Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Predictive Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Analytics-at-scale of Sensor Data for Digital Monitoring in Nuclear Plants (4th Annual Report)

Nuclear plant sites collect and store large volumes of data collected from various equipment and systems. These datasets typically include plant process parameters, maintenance records, technical logs, online monitoring data, and equipment failure data. The collection of such data affords an opportunity to leverage data-driven machine learning and artificial intelligence technologies to provide diagnostic and prognostic capabilities within the nuclear power industry to reduce operating and maintenance costs. In this way, nuclear energy can become more economically competitive with other energy sources, and premature closures can be avoided. From a maintenance standpoint, savings can be achieved by leveraging machine learning and artificial intelligence technologies to develop data-driven algorithms to better diagnose and predict potential faults within the system. Improved model accuracy can lead to reductions in unnecessary maintenance and more efficient planning of future maintenance, thus lowering the costs associated with parts, labor, and unnecessary planned, forced, or extended outages. From an operations perspective, cost savings can be generated by shifting from route-based monitoring to wireless technologies for online monitoring, and by transitioning from onsite- to cloud-based computing and storage services. Wireless monitoring would reduce the operator manhours required for taking routine measurements, while cloud computing services would generate cost savings by reducing the amount of hardware needing to be purchased and maintained—all while scaling to both computational and storage demands. This report summarizes this project’s effort to shift from costly, labor-intensive preventative maintenance to cheaper predictive maintenance.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A survey on degradation modeling, prognosis, and prognostics-driven maintenance in wind energy systems

Wind energy generation proliferated over the past decades, introducing unique challenges and opportunities for failure prediction, operation and maintenance. Decision-makers are continuously looking into new methods to infer failure mechanisms and behaviors of wind turbine components to detect and intervene in the failures before they happen. Evidently, degradation modeling and prognosis become engaging topics for researchers and practitioners to prevent catastrophic failures. Prognostics-driven approaches predict the time of failure for the components (e.g., predicting remaining useful life), which provides significant insights for scheduling of operations and maintenance activities. Integrating these prognostics-driven insights into wind farm operations and maintenance presents a substantial challenge, demanding careful consideration of numerous factors such as accessibility, crew routing, and spare part logistics. This study provides state-of-the-art review for degradation modeling, prognosis, and prognostics-driven maintenance techniques for wind energy systems. The discussed techniques align with the United Nations' sustainable development goals, in particular Goal 7 (Affordable and Clean Energy), by enhancing effectiveness and sustainability of wind energy operations. This work also showcases open research questions related to degradation modeling, prognosis, and prognostics-driven maintenance.

Altinpulluk, Nur Banu↗

Hydrogen Component Leak Rate Quantification for System Risk and Reliability Assessment through QRA and PHM Frameworks: Preprint

The National Renewable Energy Laboratory's (NREL) Hydrogen Safety Research and Development (HSR&D) program in collaboration with the University of Maryland's Systems Risk and Reliability Analysis Laboratory (SyRRA) are working to improve reliability and reduce risk in hydrogen systems. This approach strives to use quantitative data on component leaks and failures, together with Prognosis and Health Management (PHM), and Quantitative Risk Assessment (QRA) to identify at-risk components, reduce component failures and downtime, and predict when components require maintenance. Hydrogen component failures increase facility maintenance cost, facility downtime, and reduce public acceptance of hydrogen technologies, ultimately increasing facility size and cost because of potentially overly conservative requirements. Leaks are a predominant failure mode for hydrogen components. However, uncertainties in the amount of hydrogen emitted from leaking components and the frequency of those failure events limit the understanding of the risks that they present under real-world operational conditions. NREL has deployed a test fixture, the Leak Rate Quantification Apparatus (LRQA), to quantify the mass flow rate of leaking gases from medium and high-pressure components that have failed while in service. Quantitative hydrogen leak rate data from this system could ultimately be used to better inform risk assessment and Regulation Codes and Standards (RCS). Parallel activity explores the use of PHM and QRA techniques to assess and reduce risk, thereby improving safety and reliability of hydrogen systems. The results of QRAs could further provide a systematic and science-based foundation for the design and implementation of RCS, as in the latest versions of the NFPA 2 code for gaseous hydrogen stations. Alternatively, data-driven techniques of PHM could provide new damage diagnosis and health-state prognosis tools. This research will help end users, station owners and operators, and regulatory bodies move towards risk-informed preventative maintenance versus emergency corrective maintenance, reducing cost and improving reliability. Predictive modelling of failures could improve safety and affect RCS requirements such as setback distances at liquid refuelling sites. The combination of leak rate quantification research, PHM, and QRA can lead to better informed models enabling data-based decision to be made for hydrogen system safety improvements.

