Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power system operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Improving Power System Modeling. A Tool to Link Capacity Expansion and Production Cost Models

Capacity expansion models (CEM) provide a high-level long-term view at the prospects of the evolving power system. In simulating the possibilities of long-term capacity expansion, it is important to maintain the viability of power system operation in the short-term (daily, hourly and sub-hourly) scales. Production-cost models (PCM) simulate routine power system operation on these shorter time scales using detailed load, transmission and generation fleet data by minimizing production costs and following reliability requirements. When based on CEM 'predictions' about generating unit retirements and buildup, PCM provide more detailed simulation for the short-term system operation and, consequently, may confirm the validity of capacity expansion predictions. Further, production cost model simulations of a system that is based on capacity expansion model solution are 'evolutionary' sound: the generator mix is the result of logical sequence of unit retirement and buildup resulting from policy and incentives. The above has motivated us to bridge CEM with PCM by building a capacity expansion - to - production cost model Linking Tool (CEPCoLT). The Linking Tool is built to onset capacity expansion model prescriptions onto production cost model inputs. NREL's ReEDS and Energy Examplar's PLEXOS are the capacity expansion and the production cost models, respectively. Via the Linking Tool, PLEXOS provides details of operation for the regionally-defined ReEDS scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

HIPPO – A Software Platform for Electricity Market Research and Development

The goal of this project is to provide Regional transmission organizations (RTOs) and independent system operators (ISOs) a market design and prototyping software, High-Performance Power-Grid Optimization (HIPPO), that they can evaluate electricity market design options, calculate market planning strategies and operational performance. With the high standards and strict reliability requirements for operating power systems, impacts of new technologies need to be fully investigated prior to any consideration for adoption. A market design and prototyping software tool which can be used to prototype electricity market design options, to calculate market planning strategies and operational performance with high precision, and to investigate the impacts for integrating future power grid technologies will be valuable to RTOs/ISOs who operate power systems, to vendors like GE and ABB who provide the market solvers, and to market participants and researchers who are actively doing market research. HIPPO is a such tool that can be used to improve the current market operations and provide capabilities for rigorous forward-looking design and prototyping of next-generation energy markets. HIPPO has a high-resolution model for the day-ahead SCUC, which was validated with MISO and GE-Grid Solutions. HIPPO is built with parallel and distributed computing capabilities and can be executed in both multi-thread and high-performance computing (HPC) settings. This capability provides fast solution speed necessary to handle the larger and more complex SCUC problems of real-world cases and the potentially growing size and complexity of future scenarios. In addition, HIPPO has a concurrent optimizer (CO) which manages multiple algorithm executions simultaneously and leverages the advantages from different algorithms. This structure provides flexibility to better benchmark competing approaches. Highly accurate market model, fast solution technologies and flexible model and algorithm control are the features which will make HIPPO an extensible platform for developing and testing multiple approaches to meet a wide range of future market needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

What Is the Value of Alternative Methods for Estimating Ramping Needs?

Power system operators procure and deploy flexibility reserves or ramping products to address balancing needs caused by uncertainty and variability of load and generation. Existing methods estimate ramping needs using calendar information and historical forecast errors. Novel methods investigate if real-time weather information could inform ramping and other balancing requirements. This paper compares estimation methods for ramping requirements in theory and practice. The theoretical framework indicates when an alternative method could yield improved economic or reliability performance than existing methods by requiring lower or higher levels of ramping products. Preliminary simulations on a 118-bus test system for 4 days in May 2019 illustrate how system performance improves or deteriorates when ramping requirements are weather-informed (alternative) instead of calendar-based (baseline). Preliminary results suggest high variability in change of performance and underline the impact of additional factors, such as system conditions, on the realized performance change.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Modelling and control coordination scheme of a wind‐to‐hydrogen set for future renewable‐based power systems

