Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mars tasks”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Sensitivity Analysis of Heat Rejection and Propellant Management Technologies for Nuclear Thermal Propulsion Architectures

Cryogenic fluid management (CFM) technologies are very important for enabling a wider range of missions to utilize space nuclear propulsion (SNP) concepts such as nuclear thermal propulsion (NTP). Technologies for thermal and cryogenic propellant management allow for vehicles to take full advantage of the higher efficiency NTP systems for longer duration human interplanetary and deep space robotic missions. Currently, the CFM Portfolio Project at NASA’s Marshall Space Flight Center (MSFC) is developing thermal and propellant management technologies needed for SNP. When developing these technologies, it is important to understand the sensitivities of key performance parameters (KPPs) at the system and overall mission level due to the ways the technologies interact with each other, other subsystems, and influence the overall vehicle. The Advanced Concepts Office (ACO) at NASA-MSFC was tasked with building an integrated system model of a human Mars NTP mission to evaluate the impacts and sensitivities of CFM technologies on the overall vehicle and mission. This paper will cover the buildup of the model and highlight major sensitivities and breakpoints encountered, as well as future work in improving the existing models and sensitivities being evaluated.

Robert J Hetterich↗

Mars Science Laboratory Navigation Results

The Mars Science Laboratory (MSL), carrying the Curiosity rover to Mars, was launched on November 26, 2011, from Cape Canaveral, Florida. The target for MSL was selected to be Gale Crater, near the equator of Mars, with an arrival date in early August 2012. The two main interplanetary navigation tasks for the mission were to deliver the spacecraft to an entry interface point that would allow the rover to safely reach the landing area, and to tell the spacecraft where it entered the atmosphere of Mars, so it could guide itself accurately to close proximity of the landing target. MSL used entry guidance as it slowed down from the entry speed to a speed low enough to allow for a successful parachute deployment, and this guidance allowed shrinking the landing ellipse to a 99% conservative estimate of 7 by 20 kilometers. Since there is no global positioning system in Mars, achieving this accuracy was predicated on flying a trajectory that closely matched the reference trajectory used to design the guidance algorithm, and on initializing the guidance system with an accurate Mars-relative entry state that could be used as the starting point to integrate the inertial measurement unit data during entry and descent. The pre-launch entry flight path angle (EFPA) delivery requirement was +/- 0.20 deg, but after launch a smaller threshold of +/- 0.05 deg was used as the criteria for late trajectory correction maneuver (TCM) decisions. The pre-launch requirement for entry state knowledge was 2.8 kilometers in position error and 2 meters per second in velocity error, but also smaller thresholds were defined after launch to evaluate entry state update opportunities. The biggest challenge for the navigation team was to accurately predict the trajectory of the spacecraft, so the estimates of the entry conditions could be stable, and late trajectory correction maneuvers or entry parameter updates could be waved off. As a matter of fact, the prediction accuracy was such that the last TCM performed was a small burn executed eight days before landing, and the entry state that was calculated just 36 hours after that TCM, and that was uploaded to the spacecraft the same day, did not need to be updated. The final EFPA was 0.013 deg shallower than the -15.5 deg target, and the on-board entry state was just 200 meters in position and 0.11 meters per second in velocity from the post-landing reconstructed entry state. Overall the entry delivery and knowledge requirements were fulfilled with a margin of more than 90% with respect to the pre-launch thresholds. This excellent accuracy contributed to a very successful and accurate entry, descent, and landing, and surface mission.

navigation↗

Lunar and Mars Exploration: The Autonomy Factor

Long duration space flight crews have relied heavily on almost constant communication with ground control mission support. Ground control teams provide vehicle status and system monitoring, while offering near real time support for specific tasks, emergencies, and ensuring crew health and well being. With extended exploration goals to lunar and Mars outposts, real time communication with ground control teams and the ground s ability to conduct mission monitoring will be very limited compared to the resources provided to current International Space Station (ISS) crews. An operational shift toward more autonomy and a heavier reliance on the crew to monitor their vehicle and operations will be required for these future missions. NASA s future exploration endeavors and the subsequent increased autonomy will require a shift in crew skill composition, i.e. engineer, doctor, mission specialist etc. and lead to new training challenges and mission scenarios. Specifically, operational and design changes will be necessary in many areas including: Habitat Infrastructure and Support Systems, Crew Composition, Training, Procedures and Mission Planning. This paper will specifically address how to apply ISS lessons learned to further use ISS as a test bed to address decreased amounts of ground support to achieve full autonomous operations for lunar and Mars missions. Understanding these lessons learned and applying them to current operations will help to address the future impacts of increased crew autonomy for the lunar and Mars outposts and pave the way for success in increasingly longer mission durations.

