Sample Efficient Uncertainty Estimation using Probabilistic Neighborhood Component Analysis
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Purpose: To evaluate long-term health effects, costs, and cost-effectiveness of positron emission tomography (PET)-based isotoxic accelerated radiation therapy treatment (PET-ART) compared with conventional fixed-dose CT-based radiation therapy treatment (CRT) in non-small cell lung cancer (NSCLC). Methods and Materials: Our analysis uses a validated decision model, based on data of 200 NSCLC patients with inoperable stage I-IIIB. Clinical outcomes, resource use, costs, and utilities were obtained from the Maastro Clinic and the literature. Primary model outcomes were the difference in life-years (LYs), quality-adjusted life-years (QALYs), costs, and the incremental cost-effectiveness and cost/utility ratio (ICER and ICUR) of PET-ART versus CRT. Model outcomes were obtained from averaging the predictions for 50,000 simulated patients. A probabilistic sensitivity analysis and scenario analyses were carried out. Results: The average incremental costs per patient of PET-ART were €569 (95% confidence interval [CI] €−5327-€6936) for 0.42 incremental LYs (95% CI 0.19-0.61) and 0.33 QALYs gained (95% CI 0.13-0.49). The base-case scenario resulted in an ICER of €1360 per LY gained and an ICUR of €1744 per QALY gained. The probabilistic analysis gave a 36% probability that PET-ART improves health outcomes at reduced costs and a 64% probability that PET-ART is more effective at slightly higher costs. Conclusion: On the basis of the available data, individualized PET-ART for NSCLC seems to be cost-effective compared with CRT.
This paper presents probabilistic methods to estimate the quantity of carbon dioxide (CO2) that can be stored in a mature oil reservoir and analyzes the uncertainties associated with the estimation. This work uses data from the Farnsworth Field Unit (FWU), Ochiltree County, Texas, which is currently undergoing a tertiary recovery process. The input parameters are determined from seismic, core, and fluid analyses. The results of the estimation of the CO2 storage capacity of the reservoir are presented with both expectation curve and log probability plot. The expectation curve provides a range of possible outcomes such as the P90, P50, and P10. The deterministic value is calculated as the statistical mean of the storage capacity. The coefficient of variation and the uncertainty index, P10/P90, is used to analyze the overall uncertainty of the estimations. A relative impact plot is developed to analyze the sensitivity of the input parameters towards the total uncertainty and compared with Monte Carlo. In comparison to the Monte Carlo method, the results are practically the same. The probabilistic technique presented in this paper can be applied in different geological settings as well as other engineering applications.
Purpose: Cardiac toxicity due to conventional breast radiation therapy (RT) has been extensively reported, and it affects both the life expectancy and quality of life of affected women. Given the favorable oncologic outcomes in most women irradiated for breast cancer, it is increasingly paramount to minimize treatment side effects and improve survivorship for these patients. Proton RT offers promise in limiting heart dose, but the modality is costly and access is limited. Using cost-effectiveness analysis, we provide a decision-making tool to help determine which breast cancer patients may benefit from proton RT referral. Methods and Materials: A Markov cohort model was constructed to compare the cost-effectiveness of proton versus photon RT for breast cancer management. The model was analyzed for different strata of women based on age (40 years, 50 years, and 60 years) and the presence or lack of cardiac risk factors (CRFs). Model entrants could have 1 of 3 health states: healthy, alive with coronary heart disease (CHD), or dead. Base-case analysis assumed CHD was managed medically. No difference in tumor control was assumed between arms. Probabilistic sensitivity analysis was performed to test model robustness and the influence of including catheterization as a downstream possibility within the health state of CHD. Results: Proton RT was not cost-effective in women without CRFs or a mean heart dose (MHD) <5 Gy. Base-case analysis noted cost-effectiveness for proton RT in women with ≥1 CRF at an approximate minimum MHD of 6 Gy with a willingness-to-pay threshold of $100,000/quality-adjusted life-year. For women with ≥1 CRF, probabilistic sensitivity analysis noted the preference of proton RT for an MHD ≥5 Gy with a similar willingness-to-pay threshold. Conclusions: Despite the cost of treatment, scenarios do exist whereby proton therapy is cost-effective. Referral for proton therapy may be cost-effective for patients with ≥1 CRF in cases for which photon plans are unable to achieve an MHD <5 Gy.
