Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROTOTYPING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

A prototype scintillator real‐time beam monitor for ultra‐high dose rate radiotherapy

Background: FLASH Radiotherapy (RT) is an emergent cancer RT modality where an entire therapeutic dose is delivered at more than 1000 times higher dose rate than conventional RT. For clinical trials to be conducted safely, a precise and fast beam monitor that can generate out-of-tolerance beam interrupts is required. This paper describes the overall concept and provides results from a prototype ultra-fast, scintillator-based beam monitor for both proton and electron beam FLASH applications. Purpose: A FLASH Beam Scintillator Monitor (FBSM) is being developed that employs a novel proprietary scintillator material. The FBSM has capabilities that conventional RT detector technologies are unable to simultaneously provide: (1) large area coverage; (2) a low mass profile; (3) a linear response over a broad dynamic range; (4) radiation hardness; (5) real-time analysis to provide an IEC-compliant fast beam-interrupt signal based on true two-dimensional beam imaging, radiation dosimetry and excellent spatial resolution. Methods: The FBSM uses a proprietary low mass, less than 0.5 mm water equivalent, non-hygroscopic, radiation tolerant scintillator material (designated HM: hybrid material) that is viewed by high frame rate CMOS cameras. Folded optics using mirrors enable a thin monitor profile of ∼10 cm. A field programmable gate array (FPGA) data acquisition system generates real-time analysis on a time scale appropriate to the FLASH RT beam modality: 100–1000 Hz for pulsed electrons and 10–20 kHz for quasi-continuous scanning proton pencil beams. An ion beam monitor served as the initial development platform for this work and was tested in low energy heavy-ion beams ( 86 Kr +26 and protons). A prototype FBSM was fabricated and then tested in various radiation beams that included FLASH level dose per pulse electron beams, and a hospital RT clinic with electron beams. Results: Results presented in this report include image quality, response linearity, radiation hardness, spatial resolution, and real-time data processing. Furthermore, the HM scintillator was found to be highly radiation damage resistant. It exhibited a small 0.025%/kGy signal decrease from a 216 kGy cumulative dose resulting from continuous exposure for 15 min at a FLASH compatible dose rate of 237 Gy/s. Measurements of the signal amplitude versus beam fluence demonstrate linear response of the FBSM at FLASH compatible dose rates of >40 Gy/s. Comparison with commercial Gafchromic film indicates that the FBSM produces a high resolution 2D beam image and can reproduce a nearly identical beam profile, including primary beam tails. The spatial resolution was measured at 35–40 µm. Tests of the firmware beta version show successful operation at 20 000 Hz frame rate or 50 µs/frame, where the real-time analysis of the beam parameters is achieved in less than 1 µs. Conclusions: The FBSM is designed to provide real-time beam profile monitoring over a large active area without significantly degrading the beam quality. A prototype device has been staged in particle beams at currents of single particles up to FLASH level dose rates, using both continuous ion beams and pulsed electron beams. Using a novel scintillator, beam profiling has been demonstrated for currents extending from single particles to 10 nA currents. Radiation damage is minimal and even under FLASH conditions would require ≥50 kGy of accumulated exposure in a single spot to result in a 1% decrease in signal output. Beam imaging is comparable to radiochromic films, and provides immediate images without hours of processing. Real-time data processing, taking less than 50 µs (combined data transfer and analysis times), has been implemented in firmware for 20 kHz frame rates for continuous proton beams.

2D beam imaging↗

Advanced ACTPol Low-Frequency Array: Readout and Characterization of Prototype 27 and 39 GHz Transition Edge Sensors

Advanced ACTPol (AdvACT) is a third-generation polarization upgrade to the Atacama Cosmology Telescope, designed to observe the cosmic microwave background (CMB). AdvACT expands on the 90 and 150 GHz transition edge sensor (TES) bolometer arrays of the ACT Polarimeter (ACTPol), adding both high-frequency (HF, 150/230 GHz) and low-frequency (LF, 27/39 GHz) multichroic arrays. The addition of the high- and low-frequency detectors allows for the characterization of synchrotron and spinning dust emission at the low frequencies and foreground emission from galactic dust and dusty star-forming galaxies at the high frequencies. The increased spectral coverage of AdvACT will enable a wide range of CMB science, such as improving constraints on dark energy, the sum of the neutrino masses, and the existence of primordial gravitational waves. The LF array will be the final AdvACT array, replacing one of the MF arrays for a single season. Prior to the fabrication of the final LF detector array, we designed and characterized prototype TES bolometers. Detector geometries in these prototypes are varied in order to inform and optimize the bolometer designs for the LF array, which requires significantly lower noise levels and saturation powers (as low as ~1 pW) than the higher-frequency detectors. Here we present results from tests of the first LF prototype TES detectors for AdvACT, including measurements of the saturation power, critical temperature, thermal conductance, and time constants. Finally, we also describe the modifications to the time-division SQUID readout architecture compared to the MF and HF arrays.