Rando, Cynthia M.↗

Flow Simulations for Martian and Lunar Lander Plume-Surface Interaction Prediction

Landing vehicle propulsive systems introduce several risks associated with plume/surface interactions (PSI) during the final stages of descent. For example, view obscuration during descent due to the liberation of dust driven by the rocket plume’s interaction with the lunar surface was reported on several Apollo missions. Plume-driven debris impacts on vehicle and nearby assets as well as landing instabilities due to crater formation are also potential risks associated with plume/surface interactions. The importance of studying these plume/surface interactions has been elevated due to NASA’s mission to land humans on the Moon by 2024. Existing and under-development predictive simulation tools are currently being brought to application readiness under a project awarded by the NASA Space Technology Mission Directorate (STMD) Game Changing Development (GCD) program. This tool development is divided into four tasks: (1) simulating plume structure in low-pressure environments, (2) simulating crater development and ejecta, (3) regolith particle phase modeling, and (4) gas-particle interaction modeling. Recent efforts under task 1 include demonstrating existing computational fluid dynamics (CFD) tools for simulating plume structure in low pressure environments similar to those found on Mars. The results of these demonstrative simulations are compared to available experimental data. Emerging capability being developed under task 2 is also presented, demonstrating simulations of crater formation in Lunar conditions.

Thomas P Shurtz↗

Constructing an Educational Mars Simulation

January 14th 2004, President George Bush announces his plans to catalyst the space program into a new era of space exploration and discovery. His vision encompasses a robotics program to explore our solar system, a return to the moon, the human exploration of Mars, and to promote international prosperity towards our endeavors. We at NASA now have the task of constructing this vision in a very real timeframe. I have been chosen to begin phase 1 of making this vision a reality. I will be working on creating an Educational Mars Simulation of human exploration of Mars to stimulate interest and involvement with the project from investors and the community. GRC s Computer Services Division (CSD) in collaboration with the Office of Education Programs will be designing models, constructing terrain, and programming this simulation to create a realistic portrayal of human exploration on mars. With recent and past technological breakthroughs in computing, my primary goal can be accomplished with only the aid of 3-4 software packages. Lightwave 3D is the modeling package we have selected to use for the creation of our digital objects. This includes a Mars pressurized rover, rover cockpit, landscape/terrain, and habitat. Once we have the models completed they need textured so Photoshop and Macromedia Fireworks are handy for bringing these objects to life. Before directly importing all of this data into a simulation environment, it is necessary to first render a stunning animation of the desired final product. This animation with represent what we hope to capture out of the simulation and it will include all of the accessories like ray-tracing, fog effects, shadows, anti-aliasing, particle effects, volumetric lighting, and lens flares. Adobe Premier will more than likely be used for video editing and adding ambient noises and music. Lastly, V-Tree is the real-time 3D graphics engine which will facilitate our realistic simulation. Additional information is included in the original extended abstract.

Henke, Stephen A.↗

NEEMO 18-20: Analog Testing for Mitigation of Communication Latency During Human Space Exploration

NASA Extreme Environment Mission Operations (NEEMO) is an underwater spaceflight analog that allows a true mission-like operational environment and uses buoyancy effects and added weight to simulate different gravity levels. Three missions were undertaken from 2014-2015, NEEMO's 18-20. All missions were performed at the Aquarius undersea research habitat. During each mission, the effects of communication latencies on operations concepts, timelines, and tasks were studied. METHODS: Twelve subjects (4 per mission) were weighed out to simulate near-zero or partial gravity extravehicular activity (EVA) and evaluated different operations concepts for integration and management of a simulated Earth-based science team (ST) to provide input and direction during exploration activities. Exploration traverses were preplanned based on precursor data. Subjects completed science-related tasks including pre-sampling surveys, geologic-based sampling, and marine-based sampling as a portion of their tasks on saturation dives up to 4 hours in duration that were designed to simulate extravehicular activity (EVA) on Mars or the moons of Mars. One-way communication latencies, 5 and 10 minutes between space and mission control, were simulated throughout the missions. Objective data included task completion times, total EVA times, crew idle time, translation time, ST assimilation time (defined as time available for ST to discuss data/imagery after data acquisition). Subjective data included acceptability, simulation quality, capability assessment ratings, and comments. RESULTS: Precursor data can be used effectively to plan and execute exploration traverse EVAs (plans included detailed location of science sites, high-fidelity imagery of the sites, and directions to landmarks of interest within a site). Operations concepts that allow for pre-sampling surveys enable efficient traverse execution and meaningful Mission Control Center (MCC) interaction across communication latencies and can be done with minimal crew idle time. Imagery and contextual information from the EVA crew that is transmitted real-time to the intravehicular (IV) crewmember(s) can be used to verify that exploration traverse plans are being executed correctly. That same data can be effectively used by MCC (across comm latency) to provide meaningful feedback and instruction to the crew regarding sampling priorities, additional tasks, and changes to the EVA timeline. Text / data capabilities are preferred over voice capabilities between MCC and IV when executing exploration traverse plans over communication latency.

