Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REMEDIAL ACTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

The Effects of Contaminant-Aging on Decontamination Efficacy for Rapid Remediation of Concrete Surfaces - 20412

Understanding the relationship between decontamination efficacy and contaminant aging is imperative for developing effective remediation strategies following a large-scale contamination event. Non-destructive decontamination of concrete following a contamination incident becomes more difficult with increased time between contamination and decontamination because contaminants may chemically bind to concrete and/or penetrate into the concrete subsurface. In this work, we evaluated the decontamination efficacy of two decontamination methods on concrete samples contaminated with soluble Cesium-137 (Cs-137) and silica particles with 0.5 μm and 2 μm diameters. Concrete samples were aged between 1 and 59 days, with half of the coupons receiving 1 mL of artificial rainwater about once every three days. After aging, coupons were either decontaminated or analyzed to determine contaminant penetration depths. Coupons were decontaminated with 0.1 M Potassium Chloride (KCI) solution applied either by flowing solution across the contaminated coupon face or non-destructive power washing. Contaminant depth profiles were created by removing the top surface of the coupon at least 15 times, measuring the activity in each removed layer, normalizing the total activity removed to the measured decontamination efficacy following the last layer removal, and determining the penetration thickness using the coupon dimensions, bulk density, and mass of material removed for each layer. Pressurized washing effectively removed particles, but not soluble cesium, despite the majority of Cs-137 being located within the first millimeter of the subsurface. Soluble cesium removal by flowing 0.1 M KCI solution across the contaminated surface dropped to less than 12% within the first ten days. This drop in Cs-137 removal efficacy occurred within the first five days for coupons experiencing artificial rainfall events. Flowing 0.1 M KCI solution across the contaminated face was ineffective at removing particles, likely because particles had localized in surface depressions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Testbed for Pipeline Flushing - 20425

Pipelines which carry high-level waste within the DOE complex should be properly flushed in the cases where stationary or moving beds of solid sediment occur, or lines are prone to hydrogen gas buildup. Present guidelines establish a minimum for the amount of water (flush volume) and flush velocity values used for post-transfer flushing operations to achieve satisfactory cleaning of pipelines. However, further studies are needed to find optimal operating velocity modes/values in order to minimizing the flush volume and consequent downstream waste. These efforts are significantly helpful to DOE waste remediation sites by preserving tank storage, preventing additional waste processing, and minimizing dilution and changes in waste chemistry. An experimental test loop was recently developed for study of non-Newtonian slurry flushing at the Florida International University (FIU). This loop was designed to create sediment beds of various materials and bed heights and investigate parameters that effect the efficiency of flushing operations. The objective is to find flush velocity values/modes which lead to satisfactory cleaning of transport lines with a minimum amount of water usage. A 165 ft experimental test loop made of 3-inch carbon steel pipes was constructed and used in initial testing campaigns. This pipe loop was equipped with real-time monitoring instruments to record variation of pressure, density, mass flow rate, and temperature during testing. Post-flush in-situ no-flow evaluations were performed using ultrasonic, endoscopy, and visual inspection. Additional post-flush evaluations were conducted using filtration and density monitoring of residuals within a designated circulations loop. These provisions enable comparison of pipeline cleanness before the start and after termination of flushing operations for efficiency evaluation. This paper presents efforts associated with flushing of kaolin-water mixtures at different concentrations and with various flush volume and flush velocity values/modes. In initial testing, efforts focused on creating repeatable sediment beds inside the pipeline in both fully-flooded (no pre-flush drainage) and gravity-drained (pre-flush drained) systems. Bed characterization (i.e., measurement of sediment height and solids concentration) was conducted to ensure about consistency of initial conditions between tests. Preliminary results for flushing study of 10% vol. kaolin-water mixtures starting from a fully-flooded initial condition showed that flushing with 1-line volume (65 gallons) could remove up to 72 percent of solids from the pipeline. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Study on the Strategy for Final Disposal and Reuse of Decontamination Wastes after the Fukushima Daiichi NPP Accident - 20426

