Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Participation in the ISO Key Project - IPAC Project

This program used guaranteed ISO time to observe the interstellar medium in nearby galaxies. The goals of the program are to determine the origin of the infrared emission, to quantify the physical conditions of the interstellar medium, and to study the heating and physical properties of interstellar dust. This program has been carried out successfully, and produced a number of publications reporting the results.

Lo, Kwok-Yung↗

The Herschel Oxygen Project: Herschel Space Observatory Open Time Key Project

Topics include: Why oxygen and why at submillimeter wavelengths; gas phase chemistry for water, oxygen, and carbon monoxide is relatively simple; molecular oxygen structure; lower rotational levels and transitions of oxygen; oxygen abundance in interstellar clouds; SWAS spectra of terrestrial oxygen; what Herschel offers HOP; key regions for probing oxygen in the dense interstellar medium; HOP sources and strategy; and HOP data and analysis.

astrochemistry↗

Carbon Management Projects (CONNECT) Database and Explorer

Overview The Carbon Management Projects (CONNECT) Toolkit is an online exploratory visualization tool developed by the U.S. Department of Energy's (DOE) Office of Fossil Energy and Carbon Management (FECM) with support from other federal agencies such as the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Transportation (DOT). It provides a single point of access to authoritative information on federal agency investment in a portfolio of research, development, and demonstration (RD&D) projects that have been publicly announced to advance technologies for point source carbon capture, carbon dioxide removal, transport, storage, and conversion, collectively referred to as carbon management. The RD&D programs covered in this tool are authorized by annual congressional appropriations ("Base Program") and the 2021 Infrastructure Investment and Jobs Act (IIJA). The tool also incorporates public information on other federal initiatives, such as the Regional Clean Hydrogen Hubs, and public information released by other government agencies, such as the Environmental Protection Agency's (EPA) and Primacy States’ Underground Injection Control Class VI permits and EPA’s facility level greenhouse gas (GHG) emissions. Developed in a geographic information system, the tool organizes carbon management projects into five groups based on the primary technology that a project aims to advance, each visually represented as a digital layer ("carbon management project layer"). Only federally funded projects are included, which can be awarded projects that are completed or ongoing, or projects that have been selected but are currently under negotiation. Project information can be viewed in the map or in the attribute table below it when turned on. In the map view, each project is displayed at either its host site (for field work), where available, or its performer site (project lead's location, further explained in the table below). Host sites and performer sites are represented in distinct icons. Several reference layers offer additional public information on infrastructural and natural resource environment for carbon management. These reference layers, combined with multiple geographical basemaps, enable users to visualize the carbon management project layers in context. Carbon management project information will be updated monthly based on feedback and information availability. Carbon management project layers Point Source Carbon Capture (PSC) This layer contains DOE-funded projects focused on capturing carbon dioxide (CO2) from power plants or industrial facilities. Carbon Dioxide Removal (CDR) This layer contains DOE-funded projects focused on capturing CO2 from the atmosphere, including direct air capture (DAC) and DAC hubs, direct ocean capture, enhanced mineralization, and biomass carbon removal and storage. For projects with multiple host sites, each of the sites are displayed individually with the project cost and cost sharing information representing the total for the entire project. Carbon Transport This layer contains DOE- and DOT-funded projects focused on CO2 transport. The Transport Research and Development sublayer contains projects that do not involve physical infrastructure; the Proposed Transport Corridor sublayer contains projects for which either a route for the transport infrastructure has been proposed or a general area for the transport infrastructure has been identified. Carbon Storage This layer contains DOE-funded key projects focused on CO2 storage. For projects with multiple field-work sites, each of the sites are displayed individually on the map with the project cost and cost sharing information representing the overall total for the entire project. Carbon Conversion This layer contains DOE-funded projects focused on converting CO2 into economically valuable products. Reference layers The following layers provide additional information in the geographic proximity of carbon management projects. Users should reference the original sources for more details (weblinks provided below and in pop-up windows on the map). Regional Clean Hydrogen Hub and Facility These layers illustrate the approximate areas of the Regional Clean Hydrogen Hubs announced by DOE's Office of Clean Energy Demonstrations (OCED) and the approximate locations of individual facilities that constitute the hubs (see "Where are the H2Hubs located?" on the webpage linked above). EPA Facility Level GHG Emissions (direct emitter) This layer shows direct CO2 emissions from stationary sources in 2022, using data extracted from EPA's Facility Level Information on GreenHouse gases Tool (FLIGHT). Captured and injected CO2 are not deducted from direct emitters’ total emissions. Contact EPA for additional details. Underground Injection Control Class VI permit/permit application This layer shows the locations of CO2 injection wells that are granted or in the process of applying for an Underground Injection Control Class VI permit by EPA or a Primacy State (currently Louisiana, North Dakota, and Wyoming). The URLs for the permits or permit applications are provided in the pop-up windows associated with the well locations. Contact EPA for additional details. Carbon Storage Resource This layer contains information on prospective CO2 storage resources in saline formations and oil and gas reservoirs provided by the National Carbon Sequestration Database and Geographic Information System (NATCARB) spatial database. Contact NETL for additional details. Existing CO2 pipeline This layer shows active CO2 pipelines based on information digitized from the map issued by the Pipeline and Hazardous Materials Safety Administration (PHMSA). Contact PHMSA for additional details.