Chappell, Steven P.↗

Mars Climate Monitoring Mission

For future missions to Mars, Nasa wants a better understanding of the regular weather patterns on Mars. Current models of martian weather are not up to the task of predicting weather that could impair future martian prospects. To improve our models, we need accurate data, measured directly from orbiters or surface stations, like rovers or probes. One solution is to send a web of permanent surface weather stations to various locations on the surface, in order to get accurate data about large-scale martian weather patterns. Such data could be used to improve our models which could greatly aid in improving the safety of future exploration. Such a mission, though, would have countless moving parts, from launch till landing. We created this short animation to demonstrate how such a mission might be carried out, what it might tell us, and how that information could prove critically useful for future martian exploration, including human missions to the surface.

Mars↗

Water Electrolysis for In-Situ Resource Utilization (ISRU)

Sending humans to Mars for any significant amount of time will require capabilities and technologies that enable Earth independence. To move towards this independence, the resources found on Mars must be utilized to produce the items needed to sustain humans away from Earth. To accomplish this task, NASA is studying In Situ Resource Utilization (ISRU) systems and techniques to make use of the atmospheric carbon dioxide and the water found on Mars. Among other things, these substances can be harvested and processed to make oxygen and methane. Oxygen is essential, not only for sustaining the lives of the crew on Mars, but also as the oxidizer for an oxygen-methane propulsion system that could be utilized on a Mars ascent vehicle. Given the presence of water on Mars, the electrolysis of water is a common technique to produce the desired oxygen. Towards this goal, NASA designed and developed a Proton Exchange Membrane (PEM) water electrolysis system, which was originally slated to produce oxygen for propulsion and fuel cell use in the Mars Atmosphere and Regolith COllector/PrOcessor for Lander Operations (MARCO POLO) project. As part of the Human Exploration Spacecraft Testbed for Integration and Advancement (HESTIA) project, this same electrolysis system, originally targeted at enabling in situ propulsion and power, operated in a life-support scenario. During HESTIA testing at Johnson Space Center, the electrolysis system supplied oxygen to a chamber simulating a habitat housing four crewmembers. Inside the chamber, oxygen was removed from the atmosphere to simulate consumption by the crew, and the electrolysis system's oxygen was added to replenish it. The electrolysis system operated nominally throughout the duration of the HESTIA test campaign, and the oxygen levels in the life support chamber were maintained at the desired levels.

Lee, Kristopher A.↗

Rotor CFD Analysis at Terrestrial and Martian Atmospheric Densities

Much effort has been made to enhance exploration on Mars. In addition to a rover and Mars-orbiting satellites, a Mars helicopter (MH) was proposed in order to augment planetary research. Computational Fluid Dynamics (CFD) simulations have been performed to have a better understanding of the behavior and performance of vertical lift Planetary Aerial Vehicles (PAV). Due to the large differences in atmospheric conditions between Mars and Earth, predicting and testing rotorcraft performance is a complex task. The goal of this project is to understand the capability of the mid-fidelity CFD software RotCFD to predict rotor performance in terms of thrust at 1013.25 milibar and 14 milibar corresponding to Terrestrial and Martian conditions, respectively. Also, in order to characterize the wind tunnel wall effects free field and wind tunnel simulations were performed, analyzed and compared. Different analytical tools have been used in order to aid with the design process for the future vertical lift planetary aerial vehicles. One of them includes experimental tests performed on a rotor in the Aeolian Wind Tunnel (AWT) facility at NASA Ames Research Center under different pressure conditions ranging from Terrestrial to Martian atmospheric conditions. Other software was used as well in order to capture the aerodynamic coefficients of the corresponding rotor sections based on the Mach and Reynolds numbers used for the experimental tests. The aerodynamic coefficients were input into RotCFD, and various simulations were performed under Terrestrial and Martian conditions in order to mimic the experimental test. Then, the obtained results from RotCFD were compared with the AWT collected data.