After the Fukushima Daiichi NPP accident, a large area of East Japan was contaminated by radio-Cs. To discuss the final disposal of the contaminated wastes off-site and the required development of related technologies, it is important to understand the volume and radiation concentration of the wastes after various treatments. For a scientific investigation purpose, a research committee has been formed by the Society for the Remediation of Radioactive Contamination in the Environment, which is independent from the Ministry of Environment. This committee's work is focused on discussing various scenarios for the final disposal considering a mass balance evaluation of the entire process, economic evaluations, and stakeholder consultation for final consensus. The current discussions of this committee are herein reported. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Use of Long-wave Infrared Cameras for Hazardous Waste Remediation - 20457

For over fifty years, infrared cameras have been used in military applications, nondestructive testing, condition monitoring, and predictive maintenance. As infrared cameras continue to become more sophisticated and less expensive, they are providing value in an ever-increasing variety of unique applications, including hazardous waste remediation. This paper describes several instances of how infrared cameras have been used within the US Department of Defense and the US Department of Energy in support of waste remediation projects, including the author's recent use of an infrared camera in support of the Calcine Retrieval Project at the Idaho National Laboratory. Infrared cameras provide images of infrared radiation, or heat energy, which is otherwise invisible to the unaided eye. Infrared radiation is part of the electromagnetic spectrum, which includes visible light. But unlike visible light, infrared has wavelengths longer than the human eye can detect. Infrared is emitted by everything with a temperature above absolute zero (-273 deg. C, or -459 deg. F); the higher the temperature, the greater the infrared thermal radiation, or heat, that is emitted. Even objects that feel cold to us, like ice, emit thermal radiation and can be imaged by infrared cameras. These cameras are typically used to look for abnormally hot or cold spots on a component or target area under normal operating conditions. The method provides a rapid, wide-area, noncontact technique for identifying problems associated with a temperature differential. All infrared cameras can provide qualitative thermal information by displaying relative differences in temperatures within a two-dimensional image. More expensive infrared cameras can also provide quantitative information where an absolute temperature value is assigned to each pixel associated with the displayed two-dimensional image. Proper camera calibration and a solid understanding of heat transfer and thermography techniques are required when using an infrared camera to obtain quantitative information. Case studies outlined in this paper include the rapid, non-intrusive detection of hazardous decontamination solution within one-ton shipping containers at Pine Bluff Arsenal, the non-intrusive identification of residual elemental sodium within the cooling loops of the Experimental Breeder Reactor II (EBR-II) reactor at the Idaho National Laboratory, process monitoring of heat exchanger melt-and-drain efforts during EBR-II decommissioning, and the remote detection of internal steel supports within calcine storage bins prior to bin penetration. For each use of thermography, the author describes a summary of the waste remediation effort, the infrared camera used, the thermal imaging technique employed, and the results obtained. The paper concludes with a discussion on common mistakes to avoid for similar applications of thermography. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Choosing the Best Modeling Platform for Radiological Risk Assessment Models - 20468