79 ASTRONOMY AND ASTROPHYSICS↗

Prototyping phase of the high heat flux scraper element of Wendelstein 7-X

The water-cooled high heat flux scraper element aims to reduce excessive heat loads on the target element ends of the actively cooled divertor of Wendelstein 7-X. Its purpose is to intercept some of the plasma fluxes both upstream and downstream before they reach the divertor surface. The scraper element has 24 identical plasma facing components (PFCs) divided into 6 modules. One module has 4 PFCs hydraulically connected in series by 2 water boxes. A PFC, 247 mm long and 28 mm wide, has 13 monoblocks made of CFC NB31 bonded by hot isostatic pressing onto a CuCrZr cooling tube equipped with a copper twisted tape. 4 full-scale prototypes of PFCs have been successfully tested in the GLADIS facility up to 20 MW/m 2 . The difference observed between measured and calculated surface temperatures is probably due to the inhomogeneity of CFC properties. The design of the water box prototypes has been detailed to allow the junction between the cooling pipe of the PFCs and the water boxes by internal orbital welding. In conclusion, the prototypes are presently under fabrication.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Characterisation and testing of CHEC-M—A camera prototype for the small-sized telescopes of the Cherenkov telescope array

The Compact High Energy Camera (CHEC) is a camera design for the Small-Sized Telescopes (SSTs; 4 m diameter mirror) of the Cherenkov Telescope Array (CTA). The SSTs are focused on very-high-energy γ-ray detection via atmospheric Cherenkov light detection over a very large area. This implies many individual units and hence cost-effective implementation, as well as shower detection at large impact distance, and hence large field of view (FoV), and efficient image capture in the presence of large time gradients in the shower image detected by the camera. CHEC relies on dual-mirror optics to reduce the plate-scale and make use of 6 x 6 mm 2 pixels, leading to a low-cost (~150 k€), compact (0.5 m x 0.5 m), and light (~45 kg) camera with 2048 pixels providing a camera FoV of ~9 degrees. The CHEC electronics are based on custom TARGET (TeV array readout with GSa/s sampling and event trigger) application-specific integrated circuits (ASICs) and field programmable gate arrays (FPGAs) sampling incoming signals at a gigasample per second, with flexible camera-level triggering within a single backplane FPGA. CHEC is designed to observe in the γ-ray energy range of 1–300 TeV, and at impact distances up to 500 m. To accommodate this and provide full flexibility for later data analysis, full waveforms with 96 samples for all 2048 pixels can be read out at rates up to ~900 Hz. The first prototype, CHEC-M, based on multi-anode photomultipliers (MAPMs) as photosensors, was commissioned and characterised in the laboratory and during two measurement campaigns on a telescope structure at the Paris Observatory in Meudon. Here in this paper, the results and conclusions from the laboratory and on-site testing of CHEC-M are presented. They have provided essential input on the system design and on operational and data analysis procedures for a camera of this type. In conclusion, a second full-camera prototype based on Silicon photomultipliers (SiPMs), addressing the drawbacks of CHEC-M identified during the first prototype phase, has already been built and is currently being commissioned and tested in the laboratory.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A gravo-aeroelastically scaled wind turbine rotor at field-prototype scale with strict structural requirements