codes and standards↗

Risk-informed Predictive Analytics To Achieve Cost-effective Condition-based Monitoring And Maintenance Strategy

The research involves developing risk-informed predictive analytic capabilities to achieve condition-based monitoring and maintenance strategies to reduce overall maintenance costs. The research utilizes data (real-time data, periodic data, and institutional knowledge) related to a particular plant asset from a specific nuclear plant site to develop risk-informed predictive analytic algorithms. The developed algorithms and codes are used to optimize the maintenance strategy and estimate/forecast generation costs based on the state of health of the plant asset. Developed codes specifically include 1. Parameter estimation code based on Bayesian inference 2. Statistical data analysis code 3. Feature engineering code 4. Health classifier code 5. Diagnosis code 6. Prognosis code 7. Hazard code 8. Generation risk code 9. Economic code

Agarwal, Vivek↗

Shot Planning and Analysis Tools

Shot planning and analysis tools (SPLAT) integrate components necessary to help achieve a high over-all operational efficiency of the National Ignition Facility (NIF) by combining near and long-term shot planning, final optics demand and supply loops, target diagnostics planning, and target fabrication requirements. Currently, the SPLAT project is comprised of two primary tool suites for shot planning and optics demand. The shot planning component provides a web-based interface to selecting and building a sequence of proposed shots for the NIF. These shot sequences, or 'lanes' as they are referred to by shot planners, provide for planning both near-term shots in the Facility and long-term 'campaigns' in the months and years to come. The shot planning capabilities integrate with the Configuration Management Tool (CMT) for experiment details and the NIF calendar for availability. Future enhancements will additionally integrate with target diagnostics planning and target fabrication requirements tools. The optics demand component is built upon predictive modelling of maintenance requirements on the final optics as a result of the proposed shots assembled during shot planning. The predictive models integrate energetics from a Laser Performance Operations Model (LPOM), the status of the deployed optics as provided by the online Final Optics Inspection system, and physics-based mathematical 'rules' that predict optic flaw growth and new flaw initiations. These models are then run on an analytical cluster comprised of forty-eight Linux-based compute nodes. Results from the predictive models are used to produce decision-support reports in the areas of optics inspection planning, optics maintenance exchanges, and optics beam blocker placement advisories. Over time, the SPLAT project will evolve to provide a variety of decision-support and operation optimization tools.

42 ENGINEERING↗

Maintenance cost study of rotary wing aircraft

The feasibility was studied of predicting rotary wing operation maintenance costs by using several aircraft design factors for the aircraft dynamic systems. The dynamic systems considered were engines, drives and transmissions, rotors, and flight controls. Multiple regression analysis was used to correlate aircraft design and operational factors with manhours per flight hour, and equations for each dynamic system were developed. Results of labor predictions using the equations compare favorably with actual values.

Source record↗

Development of Short-Term Forecasting Models Using Plant Asset Data and Feature Selection

Nuclear power plants collect and store large volumes of heterogeneous data from various components and systems. With recent advances in machine learning (ML) techniques, these data can be leveraged to develop diagnostic and short-term forecasting models to better predict future equipment condition. Maintenance operations can then be planned in advance whenever degraded performance is predicted, thus resulting in fewer unplanned outages and the optimization of maintenance activities. This enables lower maintenance costs and improves the overall economics of nuclear power. This paper focuses on developing a short-term forecasting process that leverages a feature selection process to distill large volumes of heterogeneous data and predict specific equipment parameters. A variety of feature selection methods, including Shapley Additive Explanations (SHAP) and variance inflation factor (VIF), were used to select the optimal features as inputs for three ML methods: long short-term memory (LSTM) networks, support vector regression (SVR), and random forest (RF). Each combination of model and input features was used to predict a pump bearing temperature both 1 and 24 hours in advance, based on actual plant system data. The optimal inputs for the LSTM and SVR were selected using the SHAP values, while the optimal input for the RF consisted solely of the response variable itself. Each model produced similar 1-hour-ahead predictions, with root mean square errors (RMSEs) of roughly 0.006. For the 24-hour-ahead predictions, differences could be seen between LSTM, SVR, and RF, as reflected by model performances of 0.036 +- 0.014, 0.0026 +- 0, and 0.063 +- 0.004 RMSE, respectively. As big data and continuous online monitoring become more widely available, the proposed feature selection process can be used for many applications beyond the prediction of process parameters within nuclear infrastructure.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Analytics-at-scale of Sensor Data for Digital Monitoring in Nuclear Plants (3 rd Annual Report)