New challenges regarding system stability and efficiency arise when power systems operate with a high penetration level of inverter‐based renewable sources (IBRSs) and few synchronous generators. Since IBRSs have been on the rise, to secure the stable operation of future power systems, IBRSs will be required to support systems without having to rely on remaining synchronous generators. Also, to efficiently manage the uncertainty of renewable production, power‐to‐gas technology can provide the required flexibility. This study proposes modelling and a control coordination scheme (CCS) of a wind‐to‐hydrogen (W2H) set to optimise electricity production from a variable‐speed wind turbine generator (WTG) while helping balance between supply and demand in a system. To achieve this, a grid‐forming (GFM) inverter‐based WTG is modelled and a set of electrolyser and fuel cell is integrated at the DC circuit of a GFM‐WTG to be coordinated. Furthermore, the CCS offers an opportunity to reduce the investment cost for deploying a W2H set by utilising the control capabilities of a WTG and reducing the need for an additional device. The performance of the proposed W2H set with the CCS was verified considering the variations in system load and wind speed by using Power System Computer Aided Design (PSCAD)/ElectroMagnetic Transients including Direct Current (EMTDC).

Kim, Jinho↗

Fault Diagnosis of Power Systems Using Intelligent Systems

The power system operator's need for a reliable power delivery system calls for a real-time or near-real-time Al-based fault diagnosis tool. Such a tool will allow NASA ground controllers to re-establish a normal or near-normal degraded operating state of the EPS (a DC power system) for Space Station Alpha by isolating the faulted branches and loads of the system. And after isolation, re-energizing those branches and loads that have been found not to have any faults in them. A proposed solution involves using the Fault Diagnosis Intelligent System (FDIS) to perform near-real time fault diagnosis of Alpha's EPS by downloading power transient telemetry at fault-time from onboard data loggers. The FDIS uses an ANN clustering algorithm augmented with a wavelet transform feature extractor. This combination enables this system to perform pattern recognition of the power transient signatures to diagnose the fault type and its location down to the orbital replaceable unit. FDIS has been tested using a simulation of the LeRC Testbed Space Station Freedom configuration including the topology from the DDCU's to the electrical loads attached to the TPDU's. FDIS will work in conjunction with the Power Management Load Scheduler to determine what the state of the system was at the time of the fault condition. This information is used to activate the appropriate diagnostic section, and to refine if necessary the solution obtained. In the latter case, if the FDIS reports back that it is equally likely that the faulty device as 'start tracker #1' and 'time generation unit,' then based on a priori knowledge of the system's state, the refined solution would be 'star tracker #1' located in cabinet ITAS2. It is concluded from the present studies that artificial intelligence diagnostic abilities are improved with the addition of the wavelet transform, and that when such a system such as FDIS is coupled to the Power Management Load Scheduler, a faulty device can be located and isolated from the rest of the system. The benefit of these studies provides NASA with the ability to quickly restore the operating status of a space station from a critical state to a safe degraded mode, thereby saving costs in experimentation rescheduling, fault diagnostics, and prevention of loss-of-life.

Momoh, James A.↗

Decentralized State Estimation and Remedial Control Action for Minimum Wind Curtailment Using Distributed Computing Platform

Intermittency of wind energy poses a great challenge for power system operation and control. Wind curtailment might be necessary at the certain operating condition to keep the line flow within the limit. Remedial Action Scheme (RAS) offers quick control action mechanism to keep reliability and security of the power system operation with high wind energy integration. In this paper, a new RAS is developed to maximize the wind energy integration without compromising the security and reliability of the power system based on specific utility requirements. A new Distributed Linear State Estimation (DLSE) is also developed to provide the fast and accurate input data for the proposed RAS. A distributed computational architecture is designed to guarantee the robustness of the cyber system to support RAS and DLSE implementation. The proposed RAS and DLSE is validated using the modified IEEE-118 Bus system. Simulation results demonstrate the satisfactory performance of the DLSE and the effectiveness of RAS. Real-time cyber-physical testbed has been utilized to validate the cyber-resiliency of the developed RAS against computational node failure.