A new sub-scale field-prototype design solution is developed to realize the dynamics, structural response, and distributed loads (gravitational, aerodynamic, centrifugal) that are characteristic of a full-scale large, modern wind turbine rotor. Prior work in sub-scale wind turbine testing has focused on matching aerodynamic/aero-elastic characteristics of full-scale rotors at wind tunnel scale. However, large-scale rotor designs must expand beyond this limited set of scaling parameters for cost-effective prototyping and meet strict requirements for structural safety for field testing. Here, the challenge lies in producing a structural design meeting two competing objectives: novel scaling objectives that prescribe the sub-scale blade to have low mass and stiffness; and traditional structural safety objectives that drive the design to have higher stiffness and mass. A 20% gravo-aeroelastically scaled wind turbine blade is developed successfully that satisfies these competing objectives. First, it achieved close agreement for non-dimensional tip deflection and flap-wise blade frequency (both within 2.1%) with a blade mass distribution constrained to produce target gravitational and centrifugal loads. Second, the entire blade structure was optimized to ensure a safe, manufacturable solution meeting strict strength requirements for a testing site that can experience up to 45 m/s wind gusts. The prototype-scale blade was fabricated and successfully proof-load tested.

17 WIND ENERGY↗

District-Scale Analysis of Electricity Load and Strategies to Improve Energy Reliability Using Prototype District Models

Projected increases in electricity demand in the U.S. highlight the urgent need for effective load management to ensure grid reliability. As the building sector accounts for approximately 75% of electricity usage, enhancing energy efficiency and flexibility in this sector is crucial. Adopting district-level approaches offers significant advantages over traditional individual building analyses by enabling shared infrastructure and economies of scale. To navigate the data and computational challenges associated with modeling energy at the district level, prototype district models have been proposed as holistic, system-level solutions that capture complex interactions within typical configurations. This study presents these models as a reference tool for analyzing district-scale energy systems across various climate zones in the U.S. Developed with input from stakeholders, these models integrate varied building characteristics, inter-building connections, and energy system interactions. A case study utilizing the Urban Edge prototype district model, implemented on the URBANopt™ platform, evaluates multiple demand scenarios and the impact of distributed energy resources such as fuel-fired backup generators, photovoltaic systems, and batteries. Findings suggest that while new electric systems can significantly reduce annual energy use, they may also elevate peak electricity loads, with a notable 43% increase in heating-dominant climate zone 5B. The optimal backup power solutions vary based on location, influenced by factors such as utility rates and incentives. For example, PV and batteries perform well in high-cost regions like New York City, while diesel backup generators are more suitable for backup needs in climate zone 3A, such as Atlanta. Thus, this research highlights the importance of prototype district models for future district-scale energy planning.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydrodynamic and Structural Response Modeling of a Prototype Floating Membrane Reservoir System for Pumped Storage Hydropower

Hydrodynamic, computational fluid dynamics, and finite-element modeling were performed for a novel floating membrane reservoir system design for closed-loop pumped storage hydropower application. The conceptual design, which is now protected under an invention disclosure with a patent pending, offers a potential low-cost, low-impact solution to address the high costs, long investment return periods, and environmental disruptions encountered with traditional pumped storage development while offering modularity to enable replication at many locations. Prior to physical tests on a prototype, this paper documents the response analysis and modeling completed to simulate hydraulic and structural performance under different reservoir deployment and alignment arrangements, evaluate system stability, and refine the conceptual design. The results indicate that the excitation frequency from vortex shedding is at least an order of magnitude lower than the water sloshing frequencies in the reservoir, the structural natural frequency of the entire reservoir, and the vibrational frequencies of the side membranes, although excitation frequencies from other sources could cause mechanical resonance under certain conditions. To control destabilizing effects and prevent rocking motion and vibration, the authors conclude that the design could be improved by including a support structure around the floating reservoir, which could also provide floating-membrane containment, improve safety, and facilitate vertical reservoir movement. These conclusions, based on hydrodynamic and structural response modeling, help define specifications for upcoming full-scale prototype construction, deployment, and testing. This study demonstrates standard modeling technique application to an innovative design for which similar applications have not been previously evaluated. As a result, the refined design is capable of improving the scalability and feasibility of pumped storage hydropower in the United States and will be considered for commercialization following prototype testing.

