Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROCUREMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

SPC-70774 Rev 0 MARVEL Black Rod B4C Pellets Print Fabrication Specification

A. Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL Black Rod B4C pellets. B. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70808 Rev 0 AL-30 Secondary Support Standoff Blocks Build to Print Fabrication for Use in MARVEL

A. Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL AL-30 Secondary Support Standoff Blocks manufactured by Zircar. The design requires twelve blocks; however, the requested quantity shall be 16 to account for required testing after receipt of materials. B. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-2772 Rev 2 General Build to Print Fabrication Specification for Nuclear Use Items

This specification is for use with Safety Significant structures, systems, and components. The scope is for build to print fabrication including, but not limited to, machining, forming, welding, cutting, assembling, etc. Specific scope and associated requirements will be identified in drawings and/or additional procurement documents. ASME B31 fabrication is not included in the scope of this specification. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70804 Rev 1 Zircar ZAL-45 Alumina Standoff Plates for Use in MARVEL

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL ZAL-45 standoff plates manufactured by Zircar. The design requires eight (8) ceramic standoff plates; however, the requested quantity shall be twelve to account for required testing after receipt of materials. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70843 Rev 0 MARVEL Control Drum Actuator Fabrication Specification

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of components that make up the control drum (CD) actuators. This specification outlines the requirements for fabrication, acknowledging that specific elements will integrate into final assemblies, while others will be delivered as standalone components. The Subcontractor is not responsible for the CD actuator’s final assembly. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

How Can Probabilistic Solar Power Forecasts Be Used to Lower Costs and Improve Reliability in Power Spot Markets? A Review and Application to Flexiramp Requirements

Net load uncertainty in electricity spot markets is rapidly growing. There are five general approaches by which system operators and market participants can use probabilistic forecasts of wind, solar, and load to help manage this uncertainty. These include operator situation awareness, resource risk hedging, reserves procurement, definition of contingencies, and explicit stochastic optimization. We review these approaches, and then provide a case study in which a method for using probabilistic solar forecasts to define needs for reserves is developed and evaluated. The case study has three parts. First, we describe building blocks for enhancing the Watt-Sun solar forecasting system to produce probabilistic irradiance and power forecasts. Second, relationships between Watt-Sun forecasts for multiple sites in California and the system's need for flexible ramp capability (flexiramp) are defined by machine learning and statistical methods. Third, the performance of present methods to defining flexiramp requirements, which are not conditioned on weather and renewables forecasts, is compared with that of probabilistic solar forecast-based requirements, using a multi-timescale production costing model with an 1820-bus representation of the WECC power system. Significant potential savings in fuel and flexiramp procurement costs from using solar-informed reserve requirements are found.

14 SOLAR ENERGY↗

Electric Grid Reliability in an Era of Unprecedented Uncertainty: A Review of Advances in Electric Sector Resource Adequacy Assessment and Planning

Recent changes to the principal causes of energy shortage events on the electric grid have necessitated are thinking of paradigms for resource adequacy (RA) assessment and the related topic of procurement of a reliable portfolio. Prior studies have laid out elements of a modern paradigm for these planning activities, but there does not exist a comprehensive overview of the topic spanning academic and gray literature, and the relationship of these suggested paradigms to methods used in industry has also not been surveyed. In this paper we review recent literature establishing best practices for RA assessment and reliable portfolio procurement, and survey current practices used in industry in relation to these best practices. We establish seven key best practices for RA assessment, cover a modern methodology for capacity accreditation, and find that industry practices are not far behind the identified best practices, though some key gaps remain. We also present a suggested agenda for both academic research on the topic and opportunities for advancement in the industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Expert and operator perspectives on barriers to energy efficiency in data centers