17 WIND ENERGY↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗

Computational Algorithms for Unit Commitment with AC Power Flows (Final Report)

Security-constrained unit commitment (SCUC) is a key component in power system operations. When AC power flow constraints are considered in the SCUC model (AC-SCUC), the problem becomes extremely difficult due to its discrete and non-convex nature, as described in “Grid Optimization Competition Challenge 3 Problem Formulation (GOCC)”. There are four main challenges: (i) Discrete decisions regarding unit online/offline status and start-up/shut-down procedures for every single unit. The number of discrete decision variables increases considerably when a system integrates multiple generators; (ii) Configuration-based combined-cycle formulations, and multi-commodity models that include ramping products, spin/non-spin products, and regulation up/down products. The combined-cycle units introduce additional discrete decision variables and auxiliary service products further complicate the model by connecting multi-commodity products’ continuous and discrete variables; (iii) SCUC models with AC power flow constraints are far more complex due to massive bilinear terms in the large-scale nonlinear power balance equations. The nonlinear power balance equations are further complicated by the discrete step control variables of shunts; (iv) N − 1 contingency analysis. The size of the model increases linearly with the number of contingencies considered, greatly increasing the size of the optimization model. Accordingly, there is an emergent need to develop a robust algorithm capable of deriving a high-quality solution in a short time and passing through contingency tests simultaneously. In this project, we explore innovative techniques to address this challenging problem by integrating advanced polyhedral theory, approximation methods, relaxation strategies, decomposition techniques, and parallel computing. Each technique approaches the problem from a different perspective, leveraging its specific strengths to tackle distinct challenges. Each individual method has demonstrated its effectiveness in the PI’s previous research. Their integration is expected to significantly reduce the computational time required to solve the proposed complex problem. Successful completion of this project has the potential to transform the industry by enhancing optimization solvers capable of handling large-scale day-ahead energy market clearing models within strict time constraints, while incorporating AC power flow constraints. This advancement will lead to reduced overall generation costs and, consequently, increased social welfare.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Representation and Impact of Water Head on Power System Planning and Operation

Representing water head information in power system model files, can provide a more realistic model of the system and thereby inform operation and planning personnel in the decision-making process. This article describes a procedure for modifying the power system model files (steady-state and dynamic) to represent water head information. Additionally, the impact of representing the water head on power system reliability studies including contingency analysis, cascading failure analysis and dynamic frequency response analysis has been investigated, using the modified power system models. This paper considers the detailed Western Electricity Coordination Council model during summer and winter conditions as the test system for the impact analysis. Results show that under reduced water head: 1) the number of critical voltage and branch flow violations increases; 2) chances of cascading failure and island formation increases; and 3) frequency nadir decreases as compared to those of the base cases where the water head information is not represented.

13 - HYDRO ENERGY↗

Quantifying Solar PV Variability at Multiple Timescales for Power Systems Studies: Preprint

Increasing penetration of solar photovoltaics (PV) has concerned power system operators about their ability to balance load and generation over multiple timescales and maintain acceptable frequency profile because of the variability and uncertainty associated with solar PV. This paper focuses on developing metrics to quantify solar PV variability at multiple temporal scales ranging from seconds to an hour to help power system operators and planners better understand and account for solar PV variability under high solar PV penetration. Fourier coefficients of solar irradiation spectrum and average size of solar irradiation ramps over a day are the two metrics that are used to quantity the variability. It is shown that by using the two metrics the days with highest and lowest solar irradiation variability can be identified, which is useful information for operations planning or long-term power system planning studies. The key findings of the paper are (i) single sensor-based variability quantification can significantly exaggerate the variability of a solar PV plant, particularly at seconds to 1-min temporal resolution, (ii) at 1-minute or lower temporal resolutions, single sensor-based variability quantification of an entire plant can be fairly accurate, with the accuracy increasing as the temporal resolution reduces from 1-minute to 1-hour, (iii) at each 1-minute and lower temporal resolutions, maximum solar irradiation ramps appear to be independent of the geographical location of the sensor, and (iv) significant reduction in solar PV plant variability over a region with multiple plants is possible at all temporal scales, but more high quality, high temporal resolution data is needed to quantify the reduction with high confidence.