Radiological risk assessments, in the form of performance or safety assessments, are often required under regulations or guidance for remediation of contaminated land, decommissioning of contaminated buildings or structures, and radioactive waste disposal. These risk assessments are usually supported by fate and transport models that address decay and ingrowth of radionuclides, as well as their movement through engineered systems and the natural environment. These models are often projected thousands, or more, years into the future, largely because the radioactive species change through decay and ingrowth, and hence the magnitude of the radioactive effect changes with time. There are many computer codes that are available to address this type of modeling. They range from addressing specific pathways or processes such as infiltration of water, groundwater, surface water, air, biota, diffusion and advection of water and gases, to those that try to couple all processes together to evaluate the impact of fate and transport through the entire system to places in space and time to which access is assumed. These different types of codes are sometimes separated with the monikers process-level and systems-level codes, although it is often not clear that this separation does justice to the capabilities of the many codes that are available to evaluate fate and transport of radionuclides. The focus of this paper is the latter group of modeling codes. Several systems level modeling codes exist and are used. There are differences between these codes in terms of utility, flexibility, complexity and cost. The purpose of this paper is to compare a few of these codes in the context of work currently being performed by the International Atomic Energy Agency (IAEA) Modeling and Data for Radiological Impact Assessments (MODARIA) II Working Group 1 (WG1). The MODARIA II WG1's main focus is how stakeholder engaged decision analysis can, or should, be applied to radiological contamination problems so that better, longstanding, sustainable, solutions are reached. However, the WG1 also recognizes the potential impact of the modeling tools that are chosen to address radiological risk, which is often a primary objective of decision making for radiological problems. Other objectives might also be important, such as constraining costs, obtaining financing, minimizing impact on ecosystems, saving cultural resources, saving jobs, farmland, environmental justice, etc., in a full decision analysis for a given radiological contamination problem, but none of these other objectives have the same types of complex modeling needs as minimize radiological dose. Consequently, a further focus of WG1 is to evaluate the potential impacts on decision making of the choice of fate and transport, and risk assessment, modeling codes that are used to support decision making. The WG1 will produce a report at the end of 2020 that will focus on an approach to effective decision making and stakeholder engagement. The report will also consider the role that performance assessment modeling should play in the decision-making process, including the impact of the choice of modeling tools or computer codes on risk-informed decision making. Several sites around the World have been made available by Member States for these model comparisons, and several modeling tools have been considered. However, the focus of this paper is on two of the sites, one in Belgium and one in Ukraine, and on three of the tools: NORMALYSA (NORM And Legacy Site Assessment); GoldSim{sup C}, and AMBER{sup C}. The final report from this working group will also cover other modeling tools, including RESRAD, and PC-Cream{sup R}. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of Upcoming Process Improvement Efforts at the Saltstone Facilities at the Savannah River Site - 20474

The Saltstone Facilities at the Savannah River Site (SRS) process and dispose of low activity salt solution waste generated by other liquid waste facilities. Today in the Liquid Waste System (LWS), approximately 125 million liters of salt waste remain to be processed. The Saltstone Production Facility (SPF) receives the decontaminated salt waste, which is mixed with dry feeds consisting of cement, fly ash and slag to produce the saltstone. The mixed slurry is pumped to the Saltstone Disposal Units (SDUs) for safe disposal in the Saltstone Disposal Facility (SDF). To support continuous Salt Waste Processing Facility (SWPF) operations at annual processing volumes many times higher than present, significant modifications are required to ensure that the SPF has the capacity to support the throughput of salt waste. These changes include several infrastructure upgrades that are being worked through the Enhanced Low Activity Waste Disposal (ELAWD) project. In addition to infrastructure upgrades, Savannah River Remediation (SRR), the Savannah River Site's Liquid Waste Contractor for the U.S. Department of Energy, has identified a flowsheet improvement opportunity of implementing a cement-free saltstone formulation to eliminate cement from the current three component formulation. This two-component formulation would simplify the procurement, transport, off-loading, and storage of the premix materials, and increase the storage capacity for the individual components. This flowsheet, when implemented, will reduce operational risk and improve throughput necessary to achieve disposal rates necessary for SWPF operations. Research has been completed to confirm the feasibility of this formulation, with the new cement-free flowsheet expected to be implemented in the next few years. Improvements have also been identified downstream of the SPF to increase SDU utilization. Specifically, a concentrated effort has taken place to raise the fill height in SDU 6 to the full disposal height, 13 meters, to maximize the usage of each SDU in support of the liquid waste disposal mission. This improvement has been made through additional thermal modeling and improved process understanding to create a SDU flammability model and control strategy more representative of facility operations. This work will allow for the completion of construction and operational readiness for SDU 7 while filling SDU 6 to ensure there is no lapse in available space once SWPF starts up. A summary of these improvements as they relate to increased throughput will be provided along with associated status. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from the First Year of Property Remediation - 20475