13 HYDRO ENERGY↗

Design and Modeling of a Prototype Floating Membrane Reservoir System Application for Pumped Storage Hydropower

Design and modeling were performed for a prototype floating membrane reservoir system for closed-loop pumped storage hydropower (PSH) application. Typically, new construction of PSH requires high up-front development costs and long investment return periods. The proposed floating membrane reservoir system innovative technology would eliminate the need for highly disruptive and costly reservoir construction. Such modular systems may ultimately provide reliable, flexible power generation and can be replicated multiple times to increase energy storage capacity. This paper documents the modeling response analysis completed to refine and validate the design prior to the testing of the prototype. Computational fluid dynamics modeling efforts were completed to assess hydrostatic and hydrodynamic forces acting on the reservoir for several deployment and alignment arrangements. The system stability was evaluated using material stress and frequency response analysis. The conclusions, based on hydrodynamic and structural response modeling, support a decision to move forward with construction, deployment, and testing of the innovative prototype floating reservoir system.

Hadjerioua, Boualem↗

Prototype-Wise Sensitivity Analysis of Urban Building Energy Simulation Surrogate Modeling Accuracy

Urban Building Energy Modeling (UBEM) is an important reference for urban energy-related policymaking. Because of the significant impact of urban microclimates on the energy simulation, UBEM requires simulations of many microclimate-prototype pairs. Surrogate modeling is commonly used to reduce the cost of simulation computations. In UBEM surrogate modeling, it is important to determine the percentage of microclimates related to a prototype used for generating surrogate model training data. This study analyzes the prototype-wise variations and sensitivities of surrogate model estimation accuracy to the microclimate sampling ratios. The results of the study can help determine the number of simulations used for generating surrogate modeling data, avoid redundant simulations, and reduce the computational cost for UBEM surrogate modeling and its time.

Pan, Xiyu↗

Prototyping and validating requirements of radiation and nuclear emergency plan simulator

Organizational incapability in developing unrealistic, impractical, inadequate and ambiguous mechanisms of radiological and nuclear emergency preparedness and response plan (EPR) causing emergency plan disorder and severe disasters. These situations resulting from 65.6% of poor definition and unidentified roles and duties of the disaster coordinator. Those unexpected conditions brought huge aftermath to the first responders, operators, workers, patients and community at large. Hence, in this report, we discuss prototyping and validating of Malaysia radiation and nuclear emergency preparedness and response plan simulation model (EPRM). A prototyping technique was required to formalize the simulation model requirements. Prototyping as systems requirements validation was carried on to endorse the correctness of the model itself against the stakeholder’s intensions in resolving those organizational incapability. We have made assumptions for the proposed emergency preparedness and response model (EPRM) through the simulation software. Those assumptions provided a twofold of expected mechanisms, planning and handling of the respective emergency plan as well as in bringing off the hazard involved. This model called RANEPF (Radiation and Nuclear Emergency Planning Framework) simulator demonstrated the training emergency response perquisites rather than the intervention principles alone. The demonstrations involved the determination of the casualties’ absorbed dose range screening and the coordination of the capacity planning of the expected trauma triage. Through user-centred design and sociotechnical approach, RANEPF simulator was strategized and simplified, though certainly it is equally complex.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Tests of a full-scale ITER toroidal interferometer and polarimeter (TIP) prototype on the DIII-D tokamak (invited)

A full-scale ITER toroidal interferometer and polarimeter (TIP) prototype, including an active feedback alignment system, has been installed and tested on the DIII-D tokamak. In the TIP prototype, a two-color interferometry measurement of line-integrated density is carried out at 10.59 μm and 5.22 μm using a CO 2 and quantum cascade laser, respectively, while a separate polarimetry measurement of the plasma-induced Faraday effect is made at 10.59 μm. The TIP prototype is equipped with a piezo tip/tilt stage active feedback alignment system that minimizes noise in the measurement and keeps the diagnostic aligned throughout DIII-D discharges. The measured phase resolution for the polarimeter and interferometer is 0.05° (100 Hz bandwidth) and 1.9° (1 kHz bandwidth), respectively. Here, the corresponding line-integrated density resolution for the vibration-compensated interferometer is δnL = 1.5 × 10 18 m -2 , and the magnetic field-weighted line-integrated density from the polarimeter is δnBL = 1.5 × 10 19 Tm -2 . Both interferometer and polarimeter measurements during DIII-D discharges compare well with the expectations based on calculations using Thomson scattering measured density profiles and magnetic equilibrium reconstructions. Additionally, larger bandwidth interferometer measurements show that the diagnostic is a sensitive monitor of core density fluctuations with demonstrated measurements of Alfvén eigenmodes and tearing modes.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Construction and commissioning of CMS CE prototype silicon modules