photovoltaics↗

Operational Impacts of Operating Reserve Demand Curves on Production Cost and Reliability

The electric power industry landscape is continually evolving. As emerging technologies such as wind, solar, electric vehicles, and energy storage systems become more cost-effective and present in the system, traditional power system operating strategies will need to be reevaluated. The presence of wind and solar generation (commonly referred to as variable generation) may result in an increase in the variability and uncertainty of the net load profile. One mechanism to mitigate this is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increased variability and uncertainty occurring at finer temporal resolutions. A new operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this paper, and its implications on power system operations are analyzed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operational Impacts of Operating Reserve Demand Curves on Production Cost and Reliability: Preprint

The electric power industry landscape is continually evolving. As emerging technologies such as wind, solar, electric vehicles, and energy storage systems become more cost-effective and present in the system, traditional power system operating strategies will need to be reevaluated. The presence of wind and solar generation (commonly referred to as variable generation) may result in an increase in the variability and uncertainty of the net load profile. One mechanism to mitigate this is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increased variability and uncertainty occurring at finer temporal resolutions. A new operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this paper, and its implications on power system operations are analyzed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Systematic Evaluation of Stochastic Methods in Power System Scheduling and Dispatch with Renewable Energy

As more wind power and other renewable resources are being integrated into the electric power grid, the forecast uncertainty brings operational challenges for the power system operators. In this report, different operational strategies for uncertainty management are presented and evaluated. A comprehensive and consistent simulation framework is developed to analyze the performance of different reserve policies and scheduling techniques under uncertainty in wind power. Numerical simulations are conducted on a modified version of the IEEE 118-bus system with a 20% wind penetration level, comparing deterministic, interval, and stochastic unit commitment strategies. The results show that stochastic unit commitment provides a reliable schedule without large increases in operational costs. Moreover, decomposition techniques, such as load shift factor and Benders decomposition, can help in overcoming the computational obstacles to stochastic unit commitment and enable the use of a larger scenario set to represent forecast uncertainty. In contrast, deterministic and interval unit commitment tend to give higher system costs as more reserves are being scheduled to address forecast uncertainty. However, these approaches require a much lower computational effort Choosing a proper lower bound for the forecast uncertainty is important for balancing reliability and system operational cost in deterministic and interval unit commitment. Finally, we find that the introduction of zonal reserve requirements improves reliability, but at the expense of higher operational costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modeling the Operation of Bulk-Action Hybrid Piston Power Systems

The operation of a bulk-action hybrid piston power unit is described by a mathematical model based on the laws of energy, mass, and momentum conservation and the equation of state. The influence of the pressure in the pump and compressor sections, the gap in the compressor section, and the eccentricity on the relation between the opposing liquid flow rates through the piston seal and on the thickness of the liquid layer above the piston is analyzed.

42 ENGINEERING↗

A Machine Learning Framework to Deconstruct the Primary Drivers for Electricity Market Price Events

As the electricity grid is moving towards a 100% Renewable Energy Source Bulk Power Grid, the overall operations of the power system operations and electricity markets are changing. The electricity markets are not only dispatching resources economically but also taking into account various controllable actions like renewable curtailment, transmission congestion mitigation, and energy storage optimization to make sure the grid is operating reliably. As a result, price formations in electricity markets have become quite complex. Traditional root cause analysis and statistical approaches are rendered inapplicable to analyze and infer the main drivers behind price formation in the modern grid and markets with variable renewable energy (VRE). In this paper, we propose a machine learning analysis framework to deconstruct some primary drivers for price formation in modern electricity markets with high renewable energy and the outcomes can be utilized for various critical aspects of market design, renewable dispatch and curtailment, operations, and cyber-security applications. The framework can be applied to any ISO or market data and in this paper it is applied to open-source publicly available datasets from California Independent System Operator (CAISO) and ISO New England.

machine learning (ML), electricity markets, Renewa↗