Abstract It was last estimated in 2016 that data centers (DCs) comprise approximately 2% of total US electricity consumption. However, this estimate is currently being updated to account for the massive increase in computing needs due to streaming, cryptocurrency, and artificial intelligence (AI). To prevent energy consumption that tracks with increasing computing needs, it is imperative we identify energy efficiency strategies and investments beyond the low-hanging fruit solutions. In a two-phased research approach, we ask: What non-technical barriers still impede energy efficiency (EE) practices and investments in the data center sector, and what can be done to overcome these barriers? In particular, we are focused on social and organizational barriers to EE. In Phase I, we performed a literature review and found that technical solutions are abundant in the literature, but fail to address the top-down cultural shifts that need to take place in order to adapt new energy efficiency strategies. In Phase II, reported here, we interviewed 16 data center operators/experts to ground-truth our literature findings. Our interview protocols focus on three aspects of DC decision-making: procurement practices, metrics and monitoring, and perceived barriers to energy efficiency. We find that vendors are the key drivers of procurement decisions, advanced efficiency metrics are facility-specific, and there is convergence in the design of advanced facilities due to the heat density of parallelized infrastructure. Our ultimate goals for our research are to design DC decarbonization policies that target organizational structure, empower individual staff, and foster a supportive external market.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Biodiesel production from engineered sugarcane lipids under uncertain feedstock compositions: Process design and techno-economic analysis

In this study, different process schemes were designed and evaluated for biodiesel production from engineered cane lipids with uncertain fatty acid compositions. Four different process schemes were compared under (i) thermal glycerolysis and (ii) enzymatic glycerolysis approaches. These schemes were based on the biodiesel yield and economic indicators such as the net present value (NPV) and the minimum selling price (MSP) of biodiesel. A scheme with polar lipid separation under thermal glycerolysis resulted in the maximum NPV ($\$96.5$ million) and minimum MSP ($\$1107$ /ton biodiesel), respectively. Through local sensitivity analysis, it was concluded that the cane lipid percentage is the most significant factor influencing process economics. A conjoint analysis of the lipid procurement price and cane lipid percent suggested that 15% cane lipids with a low lipid procurement price ($\$0.536$ /kg) results in a positive NPV. When the cane lipid price is higher (> $\$0.80$ /kg), a 20% lipid content should be considered to achieve a positive NPV. At 20% cane lipids, the worst-case and best-case scenarios were evaluated by analyzing the interplay of the three most important parameters, Here, the best-case scenario revealed that the minimum NPV under any process scheme could yield more than $\$100$ million (or MSP: $\$0.80$ /L), and the worst-case analysis showed that losses incurred by the plant could be as high as 80 million (MSP: $\$1.36$ /L). A Monte Carlo simulation indicated that there is a 70% chance of the plant being profitable (NPV > 0).

09 BIOMASS FUELS↗

Multi-service battery energy storage system optimization and control

Battery energy storage systems (BESS) have become fundamental part of modern power systems due to their capability to provide multiple grid services. As the renewable penetration increases, BESS procurement is also expected to increase where it is envisioned to play a systematic and strategical role in power systems planning and operation. Hence, in this paper we present a multiple grid service procurement and operation for BESS - ranging from energy arbitrage, reserve/regulation services, power factor correction, and demand management. The proposed framework considers an optimal multi-temporal dimension, designed to be operable for both planning and real-time operation. Moreover, non-linearity inherent to BESS services and uncertainty associated to market forecasts variables are addressed using techniques such as polyhedral norms and robust optimization approaches. Here, the developed model is tested using a utility-scaled BESS and the obtained results show the effectiveness of the systematic BESS multi-service planning and operation approach.

