Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PERMITTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Solar and Battery Storage Permitting and Siting Requirements - Solar Prize Round 7 (CRADA Final Report)

The purpose of this project is to identify local zoning ordinances, state permitting requirements, federal regulatory bottlenecks throughout the development process, and the potential to use Large Language Models (LLM) and aggregate permitting and interconnection data for commercial and industrial (C&I), community, and utility-scale solar photovoltaic (PV) and battery storage projects.

14 SOLAR ENERGY↗

Wyoming CarbonSAFE Phase III: Site Characterization and Permitting Commercial-Scale Carbon Storage Complex Feasibility Study at Dry Fork Station, Wyoming

This report presents the findings of the technical and non-technical site characterization and permitting activities (“Phase III”) conducted under the Wyoming CarbonSAFE: Accelerating CCUS Commercialization and Deployment at Dry Fork Power Station (DFS) and the Wyoming Integrated Test Center project (“Wyoming CarbonSAFE”). Wyoming CarbonSAFE is part of the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) Carbon Storage Assurance Facility Enterprise (“CarbonSAFE”) Initiative. The results of Phase III demonstrate that the Wyoming CarbonSAFE project - referred to as the Northern Powder River Basin Carbon Sequestration Hub (NPRB-CSH) - meets the technical, regulatory, and commercial feasibility requirements necessary to advance toward commercial development and construction. The activities completed under this project Phase make the NPRB-CSH one of the region’s most commercially ready carbon storage sites. Completion of this Phase included the finalization of all site surface and subsurface characterization activities, completion and testing of two Class VI standard wells, 10 draft Class VI permits-to construct to address the future needs of a storage complex, finalized NEPA assessments, transportation and capture FEED studies, and a full commercialization strategy with economic modeling, operation and site closure strategies. The NPRB-CSH meets all requirements to progress to a CarbonSAFE Phase IV program or advance to full commercial operations under the development of a business partner.

01 COAL, LIGNITE, AND PEAT↗

Energy Storage Siting and Permitting Outreach Workshop Report

On March 24th, 2026, under the sponsorship of the U.S. Department of Energy’s Office of Electricity, Pacific Northwest National Laboratory (PNNL) staff hosted the Energy Storage Siting & Permitting Outreach Workshop at PNNL’s Grid Storage Launchpad (GSL) facility in Richland, Washington. The workshop convened a cohort of state and regional stakeholders from across the country to build a shared understanding of energy storage technologies, regulatory frameworks, and best practices for engaging in the permitting process. Participants left with a deeper understanding of energy storage technologies, grid uses and benefits, interconnection and regulatory processes, battery safety standards and risk management, and local engagement strategies and approaches. The workshop concluded with a guided tour of the GSL for hands-on exposure to energy storage research and development. The workshop had 17 external participants. The attendees represented a range of backgrounds, including state and local governments, nonprofits or other local organizations, project developers, and utility stakeholders.

Battery Energy Storage↗

Calendar Year 2007 Resource Conservation and Recovery Act Annual Monitoring Report for the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee - RCRA Post-Closure Permit Nos. TNHW-113, TNHW-116, and TNHW-128

This report contains groundwater quality monitoring data obtained during calendar year (CY) 2007 at the following hazardous waste treatment, storage, and disposal (TSD) units located at the US Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee; this S-3 Site, Oil Landfarm, Bear Creek Burial Grounds/Walk-In Pits (BCBG/WIP), Eastern S-3 Site Plume, Chestnut Ridge Security Pits (CRSP), Chestnut Ridge Sediment Disposal Baste (CRSDB), few Hollow Quarry (KHQ), and East Chestnut Ridge Waste Pile (ECRWP). Hit monitoring data were obtained in accordance with the applicable Resource Conservation and Recovery Act of 1976 (RCRA) hazardous waste post-closure permit (PCP). The Tennessee Department of Environment and Conservation (TDEC) - Division of Solid Waste Management issued the PCPs to define the requirements for RCRA post-closure inspection, maintenance, and groundwater monitoring at the specified TSD units located within the Bear Creek Hydrogeologic Regime (PCP no. TNHW-116), Upper East Fork Poplar Creek Hydrogeologic Regime (PCP no. TNHW-113), and Chestnut Ridge Hydrogeologic Regime (PCP no. TNHW-128). Each PCP requires the Submittal of an annual RCRA groundwater monitoring report containing the groundwater sampling information and analytical results obtained at each applicable TSD unit during the preceding CY, along with an evaluation of groundwater low rates and directions and the analytical results for specified RCRA groundwater target compounds; this report is the RCRA annual groundwater monitoring report for CY 2007. The RCRA post-closure groundwater monitoring requirements specified in the above-referenced PCP for the Chestnut Ridge Regime replace those defined in the previous PCP (permit no. TNHW-088), which expired on September 18, 2005, but remained effective until the TDEC issued the new PCP in September 2006. The new PCP defines site-specific groundwater sampling and analysis requirements for the CRSDB, CRSP, and KHQ that differ from those established under the expired PCP, including modified suites of laboratory analytes (RCRA groundwater target compounds) for each site and annual rather than semiannual sampling frequencies for the CRSDB and KHQ. The new PCP also specifies the RCRA post-closure groundwater monitoring requirements for the ECRWP, a closed TSD unit that was not addressed in the expired PCP.