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste (LLRW) in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL) on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The larger of the two PHAI scopes of work - the Port Hope Project - involves the cleanup of approximately 1.2 million cubic metres of historic LLRW from 18 major sites in Port Hope, the construction of an engineered aboveground mound where the waste will be safely contained and the long-term maintenance and monitoring of the facility. Construction of the waste water treatment plant, the first three of four cells in the mound and supporting infrastructure is complete, with construction of the fourth cell in progress. In 2017 with the movement of on-site waste at this facility began and is now complete. Waste excavation and transportation from off-site locations within the community began in 2018; the cleanup of four temporary storage sites is now complete and remediation at several other major sites is underway. The Port Hope Project also includes a survey of the interior and exterior investigation of approximately 4,800 properties, primarily residential, in the urban area of Port Hope for the presence or absence of historic LLRW. The current projection is that approximately 1,250 privately owned residential and commercial properties known as Small-Scale Sites (SSS) will be identified as having waste exceeding the PHAI clean-up criteria. This paper will outline some of the challenges and lessons learned from the first year of SSS remediation including contractual, data and design issues; interaction with and managing expectations of stakeholders; weather, site and structure conditions as well as municipal permitting, resourcing, transportation and remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Whose Gas is it anyway? Differentiating the Source of a Large Soil Vapor Plume beneath Two Adjacent Waste Sites - 20487

DOE contractor CH2M Hill Plateau Remediation Company is currently responsible for conducting groundwater contamination monitoring at several RCRA treatment, storage, and disposal units located on the Hanford Site in Richland, Washington State. The Nonradioactive Dangerous Waste Landfill treatment, storage, and disposal unit presents a distinct groundwater monitoring problem because of a large multi-contaminant soil vapor plume beneath it that is a likely source of low-level volatile organic compound groundwater contamination. Adjacent to Nonradioactive Dangerous Waste Landfill is the Solid Waste Landfill. Volatile organic compounds are inventory components of both the Nonradioactive Dangerous Waste Landfill and the Solid Waste Landfill. Therefore, it is possible that both sites could be contributing to the soil vapor plume. For regulatory purposes, it is important to differentiate which site is the primary contributor of volatile organic compounds to the plume. An approach was developed to identify the primary volatile organic compound source of the soil vapor plume beneath Nonradioactive Dangerous Waste Landfill and Solid Waste Landfill. The site conceptual model hypothesis of vapor-phase volatile organic compound transport to the dissolved phase in groundwater was tested by a simple mathematical model of vapor/liquid equilibrium concentrations at the groundwater/air interface. Once it was shown that vapor-phase volatile organic compound transport to groundwater was a valid conceptual model for Nonradioactive Dangerous Waste Landfill and Solid Waste Landfill, spatial and statistical methods were used to determine the primary site contributing to the majority of volatile organic compounds to the soil vapor plume. Average groundwater chloroform, tetrachloroethene, and trichloroethene concentrations from Nonradioactive Dangerous Waste Landfill and Solid Waste Landfill monitoring network wells were plotted on maps of the facilities and immediate vicinities and compared to soil vapor sampling probe locations. Principal component analysis and mixing ratios were used to identify source contributions of each treatment, storage, and disposal unit to the plume. Results of the vapor/liquid equilibrium concentrations mathematical model showed that transport phenomena outweigh steady-state equilibria. Estimated vapor/liquid equilibrium concentrations were considerably lower than soil vapor measurements. The results indicate that dynamic vadose zone and groundwater factors such as decreased vapor concentrations with depth, vapor dilution from dispersion in the vadose zone, and advective and diffusional volatile organic compound dilution in groundwater result in groundwater volatile organic compound concentrations much less than would be measured under steady-state equilibrium conditions. Site source contribution differentiation by principal component analysis and mixing ratios was inconclusive using actual soil gas data because of the similarity in concentration values in both datasets for Nonradioactive Dangerous Waste Landfill and Solid Waste Landfill. Similar data populations suggest mixing of the vapor contributions from both sites by dispersion through the soil matrix pore spaces. However, when groundwater volatile organic compound data were compared between the Nonradioactive Dangerous Waste Landfill and Solid Waste Landfill monitoring networks, Solid Waste Landfill mean concentrations were higher, suggesting more vapor-phase volatile organic compound transport to groundwater at those locations. Simulated volatile organic compound soil vapor and groundwater datasets created to test the methods developed for this study show that the method can be successful in source differentiation when significantly different datasets are compared. This paper will describe a method of testing a conceptual model for vapor-phase contaminant transport to groundwater and for differentiating site sources of contaminants comprising a mixed-constituent soil vapor plume. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low Count and Background Radionuclides Analysis - 20488