This report documents implementation of the smart sampling-based probabilistic look-ahead contingency analysis algorithm, the integration with General Electric (GE) Grid Solutions’ commercial energy management system (EMS) tool, and the case study results using real world data from the Bonneville Power Administration (BPA).The probabilistic look-ahead contingency analysis algorithm incorporates forecast errors of renewable energy and load into contingency analysis functions to enable a predictive capability with a more complete picture, revealing the potential violations that are not normally detected by traditional deterministic approaches. To test its performance under practical environments, the probabilistic look-ahead contingency analysis algorithm has been integrated with the dominant GE EMS tool as a proof-of-concept for a seamless integration. To meet the output format of GE EMS tool, an extreme value distribution (EVD) algorithm is newly adapted to analyze the GE EMS’s violation-only output. Real world data from BPA are used to test its performance, and the results clearly show the effectiveness of the developed algorithm and improved situational awareness. This effort is an example of successful technology transition and cooperation under a real-world environment because it is a joint effort from department of energy, a national laboratory, a commercial vendor, and a large utility.
This presentation summarizes the methodology and results for a probabilistic risk analysis of research, development, and demonstration work-primarily for enhanced geothermal systems (EGS)-sponsored by the U.S. Department of Energy Geothermal Technologies Program.
Purpose: Surgery combined with radiation therapy (RT) is the cornerstone of multidisciplinary management of extremity soft tissue sarcoma (STS). Although RT can be given in either the preoperative or the postoperative setting with similar local recurrence and survival outcomes, the side effect profiles, costs, and long-term functional outcomes are different. The aim of this study was to use decision analysis to determine optimal sequencing of RT with surgery in patients with extremity STS. Methods and Materials: A cost-effectiveness analysis was conducted using a state transition Markov model, with quality-adjusted life years (QALYs) as the primary outcome. A time horizon of 5 years, a cycle length of 3 months, and a willingness-to-pay threshold of $50,000/QALY was used. One-way deterministic sensitivity analyses were performed to determine the thresholds at which each strategy would be preferred. The robustness of the model was assessed by probabilistic sensitivity analysis. Results: Preoperative RT is a more cost-effective strategy ($26,633/3.00 QALYs) than postoperative RT ($28,028/2.86 QALYs) in our base case scenario. Preoperative RT is the superior strategy with either 3-dimensional conformal RT or intensity-modulated RT. One-way sensitivity analyses identified the relative risk of chronic adverse events as having the greatest influence on the preferred timing of RT. The likelihood of preoperative RT being the preferred strategy was 82% on probabilistic sensitivity analysis. Conclusions: Preoperative RT is more cost effective than postoperative RT in the management of resectable extremity STS, primarily because of the higher incidence of chronic adverse events with RT in the postoperative setting.
The Idaho National Laboratory is a primary developer of probabilistic risk and reliability analysis (PRRA) tools, dating back over 35 years. Evolving from mainframe-based software, the current state-of-the-practice has lead to the creation of the SAPHIRE software. Currently, agencies such as the Nuclear Regulatory Commission, the National Aeronautics and Aerospace Agency, the Department of Energy, and the Department of Defense use version 7 of the SAPHIRE software for many of their risk-informed activities. In order to better understand and appreciate the power of software as part of risk-informed applications, we need to recall that our current analysis methods and solution methods have built upon pioneering work done 30 to 40 years ago. We contrast this work with the current capabilities in the SAPHIRE analysis package. As part of this discussion, we provide information for both the typical features and special analysis capabilities which are available. We also present the application and results typically found with state-of-the-practice PRRA models. By providing both a high-level and detailed look at the SAPHIRE software, we give a snapshot in time for the current use of software tools in a risk-informed decision arena.