Atmospheric Pressures↗

Vertical Lunar Regolith Conveying as A Flight Experiment in Simulated Lunar-Gravity

Regolith conveying will be an essential task for supplying regolith feedstock to In-Situ Resource Utilization (ISRU) reactor systems for regolith processing on the Moon and Mars. The Vertical Lunar Regolith Conveyor (VLRC) is a technology being developed at NASA Kennedy Space Center (KSC) as a regolith transport task for the GCD ISRU FLEET project led by NASA Glenn Research Center (GRC). Single test loop versions of the VLRC are being developed at NASA KSC as a technology demonstration for a flight experiment. The NASA Flight Opportunities program selected the VLRC for a technology demonstration opportunity on a future Blue Origin New Shepard suborbital launch vehicle to study regolith transport physics in a relevant environment in a vacuum chamber under simulated lunar gravity conditions in order to advance its technology readiness level (TRL) for future space applications. This presentation will discuss the objectives and current status of the VLRC lunar-gravity flight experiment, including the types of granular mineral materials that will be conveyed.

regolith↗

Vertical Lunar Regolith Conveying as a Flight Experiment in Simulated Lunar-Gravity

Regolith conveying will be an essential task for supplying regolith feedstock to In-Situ Resource Utilization (ISRU) reactor systems for regolith processing on the Moon and Mars. The Vertical Lunar Regolith Conveyor (VLRC) is a technology being developed at NASA Kennedy Space Center (KSC) as a regolith transport task for the GCD ISRU FLEET project led by NASA Glenn Research Center (GRC). Single test loop versions of the VLRC are being developed at NASA KSC as a technology demonstration for a flight experiment. The NASA Flight Opportunities program selected the VLRC for a technology demonstration opportunity on a future Blue Origin New Shepard suborbital launch vehicle to study regolith transport physics in a relevant environment in a vacuum chamber under simulated lunar gravity conditions in order to advance its technology readiness level (TRL) for future space applications. The VLRC system includes four primary subsystems to achieve the objectives of the lunar gravity (Lunar-G) flight experiment. (1) An eccentric vibratory conveyor stack to convey regolith particles consisting of three single-loop helical surface conveyors with each actuated by two vibratory motors that vibrate in unison. One of the three single-loops contains a 0.8°-3.1° inclined helical path and the other two contain a 1.6°-6.2° incline. (2) A stick-slip conveyor stack to convey regolith particles consisting of three single-loop helical surface conveyors with each actuated by the same motor to move in unison in a stick-slip motion. One of the three single-loops contains a 0.8°-3.1° inclined helical path and the other two contain a 1.6°-6.2° incline. (3) A regolith containment system to contain the regolith in each single-loop track during launch before the start of the experiment using containment caps that will be lifted in unison at the start of Lunar-G. (4) COTS cameras will record the motion of regolith and tracer particles. Post-flight analysis of the videos will be used to determine convey speeds and flow rates. The VLRC experiment will use the well-known technique of Particle Image Velocimetry (PIV) image analysis to determine the velocity of tracer particles entrained in the regolith flow. This velocity will be used to calculate the mass flow rate of the regolith being conveyed.

ISRU↗

Comparing Trash Disposal and Reuse Options for Deep Space Gateway and Mars Missions

Taking out the trash at NASA's newly proposed Deep Space Gateway (DSG) will not be a trivial task. While not the most important aspect of planning this cislunar outpost, there are several options that should be carefully considered since they may affect the crew as well as mission mass and volume. This study extends an earlier one, which focused on waste disposal options for a Mars Transit Vehicle. In that study, gasifying and venting trash along the way was found to noticeably reduce propellant needs and launch mass, whereas keeping processed trash on board in the form of radiation shielding tiles would significantly lower the crew's radiation dose during a solar particle event. Another favorable strategy was packing trash in a used logistics module for disposal. Since the DSG does not need much propulsion to maintain its orbit and Orion will be present with its own radiation storm shelter at the Gateway, the driving factors of the waste disposal trade study are different than for the Mars mission. Besides reviewing the propulsion and radiation shielding factors, potential drivers such as mass, power, volume, crew time, and human factors (e.g. smell) were studied. Disposal options for DSG include jettison of a used logistics module containing waste after every human stay, jettison of the same logistics module after several missions once it is full, regular disposal of trash via an airlock, or gasifying waste products for easier disposal or reuse. Conversely, a heat melt compactor device could be used to remove water and stabilize trash into tiles which could be more compactly stored on board and used as radiation shielding. Equivalent system mass analysis is used to tally the benefits and costs (mass, volume, power, crew time) of each case on an equivalent mass basis. Other more subjective factors are also discussed. Recommendations are made for DSG and Mars mission waste disposal.