As part of its HL-LHC upgrade program, the CMS collaboration is developing a High Granularity Calorimeter (CE) to replace the existing endcap calorimeters. The CE is a sampling calorimeter with unprecedented transverse and longitudinal readout for both electromagnetic (CEE) and hadronic (CE-H) compartments. The calorimeter will be built with ~30,000 hexagonal silicon modules. Prototype modules have been constructed with 6-inch hexagonal silicon sensors with cell areas of 1.1 cm 2 , and the SKIROC2-CMS readout ASIC. Beam tests of different sampling configurations were conducted with the prototype modules at DESY and CERN in 2017 and 2018. This paper describes the construction and commissioning of the CE calorimeter prototype, the silicon modules used in the construction, their basic performance, and the methods used for their calibration.

Calorimeters↗

Performance of the CMS High Granularity Calorimeter prototype to charged pion beams of 20–300 GeV/c

The upgrade of the CMS experiment for the high luminosity operation of the LHC comprises the replacement of the current endcap calorimeter by a high granularity sampling calorimeter (HGCAL). The electromagnetic section of the HGCAL is based on silicon sensors interspersed between lead and copper (or copper tungsten) absorbers. The hadronic section uses layers of stainless steel as an absorbing medium and silicon sensors as an active medium in the regions of high radiation exposure, and scintillator tiles directly read out by silicon photomultipliers in the remaining regions. As part of the development of the detector and its readout electronic components, a section of a silicon-based HGCAL prototype detector along with a section of the CALICE AHCAL prototype was exposed to muons, electrons and charged pions in beam test experiments at the H2 beamline at the CERN SPS in October 2018. The AHCAL uses the same technology as foreseen for the HGCAL but with much finer longitudinal segmentation. The performance of the calorimeters in terms of energy response and resolution, longitudinal and transverse shower profiles is studied using negatively charged pions, and is compared to GEANT4 predictions. This is the first report summarizing results of hadronic showers measured by the HGCAL prototype using beam test data.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Irradiation tests of prototype self-powered gamma and neutron detectors

In the framework of the SCK.CEN-CEA Joint Instrumentation Laboratory, we are developing and optimizing a self-powered detector for selective in-core monitoring of the gamma field. Several prototypes with bismuth emitters were developed and tested in a pure gamma field (the PAGURE gamma irradiation facility at CEA) and in mixed neutron and gamma fields (in the OSIRIS reactor at CEA and in the BR2 reactor at SCK.CEN). Detailed MCNP modelling was performed to calculate the gamma and neutron sensitivities. Apart from a few failing prototypes, all detectors showed equilibrium signals proportional to the gamma field with a good long-term stability (under irradiation during several weeks). A tubular geometry design was finally selected as the most appropriate for in-core gamma detection, coupling a larger sensitivity with better response characteristics. In the same experiment in BR2 six prototype Self-Powered Neutron Detectors (SPNDs) with continuous sheaths (i.e. without any weld between the sensitive part and the cable) were extensively tested: two SPNDs with Co emitter, two with V emitter and two with Rh emitters, with varying geometries. All detector responses were verified to be proportional to the reactor power. The prompt and delayed response contributions were quantified. The signal contributions due to the impact of gamma rays were experimentally determined. The evolution of the signals was continuously followed during the full irradiation period. The signal-to-noise level was observed to be well below 1% in typical irradiation conditions. The absolute neutron and gamma responses for all SPNDs are consistent. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Test of a prototype neutron spectrometer based on diamond detectors in a fast reactor

A prototype of neutron spectrometer based on diamond detectors has been developed. This prototype consists of a {sup 6}Li neutron converter sandwiched between two CVD diamond crystals. The radiation hardness of the diamond crystals makes it suitable for applications in low power research reactors, while a low sensitivity to gamma rays and low leakage current of the detector permit to reach good energy resolution. A fast coincidence between two crystals is used to reject background. The detector was read out using two different electronic chains connected to it by a few meters of cable. The first chain was based on conventional charge-sensitive amplifiers, the other used a custom fast charge amplifier developed for this purpose. The prototype has been tested at various neutron sources and showed its practicability. In particular, the detector was calibrated in a TRIGA thermal reactor (LENA laboratory, University of Pavia) with neutron fluxes of 10{sup 8} n/cm{sup 2}s and at the 3 MeV D-D monochromatic neutron source named FNG (ENEA, Rome) with neutron fluxes of 10{sup 6} n/cm{sup 2}s. The neutron spectrum measurement was performed at the TAPIRO fast research reactor (ENEA, Casaccia) with fluxes of 10{sup 9} n/cm{sup 2}s. The obtained spectra were compared to Monte Carlo simulations, modeling detector response with MCNP and Geant4. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Performance of Superconducting Magnet Prototypes for LCLS-II Linear Accelerator