The US Department of Energy (DOE) is often faced with the need to evaluate radionuclides at low concentrations. When site sample data are likely to be close to threshold activity concentrations of interest, then the means by which the radiochemical analysis is performed and reported is critical. This situation can occur when differentiating from zero (presence/absence) for radionuclides that do not occur naturally, close comparison with environmental background for naturally occurring radionuclides, close comparison with a risk- or dose-based threshold concentrations of interest, or even comparisons across studies. There are several analytical issues that are of concern, but the two that appear to cause incorrect decisions to be made most often involve establishing detection limits and subtracting ambient background conditions in the laboratory. These issues are not critical when radionuclide activity concentrations are large relative to thresholds of concern, but they seem to be poorly understood when it matters. When the comparisons are important and are likely to be close to a threshold of interest, then the general contract with the analytical laboratories needs to be changed so that the right or appropriate data are obtained. The concern is that important decisions are made incorrectly more often as greater scrutiny is placed on DoE's radionuclide cleanup or monitoring decisions by the public and other stakeholders. Examples are presented of problems that have been observed for different projects, both within and outside the realm of DOE and NRC remediation and radioactive waste disposal problems, and solutions are offered that should lead to better data from which important decisions need to be made. The first example is from Los Alamos National Laboratory (LANL) and involves radionuclide concentrations in soil and rock beneath LANL's Material Disposal Area (MDA) G. An initial review of the data led to a conclusion that americium and plutonium are a long way present beneath MDA G. A more thorough review of the data that accounted properly for ambient background and the detection limits that had been established led to the opposite conclusion. Another example is from the Nevada National Security Site where tritium results from one of the wells were unexpectedly high. Proper understanding and analysis of ambient background led to the conclusion that the increased concentrations were not so obvious, and that a different contract with the analytical laboratory was needed to provide more appropriate data to support a better determination. Other examples are used from regulatory review of projects in Nevada, where background levels and secular equilibrium for naturally occurring radionuclides are not established correctly because of analytical issues. The same basic issues have also been found to create difficulties analyzing historical data from the West Valley Demonstration Project. There is evidence in the data that the apparent lack of secular equilibrium where it is expected to exist is related to ambient background subtraction or other analytical issues. A final example is presented for analysis of Tc-99 in samples of depleted uranium. In this case, two different studies that were performed only three months apart provide quite different results. The US Environmental Protection Agency (EPA) established the data quality objectives (DQO) process in the mid-1980's to establish decision performance criteria for data collection. EPA guidance (EPA G-4, for example) clearly distinguishes between DQOs and measurement performance objectives (MQOs) that should be addressed for laboratory analysis of samples. The language of DQOs and MQOs has become confused over time it seems, and the subsequent effects seem to include a lack of attention to decision performance and a routine approach to measurement quality. In order to better address radionuclide sample analysis when the concentrations are close to thresholds of concern, which might be zero for some radionuclides, background for others, and risk-based thresholds for yet others, it is important that routine laboratory analysis methods are adjusted, and that the project team and the laboratory work closely together to ensure that the data meets the MQO requirements of laboratory analysis and reporting of results, and that the MQOs effectively support project-specific DQOs. This basic approach will be applied in Los Alamos in the coming year to the collection of moisture data from underneath MDA T that will be analyzed for americium and neptunium isotopes. Proper understanding of the radiochemistry methods and reporting, and of appropriate statistical methods is critical to the success of such projects, ensuring that the right decisions are made. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Life cycle Management of 324 Project High-Activity, Mixed/Low-Level Radioactive Waste - 20506

