Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “NEPA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Dynamic Radioisotope Power System (DRPS) Design Reference Mission (DRM) Lunar Rover

The Radioisotope Power Systems (RPS) Program tasked the Compass Team to evaluate use of Dynamic Radioisotope Power Systems (DRPS) for lunar science rovers. The object was to identify their advantages and challenges as well as to influence the technology developments with flight-type requirements. This was easily done by using the promising Volatiles Investigating Polar Exploration Rover (VIPER) solar- powered rover mission as a platform to ‘swap in’ a DRPS. The ‘pickup truck bed’ approach allowed both simplified installation and operation of the DRPS while keeping the forward lunar surface ‘blocked’ from the DRPS waste heat which could sublimate the icy surface. It was found that with the Stirling DRPS option the mass is within the planned VIPER lander capability and is very close to VIPER mass and size (the DRPS replaces large battery pack/solar arrays). The Stirling DRPS option produced ~300 Watts electrical (We) using six general purpose heat source (GPHS) bricks and eight Stirling convertors. Replacing the solar/battery power with radioisotope power allows a continuous presence (instead of 6 hours) in a permanently shadowed region (PSR) and over 18 months of operations with minimal science impact (rearward surface heating). It was also found that use of a dynamic system (instead of a thermoelectric system) reduces the heat impact on the science environment two-to-three times. The DRPS, along with a relay link (like Gateway), can provide continuous access to PSRs. The system was also found to be capable of roving for 8 hours per day with a range of over 500 km in 18 months. Preliminary cost estimates fit into a Class D mission but only assuming VIPER heritage and launch, lander, operations, nuclear specific costs [National Environmental Policy Act (NEPA), fueling, transport, Launch Services Program (LSP), etc.] and DRPS are not included.

DRPS↗

Information and Best Practices Related to NASA Nuclear Flight Safety for Space Flights Involving Space Nuclear Systems

The purpose of this handbook is to facilitate a repeatable and robust process that promotes clear and effective interfaces between activities and stakeholders focused on meeting nuclear flight safety requirements for missions utilizing space nuclear systems (SNS), within the context of NASA’s broader nuclear-related activities and interfaces. NPR 8715.26, Nuclear Flight Safety, requires that the NASA project manager “incorporate nuclear flight safety considerations starting with program or project formulation through the point at which the SNS or other radioactive material no longer has the potential to affect Earth’s biosphere.” NASA’s use of SNS inherently involves partnering with other stakeholders to conduct a range of related activities that interface with nuclear flight safety. From a categorical perspective these include: (i) meeting the authorities and licensing requirements for possession and use of nuclear material, as governed by other Federal authorities; (ii) conducting National Environmental Policy Act (NEPA) activities for nuclear-enabled missions; (iii) meeting Federal nuclear launch authorization requirements; (iv) conducting radiological contingency planning activities, including those associated with international commitments; (v) performing risk communication and public outreach activities; and (vi) ensuring decommissioning and disposal strategies reflect National policies and interests. It is the intent of this handbook to promote an effective interface between nuclear flight safety and these interrelated categorical activities. In addition to activities undertaken with partnering agencies, there are individual nuclear-related activities and programs that have a nexus to nuclear flight safety, and these include: (i) applicable NASA Standing Review Boards; (ii) the US Department of Energy nuclear safety activities conducted in partnership with NASA under Memoranda of Understanding; (iii) the Department of Defense’s Range Safety activities; (iv) NASA’s general involvement in interagency and international dialogues regarding nuclear safety; (v) the NASA-administered Interagency Nuclear Safety Review Board; (vi) NASA’s program and project governance activities and nuclear-specific Technical Discipline Team activities under the Office of the Chief Engineer; and others. It is the intent of this handbook to promote effective leveraging of these additional interrelated organizational activities, as appropriate.

