new data types (needed for more definitive analysis of EZs) argued strongly for a new orbiter mission, and possibly one or more surface missions, to obtain these data, (c) a general consensus that this Workshop was an excellent start to identifying a place where future human missions to Mars can productively explore this planet and learn to live and work there for the long term. Building on these findings, HEOMD and SMD are: (a) refining the EZ selection criteria and overall selection process to improve on lessons learned from the first EZ workshop, (b) using these proposed locations to develop "reference EZs" for assessment purposes (primarily engineering assessments), (c) gathering data and conducting analyses to better understanding the different potential sources for water, including the ease of extraction and purification, and (d) assessing trends in additional data that are needed to better characterize EZs proposed at the workshop and how these data needs impact the design and operation of future robotic Mars missions.

Hoffman, Stephen J.↗

Wind energy developments in the 20th century

Wind turbine systems for generating electrical power have been tested in many countries. Representative examples of turbines which have produced from 100 to 1250 kW are described. The advantages of wind energy consist of its being a nondepleting, nonpolluting, and free fuel source. Its disadvantages relate to the variability of wind and the high installation cost per kilowatt of capacity of wind turbines when compared to other methods of electric-power generation. High fuel costs and potential resource scarcity have led to a five-year joint NASA-NSF program to study wind energy. The program will study wind energy conversion and storage systems with respect to cost effectiveness, and will attempt to estimate national wind-energy potential and develop techniques for generator site selection. The studies concern a small-systems (50-250 kW) project, a megawatt-systems (500-3000 kW) project, supporting research and technology, and energy storage. Preliminary economic analyses indicate that wind-energy conversion can be competitive in high-average-wind areas.

Vargo, D. J.↗

SILVER: Surface Imaging for Lunar Volatiles, Resources, and Exploration

The Surface Imaging for Lunar Volatiles, Exploration, and Resources (SILVER) instrument is a proposed imaging investigation for the 2008 Lunar Reconnaissance Orbiter (LRO) mission. SILVER and its experienced Measurement Team will prepare for and support future lunar human exploration activities, especially landing site identification and certification on the basis of potential resources. SILVER combines a high-resolution pushbroom visible imaging channel (SILVER-HR) and a wide-field-of-view (45 deg) framing imaging channel (SILVER-WF). SILVER-HR will obtain a single-detector 6 km imaging swath of 12,228 pixels at 0.5 m/pixel to image greater than 100 sq km target areas from 50 km altitude, imaging greater than 15% the lunar surface during a 1 year nominal mission. SILVER-HR has excellent stray-light rejection and its imaging detector has selectable time delay integration (TDI) with up to 128 stages for extreme low-light sensitivity, permitting direct imaging of permanently shadowed polar regions in scattered sunlight or earthshine. SILVER-WF will obtain geodetic framing images in a 2048 x 2048 format at 20m/pixel, with 60% along-track overlap stereo for imaging context and for derivation of a global digital elevation model of meter-scale lunar topography.

Pappalardo, R. T.↗

The Potential for Biomass District Energy Production in Port Graham, Alaska

This project was a collaboration between The Energy & Environmental Research Center (EERC) and Chugachmiut – A Tribal organization Serving the Chugach Native People of Alaska and funded by the U.S. Department of Energy (DOE) Tribal Energy Program. It was conducted to determine the economic and technical feasibility for implementing a biomass energy system to service the Chugachmiut community of Port Graham, Alaska. The Port Graham tribe has been investigating opportunities to reduce energy costs and reliance on energy imports and support subsistence. The dramatic rise in the prices of petroleum fuels have been a hardship to the village of Port Graham, located on the Kenai Peninsula of Alaska. The Port Graham Village Council views the forest timber surrounding the village and the established salmon industry as potential resources for providing biomass energy power to the facilities in their community. Benefits of implementing a biomass fuel include reduced energy costs, energy independence, economic development, and environmental improvement. Fish oil–diesel blended fuel and indoor wood boilers are the most economical and technically viable options for biomass energy in the village of Port Graham. Sufficient regional biomass resources allow up to 50% in annual heating savings to the user, displacing up to 70% current diesel imports, with a simple payback of less than 3 years for an estimated capital investment under $300,000. Distributive energy options are also economically viable and would displace all imported diesel, albeit offering less savings potential and requiring greater capital. These include a large-scale wood combustion system to provide heat to the entire village, a wood gasification system for cogeneration of heat and power, and moderate outdoor wood furnaces providing heat to 3–4 homes or community buildings per furnace. Coordination of biomass procurement and delivery, ensuring resource reliability and technology acceptance, and arbitrating equipment maintenance mitigation for the remote village are challenges to a biomass energy system in Port Graham that can be addressed through comprehensive planning prior to implementation.

02 PETROLEUM↗