Carbon Conversion↗

Improving Project Management with Simulation and Completion Distribution Functions

Despite the critical importance of project completion timeliness, management practices in place today remain inadequate for addressing the persistent problem of project completion tardiness. A major culprit in late projects is uncertainty, which most, if not all, projects are inherently subject to. This uncertainty resides in the estimates for activity durations, the occurrence of unplanned and unforeseen events, and the availability of critical resources. In response to this problem, this research developed a comprehensive simulation based methodology for conducting quantitative project completion time risk analysis. It is called the Project Assessment by Simulation Technique (PAST). This new tool enables project stakeholders to visualize uncertainty or risk, i.e. the likelihood of their project completing late and the magnitude of the lateness, by providing them with a completion time distribution function of their projects. Discrete event simulation is used within PAST to determine the completion distribution function for the project of interest. The simulation is populated with both deterministic and stochastic elements. The deterministic inputs include planned project activities, precedence requirements, and resource requirements. The stochastic inputs include activity duration growth distributions, probabilities for events that can impact the project, and other dynamic constraints that may be placed upon project activities and milestones. These stochastic inputs are based upon past data from similar projects. The time for an entity to complete the simulation network, subject to both the deterministic and stochastic factors, represents the time to complete the project. Repeating the simulation hundreds or thousands of times allows one to create the project completion distribution function. The Project Assessment by Simulation Technique was demonstrated to be effective for the on-going NASA project to assemble the International Space Station. Approximately $500 million per month is being spent on this project, which is scheduled to complete by 2010. NASA project stakeholders participated in determining and managing completion distribution functions produced from PAST. The first result was that project stakeholders improved project completion risk awareness. Secondly, using PAST, mitigation options were analyzed to improve project completion performance and reduce total project cost.

Cates, Grant R.↗

Project Management Using Modern Guidance, Navigation and Control Theory

Implementing guidance, navigation, and control (GN&C) theory principles and applying them to the human element of project management and control is not a new concept. As both the literature on the subject and the real-world applications are neither readily available nor comprehensive with regard to how such principles might be applied, this paper has been written to educate the project manager on the "laws of physics" of his or her project (not to teach a GN&C engineer how to become a project manager) and to provide an intuitive, mathematical explanation as to the control and behavior of projects. This paper will also address how the fundamental principles of modern GN&C were applied to the National Aeronautics and Space Administration's (NASA) Constellation Program (CxP) space suit project, ensuring the project was managed within cost, schedule, and budget. A project that is akin to a physical system can be modeled and managed using the same over arching principles of GN&C that would be used if that project were a complex vehicle, a complex system(s), or complex software with time-varying processes (at times nonlinear) containing multiple data inputs of varying accuracy and a range of operating points. The classic GN&C theory approach could thus be applied to small, well-defined projects; yet when working with larger, multiyear projects necessitating multiple organizational structures, numerous external influences, and a multitude of diverse resources, modern GN&C principles are required to model and manage the project. The fundamental principles of a GN&C system incorporate these basic concepts: State, Behavior, Feedback Control, Navigation, Guidance and Planning Logic systems. The State of a system defines the aspects of the system that can change over time; e.g., position, velocity, acceleration, coordinate-based attitude, and temperature, etc. The Behavior of the system focuses more on what changes are possible within the system; this is denoted in the state of the system. The behavior of a system, as captured in the system modeling, when properly done will aid in accurately predicting future system performance. The Feedback Control system understands the state and behavior of the system and uses feedback to adjust control inputs into the system. The feedback, which is the right arm of the Control system, allows change to be affected in the overall system; it therefore is important to not only correctly identify the system feedback inputs, but also the system response to the feedback inputs. The Navigation system takes multiple data inputs and based on a priori knowledge of the inputs, develops a statistically based weighting of the inputs and measurements to determine the system's state. Guidance and Planning Logic of the system, complete with an understanding of where the system is (provided by the Navigation system), will in turn determine where the system needs to be and how to get it there. With any system/project, it is critical that the objective of the system/project be clearly defined -- not only to plan but to measure performance and to aid in guiding the system or the project. The system principles discussed above, which can be and have been applied to the current CxP space suit development project, can also be mapped to real-world constituents, thus allowing project managers to apply systems theories that are well defined in engineering and mathematics to a discipline (i.e., Project Management) that historically has been based in personal experience and intuition. This mapping of GN&C theory to Project Management will, in turn, permit a direct, methodical approach to Project Management, planning and control providing a tool to help predict (and guide) performance and an understanding of the project constraints, how the project can be controlled, and the impacts to external influences and inputs. This approach, to a project manager, flows down to the three bottom-line variables of cost, schedule, and scope ando the needed control of these three variables to successfully perform and complete a project.