Donald Helton↗

A Blueprint for GNEP Advanced Burner Reactor Startup Fuel Fabrication Facility

The purpose of this article is to identify the requirements and issues associated with design of GNEP Advanced Burner Reactor Fuel Facility. The report was prepared in support of providing data for preparation of a NEPA Environmental Impact Statement in support the U. S. Department of Energy (DOE) Global Nuclear Energy Partnership (GNEP). One of the GNEP objectives was to reduce the inventory of long lived actinide from the light water reactor (LWR) spent fuel. The LWR spent fuel contains Plutonium (Pu) -239 and other transuranics (TRU) such as Americium-241. One of the options is to transmute or burn these actinides in fast neutron spectra as well as generate the electricity. A sodium-cooled Advanced Recycling Reactor (ARR) concept was proposed to achieve this goal. However, fuel with relatively high TRU content has not been used in the fast reactor. To demonstrate the utilization of TRU fuel in a fast reactor, an Advanced Burner Reactor (ABR) prototype of ARR was proposed, which would necessarily be started up using weapons grade (WG) Pu fuel. The WG Pu is distinguished by relatively highest proportions of Pu-239 and lesser amount of other actinides. The WG Pu was assumed to be used as the startup fuel along with TRU fuel in lead test assemblies. Because such fuel is not currently being produced in the US, a new facility (or new capability in an existing facility) was being considered for fabrication of WG Pu fuel for the ABR. It was estimated that the facility will provide the startup fuel for 10-15 years and would take 3 to 5 years to construct.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Carbon Mineralization by Aqueous Precipitation for Beneficial Use of CO2 from Flue Gas

The objective of this project is to demonstrate an innovative process to mineralize CO2 from flue gas directly to reactive carbonates and maximize the value and versatility of its beneficial use products. The program scope includes the design, construction, and testing of a CO2 Conversion to Material Products (CCMP) Pilot Demonstration Plant utilizing CO2 from the flue gas of a power production facility in Moss Landing, CA. This topical report covers Subphase 2a which is the design phase of pilot demonstration subsystems. Materials of construction have been selected and proven in both lab scale and prototype testing to be acceptable for the reagent conditions of interest. The target application for the reactive carbonate material has been selected based upon small-scale feasibility studies and the design of a continuous fiber board production line has been completed. The electrochemical cell architecture and components have been selected based upon both lab scale and prototype testing. The appropriate quality control and diagnostic techniques have been developed and tested along with the required instrumentation and controls. Finally the demonstrate site infrastructure, NEPA categorical exclusion, and permitting is all ready for the construction and installation of the new units and upgrades.

Devenney, Martin↗

SkyMine Carbon Mineralization Pilot Project

This Topical Report addresses accomplishments achieved during Phase 2b of the SkyMine® Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO2 from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO2 to products having commercial value (i.e., beneficial use), show the economic viability of the CO2 capture and conversion process, and thereby advance the technology to the point of readiness for commercial scale demonstration and deployment. The overall process is carbon negative, resulting in mineralization of CO2 that would otherwise be released into the atmosphere. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at the commercial scale. The project is being conducted in two phases. The primary objectives of Phase 1 were to evaluate proven SkyMine® process chemistry for commercial pilot-scale operation and complete the preliminary design for the pilot plant to be built and operated in Phase 2, complete a NEPA evaluation, and develop a comprehensive carbon life cycle analysis. The objective of Phase 2b was to build the pilot plant to be operated and tested in Phase 2c.

Christenson, Norm↗

Wildlife Densities and Habitat Use Across Temporal and Spatial Scales on the Mid-Atlantic Outer Continental Shelf. Final Report to the Department of Energy EERE Wind & Water Power Technologies Office