The new LCLS-II Linear Superconducting Accelerator at SLAC needs superconducting magnet packages installed inside SCRF Cryomodules to focus and steer an electron beam. Two magnet prototypes were built and successfully tested at Fermilab. Magnets have an iron dominated configuration, quadrupole and dipole NbTi superconducting coils, and splittable in the vertical plane configuration. Magnets inside the Cryomodule are conductively cooled through pure Al heat sinks. Both magnets performance was verified by magnetic measurements at room temperature, and during cold tests in liquid helium. Test results including magnetic measurements are discussed. Special attention was given to the magnet performance at low currents where the iron yoke and the superconductor hysteresis effects have large influence. Both magnet prototypes were accepted for the installation in FNAL and JLAB prototype Cryomodules.

43 PARTICLE ACCELERATORS↗

Mechanical Performance of the First Two Prototype 4.5 m Long Nb$_3$Sn Low-$β$ Quadrupole Magnets for the Hi-Lumi LHC Upgrade

The U.S. High-Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP) team is collaborating with CERN in the design and fabrication of the first 4.5 m long MQXFA magnets, a 150 mm aperture high-field Nb$_3$Sn quadrupole magnet that uses the aluminum shell-based bladder-and-key technology. The first two prototype magnets, MQXFAP1 and MQXFAP2, were assem-bled and tested while the first pre-series structure (MQXFA03) was in fabrication. This paper summarizes the mechanical perfor-mance of these prototype structures based on the comparison of measured strain gauge data with finite element model analyses from all load steps to powering. The MQXFAP1 magnet almost reached ultimate current before a short to ground was detected and the test was stopped. The MQXFAP2 magnet experienced a low training performance due to a fractured aluminum shell. MQXFAP1b was rebuilt with a new replacement coil, but an old coil limited the magnet from achieving the ultimate current. The mitigations and analyses of these prototype magnets are discussed in the context of the transition to pre-series production.

43 PARTICLE ACCELERATORS↗

Prototype Design of Global Common Module for ATLAS Experiment’s Phase-II Upgrade

A new Global Trigger subsystem will be installed in the Level-0 Trigger as part of HL-LHC Upgrade of ATLAS during the upcoming Long-Shutdown 3. It will feature new and improved trigger hardware and algorithms, and an increased maximum output rate of 1 MHz. The Global Trigger will run offline-like trigger algorithms on full-granularity data, gathered from several sub-detectors and trigger-processing subsystems. A single Global Common Module (GCM) hardware is implemented across the Global Trigger system to be used as Multiplexer Processor, Global Event Processor and CTP Interface (gCTPi). This common hardware platform method will minimize the complexity of the firmware and simplify the system design and long-term maintenance. The GCM prototype is an ATCA front form factor board with two Xilinx Virtex UltraScale+ FPGA VU13P and one ZYNQ UltraScale+ FPGA ZU19EG and seventeen 25.78125 Gb/s FireFly duplex optical modules on it. The total power consumption of this board must be less than 350 W, and the temperature of the optical modules should be less than 70 °C in the worst case. The VU13Ps serve as algorithms processor nodes such as MUX, GEP and gCTPi, and the ZU19EG with Peta Linux OS running on it, is used as Command/Control/Readout Unit to configure and monitor the board and communicate with the ATLAS Detector Control System (DCS). The development of an ATCA blade with three large FPGAs and about 200 optical links running at 25Gb/s is a very challenging task, and the successful test results have demonstrated this GCM prototype as an advancement of state-of-the-art electronics module design in HEP experiments. This paper presents the hardware design considerations, functionalities, and performance test results of this GCM prototype.

47 OTHER INSTRUMENTATION↗