Hill, Terry R.↗

The Project Manager Who Saved His Country

George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.

Baniszewski, John↗

Montana Community-Scale Solar Strategy Project (Final Technical Report)

Grid-tied solar photovoltaic (PV) development began gradually in Montana, initially taking root in the early 2000s, largely in the form of small residential systems, rarely larger than two kilowatts. Utility support for solar technology through public benefit funding triggered the installation of the state’s first solar PV installations on community-owned facilities including schools, libraries, fire stations and local government buildings in the mid-2000s. By 2016, solar PV installations totaled approximately 28 megawatts of installed capacity, generating less than 0.05% of electricity sold in Montana. Montana’s solar fleet in 2016 included 17 megawatts of utility-scale solar farms, and three shared solar projects developed by rural electric cooperatives that ranged from 25 to 50 kilowatts in size. However, with only 3,000 households utilizing solar PV, either through an on-site installation or participation in a shared solar project, the potential benefits and reach of solar technology was limited. The Montana Solar Community Project (MSCP) was developed by the Montana Energy Office (MEO) at the Department of Environmental Quality in order to implement a “community-scale” solar energy strategy for the state that would cost-effectively expand Montanans’ access to solar PV. This project defines three types of community-scale solar projects: shared solar, community-sited solar, and group purchasing programs. The MSCP project conducted research and stakeholder engagement that helped to inform and develop model community-scale initiatives and an overarching community-scale solar strategy for Montana. Specifically, the project included a solar market assessment, stakeholder meetings across Montana, development of a menu of community-scale solar options, a study of solar potential on schools, community solar market research, and community-scale project implementation support. MSCP activities were successful in implementing solar projects and supporting solar development in communities across Montana. Project activities realized 280 kW of newly installed solar from two solarize programs, a shared solar array at a rural electric cooperative, and a solar array atop a Bozeman high school. The community-scale project implementation support and Solar on Schools components of the project resulted directly in the analysis and design of nearly 2 MW of distributed solar systems across the state. The Solar on Schools analysis alone produced solar designs for 25 schools, representing 920.8 kW of solar potential. Many of the deliverables from this project provide guidance on future development of community-scale solar in Montana, and resulted in a number of important conclusions about community-scale solar in Montana. There is strong interest in community-scale solar in Montana, as noted during stakeholder meetings, in response to solar market research surveys, and as seen by applications for implementation support grants provided by MEO. Project activities also suggest that Montanans demonstrated a desire and need for more information about solar energy technology, solar financing options, and the state’s policy and regulatory framework. Additionally, the project found that schools will be key partners for future community-scale solar programs. In addition to being excellent hosts for solar arrays, schools have the opportunity to use the installation of a solar array to develop educational materials and curricula to educate Montana’s future leaders about these technologies, which can be shared and replicated across the state. Project activities laid a clear path forward for solar energy in Montana. Certain activities have concrete next steps. For example, numerous solar arrays were designed for schools and other public buildings around the state. Many of those designs will be used as soon as funding becomes available. Other activities have less developed next steps, though lay the foundation for future work. The solar market assessment, solar market research, and community stakeholder meetings are good examples. These documents can be used as stepping stones to increase renewable energy education, increase stakeholder outreach, and support communities as they seek to develop community-scale solar projects.

14 SOLAR ENERGY↗