The Mid-Atlantic Baseline Studies Project helped address environmental barriers to offshore wind energy development in the mid-Atlantic region by providing regulators, developers, and other stakeholders with comprehensive baseline ecological data and analyses. Project funders and collaborators from a range of academic institutions, non-governmental organizations, federal agencies, foundations, and private companies came together to study bird, sea turtle, and marine mammal distributions, densities, and movements on the mid-Atlantic Outer Continental Shelf between 2012 and 2014. Specific project activities and goals included the following: (1) Conduct standardized surveys to quantify bird, sea turtle, and marine mammal densities seasonally and annually throughout the study region and identify important habitat use or aggregation areas. (2) Develop statistical models to help understand the drivers of wildlife distribution and abundance patterns. (3) Use individual tracking data for several focal bird species to provide information on population connectivity and individual movements that is complementary to survey data. (4) Identify species that are likely to be exposed to offshore wind energy development activities in the mid-Atlantic study area. (5) Develop U.S.-based technological resources and assessment methods for future monitoring efforts, including a comparison of high resolution digital video aerial surveys to boat-based surveys. (6) Help meet data needs associated with National Environmental Policy Act (NEPA), Marine Mammal Protection Act, and Endangered Species Act requirements, by contributing several years of data and analysis towards future Environmental Impact Statements. This report consists of six parts: Project overview (executive summary and Chapters 1-2); Examining wildlife distributions and relative abundance from a digital video aerial survey platform (Chapters 3-6); Examining wildlife distributions and abundance using boat-based surveys (Chapters 7-12); Integrating data across survey platforms (Chapters 13-19); Individual movements and habitat use for focal bird species (Chapters 20-25); and Nocturnal avian migration monitoring (Chapters 26-27). Boat-based and digital video aerial surveys each had specific advantages and disadvantages, but were largely complementary (Chapters 1, 5, 13-14). Digital aerial surveys were particularly useful for covering offshore areas at broad scales, where general distributions of taxonomic groups were a priority; boat surveys could provide more detailed data on species identities and behaviors, but were more limited in geographic scope due to their slower survey pace. The mid-Atlantic study area was important for wintering and breeding taxa, and its location also made it a key migratory corridor. There was considerable variation in species composition and spatial patterns by season, largely driven by dynamic environmental conditions (Chapters 12, 15, and 20-22). Habitat gradients in nearshore waters, however, were reliable influences on productivity and patterns of species distributions and abundance. Areas within about 30-40 km of the coast offshore of the mouths of Chesapeake and Delaware Bays, as well as to the south of Delaware Bay along the coast, were consistent hotspots of abundance and species diversity, regardless of survey methodology or analytical approach (Chapters 2, 12, 17). Inter-annual variation was substantial, and the importance of certain environmental variables in predicting animal distributions indicates that these species may well respond to future environmental shifts brought about by anthropogenic effects and climatic change. This study is an important first step, however, towards understanding how bird, marine mammal, and sea turtle populations in the mid-Atlantic may be exposed to offshore wind energy development and other anthropogenic activities. The results of this study provide insight to help address environmental permitting requirements for current and future offshore development projects, and serve as a starting point for more site-specific studies, risk analyses, and evaluation of potential measures to avoid and minimize those risks.

17 WIND ENERGY↗

Decision Point 1 Topical Report

This Topical Report addresses accomplishments achieved during Phase 2a of the SkyMine® Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO2 from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO2 to products having commercial value (i.e., beneficial use), show the economic viability of the CO2 capture and conversion process, and thereby advance the technology to the point of readiness for commercial scale demonstration and proliferation. The overall process is carbon negative, resulting in mineralization of CO2 that would otherwise be released into the atmosphere. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at the commercial scale. The project is being conducted in two phases. The primary objectives of Phase 1 were to elaborate proven SkyMine® process chemistry to commercial pilot-scale operation and complete the preliminary design for the pilot plant to be built and operated in Phase 2, complete a NEPA evaluation, and develop a comprehensive carbon life cycle analysis. The objective of the current Phase (2a) is to complete the detailed design of the pilot plant to be built in Phase 2b.