Purpose: To compare the cost-effectiveness of intensity modulated radiation therapy (IMRT) and 3-dimensional conformal radiation therapy (3D-CRT) for anal cancer and determine disease, patient, and treatment parameters that influence the result. Methods and Materials: A Markov decision model was designed with the various disease states for the base case of a 65-year-old patient with anal cancer treated with either IMRT or 3D-CRT and concurrent chemotherapy. Health states accounting for rates of local failure, colostomy failure, treatment breaks, patient prognosis, acute and late toxicities, and the utility of toxicities were informed by existing literature and analyzed with deterministic and probabilistic sensitivity analysis. Results: In the base case, mean costs and quality-adjusted life expectancy in years (QALY) for IMRT and 3D-CRT were $32,291 (4.81) and $28,444 (4.78), respectively, resulting in an incremental cost-effectiveness ratio of $128,233/QALY for IMRT compared with 3D-CRT. Probabilistic sensitivity analysis found that IMRT was cost-effective in 22%, 47%, and 65% of iterations at willingness-to-pay thresholds of $50,000, $100,000, and $150,000 per QALY, respectively. Conclusions: In our base model, IMRT was a cost-ineffective strategy despite the reduced acute treatment toxicities and their associated costs of management. The model outcome was sensitive to variations in local and colostomy failure rates, as well as patient-reported utilities relating to acute toxicities.
Material control and accounting (MC&A) safeguards operations that track and account for critical assets at nuclear facilities provide a key protection approach for defeating insider adversaries. These activities, however, have been difficult to characterize in ways that are compatible with the probabilistic path analysis methods that are used to systematically evaluate the effectiveness of a site's physical protection (security) system (PPS). MC&A activities have many similar characteristics to operator procedures performed in a nuclear power plant (NPP) to check for anomalous conditions. This work applies human reliability analysis (HRA) methods and models for human performance of NPP operations to develop detection probabilities for MC&A activities. This has enabled the development of an extended probabilistic path analysis methodology in which MC&A protections can be combined with traditional sensor data in the calculation of PPS effectiveness. The extended path analysis methodology provides an integrated evaluation of a safeguards and security system that addresses its effectiveness for attacks by both outside and inside adversaries.
This paper describes a probabilistic look-ahead contingency analysis application that incorporates smart sampling and high-performance computing (HPC) techniques. Smart sampling techniques are implemented to effectively represent the structure and statistical characteristics of uncertainty introduced by different sources in the power system. They can significantly reduce the data set size required for multiple look-ahead contingency analyses, and therefore reduce the time required to compute them. High-performance-computing (HPC) techniques are used to further reduce computational time. These two techniques enable a predictive capability that forecasts the impact of various uncertainties on potential transmission limit violations. The developed package has been tested with real world data from the Bonneville Power Administration. Case study results are presented to demonstrate the performance of the applications developed.
A fire hazard analysis, required for many U.S. Department of Energy (DOE) facilities, is a complex, cumbersome, and costly process. Fire hazard analyses may be viewed as a checkbox, but ideally and in spirit with the DOE-STD-1066, the fire hazard analysis (FHA) should be a part of the workflow and used to help in modifications, maintenance, and improving operational safety. With current FHA development processes, it is both time and cost prohibitive for true integration. A tool called Fire Risk Investigation in 3D or FRI3D was developed under the DOE Light Water Reactor Sustainability program to simplify and automate many aspects of a fire probabilistic risk analysis for existing nuclear power plants. The FRI3D tool automates fire scenarios by combining approved fire simulation codes, U.S. Nuclear Regulatory Commission fire calculations methods, 3D modeling and visualization, and probabilistic risk analysis models into a single workflow supported with a user interface. FRI3D was initially designed for used in combination with a PRA, this case study, evaluated using FRI3D for a plant modification, determined the benefits that detailed fire modeling can have for U.S. Department of Energy facilities with or without a PRA model. It also looked at what tasks from DOE requirements could be reduced using the tool and what is needed to integrate fire hazard analysis into site workflow.