Nuclear power plants collect and store large volumes of heterogeneous data from various components and systems. With recent advances in machine learning (ML) techniques, these data can be leveraged to develop diagnostic and short-term forecasting models to better predict future equipment condition. Maintenance operations can then be planned in advance whenever degraded performance is predicted, thus resulting in fewer unplanned outages and the optimization of maintenance activities. This enables lower maintenance costs and improves the overall economics of nuclear power. This report primarily focuses on developing a short-term forecasting process that leverages a feature selection process to distill large volumes of heterogeneous data and predict specific equipment parameters. A variety of feature selection methods, including Shapley Additive Explanations (SHAP) and variance inflation factor (VIF), were used to select the optimal features as inputs for three ML methods: long short-term memory (LSTM) networks, support vector regression (SVR), and random forest (RF). Each combination of model and input features was used to predict a pump bearing temperature both 1 and 24 hours in advance, based on actual plant system data. The optimal inputs for the LSTM and SVR were selected using the SHAP values, while the optimal input for the RF consisted solely of the response variable itself. Each model produced similar 1-hour-ahead predictions, with root mean square errors (RMSEs) of roughly 0.006. For the 24-hour-ahead predictions, differences could be seen between LSTM, SVR, and RF, as reflected by model performances of 0.036 ± 0.014, 0.0026 ± 0, and 0.063 ± 0.004 RMSE, respectively. As big data and continuous online monitoring become more widely available, the proposed feature selection process can be used for many applications beyond the prediction of process parameters within nuclear infrastructure. This report summarizes the Fiscal Year 2021 research progress encompassing the (1) data cleaning and feature selection necessary for ML applications; (2) development of short-term forecasting models to predict future plant process parameters for both single and multiple time steps ahead; and (3) validation of the feature selection methods and short-term forecasting models given new data from different systems.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Power electronics reliability.

The project's goals are: (1) use experiments and modeling to investigate and characterize stress-related failure modes of post-silicon power electronic (PE) devices such as silicon carbide (SiC) and gallium nitride (GaN) switches; and (2) seek opportunities for condition monitoring (CM) and prognostics and health management (PHM) to further enhance the reliability of power electronics devices and equipment. CM - detect anomalies and diagnose problems that require maintenance. PHM - track damage growth, predict time to failure, and manage subsequent maintenance and operations in such a way to optimize overall system utility against cost. The benefits of CM/PHM are: (1) operate power conversion systems in ways that will preclude predicted failures; (2) reduce unscheduled downtime and thereby reduce costs; and (3) pioneering reliability in SiC and GaN.

25 ENERGY STORAGE↗

High Fidelity Digital Twins for BWRX-300 Critical Systems

This project developed and demonstrated digital-twin technology for advanced nuclear systems under the ARPA-E GEMINA program, with a focus on the BWRX-300 small modular reactor. The primary objective was to reduce operation and maintenance (O&M) costs through predictive health monitoring and model-based fault detection. The project combined MIT’s high-fidelity physics models and machine-learning and digital-twin algorithms, and GE Hitachi’s digital-twin algorithms and operational expertise to build physics-based digital twins capable of real-time system monitoring and maintenance scheduling.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Preserving SSC Design Function Using RCM Principles

Reliability-Centered Maintenance (RCM) can be defined as an approach that employs preventive, predictive, proactive, and reactive maintenance practices and strategies in an integrated manner to increase the probability that a Structure, System, or Component (SSC) will function as designed over its life cycle with optimum maintenance. The goal of RCM is to preserve the SSC intended design function at the lowest cost by developing a maintenance strategy that is supported by sound technical and economic justification. RCM has been used extensively by the aircraft, space, defense, power generation, and manufacturing industries where functional failures of SSCs can have the potential to compromise worker or public safety, cause adverse environmental impact, cause loss of production, and/or result in excessive damage to critical SSCs. This paper provides a framework for performing an RCM analysis in support of DOE Order 430.1A (Life Cycle Asset Management) and DOE Order 420.1B (Facility Safety). The influence of RCM on the various aspects of the maintenance program including the work control process is also discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NCAR Contribution to A U.S. National Multi-Model Ensemble (NMME) ISI Prediction System