Yablonsky, Al↗

Texas Clean Energy Project: Decision Point Application, Section 2: Topical Report - Phase 1, February 2010-October 2013

Summit Texas Clean Energy, LLC (STCE) is developing the Texas Clean Energy Project (TCEP or the Project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) power plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO 2 ) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin subbituminous coal delivered by rail from Wyoming into a synthetic gas (syngas) that will be cleaned and further treated so that at least 90 percent of the overall carbon entering the IGCC facility will be captured. The clean syngas will then be divided into two highhydrogen (H 2 ) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO 2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR and permanent underground sequestration. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. STCE and the DOE executed a Cooperative Agreement dated January 29, 2010, which defined the objectives of the Project for all phases. During Phase 1, STCE conducted and completed all objectives defined in the initial development, permitting and design portions of the Cooperative Agreement. This topical report summarizes all work associated with the project objectives, and additional work required to complete the financing of the Project. In general, STCE completed project definition, a front-end, engineering and design study (FEED), applied for and received its Record of Decision (ROD) associated with the NEPA requirements summarized in a detailed Environmental Impact Statement. A topical report covering the results of the FEED is the subject of a separate report submitted to the DOE on January 26, 2012. References to the FEED report are contained herein. In August 2013, STCE executed fixed-price turnkey EPC contracts and previously, in December 2011 a long-term O&M agreement, with industry-leading contractors. Other work completed during Phase 1 includes execution of all commercial input and offtake agreements required for project financing. STCE negotiated long-term agreements for power, CO 2 and urea offtake. A contract for the purchase of coal feedstock from Cloud Peak Energy’s Cordero Rojo mine was executed, as well as necessary agreements (supplementing the tariff) with the Union Pacific Railroad (UPRR) for delivery of the coal to the TCEP site. STCE executed firm agreements for natural gas transportation with ONEOK for long-term water supply with a private landowner. In addition, STCE secured options for critical easements and rights-of-way, completed and updated a transmission study, executed an interconnection agreement and has agreed a target October 31, 2013 financial closing date with debt and conventional and tax equity.

Mattes, Karl↗

Texas Clean Energy Project: Topical Report, Phase 1 - February 2010-December 2012

Summit Texas Clean Energy, LLC (STCE) is developing the Texas Clean Energy Project (TCEP or the project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO 2 ) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin subbituminous coal delivered by rail from Wyoming into a synthetic gas (syngas) which will be cleaned and further treated so that at least 90 percent of the overall carbon entering the facility will be captured. The clean syngas will then be divided into two high-hydrogen (H 2 ) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO 2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR and permanent underground sequestration. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. STCE and the DOE executed a Cooperative Agreement dated January 29, 2010, which defined the objectives of the project for all phases. During Phase 1, STCE conducted and completed all objectives defined in the initial development, permitting and design portions of the Cooperative Agreement. This topical report summarizes all work associated with the project objectives, and additional work required to complete the financing of the project. In general, STCE completed project definition, a front-end, engineering and design study (FEED), applied for and received its Record of Decision (ROD) associated with the NEPA requirements summarized in a detailed Environmental Impact Statement. A topical report covering the results of the FEED is the subject of a separate report submitted to the DOE on January 26, 2012. References to the FEED report are contained herein. In December 2011, STCE executed fixed-price turnkey EPC contracts and a long-term O&M agreement with industry-leading contractors.. Other work completed during Phase 1 includes execution of all major commercial input and offtake agreements. STCE negotiated long-term agreements for power, CO 2 and urea offtake. A contract for the purchase of coal feedstock from Cloud Peak Energy’s Cordero Rojo mine was executed, as well as a memorandum of understanding with the Union Pacific Railroad (UPRR) for delivery of the coal to the TCEP site. An MOU for natural gas supply was completed with ONEOK, and a long-term water supply agreement was completed with a private landowner. In addition, STCE secured options for easements and rights-of-way, completed a transmission study, executed an interconnection agreement and devoted substantial effort to debt and conventional and tax equity structuring to position the Project for project financing, currently scheduled for closing on December 31, 2012.

Mattes, Karl↗

Geothermal Induced Seismicity National Environmental Policy Act Review

This presentation reviews four National Environmental Policy Act of 1969 (NEPA) documents to understand how Federal agencies, including the U.S. Bureau of Land Management and Department of Energy, review and analyze the potential impacts to the human environment when funding or approving permits for enhanced geothermal system with the potential for induced seismicity.