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) manages the 324 Building and is preparing to remotely excavate and disposition the radioactive soil beneath the building to allow further deactivation of the building. The 324 Building is a non-reactor Category 2 Nuclear Facility located in the 300 Area of the Hanford Site. Records indicate that in October 1986, approximately 516 liters of a concentrated liquid waste stream containing cesium-137 ({sup 137}Cs) and strontium-90 ({sup 90}Sr) spilled onto the floor of a hot cell, B-Cell, in the 324 Building. The spill contained an estimated 1.3 million curies (Ci) of radioactivity. A breach in the sump of B-Cell was discovered in November 2009 during characterization of the soil under the building. Exposure rates in excess of 10,000 R/hr were detected through a system of access pipes installed under the hot cell, and an estimated 1.557 E+05 Ci of {sup 137}Cs and 6.842 E+04 Ci of {sup 90}Sr are in the soil beneath B-Cell. The magnitude of the soil contamination below B-Cell represents one of the most challenging remediation activities in the DOE complex. The objective of CHPRC's 324 Project is to remotely excavate and disposition the highly contaminated soil under the hot cell so building deactivation and stabilization activities can resume. Depending on the volume and radioactivity of contaminated soil under B-Cell, the material will be dispositioned either at the Hanford Site's Environmental Restoration Disposal Facility (ERDF) or in grout monoliths that will be created in the hot cells (A, C and D) next to B-Cell during future building demolition activities. The current project scope includes installing structural supports under the walls of B-Cell and using remotely operated equipment to remove debris from the hot cell, remove debris mixed with grout on the floor, saw through and remove the cell floor and liner, and excavate contaminated soil under B-Cell to a depth of up to 3.66 meters (12 feet). Addition or removal of debris in A-Cell may be required to support B-Cell cleanout and excavation activities. The base approach is to disposition debris and soil bins in the Radiochemical Engineering Cell (REC) monoliths, and subsequently disposition the monoliths during building demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Removal: Success and Partnership with T Plant - 20510

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) has safely and efficiently managed the removal of highly radioactive sludge from the 105-K West Reactor fuel storage basin (105- KW Basin) near the Columbia River. In mid-September 2019, sludge retrieval was completed after 21 storage containers were safely loaded with highly radioactive sludge and transported approximately 13 miles from the 105-KW Basin to T Plant, located in the 200 West Area on the Central Plateau of the Hanford Site. Sludge removal represents the last major source term reduction necessary before the K West Reactor and fuel storage basin can transition to closure activities in preparation for final deactivation and demolition. The technical complexity of the sludge retrieval process, coupled with the challenging physical and radiological characteristics of the waste, necessitated a methodical and deliberate approach using unique design and operational solutions to safely conduct the work. This challenge was further complicated by the need to plan and conduct the work in two separate facilities, each subject to the controls and requirements of its own nuclear facility safety basis. The project overcame these challenges through creating an integrated team that actively engaged, communicated and coordinated each phase of the project to ensure successful completion. This paper will cover how these key elements of the Sludge Removal Project led to its success: - Integrating project planning and management; - Lessons learned from design and construction; - Preparing for a successful campaign (lessons learned from testing and start-up); - Lessons learned from operating in two separate facilities, transporting sludge containers on the Hanford Site and ensuring compliance with a range of regulatory and safety basis requirements. The establishment of an integrated group spanning two facilities and multiple organizations created a team capable of overcoming the challenges necessary to successfully plan and execute the sludge retrieval mission. Sharing lessons learned from this successful project can enhance the ability of teams across the DOE complex to successfully plan and execute complex projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Challenge of Achieving Site Closure of a Complex Groundwater Plume - 20531

Over the last three decades, DOE has made substantial progress in nearly every area of nuclear waste cleanup and has closed and transitioned 91 of the 107 sites in the EM complex. Several of the remaining groundwater plumes at Hanford, Los Alamos, Paducah, Oak Ridge, and Savannah River are complex and tend to have unique site or contaminant characteristics which provide an almost impossible challenge to remediate to regulatory levels. As a result, these complex sites will require a large investment to remediate. In order for DOE to achieve regulatory closure, a technically sound case must be developed and presented to regulators and stakeholders that clearly demonstrates that remedial goals have been or will be irreversibly achieved or that there is an alternate acceptable end-state. Five lines of evidence are required: - A conceptual site model that is as complete as possible, with the knowledge that it may continue to evolve with time; - Demonstration that trends in contaminant concentrations, or flux, versus time indicate that remedial goals will be achieved on schedule or within a reasonable time thereafter and that trends that deviate from this path are explainable by the conceptual model; - Demonstration that remobilization of attenuated contaminants is unlikely to occur in the future; - Explicit consideration of remedial contingencies, should deviations in the path toward remedial goals occur; - Development of an effective long-term monitoring plan to detect any conditions that might alter the path toward remedial goals. SRS has made significant progress in the remediation of contamination associated with the F-area and H-Area Seepage Basins, and it is currently developing a strategic closure path that addresses each of these lines of evidence and identifies both basic and applied scientific issues that will need to be addressed in order to obtain regulatory closure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GPS-Based Gamma Survey for Characterizing and Decommissioning NORM Sites - 20389