25 ENERGY STORAGE↗

Hybrid Power Purchase Agreements for Flexible 24/7 Energy Delivery – A Comprehensive Review of Current Practices and Research Pathways

Power Purchase Agreements (PPAs) are becoming increasingly preferred among large energy consumers, such as data centers, to secure cost-effective energy and meet accelerating demand growth. Traditionally, variable renewable energy (VRE)-based PPAs operate on a pay-as-produced basis, balancing supply and demand for a relatively longer duration (e.g., annually). However, the focus is shifting toward matching supply and demand on an hourly basis to fully meet energy needs. This shift requires the integration of flexible energy resources, such as hydropower, thermal generation, and energy storage, to complement VRE sources like wind and solar, forming the foundation for 24/7 PPA. This work contributes by: (i) reviewing emerging market trends and current practices in PPA procurement, supported by data on PPA prices and technology portfolios; (ii) synthesizing the existing literature on modeling approaches for contract pricing, quantities, hybrid resource procurement, and risk management in 24/7 PPA design, while identifying key research gaps; and (iii) proposing an integrated 24/7 PPA design framework along with two contracting mechanisms from the perspectives of both PPA providers and consumers. The proposed framework highlights critical modeling challenges, risk-allocation issues, and future research opportunities for 24/7 PPA design.

24/7↗

Optimization of harvest and logistics for multiple lignocellulosic biomass feedstocks in the northeastern United States

A mixed-integer linear programming model was developed to optimize the multiple biomass feedstock supply chains, including feedstock establishment, harvest, storage, transportation, and preprocessing. The model was applied for analyses of multiple biomass feedstocks at county level for 13 states in the northeastern United States. In the base case with a demand of 180,000 dry Mg/year of biomass, the delivered costs ranged from $\$67.90$ to $\$86.97$ per dry Mg with an average of $\$79.58$ /dry Mg. The biomass delivered costs by county were from $\$67.90$ to 150.81 per dry Mg across the northeastern U.S. Considered the entire study area, the delivered cost averaged $\$85.30$ /dry Mg for forest residues, $\$84.47$ /dry Mg for hybrid willow, $\$99.68$ for switchgrass and $\$97.87$ per dry Mg for Miscanthus. Seventy seven out of 387 counties could be able to deliver biomass at $84 per dry Mg or less a target set by US DOE by 2022. A sensitivity analysis was also conducted to evaluate the effects of feedstock availability, feedstock price, moisture content, procurement radius, and facility demand on the delivered cost. Lastly, our results showed that procurement radius, facility capacity, and forest residue availability were the most sensitive factors affecting the biomass delivered costs.

09 BIOMASS FUELS↗

Reserve and energy scarcity pricing in United States power markets: A comparative review of principles and practices

Here, errors in forecasting load and renewable-based generation in restructured power systems mean that independent system operators (ISOs) must procure sufficient operating reserves to keep the real-time operation of the system reliable and secure. But when procured reserves turn out to be insufficient in real-time due to the lack of resource capacity or ramp capability, operators often set higher prices for reserves and energy to encourage more supply, and to motivate consumers to decrease usage or shift it to other times. This procedure, which is called scarcity or shortage pricing, is a core feature of U.S. electricity markets. It is receiving increased attention from market designers and stakeholders because scarcity will become more important for spot price formation in the future with the increased penetration of zero-marginal cost renewables, and the shrinking role of fuel costs in setting prices. Scarcity pricing is implemented in various ways by different ISOs. These differences have practical implications for the level of prices and incentives for investment, operations, and demand modification. In this paper, general approaches and specific calculation procedures for reserve and energy scarcity pricing practices and calculations across the seven ISO-based U.S. power markets are reviewed and compared. A consistent terminology is used to facilitate the comparison. Current scarcity pricing practices are grouped into three approaches: (1) imposing an adder after the spot market is run; (2) including stepwise demand curves within market clearing procedures for non-contingency reserve products (e.g., the novel flexiramp product), which tends to yield longer right tails for energy scarcity premium curves; and (3) having stepwise demand curves for traditional contingency reserve products only, which results in shorter right tails in energy scarcity curves. A generic numerical example is presented to highlight the large practical differences among the reserve scarcity pricing approaches and specific implementations. To further investigate factors that contribute the most to demand curves differences among ISOs, a sensitivity analysis is performed. This analysis shows that the largest source of differences among the curves is the scarcity prices assumed in the case of severe scarcity, while the number of steps used and whether flexiramp is considered also yields important differences in scarcity prices. As renewable penetration increases, it will become increasingly crucial to employ administrative demand curves so that spot prices more effectively motivate supply and demand adjustments exactly when and where they are needed. This study shows that the different assumptions yield very different scarcity premiums for reserves and energy, and are likely to provide divergent incentives for resources to respond to shortages. It is concluded that to promote market efficiency, a reserve shortage demand curve should have at least three features: inclusion of the marginal value of reserve products at each shortage level, consideration of the magnitude and probability of supply contingencies, and avoidance of abrupt price discontinuities that can cause excessively volatile market outcomes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Equitable Design of Behind-the-Meter Energy Storage Programs: A Customer Perspective