15 GEOTHERMAL ENERGY↗

Stakeholder Transportation Scorecard: Reviewing Nevada's Recommendations for Enhancing the Safety and Security of Nuclear Waste Shipments - 13518

As a primary stakeholder in the Yucca Mountain program, the state of Nevada has spent three decades examining and considering national policy regarding spent nuclear fuel and high-level radioactive waste transportation. During this time, Nevada has identified 10 issues it believes are critical to ensuring the safety and security of any spent nuclear fuel transportation program, and achieving public acceptance. These recommendations are: 1) Ship the oldest fuel first; 2) Ship mostly by rail; 3) Use dual-purpose (transportable storage) casks; 4) Use dedicated trains for rail shipments; 5) Implement a full-scale cask testing program; 6) Utilize a National Environmental Policy Act (NEPA) process for the selection of a new rail spur to the proposed repository site; 7) Implement the Western Interstate Energy Board (WIEB) 'straw man' process for route selection; 8) Implement Section 180C assistance to affected States, Tribes and localities through rulemaking; 9) Adopt safety and security regulatory enhancements proposed states; and 10) Address stakeholder concerns about terrorism and sabotage. This paper describes Nevada's proposals in detail and examines their current status. The paper describes the various forums and methods by which Nevada has presented its arguments and sought to influence national policy. As of 2012, most of Nevada's recommendations have been adopted in one form or another, although not yet implemented. If implemented in a future nuclear waste program, the State of Nevada believes these recommendations would form the basis for a successful national transportation plan for shipments to a geologic repository and/or centralized interim storage facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Right-Sized Reuse - Use a Systematic Process, and Design for a Specialized, Yet Flexible Result - 13558

The process of transferring real property from the U.S. Department of Energy (DOE) is always the same - except when it's not. The most frequently asked questions in the process are: how can this take so long and be so complex, and why is it different every time? The process of transferring real property from the Department of Energy is always the same - except when it's not. Repeat as needed. The authority for DOE to transfer property is found in the Atomic Energy Act of 1954 (AEA). Specifically, the transfer of real property for mission-related purposes is done pursuant to the AEA Section 161(g). Another rule that can provide certain unique benefits to the transferee is found in 10 Code of Federal Regulations (CFR) Part 770, Transfer of Real Property at Defense Nuclear Facilities for Economic Development; it can be followed for economic development purposes at defense nuclear facilities. All federal real property transfers include at minimum a National Environmental Policy Act (NEPA) review and a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) chap. 120(h) environmental due diligence evaluation. The end-point objective is to be able to demonstrate that a transfer is protective of human health and the environment - typically attained via a risk evaluation. That's it...mostly. None of these requirements are new; their processes are well-known. So, why is it different every time there is a transfer and what can be done to move things along? Time and the perception of open-ended schedules kill projects. Economic development projects that are proposed by Community Reuse Organizations (CROs) and others or by parties who need private capital are especially time-sensitive. It is not reasonable to expect business interests or investors to wait two years while the property transfer process is carried out. Lenders are also risk-sensitive and not solely business-risk sensitive. After all, these are federal properties where contamination is a factor. What are some of the things you can do to address those time and risk issues? Issues of time and complexity arise from several variables. Short-sighted vision and lack of project definition lead to wasted effort and lengthy delays. Some variability on the input side of the process can be controlled in a way that will save you time and actually work to your advantage. Steps can be taken to systematize the transfer process on the agency's part and on the requester/grantee's part. Having the right mix of dedicated people from the beginning, planning with flexibility, coordinating with the clean-up program at your site, knowing the interests and issues of your stakeholders, and working with the CRO/economic development authorities - all of these measures and others can and will help you. The key is not simply knowing the steps and making a punch-list, but understanding the steps and how to work with and use them. These concepts can be applied to create a vision of success for those engaged in real property transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stakeholder Engagement on the Environmental Impact Statement for the Disposal of Greater-Than-Class C Low-Level Radioactive Waste -12565