NCAR brought the latest version of the Community Earth System Model (version 1, CESM1) into the mix of models in the NMME effort. This new version uses our newest atmospheric model CAM5 and produces a coupled climate and ENSO that are generally as good or better than those of the Community Climate System Model version 4 (CCSM4). Compared to CCSM4, the new coupled model has a superior climate response with respect to low clouds in both the subtropical stratus regimes and the Arctic. However, CESM1 has been run to date using a prognostic aerosol model that more than doubles its computational cost. We are currently evaluating a version of the new model using prescribed aerosols and expect it will be ready for integrations in summer 2012. Because of this NCAR has not been able to complete the hindcast integrations using the NCAR loosely-coupled ensemble Kalman filter assimilation method nor has it contributed to the current (Stage I) NMME operational utilization. The expectation is that this model will be included in the NMME in late 2012 or early 2013. The initialization method will utilize the Ensemble Kalman Filter Assimilation methods developed at NCAR using the Data Assimilation Research Testbed (DART) in conjunction with Jeff Anderson’s team in CISL. This methodology has been used in our decadal prediction contributions to CMIP5. During the course of this project, NCAR has setup and performed all the needed hindcast and forecast simulations and provide the requested fields to our collaborators. In addition, NCAR researchers have participated fully in research themes (i) and (ii). Specifically, i) we have begun to evaluate and optimize our system in hindcast mode, focusing on the optimal number of ensemble members, methodologies to recalibrate individual dynamical models, and accessing our forecasts across multiple time scales, i.e., beyond two weeks, and ii) we have begun investigation of the role of different ocean initial conditions in seasonal forecasts. The completion of the calibration hindcasts for Seasonal to Interannual (SI) predictions and the maintenance of the data archive associated with the NCAR portion of this effort has been the responsibility of the Project Scientist I (Alicia Karspeck) that was partially supported on this project.

54 ENVIRONMENTAL SCIENCES↗

Abstract for CRADA between the National Energy Technology Laboratory and Strategic Power Systems, Inc. (AGMT-0884)

This project will utilize field data, available through the Operational Reliability Analysis Program (ORAP®), to assess the operation of natural gas combined cycle (NGCC) and coal fired plants in cyclic duty. The emphasis will be on Heat Recovery Steam Generator (HRSG) and coal-fired boiler operating conditions and failure experience related to tube failures. The project will be based on high-fidelity data available in ORAP through the collection of near real time process data characterizing the operating environment and dynamic conditions, from start up to shut-down, that affect the HRSG and coal-fired boiler (i.e. the boiler tubes). It is important to understand the operating environment to assess the influence of the cyclic start-stop cycles, time at temperature, and other operating conditions that can be seen in the data, with their possible impact on the life and reparability of the boiler tubes. This knowledge is important to influence/develop a predictive operations and maintenance strategy to improve performance, increase life, and reduce cost.

20 FOSSIL-FUELED POWER PLANTS↗

Consideration for solar system exploration - A system to Mars

Biomedical issues related to a manned mission to Mars are reviewed. Consideration is given to cardiovascular deconditioning, hematological and immunological changes, bone and muscle changes, nutritional issues, and the development of physiological countermeasures. Environmental issues are discussed, including radiation hazards, toxic chemical exposure, and the cabin environment. Also, human factors, performance and behavior, medical screening of the crew, disease prediction, and health maintenance are examined.

Nicogossian, Arnauld E.↗

Reusable Rocket Engine Operability Modeling and Analysis

This paper describes the methodology, model, input data, and analysis results of a reusable launch vehicle engine operability study conducted with the goal of supporting design from an operations perspective. Paralleling performance analyses in schedule and method, this requires the use of metrics in a validated operations model useful for design, sensitivity, and trade studies. Operations analysis in this view is one of several design functions. An operations concept was developed given an engine concept and the predicted operations and maintenance processes incorporated into simulation models. Historical operations data at a level of detail suitable to model objectives were collected, analyzed, and formatted for use with the models, the simulations were run, and results collected and presented. The input data used included scheduled and unscheduled timeline and resource information collected into a Space Transportation System (STS) Space Shuttle Main Engine (SSME) historical launch operations database. Results reflect upon the importance not only of reliable hardware but upon operations and corrective maintenance process improvements.