Utility deployment of energy storage is done as a utility-scale asset connected directly to the grid (front of meter) or in partnership with a customer on the customer’s premises (behind the meter). By offering incentives for customers to install behind-the-meter storage, utilities can gain operational control of the assets and operate them in a manner that benefits all customers. Some states have also begun providing increased incentive levels to low-income customers to ensure that they can equitably share in the benefits of behind-the-meter energy storage programs. This paper evaluates different approaches to energy storage procurement from the customer’s perspective and evaluates how behind-the-meter programs can be equitably structured while keeping customers financially indifferent between front-of-meter and behind-the-meter energy storage procurements.

Twitchell, Jeremy B.↗

Fungal elemental profiling unleashed through rapid laser-induced breakdown spectroscopy (LIBS)

ABSTRACT Elemental profiling of fungal species as a phenotyping tool is an understudied topic and is typically performed to examine plant tissue or non-biological materials. Traditional analytical techniques such as inductively coupled plasma–optical emission spectroscopy (ICP-OES) and inductively coupled plasma–mass spectrometry (ICP-MS) have been used to identify elemental profiles of fungi; however, these techniques can be cumbersome due to the difficulty of preparing samples. Additionally, the instruments used for these techniques can be expensive to procure and operate. Laser-induced breakdown spectroscopy (LIBS) is an alternative elemental analytical technique—one that is sensitive across the periodic table, easy to use on various sample types, and is cost-effective in both procurement and operation. LIBS has not been used on axenic filamentous fungal isolates grown in substrate media. In this work, as a proof of concept, we used LIBS on two genetically distinct fungal species grown on a nutrient-rich and nutrient-poor substrate media to determine whether robust elemental profiles can be detected and whether differences between the fungal isolates can be identified. Our results demonstrate a distinct correlation between fungal species and their elemental profile, regardless of the substrate media, as the same strains shared a similar uptake of carbon, zinc, phosphorus, manganese, and magnesium, which could play a vital role in their survival and propagation. Independently, each fungal species exhibited a unique elemental profile. This work demonstrates a unique and valuable approach to rapidly phenotype fungi through optical spectroscopy, and this approach can be critical in understanding these fungi's behavior and interactions with the environment. IMPORTANCE Historically, ionomics, the elemental profiling of an organism or materials, has been used to understand the elemental composition in waste materials to identify and recycle heavy metals or rare earth elements, identify the soil composition in space exploration on the moon or Mars, or understand human disorders or disease. To our knowledge, ionomic profiling of microbes, particularly fungi, has not been investigated to answer applied and fundamental biological questions. The reason is that current ionomic analytical techniques can be laborious in sample preparation, fail to measure all potential elements accurately, are cost-prohibitive, or provide inconsistent results across replications. In our previous efforts, we explored whether laser-induced breakdown spectroscopy (LIBS) could be used in determining the elemental profiles of poplar tissue, which was successful. In this proof-of-concept endeavor, we undertook a transdisciplinary effort between applied and fundamental mycology and elemental analytical techniques to address the biological question of how LIBS can used for fungi grown axenically in a nutrient-rich and nutrient-poor environment.