Gamma survey techniques are an especially powerful decommissioning tool at naturally occurring radioactive material (NORM) sites due to both the low cost to obtain data over a large spatial scale and the abundance of gamma emitters in the uranium and thorium decay series. Gamma surveys are executed by coupling a detector - most often a sodium iodide crystal - to a global positioning system (GPS), then reporting a location and gross gamma reading coincidentally to a data logger. Systems may be carried by workers or mounted to a car, all-terrain vehicle, or unmanned aerial system (UAS). The resulting data set provides a high-resolution but low precision map of the gamma radiation field over the area surveyed. Frequently this map is also correlated to soil concentrations of NORM radionuclides (most often, Ra-226) and/or exposure rate. Gamma survey parameters such as movement speed, transect spacing, and data logging frequency define the spatial resolution of the resulting surface, and can be optimized depending on the desired survey sensitivity. This paper examines gamma survey as a tool for decommissioning NORM sites and provides an overview of current gamma survey technology designed to improve the efficiency and effectiveness of the decommissioning process. Topics to be discussed in the paper include: - An overview of gamma survey systems, and the utility of different delivery vehicles depending on desired cost, desired spatial resolution, and site topography. - The influence of physical detector characteristics on detection sensitivity and survey planning. - The tradeoff between high-resolution and large spatial extent, but inherently uncertain data, and low-resolution, low spatial extent, but highly certain data, as well as the specific utility of each of these types of data during NORM facility decommissioning. - Confounding variables that may limit the utility of gamma survey at some sites (e.g., radon gas and spatial heterogeneity / hot spots), and methods to plan for and control these conditions. Results show that the confounding variables, such as radon and data output can greatly influence the overall data quality associated with the decommissioning process. In addition, the use of real-time and aerial survey platforms provides a method for ensuring proper spatial extent of the data. When applied thoughtfully, gamma survey is a powerful tool for detecting NORM radionuclides in the environment and a cost-effective technique for identifying areas requiring remediation. However, entities performing or using gamma survey as a decommissioning tool must be aware of both its advantages and its limitations before basing remediation or regulatory action on gamma survey results. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Scaling a Smart Sub-metered Electrical Data Solution for the Center

Currently, there is no single Center-level point solution that enables facility systems data to be collected and stored from buildings on-site, on-demand, and through a faceted search capability that would enable the cultivation of deeper insights into incipient facility-related issues that would otherwise be overlooked. Such insights would represent a powerful and very valuable tool to aid in data-driven decision making and informing actionable steps for remediation and resolution of these problems. Access to electrically sub-metered data via hardware upgrades is in the process of being restored for Building N232, Sustainability Base, but this is only the first step. The native software capabilities that were originally part of a proposed Agencywide Smart Center initiative project can unlock the ability to access actionable insights. This work would also nicely complement many initiatives that are actively being pursued, under consideration, or pending submission to this same call at the Center. This project is poised to support an NRSAA with Verdigris Technologies, as well as in support of an Agencywide Smart Center initiative. Monitoring electrical consumption usage at the most granular level in Bldg. N232 will be instrumental in accurately quantifying potential utility costs and investments, and monitoring usage trends, as it is being converted into hoteling spaces, to help. This will also help with determining how the capability can scale more broadly across the Center and Agency at large.