Christenson, R. L.↗

The Launch Systems Operations Cost Model

One of NASA's primary missions is to reduce the cost of access to space while simultaneously increasing safety. A key component, and one of the least understood, is the recurring operations and support cost for reusable launch systems. In order to predict these costs, NASA, under the leadership of the Independent Program Assessment Office (IPAO), has commissioned the development of a Launch Systems Operations Cost Model (LSOCM). LSOCM is a tool to predict the operations & support (O&S) cost of new and modified reusable (and partially reusable) launch systems. The requirements are to predict the non-recurring cost for the ground infrastructure and the recurring cost of maintaining that infrastructure, performing vehicle logistics, and performing the O&S actions to return the vehicle to flight. In addition, the model must estimate the time required to cycle the vehicle through all of the ground processing activities. The current version of LSOCM is an amalgamation of existing tools, leveraging our understanding of shuttle operations cost with a means of predicting how the maintenance burden will change as the vehicle becomes more aircraft like. The use of the Conceptual Operations Manpower Estimating Tool/Operations Cost Model (COMET/OCM) provides a solid point of departure based on shuttle and expendable launch vehicle (ELV) experience. The incorporation of the Reliability and Maintainability Analysis Tool (RMAT) as expressed by a set of response surface model equations gives a method for estimating how changing launch system characteristics affects cost and cycle time as compared to today's shuttle system. Plans are being made to improve the model. The development team will be spending the next few months devising a structured methodology that will enable verified and validated algorithms to give accurate cost estimates. To assist in this endeavor the LSOCM team is part of an Agency wide effort to combine resources with other cost and operations professionals to support models, databases, and operations assessments.

Prince, Frank A.↗

Economic Dispatch Optimization of Multi-Unit SMR Site

With the increase of integration of variable renewable into the grid, grid resilience can be compromised without flexible electricity suppliers. Flexible operation of NPP can expand the scope of integration of new nuclear power plants in regions with high share of renewables. It also provides opportunity to increase profits through participation in ancillary services. In this research, NuScale modules are used as the case study. NuScale is an integrated pressurized water reactor with thermal power of 250 MWth. Having multiple units can provide higher flexibility in changing power levels and supplying the grid with electricity all year long. Additionally, load-following might perturbate the ordered sequence of refueling (every 24 months for NuScale). To maintain the 2 year refueling cycles, the loading patterns will need to be adjusted in a year-to-year basis, resulting in additional unnecessary costs. Another solution is to find the optimal outage schedule. This will also shift the focus of the planned outage to a more optimized predictive outages and maintenance. Results from short-term optimization (i.e., daily participation in energy and ancillary services markets) shows that average commitment to regulation down ancillary service markets during late night and early morning hours can increase revenues. Participating in upward reserves during pre-work commuting hours and early evening hours can also generate additional revenues due to high ramp up of electricity demand. Having multiple units at a single site can also help operate flexibly. Results from long-term optimization show that daily fluctuation in electric power is usually handled by few units while other units operate on base-load profile. It is possible to combine base-load operation with flexible operation to extend component remaining useful life in some units and find optimal outage schedule for the units.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Propellant-remaining modeling

A successful satellite mission is predicted upon the proper maintenance of the spacecraft's orbit and attitude. One requirement for planning and predicting the orbit and attitude is the accurate estimation of the propellant remaining onboard the spacecraft. Focuss is on the three methods that were developed for calculating the propellant budget: the errors associated with each method and the uncertainties in the variables required to determine the propellant remaining that contribute to these errors. Based on these findings, a strategy is developed for improved propellant-remaining estimation. The first method is based on Boyle's law, which related the values of pressure, volume, and temperature (PVT) of an ideal gas. The PVT method is used for the monopropellant and the bipropellant engines. The second method is based on the engine performance tests, which provide data that relate thrust and specific impulse associated with a propellant tank to that tank's pressure. Two curves representing thrust and specific impulse as functions of pressure are then generated using a polynomial fit on the engine performance data. The third method involves a computer simulation of the propellant system. The propellant flow is modeled by creating a conceptual model of the propulsion system configuration, taking into account such factors as the propellant and pressurant tank characteristics, thruster functionality, and piping layout. Finally, a thrust calibration technique is presented that uses differential correction with the computer simulation method of propellant-remaining modeling. Thrust calibration provides a better assessment of thruster performance and therefore enables a more accurate estimation of propellant consumed during a given maneuver.

Torgovitsky, S.↗