54 ENVIRONMENTAL SCIENCES↗

Leveraging regional mesh refinement to simulate future climate projections for California using the Simplified Convection-Permitting E3SM Atmosphere Model Version 0

Abstract. The spatial heterogeneity related to complex topography in California demands high-resolution (< 5 km) modeling, but global convection-permitting climate models are computationally too expensive to run multi-decadal simulations. We developed a 3.25 km California climate modeling framework by leveraging regional mesh refinement (CARRM) using the U.S. Department of Energy (DOE)'s global Simple Cloud-Resolving E3SM Atmosphere Model (SCREAM) version 0. Four 5-year time periods (2015–2020, 2029–2034, 2044–2049, and 2094–2099) were simulated by nudging CARRM outside California to 1° coupled simulation of E3SMv1 under the Shared Socioeconomic Pathways (SSP)5-8.5 future scenario. The 3.25 km grid spacing adds considerable value to the prediction of the California climate changes, including more realistic high temperatures in the Central Valley and much improved spatial distributions of precipitation and snowpack in the Sierra Nevada and coastal stratocumulus. Under the SSP5-8.5 scenario, CARRM simulation predicts widespread warming of 6–10 °C over most of California, a 38 % increase in statewide average 30 d winter–spring precipitation, a near-complete loss of the alpine snowpack, and a sharp reduction in shortwave cloud radiative forcing associated with marine stratocumulus by the end of the 21st century. We note a climatological wet precipitation bias for the CARRM and discuss possible reasons. We conclude that SCREAM RRM is a technically feasible and scientifically valid tool for climate simulations in regions of interest, providing an excellent bridge to global convection-permitting simulations.

58 GEOSCIENCES↗

Seal-off assembly permits rapid evacuation of air from containers

Seal-off assembly which permits rapid container evacuation using large diameter tubing has a vacuum valve that permits sealing plate transfer from the vacuum valve stem to the container after evacuation. The sealing plate can be reused repeatedly. This device can repump in case of a small leak without exposing the container to the atmosphere.

Demers, R. R.↗

Voluntary presetting of the vestibular ocular reflex permits gaze stabilization despite perturbation of fast head movements

Normal subjects are able to change voluntarily and continuously their head-eye latency together with their compensatory eye movement gain. A continuous spectrum of intent-latency modes of the subject's coordinated gaze through verbal feedback could be demonstrated. It was also demonstrated that the intent to counteract any perturbation of head-eye movement, i.e., the mental set, permitted the subjects to manipulate consciously their vestibular ocular reflex (VOR) gain. From the data, it is inferred that the VOR is always on. It may be, however, variably suppressed by higher cortical control. With appropriate training, head-mounted displays should permit an easy VOR presetting that leads to image stabilization, perhaps together with a decrease of possible misjudgements.

Zangemeister, Wolfgang H.↗

The Representation of Tropical Cyclones Within the Global William Putman Non-Hydrostatic Goddard Earth Observing System Model (GEOS-5) at Cloud-Permitting Resolutions

The Goddard Earth Observing System Model (GEOS-S), an earth system model developed in the NASA Global Modeling and Assimilation Office (GMAO), has integrated the non-hydrostatic finite-volume dynamical core on the cubed-sphere grid. The extension to a non-hydrostatic dynamical framework and the quasi-uniform cubed-sphere geometry permits the efficient exploration of global weather and climate modeling at cloud permitting resolutions of 10- to 4-km on today's high performance computing platforms. We have explored a series of incremental increases in global resolution with GEOS-S from irs standard 72-level 27-km resolution (approx.5.5 million cells covering the globe from the surface to 0.1 hPa) down to 3.5-km (approx. 3.6 billion cells).