The Department of Energy's (DOE) Office of Disposal Operations is responsible for developing a permanent disposal capability for a small volume, but highly radioactive, class of commercial low-level radioactive waste, known as Greater-Than-Class C (GTCC) low-level radioactive waste. DOE has issued a draft environmental impact statement (EIS) and will be completing a final EIS under the National Environmental Policy Act (NEPA) that evaluates a range of disposal alternatives. Like other classes of radioactive waste, proposing and evaluating disposal options for GTCC waste is highly controversial, presents local and national impacts, and generates passionate views from stakeholders. Recent national and international events, such as the cancellation of the Yucca Mountain project and the Fukushima Daiichi nuclear accident, have heighten stakeholder awareness of everything nuclear, including disposal of radioactive waste. With these challenges, the Office of Disposal Operations recognizes that informed decision-making that will result from stakeholder engagement and participation is critical to the success of the GTCC EIS project. This paper discusses the approach used by the Office of Disposal Operations to engage stakeholders on the GTCC EIS project, provides advice based on our experiences, and proffers some ideas for future engagements in today's open, always connected cyber environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Exploring communication techniques across a wide spectrum of groups - 15105

Communication about radionuclide and nuclear waste is one factor in facilitating decisions regarding environmental issues and energy solutions. However, the decision process involves many people with a variety of perceptions that have been formed throughout many years. This paper describes various communication techniques across a spectrum of stakeholders from the general public, students, first responders, analysts, and decisions makers. Techniques include dose assessment tools, assessment training, preparing first responders to confront potential radiological/nuclear situations, web multimedia information, ongoing Department of Energy (DOE) education projects, public talks and presentations, and National Environmental Policy Act (NEPA) participation. Issues are identified concerning perception including units, background radiation, effects of environmental levels of radiation, potential approaches to energy literacy, and risk comparison. These various communication techniques across a spectrum of stakeholders are evaluated with feedback and use statistics concerning aspects of strategies, challenges, and common perceptions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned From Public Outreach: Effective Incorporation of the Stakeholder Voice - 18447

The licensing process for any facility associated with nuclear power or aspects of the nuclear fuel cycle can be expected to encounter intense stakeholder interest, and often significant challenges. Over the last decade, staff of the Center for Nuclear Waste Regulatory Analyses (CNWRA{sup R}) at Southwest Research Institute{sup R} (SwRI{sup R}) provided comprehensive support to the U.S. Nuclear Regulatory Commission (NRC) for public outreach efforts across a wide variety of nuclear activities. Many of these projects included public involvement and consultation activities for compliance with the National Environmental Policy Act (NEPA), including scoping, public meetings, responding to public comments on draft documents, and holding small meetings with affected local, state, and tribal governments. In addition, we have supported NRC public outreach related to nuclear facility licensing activities (including the proposed repository at Yucca Mountain), rulemaking, and regulatory guidance development. This experience has offered us a broad view of the challenges faced by industry, regulators, and stakeholders. In the process, we have observed some best practices that lead to effective stakeholder communication. Communication about complex technical issues is challenging, particularly for societally controversial topics, such as civilian use of nuclear power and management of radioactive waste. Most commonly, we have observed a lack of mutual trust and respect among industry, regulators, and stakeholders that creates an atmosphere ripe for suspicion and misunderstanding. Stakeholders have, in public comments, criticized the lack of appropriate venues to raise concerns in which they feel they can get meaningful responses from the nuclear industry and regulators. Conversely, industry faces difficulty in reaching compromise with stakeholders, who sometimes misinterpret or misrepresent factual information. Within this contentious environment, regulators are constrained by their statutory framework, even as they are challenged to be more responsive, transparent, and fair to both stakeholders and industry. In spite of these obstacles, there are examples where feedback from stakeholders was heard and utilized. Because of successful collection of appropriate feedback, regulators became more adept at understanding the full range of perspectives from both industry and stakeholders, and subsequently did a better job at effectively incorporating feedback and communicating their decisions and findings in a clear and understandable way. Ultimately, the success of these examples was based on a measure of mutual respect, which was reached through effective communication and implementation of some best practices. These best practices include (i) outreach planning that is abundantly mindful of the various stakeholder points of view, site history, regional characteristics, and probable future and related actions, combined with advance identification of key stakeholders; (ii) development and distribution of information that facilitates public participation; and (iii) use of avenues by which stakeholders can provide meaningful and effective comments. Illustrative examples include (i) how concerns raised by stakeholders were heard by an applicant and resulted in a revised project proposal; (ii) use of a variety of interaction formats that incorporated input across a broad spectrum of stakeholders; (iii) utilizing stakeholder feedback received during scoping; and (iv) how a facility underestimated the impact of 'outsider' stakeholder voices that were in contrast to the known local community. By moving past the viewpoint that public outreach is a 'necessary evil' and engaging only to check a procedural box, each participant can benefit from mutually satisfactory and improved outcomes. (author)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