Using traditional probabilistic risk analysis methods for severe accident safety risk management on non-digital systems, structures, and components at nuclear power plants is well-established. In contrast, cyber risk analysis of digital assets is still an immature field with unproven techniques due, in part, to the continuously changing threat environment and the challenge of digital assets failing in unexpected ways. As the nuclear fleet continues to adopt digital instrumentation and control systems, it is increasingly important to have effective and efficient cyber risk analysis techniques to support risk management decisions, such as risk elimination by system redesign or risk mitigation by implementation of prioritized security controls. To understand the state of the art in cyber risk analysis for future research, we surveyed 36 publications across ten application domains. We describe our survey methodology and rate each technique based upon scope, adoptability, and repeatability. In this work, we examine the unique constraints of the nuclear industry and outline the strengths and weaknesses of using the cyber risk analysis techniques in the industry, highlighting gaps with current techniques. We also discuss challenges and potential research directions for advancing the science for both existing and new advanced reactors.
Currently, available Human Reliability Analysis (HRA) methods were generally developed to support Level 1 Probabilistic Safety Analysis (PSA) models. There has been an increased emphasis placed on Level 2 PSA in recent years; however, the currently used HRA methods are not ideal for this application, including the SPAR-H method. Challenges that will likely be present during a severe accident such as degraded or hazardous operating conditions, shift in control from the main control room to the technical support center, unavailability of instrumentation, and others are not routinely considered for Level 1 HRA analysis. These factors combine to create a much more uncertain condition to be accounted for in the HRA analysis. While the SPAR-H shaping factors were established to support Level 1 HRA, previous studies have shown it may be used for Level 2 HRA analysis as well. The Canadian Nuclear Safety Commission (CNSC) and Idaho National Laboratory (INL) in a joint project are investigating modifications to the SPAR-H method to create more consistency in applying the performance shaping factors used in the method for Level 2 analysis.
NREL conducted an annual program risk analysis on behalf of the U.S. Department of Energy Geothermal Technologies Program (GTP). NREL implemented a probabilistic risk analysis of GTP-sponsored research, development, and demonstration (RD&D) work, primarily for enhanced geothermal systems (EGS). The analysis examined estimates of improvement potential derived from program RD&D work for two types of technology performance metric (TPM): EGS-enabling technologies potential and EGS cost improvement potential. Four risk teams (exploration, wells/pumps/tools, reservoir engineering, and power conversion) comprised of industry experts, DOE laboratory researchers, academic researchers, and laboratory subcontractors estimated the RD&D impacts and TPM-improvement probability distributions. The assessment employed a risk analysis spreadsheet add-in that uses Monte Carlo simulation to drive the Geothermal Electric Technology Evaluation Model (GETEM). The GETEM-based risk analysis used baseline data from the experts' discussion of multiple reports and data sources. Risk results are expressed in terms of each metric's units and/or the program's top-level metric: levelized costs of electricity (LCOE). Results--both qualitative comments and quantitative improvement potential--are thorough and cohesive in three of the four expert groups. This conference paper summarizes the industry's current thinking on various metrics and potential for research improvement in geothermal technologies.
NREL conducted an annual program risk analysis on behalf of the U.S. Department of Energy Geothermal Technologies Program (GTP). NREL implemented a probabilistic risk analysis of GTP-sponsored research, development, and demonstration (RD&D) work, primarily for enhanced geothermal systems (EGS). The analysis examined estimates of improvement potential derived from program RD&D work for two types of technology performance metric (TPM): EGS-enabling technologies potential and EGS cost improvement potential. Four risk teams (exploration, wells/pumps/tools, reservoir engineering, and power conversion) comprised of industry experts, DOE laboratory researchers, academic researchers, and laboratory subcontractors estimated the RD&D impacts and TPM-improvement probability distributions. The assessment employed a risk analysis spreadsheet add-in that uses Monte Carlo simulation to drive the Geothermal Electric Technology Evaluation Model (GETEM). The GETEM-based risk analysis used baseline data from the experts' discussion of multiple reports and data sources. Risk results are expressed in terms of each metric's units and/or the program's top-level metric: levelized costs of electricity (LCOE). Results--both qualitative comments and quantitative improvement potential--are thorough and cohesive in three of the four expert groups. This conference paper summarizes the industry's current thinking on various metrics and potential for research improvement in geothermal technologies.
Not Available
Explore the source record for details and available documents.