Putman, William M.↗

An Analytical Impact Assessment Framework for Wildlife to Inform the Siting and Permitting of Wind Energy Facilities

In the United States overall electrical generation capacity is expected to increase by 10-25 gigawatts (GW) per year to meet increases in demand. Wind energy is a key component of state and federal renewable energy standards, and central to the Department of Energy’s 20% by 2030 wind production goals. Increased wind energy development may present increased resource conflict with avian wildlife, and environmental permitting has been identified as a potential obstacle to expansion in the sector. ICF developed an analytical framework to help applicants and agencies examine potential impacts in support of facility siting and permitting. A key objective of our work was to develop a framework that is scalable from the local to the national level, and one that is generalizable across the different scales at which biological communities operate – from local influences to meta-populations. The intent was to allow natural resource managers to estimate the cumulative impacts of turbine strikes and habitat changes on long-term population performance in the context of a species demography, genetic potential, and life history. We developed three types of models based on our literature review and participation in the scientific review processes. First, the conceptual model was developed as a general description of the analytical framework. Second, we developed the analytical framework based on the relationships between concepts, and the functions presented in the scientific literature. Third, we constructed an application of the model by parameterizing the framework using data from and relevant to the Altamont Pass Wind Resource Area (APWRA), and an existing golden eagle population model. We developed managed source code, database create statements, and written documentation to allow for the reproduction of each phase of the analysis. ICF identified a potential template adaptive management system in the form of the US Fish & Wildlife Service (USFWS) Adaptive Harvest Management (AHM) program, and developed recommendations for the structure and function of a similar wind-facility related program. We provided a straw-man implementation of the analytical framework based on assumptions for APWRA-wide golden eagle fatalities, and presented a statistical examination of the model performance. APWRA-wide fatality rates appear substantial at all scales examined from the local APWRA population to the Bird Conservation Region. Documented fatality rates significantly influenced population performance in terms of non-territorial non-breeding birds. Breeder, Juvenile, Subadult, and Adult abundance were mostly unaffected by Baseline APWRA-wide fatality rates. However, increased variability in fatality rates would likely have impacts on long-term population performance, and would result in a substantially larger loss of resources. We developed four recommendations for future study. First, we recommend establishment of concept experts through the existing system of non-profits, regulatory agencies, academia, and industry in the wind energy sector. Second, we recommend the development of a central or distributed shared data repository, and establish guidelines for data sharing and transparency. Third, we recommend development a forum and process for model selection at the local and national level. Last, we recommend experimental implementation of the prescribed system at broader scales, and refinement the expectations for modeling and adaptive management.

54 ENVIRONMENTAL SCIENCES↗

IMPLEMENTATION OF THE WIPP PERMIT MODIFICATION AT THE HANFORD TRANSURANIC (TRU) PROGRAM

Hanford is one of the Department of Energy's sites that ships transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP). WIPP's revised Hazardous Waste Facility Permit, granted by the State of New Mexico, required Hanford's TRU Program to make substantial changes to its process for certifying and shipping waste. This paper presents the extent of the changes to WIPP's permit and describes the way Hanford addressed the new requirements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

INNOVATIVE APPROACHES TO COMPLYING WITH VERY LOW NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT LIMITS FOR METALS

The NPDES permit issued to the Savannah River Site (SRS) in 2003 contained very low metals limits for several outfalls. Copper, lead and zinc limits were as low as seven micrograms per liter (7 ug/l), 1 ug/l, and 100 ug/l, respectively. The permit contained compliance schedules that provided SRS with only three to five years to select and implement projects that would enable outfall compliance. Discharges from a few outfalls were eliminated or routed into other locations relatively inexpensively. However, some outfall problems were much more difficult to correct. SRS personnel implemented several innovative projects in order to meet compliance schedule deadlines as inexpensively as possible. These innovations included (1) connecting several outfall discharges to the site's Central Sanitary Wastewater Treatment Facility (CSWTF), (2) constructing a treatment wetlands and completing a water-effects ratio (WER) on its effluent, (3) installing a stannous chloride feed system to remove mercury in an existing air stripper, and (4) constructing a humic acid feed system to increase effluent dissolved organic carbon (DOC) content and take advantage of biotic ligand modeling to raise effluent limits.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hydropower Regulatory and Permitting Information Desktop (RAPID) Toolkit

Hydropower Regulatory and Permitting Information Desktop (RAPID) Toolkit presentation from the WPTO FY14-FY16 Peer Review. The toolkit is aimed at regulatory agencies, consultants, project developers, the public, and any other party interested in learning more about the hydropower regulatory process.

