DOE OSTI2023
This is the final progress report submitted by X-energy, LLC (XE) to the Department of Energy in support of cooperative agreement DE-NE0008745. This report provides a high-level summary of the work performed during the entire period of performance, running from August 24, 2018 – August 22, 2022. This span of time covers the original 3-year award and a one year no-cost extension. There were five tasks within this project: (1) project management, (2) systems engineering and studies, (3) TRISO-X Facility design, (4) facility license application development, and (5) support to application review. Detailed reporting during execution of the project was provided by a total of 16 quarterly reports, voluntary monthly update presentations, and annual summary presentations. Technical work products include 103 X-energy technical reports, 38 subcontractor (Centrus technical reports), 75 Nuclear Criticality Safety Evaluations/Calculation reports, and 272 miscellaneous design documents (e.g., Engineering Service Orders, Engineering Component Specifications, Procedures, Guidelines/Policies, Design and Interface Requirements documents, and Drawings). All 29 of the X Energy milestones/deliverables were met early or on time and are archived in the DOE Office of Nuclear Energy’s Program Information Control System: Nuclear Energy under Fiscal Year 2018, Work Breakdown Structure F.OA – Industry FOA FY 2018 Awards, F.03 – X-Energy TRISO-X Project. All other work products are available to DOE upon request.
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