Ewert, Michael↗

Manned Mars Mission on-orbit operations metric development

This report describes the effort made to develop a scoring system, or metric, for comparing astronaut Extra Vehicular Activity with various robotic options for the on-orbit assembly of a very large spacecraft, such as would be needed for a Manned Mars Mission. All trade studies comparing competing approaches to a specific task involve the use of some consistent and unbiased method for assigning a score, or rating factor, to each concept under consideration. The relative scores generated by the selected rating system provide the tool for deciding which of the approaches is the most desirable.

Gorin, Barney F.↗

Intelligent control and adaptive systems; Proceedings of the Meeting, Philadelphia, PA, Nov. 7, 8, 1989

Various papers on intelligent control and adaptive systems are presented. Individual topics addressed include: control architecture for a Mars walking vehicle, representation for error detection and recovery in robot task plans, real-time operating system for robots, execution monitoring of a mobile robot system, statistical mechanics models for motion and force planning, global kinematics for manipulator planning and control, exploration of unknown mechanical assemblies through manipulation, low-level representations for robot vision, harmonic functions for robot path construction, simulation of dual behavior of an autonomous system. Also discussed are: control framework for hand-arm coordination, neural network approach to multivehicle navigation, electronic neural networks for global optimization, neural network for L1 norm linear regression, planning for assembly with robot hands, neural networks in dynamical systems, control design with iterative learning, improved fuzzy process control of spacecraft autonomous rendezvous using a genetic algorithm.

Rodriguez, Guillermo↗

Contingency Planning for Planetary Rovers

There has been considerable work in AI on planning under uncertainty. But this work generally assumes an extremely simple model of action that does not consider continuous time and resources. These assumptions are not reasonable for a Mars rover, which must cope with uncertainty about the duration of tasks, the power required, the data storage necessary, along with its position and orientation. In this paper, we outline an approach to generating contingency plans when the sources of uncertainty involve continuous quantities such as time and resources. The approach involves first constructing a "seed" plan, and then incrementally adding contingent branches to this plan in order to improve utility. The challenge is to figure out the best places to insert contingency branches. This requires an estimate of how much utility could be gained by building a contingent branch at any given place in the seed plan. Computing this utility exactly is intractable, but we outline an approximation method that back propagates utility distributions through a graph structure similar to that of a plan graph.

Dearden, Richard↗

Incremental Contingency Planning

There has been considerable work in AI on planning under uncertainty. However, this work generally assumes an extremely simple model of action that does not consider continuous time and resources. These assumptions are not reasonable for a Mars rover, which must cope with uncertainty about the duration of tasks, the energy required, the data storage necessary, and its current position and orientation. In this paper, we outline an approach to generating contingency plans when the sources of uncertainty involve continuous quantities such as time and resources. The approach involves first constructing a "seed" plan, and then incrementally adding contingent branches to this plan in order to improve utility. The challenge is to figure out the best places to insert contingency branches. This requires an estimate of how much utility could be gained by building a contingent branch at any given place in the seed plan. Computing this utility exactly is intractable, but we outline an approximation method that back propagates utility distributions through a graph structure similar to that of a plan graph.

Dearden, Richard↗

An Overview of Program Development for NASA's Space Environments and Effects (SEE) Program

This paper describes many of the changes affecting NASA's Space Environments and Effects (SEE) Program since the initiation of the Vision for Space Exploration. Programmatic and procedural changes are discussed, six new technical tasks applicable to any return to the Moon or onward towards Mars are highlighted, and personnel changes and new contact information is given.

Minor, Jody L.↗

Three Dimensional Rover/Lander/Orbiter Mission-Planning (3D-ROMPS) System: A Modern Approach to Mission Planning

NASA's current mission planning system is based on point design, two-dimensional display, spread sheets, and report technology. This technology does not enable engineers to analyze the results of parametric studies of missions plans. This technology will not support the increased observational complexity and data volume of missions like Cassini, Mars Reconnaissance Orbiter (MRO), Mars Science Laboratory (MSL), and Mars Sample Return (MSR). The goal of the 3D-ROMPS task has been to establish a set of operational mission planning and analysis tools in the Image Processing Laboratory (IPL) Mission Support Area (MSA) that will respond to engineering requirements for planning future Solar System Exploration (SSE) missions using a three-dimensional display.

Scharfe, Nathan D.↗