13 HYDRO ENERGY↗

Environments of Long-Lived Mesoscale Convective Systems Over the Central United States in Convection Permitting Climate Simulations

Continental-scale convection-permitting simulations of the warm seasons of 2011 and 2012 reproduce realistic structure and frequency distribution of lifetime and event mean precipitation of mesoscale convective systems (MCSs) over the central United States. In this work, analysis is performed to determine the environmental conditions conducive to generating the longest-lived MCSs and their subsequent interactions. The simulations show that MCSs systematically form over the Great Plains ahead of a trough in the westerlies in combination with an enhanced low-level jet from the Gulf of Mexico. These environmental properties at the time of storm initiation are most prominent for the MCSs that persist for the longest times. Systems reaching 9 h or more in lifetime exhibit feedback to the environment conditions through diabatic heating in the MCS stratiform regions. As a result, the parent synoptic-scale wave is strengthened as a divergent perturbation develops over the MCS at high levels, while a cyclonic circulation perturbation develops in the midlevels of the trough, where the vertical gradient of heating in the MCS region is maximized. The quasi-balanced mesoscale vortex helps to maintain the MCS over a long period of time by feeding dry, cool air into the environment at the rear of the MCS region, so that the MCS can draw in air that increases the evaporative cooling that helps maintain the MCS. At lower levels the south-southeasterly jet of warm moist air from the Gulf is enhanced in the presence of the synoptic-scale wave. That moisture supply is essential to the continued redevelopment of the MCS.

54 ENVIRONMENTAL SCIENCES↗

Risk-based area of review estimation in overpressured reservoirs to support injection well storage facility permit requirements for CO 2 storage projects

This paper by the Energy & Environmental Research Center presents a workflow and modeling approach for delineating a risk-based area of review (AOR) to support a U.S. Environmental Protection Agency (EPA) Class VI permit for a carbon dioxide (CO 2 ) storage project. The approach combines semianalytical solutions for estimating formation fluid leakage through a hypothetical leaky wellbore with the results of numerical reservoir simulations to define the AOR. The modeling utilizes 1) semianalytical solutions from the peer-reviewed literature for formation fluid leakage through abandoned wellbores by Raven (1990) and Avci (1994), 2) a FORTRAN model compiled and described in Cihan et al. (2011, 2012) called ASLMA (Analytical Solution for Leakage in Multilayered Aquifers), and 3) a computational framework for estimating a risk-based AOR first proposed by Oldenburg et al. (2014, 2016). Therefore, the approach builds upon well-established research and underlying hydrogeological principles that have been upheld for nearly three decades. Moreover, the ASLMA model has been broadly applied to an array of storage projects. The work presented herein extends these earlier works using a custom wrapper written in the software environment, R (R Core Team, 2020), which was developed to perform multiple runs of the ASLMA model using given ranges for one or more input parameters. In addition, the current work simulates the pressure buildup within the storage reservoir in response to CO 2 injection using a compositional simulator to better accommodate the temporospatial evolution of pressure buildup within the storage reservoir that is more accurately modeled using a heterogeneous geologic model and a compositional simulator that accounts for the multiphase interactions. The workflow is demonstrated using a case study for a 180,000-metric-ton-per-year storage project located in the PCOR (Plains CO 2 Reduction) Partnership region. For the storage project evaluated here, under the scenario where the leaky wellbore is open to a saline aquifer (thief zone) between the overlying seal (cap rock) and the underground sources of drinking water (USDW), the risk-based AOR essentially collapses to the areal extent of the CO 2 plume in the storage reservoir because the pressure buildup in the storage reservoir beyond the CO 2 plume is insufficient to drive formation fluids up a hypothetical leaky wellbore into the USDW. However, even under the conservative assumption that the leaky wellbore is not open to a thief zone, beyond the areal extent of the CO 2 plume, the incremental leakage is less than 400 m 3 over 20 years, which represents ~0.0001% or less of the total volume of water contained within the USDW rock volume. As discussed in the text, the threshold criterion for defining the risk-based AOR is site-specific and should be informed by the results of the sensitivity analysis and available site characterization data. The approach outlined in this paper is designed to be protective of USDWs and, therefore, comply with the Safe Drinking Water Act requirements and provisions for the U.S. EPA Class VI Underground Injection Control (UIC) Program (Class VI Rule) and North Dakota Administrative Code Chapter 43-05-01.

54 ENVIRONMENTAL SCIENCES↗