59 BASIC BIOLOGICAL SCIENCES↗

Data from Biodiesel Production from Engineered Sugarcane Lipids under Uncertain Feedstock Compositions: Process Design and Techno-Economic Analysis

In this study, different process schemes were designed and evaluated for biodiesel production from engineered cane lipids with uncertain fatty acid compositions. Four different process schemes were compared under (i) thermal glycerolysis and (ii) enzymatic glycerolysis approaches. These schemes were based on the biodiesel yield and economic indicators such as the net present value (NPV) and the minimum selling price (MSP) of biodiesel. A scheme with polar lipid separation under thermal glycerolysis resulted in the maximum NPV ($96.5 million) and minimum MSP ($1107/ton biodiesel), respectively. Through local sensitivity analysis, it was concluded that the cane lipid percentage is the most significant factor influencing process economics. A conjoint analysis of the lipid procurement price and cane lipid percent suggested that 15% cane lipids with a low lipid procurement price ($0.536/kg) results in a positive NPV. When the cane lipid price is higher (>$0.80/kg), a 20% lipid content should be considered to achieve a positive NPV. At 20% cane lipids, the worst-case and best-case scenarios were evaluated by analyzing the interplay of the three most important parameters, The best-case scenario revealed that the minimum NPV under any process scheme could yield more than $100 million (or MSP: $0.80/L), and the worst-case analysis showed that losses incurred by the plant could be as high as $80 million (MSP: $1.36/L). A Monte Carlo simulation indicated that there is a 70% chance of the plant being profitable (NPV > 0).

Conversion↗

Design of the 650 MHz High Beta Prototype Cryomodule for PIP-II at Fermilab

The Proton Improvement Plan II (PIP-II) is the first U.S. accelerator project that will have significant contributions from international partners. The prototype High Beta 650 MHz cryomodule (pHB650 CM) is designed by an integrated design team, consisting of Fermilab (USA), CEA (France), UKRI-STFC (UK), and RRCAT (India). The manufacturing & assembly of this prototype cryomodule will be done at Fermilab, whereas the production cryomodules will be manufactured and/or assembled by UKRI-STFC, RRCAT, or Fermilab. Similar to the prototype Single Spoke Resonator 1 cryomodule (pSSR1 CM), this cryomodule is based on a strong-back at room temperature supporting the coldmass. The pSSR1 CM led to significant lessons being learnt on the design, procurement, and assembly processes. These lessons were incorporated into the design and processes for the pHB650 CM. Amongst many challenges faced, the main challenges of the pHB650 CM design were to make the cryomodule compatible to overseas transportation and to design components that can be procured in USA, Europe, and India.

43 PARTICLE ACCELERATORS↗

ORBIT: Offshore Renewables Balance-of-System and Installation Tool

This report describes the Offshore Renewables Balance-of-system Installation Tool ("ORBIT"), a new model developed by the National Renewable Energy Laboratory (NREL) to evaluate the balance-of-system (BOS) costs associated with offshore wind projects. In the context of wind energy projects BOS costs encompass all expenses required to construct a project other than the capital expenditures (CapEx) of the turbines and towers, including the procurement costs for all other components (such as substructures, cables, and electrical infrastructure), offshore and land-based construction costs, port costs, site surveying fees, permitting fees, and leasing fees are all categorized as BOS costs. BOS costs significantly contribute to the levelized cost of energy (LCOE) for offshore wind, typically comprising over 50\% of the CapEx for a fixed-bottom offshore wind project and 60\% for a floating project. In addition, technology solutions and installation methods vary drastically between projects as they are impacted by factors such as vessel availability, geographic considerations and site geotechnical conditions. These effects require a model with appropriate fidelity to understand how these costs scale as turbine rating increases and the offshore wind supply chain, particularly offshore construction vessels, is expanded. For offshore wind, cost savings attributed to increased turbine rating are primarily realized through BOS procurement and project installation as fewer substructures and less cable are required. BOS costs represent both a modeling challenge, as well as an opportunity, for project developers to optimize solutions to reduce costs. It is critical to understand how these costs are affected by novel technologies, innovative installation processes, and operational constraints in order identify meaningful cost reductions for offshore wind energy.

17 WIND ENERGY↗