Rodney Alexander Martin↗

Scaling a Smart Sub-metered Electrical Data Solution for the Center

Currently, there is no single Center-level point solution that enables facility systems data to be collected and stored from buildings on-site, on-demand, and through a faceted search capability that would enable the cultivation of deeper insights into incipient facility-related issues that would otherwise be overlooked. Such insights would represent a powerful and very valuable tool to aid in data-driven decision making and informing actionable steps for remediation and resolution of these problems. Access to electrically sub-metered data via hardware upgrades is in the process of being restored for Building N232, Sustainability Base, but this is only the first step. The native software capabilities that were originally part of a proposed Agencywide Smart Center initiative project can unlock the ability to access actionable insights. This work would also nicely complement many initiatives that are actively being pursued, under consideration, or pending submission to this same call at the Center. This project is poised to support an NRSAA with Verdigris Technologies, as well as in support of an Agencywide Smart Center initiative. Monitoring electrical consumption usage at the most granular level in Bldg. N232 will be instrumental in accurately quantifying potential utility costs and investments, and monitoring usage trends, as it is being converted into hoteling spaces, to help. This will also help with determining how the capability can scale more broadly across the Center and Agency at large.

Rodney Alexander Martin↗

Evaluation of the fuselage lap joint fatigue and terminating action repair

Terminating action is a remedial repair which entails the replacement of shear head countersunk rivets with universal head rivets which have a larger shank diameter. The procedure was developed to eliminate the risk of widespread fatigue damage (WFD) in the upper rivet row of a fuselage lap joint. A test and evaluation program has been conducted by Foster-Miller, Inc. (FMI) to evaluate the terminating action repair of the upper rivet row of a commercial aircraft fuselage lap splice. Two full scale fatigue tests were conducted on fuselage panels using the growth of fatigue cracks in the lap joint. The second test was performed to evaluate the effectiveness of the terminating action repair. In both tests, cyclic pressurization loading was applied to the panels while crack propagation was recorded at all rivet locations at regular intervals to generate detailed data on conditions of fatigue crack initiation, ligament link-up, and fuselage fracture. This program demonstrated that the terminating action repair substantially increases the fatigue life of a fuselage panel structure and effectively eliminates the occurrence of cracking in the upper rivet row of the lap joint. While high cycle crack growth was recorded in the middle rivet row during the second test, failure was not imminent when the test was terminated after cycling to well beyond the service life. The program also demonstrated that the initiation, propagation, and linkup of WFD in full-scale fuselage structures can be simulated and quantitatively studied in the laboratory. This paper presents an overview of the testing program and provides a detailed discussion of the data analysis and results. Crack distribution and propagation rates and directions as well as frequency of cracking are presented for both tests. The progression of damage to linkup of adjacent cracks and to eventual overall panel failure is discussed. In addition, an assessment of the effectiveness of the terminating action repair and the occurrence of cracking in the middle rivet row is provided, and conclusions of practical interest are drawn.

Samavedam, Gopal↗

Model Package Report: Geoframework Model of the Hanford Site 100 Area

The purpose of the 100 Area Geoframework Model (GFM) is to provide a reasonable, consistent, and defensible three dimensional representation of the hydrostratigraphic units below the River Corridor at the Hanford Site to support contaminant fate and transport models. The GFM is a three dimensional representation of the subsurface geologic structure. From this, three dimensional geologic model-exported results, in the form of points or surfaces, are used as inputs to populate and assemble the various numerical model architectures. The objective of this report is to define the process used to produce a hydrostratigraphic model for the hydrostratigraphic units beneath the Hanford Site 100 Area. The GFM may support several other CH2M HILL Plateau Remediation Company project needs and objectives, including providing geologic information to support remedial investigations and actions and as a tool to present River Corridor geology and contaminant extents. The GFM was constructed based on information through 2019 available in the Integrated Data Management System, Hanford Environmental Information System, and the Hanford Site geologic contacts (GeoContacts) datasets. Revisions to the 100 Area GFM may occur to incorporate new data and information. Each version will be maintained in configuration control using date stamps for identifying supporting databases, figures, and interpretations. Supporting data include the final three dimensional geoframework surfaces, two dimensional structure and isopach maps, and all the geologic contact inputs and interpreted geologic log data. These final products provide a supporting set of geologic information that together allow the creation of the GFM. This information is managed, updated, and maintained via CH2M HILL Plateau Remediation Company under the Environmental Model Management Archive.

58 GEOSCIENCES↗