ECAR-5363 Rev 0 MARVEL Environmental Assessment Inhalation Dose Consequence Calculations

The following dose consequence analysis is performed to support the Microreactor Applications Research Validation and Evaluation Project (MARVEL) environmental assessment. The purpose of the MARVEL project is to develop a nuclear microreactor applications test bed at Idaho National Laboratory (INL) to perform research and development on various operational features of microreactors to ultimately improve integration of microreactors to end-user applications. The MARVEL concept is a 100-kilowatt thermal (kWth) and approximately 20-kilowatt electric (kWe) generating microreactor. The MARVEL system will be located in the INL TREAT facility in the north high bay equipment pit. This ECAR analyzes a maximum reasonably foreseeable accident for MARVEL as required by “Recommendations for Analyzing Accidents under NEPA.” Consistent with the recommendations from this guidance, this ECAR considers the median air dispersion parameters for INL in evaluation accident releases from the MARVEL reactor concept and documents the dose from the maximum reasonably foreseeable accident.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

COR-0011 Rev 6 MARVEL Project Code of Record

This Code of Record identifies the codes, standards, and procedures necessary to design, develop, construct, and startup the Microreactor Applications Research Validation and Evaluation (MARVEL) Project at the Materials and Fuel Complex (MFC) Transient Reactor Test (TREAT) Facility and the Idaho National Laboratory (INL). The MARVEL Project is an INL test microreactor funded by the United States Department of Energy (DOE) via the Microreactor Program (MRP). The goal of the project is to establish an operational nuclear applications test bed that can generate combined heat and power to enable integration and R&D with end-user technologies, as well as allow microreactor technologists to test next-generation control systems. The microreactor is a thermal reactor utilizing Uranium Zirconium Hydride (UZrH) fuel with review and authorization by the Department of Energy Idaho Operations Office (DOE-ID) for National Environmental Policy Act (NEPA) compliance, safety review, and supplemental readiness assessments for startup and operation. To enable rapid deployment, the MARVEL reactor will reside in the Transient Reactor Test (TREAT) Facility and utilize the existing operating Category B reactor facility, approved facility safety basis, operating crews, and recent re-start experience.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

IMPROVING CONSISTENCY OF PERFORMANCE ASSESSMENTS IN THE DOE COMPLEX

The low-level waste (LLW) performance assessment (PA) process has been traditionally focused on disposal facilities at a few United States Department of Energy (USDOE) sites and commercial disposal facilities. In recent years, there has been a dramatic increase in the scope of the use of PA-like modeling approaches, involving multiple activities, facilities, contractors and regulators. The scope now includes, for example: (1) National Environmental Policy Act (NEPA) assessments, (2) CERCLA disposal cells, (3) Waste Determinations and High-Level Waste (HLW) Closure activities, (4) Potential on-site disposal of Transuranic (TRU) waste, and (5) In-situ decommissioning (including potential use of existing facilities for disposal). The dramatic increase in the variety of activities requiring more detailed modeling has resulted in a similar increase in the potential for inconsistency in approaches both at a site and complexwide scale. This paper includes a summary of USDOE Environmental Management (EM) sponsored initiatives and activities for improved consistency. New initiatives entitled the Performance Assessment Community of Practice and Performance Assessment Assistance Team are also introduced.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